March 3, 2011 Byron Unit 1 - Supplemental Document Request to Support Baseline ISI inspection procedure 71111.08.
Please provide the inspector (Atif Shaikh) with the following documents at the on-site inspection entrance meeting scheduled for March 16, 2011. Additionally, please provide scaffolding, fall protection, and FME training for the inspector to support observation of NDE examinations.
Welds Selected for Observation and Review WO No and Date of Welding Description/Weld No.
& System Supporting Docs.
Welds selected for review
- 01216465 12/9/2009
- 01263892 11/29/2009
- 01267306 12/4/2009 1SI18EB-2 (Class 2)
Replace Piping 1RY06121S (Class 1)
Replace Snubber 1SI8900D (Class 1)
Replace Valve Weld documents as identified in Section B.1 of NRC information request letter dated January 12, 2011.
Welds selected for observation
- 1348439
- 1348440 3/21/2011 1SI8819A, 1SI8819D Replace Check Valve and pipe/elbow/flange Weld documents as identified in Section B.1 of NRC information request letter dated January 12, 2011. Drawings of the weld joint configuration to be used. Portions of work order identifying the post weld non-destructive examination/testing. Copies of the procedures to be used for post weld non-destructive examination. Copy of the applicable construction Code (e.g. ASME Section III or B31.1) applicable to the welded joints.
Corrective Action Documents Selected for Review IR #
Date Description 01028708 02/11/10 DISCH CK VLV SPRING PART MISSING. 2SA10CA 01045256 03/19/10 GASKET-LIKE MATERIAL FOUND IN U-1 TO STRAINER 01060894 04/24/10 FOREIGN MATERIAL OBSERVED IN THE REFUELING CAVITY 01061204 04/25/10 FOREIGN MATERIAL FOUND IN REACTOR CAVITY 01063809 04/30/10 B2R15 2D SG CHANNEL HEAD FOREIGN OBJECT 01064793 05/03/10 DOCUMENTATION OF FME RECOVERY EFFORTS FOR 2CB06M GASKET 01077278 06/04/10 SECURITY - FME ENTERED SX BASIN 01088866 07/08/10 FME FOUND IN 0B SXCT DURING INSPECTION.
01090292 07/13/10 CHUNK OF CONCRETE FOUND IN 0SXA (NORTH BASIN) 01092475 07/20/10 SECURITY - FME ENTERED SX BASIN 01104940 08/23/10 FME - SPENT FUEL POOL WET CASK PIT 01113191 09/15/10 IDENTIFIED MISSING PARTS IN 1A RH PUMP BOWL 01130465 10/25/10 PARTS OF 7L PISTON PIN BUSHING FOUND IN ENGINE CRANKCASE 01057786 04/16/10 RECORDABLE INDICATIONS DISCOVERED DURING ISI EXAMINATION 01060421 04/23/10 B2R15 LL - THE NRC QUESTIONED MAXIMUM TEMPERATURE LIMITS 01060446 04/23/10 B2R15, NRC QUESTIONED NDE ILLUMINATION VERIFICATION FOR NDE 01115877 09/21/10 COMPLIANCE WITH THE ASME CODE, SECTION XI, IWA-2240 759588 4/4/2008 Foreign Object Not Retrieved from 1C SG 1062754 4/28/2010 FOREIGN OBJECTS FOUND IN THE 2C SG SECONDARY B2R15 1062904 4/29/2010 FOREIGN OBJECTS FOUND IN THE 2A SG SECONDARY B2R15 1062902 4/29/2010 FOREIGN OBJECTS FOUND IN THE 2B SG SECONDARY B2R15 1063560 4/30/2010 FOREIGN OBJECTS FOUND IN THE 2D SG SECONDARY B2R15 Exams with recordable indications selected for review Report #
Supplemental Information 2009-344 2009-345 Completed VT Examination report documenting extent of indications and applicable acceptance criteria.
B1R16-PT-001 Completed PT Examination report documenting extent of indications and applicable acceptance criteria.
NDE Activities Selected for Observation/Review WO No and Date of Activity Description/System/Examination Supporting Docs.17-130,131,132 3/22/2011 17-140,141 3/18/2011 17 BL 3/23/2011 0128495301 3/28/2011 0126700201 3/16/2011 1RC21AB-8/J07,08,10 UT (reactor coolant system)
Below B loop Pipe to Elbow, Elbow to Pipe 1RY-01-S/PN-01-F1S, 1RY11A-14/J01AS UT (pressurizer system)
Pressurizer bottom surge nozzle to safe end and safe end to pipe 1RY03BC-6/FLG 1-12 VT-1 (pressurizer system)
Pressurizer top piping flange bolting Reactor Pressure Vessel Head Bare Metal Visual Examination (BMV) VT Reactor Pressure Vessel CRDM Volumetric Examination UT Work orders, ISO and detailed drawings, and Post NDE reports.
MSIP Activities:
Would like to observe sample of the actual squeeze on HLs and CLs and sample of post examination calibrations if scheduling permits.
Supplemental documents requested include HL/CL ISO and detailed drawings, and MSIP procedure.
Steam Generator Examination Activities:
Would like to observe sample of ET exams and both HL and CL. Also, would like to observe a sample of any plugging activities being performed.