ML090620366

From kanterella
Jump to navigation Jump to search
Indian Point - Hearing File Index Supplement 1
ML090620366
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 02/27/2009
From: Sherwin Turk
NRC/OGC
To:
SECY RAS
Shared Package
ML090620151 List:
References
50-247-LR, 50-286-LR
Download: ML090620366 (4)


Text

ATTACHMENT 1 - Indian Point License Renewal Hearing File Index Supplement 1 - February 27, 2009 ADAMS Accession ID # Number Document Date Title/Description 01-001 ML090410016 9/12/1991 Drawing No. A250907-21, Electrical Distribution and Transmission System WCAP-13587, Reactor Vessel Upper Shelf Energy Bounding Evaluation for Westinghouse Pressurized Water Reactors. (Previously listed as PLL9303230154 in Safety Evaluation Report,01-002 ML090440295 2/28/1993 Appendix D.)

IP 2, Condition Monitoring & Operational Assessment; September 2003 Westinghouse Electric 01-003 ML081200258 9/15/2003 Co.01-004 ML081210137 2/6/2004 SOP 29.20, Revision 0, Emergency Fuel Oil Transfer Using the Trailer Engineering Report No. IP3-RPT-SG-03842, Rev. 1, Operational Assessment of Generator 01-005 ML081200235 3/8/2005 Tubing 01-006 ML081200295 8/9/2005 Flow Test for Underground Service Water Line 408, 8-16-2005; Line 409, 9-19-2005 01-007 ML081200320 9/2/2005 Flow Test for Underground Service Water Line 108, 8-16-2005; Line 409, 09-19-2005 01-008 ML081210102 11/19/2005 Rev. 11, Flow Test, Line 409 Engineering Report No. IP-RPT-06-00055, Rev. 0, Condition Monitoring & Operational 01-009 ML081200225 5/9/2006 Assessment Steam Generator Tubing 01-010 ML081210150 9/7/2006 IP 2 & 3 - Report, IP Units 2 & 3 Eddy Current Program 01-011 ML090410028 11/6/2006 Entergy Nuclear Northeast GRAPH-TC-29, Revision 2; City Water Storage Tank Level.01-012 ML090410302 12/12/2006 Entergy Nuclear Northeast - OAP-024, Revision: 3; Operations Testing Engineering Report No. IP-RPT-07-00031, Rev. 0, Condition Monitoring & Operational 01-013 ML081200204 3/24/2007 Assessment 3 Steam Generators IP-RPT-06-AMM20, Revision 0, Aging Management Review and Appendix R Diesel Generator 01-014 ML081210162 4/19/2007 System 01-015 ML090410341 6/5/2007 Indian Point-SMM-WM-100, Revision 7; Work Management Process Email : Re: Response from Contact the NRC Web Site Staff. (Redacted version of 01-016 ML090300339 6/21/2007 ML082890135 listed in Initial Disclosures, Attachment 3.)01-017 ML090410259 6/21/2007 Indian Point, Unit 2, Station Blackout (SBO) / Appendix R Diesel Generator Commitment IP 2 & 3, Phase IA Literature Review and Archeological Sensitivity Assessment.01-018 ML090300343 8/21/2007 (Redacted version of ML090300345 in Supplement 1, Attachment 3.)

Indian Point Site Audit and Meetings Information.01-019 ML090350658 9/6/2007 (Redacted version of ML073510185 listed in Initial Disclosures, Attachment 1.)01-020 ML090410296 10/3/2007 Entergy Nuclear Northeast - OAP-008, Revision: 4; Severe Weather Preparations Page 1 of 4

