Similar Documents at Byron |
---|
Category:Graphics incl Charts and Tables
MONTHYEARBYRON 2022-0045, Day Inservice Inspection Report for Interval 4, Period 2, (B2R23)2022-07-15015 July 2022 Day Inservice Inspection Report for Interval 4, Period 2, (B2R23) ML20280A2482020-10-0707 October 2020 Summary of September 22, 2020, Presubmittal Meeting Between the NRC and Exelon Generation Company LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Units 1 and 2 and Dresden, Units 2 and 3 ML15253A9132015-09-11011 September 2015 ACRS Full Committee - Corrections to the Aging Management Programs Table ML15229A1482015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10CFR 50.54 Information Request - Flood Causing Mechanism Reevaluation ML15226A5982015-09-0303 September 2015 Tables 1 and 2 8-11-2015 Edited-SB RS-15-059, Units 1 & 2 - Update to LRA Section 4.3.4, Class 1 Component Fatigue Analyses Supporting GSI-190 Closure, Related to License Renewal Application2015-02-0606 February 2015 Units 1 & 2 - Update to LRA Section 4.3.4, Class 1 Component Fatigue Analyses Supporting GSI-190 Closure, Related to License Renewal Application ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T RA-13-075, Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites2013-09-12012 September 2013 Response to NRC Request for Information Per 10 CFR 50.54(f) Re the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident- 1.5 Year Response for CEUS Sites ML1106107952011-03-0202 March 2011 E-mail Byron Station Unit 1 Supplemental Information Request to Support Baseline ISI Inspection Procedure NEI 08-09, Re-Submittal of the Exelon Cyber Security Plan2010-07-23023 July 2010 Re-Submittal of the Exelon Cyber Security Plan RS-10-105, Byron Parent Guarantee Calculation RS-10-1052010-03-10010 March 2010 Byron Parent Guarantee Calculation RS-10-105 ML0934313182009-12-0101 December 2009 Updated Decommissioning Shortfalls as of December 1, 2009 ML0818300872008-03-31031 March 2008 Steam Generator Eddy Current Inspection Report, Refueling Outage 15, Attachment B, Inspection Scope, Through Attachment B.2, Cold Leg Bobbin Coil Inspection Scope. ML0802501902008-01-10010 January 2008 Amag Corrosion Factor for Reactor Coolant Loop Vs. Date for Byron Unit 1 ML0802501842008-01-10010 January 2008 Amag Loop Corrosion Factor Vs. Date for Byron Unit 2 ML0802501512008-01-10010 January 2008 Graphs RS-07-022, Response to Request for Additional Information Regarding Application for Steam Generator Tube Integrity Technical Specification2007-02-15015 February 2007 Response to Request for Additional Information Regarding Application for Steam Generator Tube Integrity Technical Specification ML0612206832006-04-27027 April 2006 Oak Ridge Institute for Science and Education, Analytical Results for 41 Water Samples in Batch Two from the Vicinity of the Byron Generating Station, Byron Illinois (Inspection Report No. 05000454/2006-003) (Rfta No. 06-001) BYRON 2006-0007, Steam Generator Eddy Current Inspection Report, Cycle 12 Refueling Outage. Attachment B - Attachment B.5, Pages 17 Through 222006-01-0303 January 2006 Steam Generator Eddy Current Inspection Report, Cycle 12 Refueling Outage. Attachment B - Attachment B.5, Pages 17 Through 22 RS-04-191, Units 1 & 2 - Updated Final Safety Analysis Report (Ufsar), Braidwood Figure 2.1-1 Through 2.5-3192004-12-16016 December 2004 Units 1 & 2 - Updated Final Safety Analysis Report (Ufsar), Braidwood Figure 2.1-1 Through 2.5-319 ML0422603572004-08-12012 August 2004 Figure 1 and 2, Results of the Spring 2004 Steam Generator Inspections 2022-07-15
[Table view] |
Text
Byron Unit 1 1
J) 0.995 0.99
- Loop A U-i 0.985 C) -Loop B 0 Loop C
-X- Loop D 0.98 -*--- Average 0.975 0.97 0.965 -M 5/4/2000 11/20/2000 12/25/2001 7/13/2002 1/29/2003 8/17/2003 Date