ATTACHMENT 1 - Indian Point License Renewal Hearing File Index Supplement 1 - February 27, 2009 ADAMS Accession ID # Number Document Date Title/Description 01-021 ML081210319 1/9/2008 Inspection Cover Sheet and Inspection Plan IP-RPT-06-LRD07, Revision 3, Aging Management Program Evaluation Results - Non Class 1 01-022 ML081210187 1/11/2008 Mechanical 01-023 ML090410103 1/28/2008 EN-DC-117, Rev. 1, Post Modification Testing and Special Instructions01-024 ML090410107 1/28/2008 EN-DC-167, Rev. 1; Classification of Structures, Systems, and Components01-025 ML090410124 1/30/2008 EN-WM-100, Rev. 3, Work Request (WR) Generation, Screening and Classification 01-026 ML090410143 2/1/2008 EN-WM-101, Rev. 3, On-line Work Management Process01-027 ML090410148 2/11/2008 Indian Point, Unit 2, EN-WM-105, Rev. 3, Planning 01-028 ML090400895 2/29/2008 IP- Electrical Distribution & Transmission System Diagram.

Entergy Nuclear Northeast OSP-27.6, Revision: 0; Support Procedure/Diesel Generator 01-029 ML090400751 3/19/2008 Operation 01-030 ML090410147 3/27/2008 EN-WM-102, Rev. 2; Work Implementation and Closeout 01-031 ML090400254 4/1/2008 Excerpt TRM - Diesel Electrical Distribution System 01-032 ML090410062 4/12/2008 IP Change Form; IP-SMM - LI-113, Rev. 3 01-033 ML090410322 4/15/2008 Entergy's Quality Assurance Program Manual, Revision 18; Effective: April 15, 2008 01-034 ML090400737 4/23/2008 Entergy Nuclear Northeast ECA-0.0, Revision: 2; Loss of All AC Entergy Nuclear Northeast AOP-SSD-1, Revision: 12; Control Room Inaccessibility Safe 01-035 ML090400717 4/23/2008 Shutdown Control Entergy Nuclear Northeast - AOI 27.1.9.2, Revision: 1; Providing Appendix R Power From Unit 01-036 ML090410026 4/23/2008 3 01-037 ML090400810 4/24/2008 Entergy Nuclear Northeast SOP-27.6, Revision: 0; Diesel Generator Operation.

Request for Additional Information License Renewal Application - Metal Enclosed Buses and 01-038 ML081150435 4/29/2008 Fire Protection.01-039 ML090410242 4/30/2008 Amendment 4 to License Renewal Application (LRA)01-040 ML090410538 6/2/2008 IP 2 Entrance Meeting;SBO Diesel Modification Inspection 01-041 ML090410526 6/2/2008 Inspection Plan - Indian Point 2; Station Blackout Diesel Generator Modification & 50.59 01-042 ML090410515 6/2/2008 Pre-Inspection Cover Sheet for Indian Point Unit 2, 50-247/2008-012 Inspection 01-043 ML090410029 6/4/2008 Condition Report CR-IP2-2008-02917 Page 2 of 4

ATTACHMENT 1 - Indian Point License Renewal Hearing File Index Supplement 1 - February 27, 2009 ADAMS Accession ID # Number Document Date Title/Description 01-044 ML090400347 6/4/2008 Condition Report CR-IP2-2008-02917 01-045 ML090410034 6/5/2008 Condition Report CR-IP2-2008-02938 01-046 ML090400305 6/5/2008 Condition Report CR-IP2-2008-02938 01-047 ML090410208 6/5/2008 IP 2 Diesel Generator (DG) PM001.png; Develop PM for Diesel Generator Battery.01-048 ML090410218 6/5/2008 IP 2 DG PM002.jpg; Develop PM for DG Battery.01-049 ML090410032 6/6/2008 Condition Report CR-IP2-2008-02917; Operability; Version 4 01-050 ML090410507 6/6/2008 Document Input into NRC IPEC License Renewal Hearing File 01-051 ML090400790 6/12/2008 Entergy Nuclear Northeast PT-M110, Diesel Generator Functional Test.01-052 ML090410360 6/13/2008 Entergy Nuclear Northeast SOP-27.6, Revision 1; Diesel Generator Operation 01-053 ML090400867 6/13/2008 Entergy Nuclear Northeast SOP-27.6, Revision: 1; Diesel Generator Operation 01-054 ML090400872 6/13/2008 Entergy Nuclear Northeast TOP-011, Revision 0; Diesel Generator Test 01-055 ML090400881 6/13/2008 Entergy Nuclear Northeast Procedure No. 2-TOP-011, Revision 0; Diesel Generator 01-056 ML090410271 6/13/2008 Site VP, Labor Organizational Chart as of June 13, 2008 01-057 ML090410046 6/16/2008 Implementing Procedure Preparation, Review, and Approval 01-058 ML090410405 6/17/2008 IPEC WO 00155804 01, App R Diesel Auxiliaries Transfer Switch Functional Test 01-059 ML090410400 6/17/2008 Vendor Data for 24-Hr. Run; Entergy 01-060 ML090410040 7/1/2008 Condition Report CR-IP2-2008-02938; Pages 1-7.01-061 ML090410051 7/1/2008 Revision 1, Indian Point 2 Station Blackout and Appendix R Diesel Generator Set 01-062 ML090410096 7/1/2008 ECN 7385; Attachment 7.46 - Post MOD Test Plan 01-063 ML090400773 7/1/2008 Entergy Nuclear Northeast PT-M110, Revision 0; Diesel Generator Functional Test IP 2 SBO DG PM003.png; Develop Annual PM for SBO/App R DG SWGR/SFMRS Space 01-064 ML090410228 7/1/2008 Heaters.

Indian Point-2 SBO DG PM004.jpg; Develop Annual PM for SBO/App R DG SWGR/XFMRS01-065 ML090410238 7/1/2008 Space Heaters.01-066 ML090410038 7/1/2008 SBO Event: Time line to energize 480V Bus 6A from GT-25/26 01-067 ML090400697 7/1/2008 SBO Event: Time line to energize a 480V Bus from GT-25/26 and App R Diesel.

Page 3 of 4

ATTACHMENT 1 - Indian Point License Renewal Hearing File Index Supplement 1 - February 27, 2009 ADAMS Accession ID # Number Document Date Title/Description 01-068 ML090400677 7/1/2008 Unit 3 SBO Event: Time line to energize Unit 3 Bus from App R diesel via GT/BT.

Email: Chapter 3. (Redacted version of ML082670902 listed in Initial Disclosures, Attachment 01-069 ML090300342 7/3/2008 3.)

Email: Re: Chapter 3.(Redacted version of ML082670899 listed in Initial Disclosures,01-070 ML090300340 7/6/2008 Attachment 3.)

Scoping of Non-Safety Systems and the Proposed Aging Management, Application for 01-071 ML082180323 7/11/2008 Renewed License, Draft.01-072 ML090291041 7/18/2008 Email: 4th Consent Order Email: Needs for Cumulative in Ecology. (Redacted version of ML082520120 listed in Initial 01-073 ML090300341 7/24/2008 Disclosures, Attachment 3.)01-074 ML090290237 1/28/2009 Email: IPEC License Renewal RAI Reply - Miscellaneous Items01-075 ML090291083 1/29/2009 Email: Additional Citations for Protecting Cultural Resource Information 01-076 ML090290277 1/29/2009 Email:Cumulative Impacts01-077 ML090291084 1/29/2009 Email: RE: Please call 01-078 ML090291082 1/29/2009 Email: RE: Please call Safety Assessment of Report WCAP - 13587, Revision 1, Reactor Vessel Upper Shelf Energy Bounding Evaluation for Westinghouse Pressurized Water Reactors. (Previoulsy listed as01-079 ML090580069 4/21/1994 PLL9405060287 in Safety Evaluation Report, Appendix D.)01-080 ML090580501 2/27/2009 List of Indian Point Draft SEIS References Available on Internet, not in ADAMS.

Page 4 of 4