ML090620376

From kanterella
Jump to navigation Jump to search
Indian Point - Hearing File Index Deliberative Process (Privilege Log)
ML090620376
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 02/27/2009
From: Sherwin Turk
NRC/OGC
To:
SECY RAS
Shared Package
ML090620151 List:
References
50-247-LR, 50-286-LR
Download: ML090620376 (3)


Text

Attachment 2 - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 1 - February 27, 2009 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosures as predecisional, deliberative information. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.

Accession Author Document Page ID # Number Name/Affiliation Title/Description Date Document Type Comment Count DPP John Richmond, IP-2 License Renewal Station Blackout Diesel Draft notes of scope of 001 ML090410670 NRC/RGN-I Generator Modification Inspection 6/17/2008 Notes inspection 1 DPP John Richmond, IP-2 License Renewal Station Blackout Diesel Internal notes of 002 ML090410675 NRC/RGN-I Generator Modification Inspection. 7/1/2008 Notes adequacy of tests 5 IP-2 License Renewal Station Blackout Diesel DPP John Richmond, Generator Modification Inspection Closeout, Draft internal notes of 003 ML090410680 NRC/RGN-I Rev. 0 7/1/2008 Notes adequacy of tests 4 IP-2 License Renewal Station Blackout Diesel DPP John Richmond, Generator Modification Inspection Closeout, Draft internal notes of 004 ML090410683 NRC/RGN-I Rev. 1 7/1/2008 adequacy of tests 1 Draft findings related DPP John Richmond, IP-2 Draft Finding on Operating Procedures, to adequacy of 005 ML090410627 NRC/RGN-I Rev. 0. 7/1/2008 operating procedures 3 Draft findings related DPP John Richmond, IP-2 Draft Finding on Operating Procedures, to adequacy of 006 ML090410632 NRC/RGN-I Rev. 1. 7/1/2008 operating procedures 2 Draft findings related DPP John Richmond, IP-2 Draft Finding on Operating Procedures, to adequacy of 007 ML090410645 NRC/RGN-I Rev. 2. 7/1/2008 operating procedures 2 Draft findings related DPP John Richmond, IP-2 Draft Finding on Operating Procedures, to adequacy of 008 ML090410658 NRC/RGN-I Rev. 3. 7/1/2008 operating procedures 2 Draft findings related to adequacy of quality DPP John Richmond, IP-2 Draft Finding, Post Modification Test of assurance 009 ML090410608 NRC/RGN-I Station Blackout Diesel Generator, Rev. 0. 7/1/2008 requirements 2 Draft findings related to adequacy of quality DPP John Richmond, IP-2 Draft Finding, Post Modification Test of assurance 010 ML090410619 NRC/RGN-I Station Blackout Diesel Generator, Rev. 1. 7/1/2008 requirements 2 Page 1 of 3

Attachment 2 - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 1 - February 27, 2009 Accession Author Document Page ID # Number Name/Affiliation Title/Description Date Document Type Comment Count Draft findings related to adequacy of quality DPP John Richmond, IP-2 Draft Finding, Post Modification Test of assurance 011 ML090410622 NRC/RGN-I Station Blackout Diesel Generator, Rev. 2. 7/1/2008 requirements 2 Internal notes scoping DPP John Richmond, IP-2 Diesel 24-Hour Endurance Run; Items to inspection of diesel 012 ML090410200 NRC/RGN-I Observe or Verify. 7/1/2008 Notes generator operation 1 Internal notes related DPP John Richmond, IP-2 Station Blackout Operating Procedure, operating procedures 013 ML090410604 NRC/RGN-I Rev. 0. 7/1/2008 Notes of Unit 2 1 Internal notes related DPP John Richmond, Notes from Follow-up Inspection 6/2-6/08, to testing, operating 014 ML090410581 NRC/RGN-I Station Blackout, Post-modification Testing 7/1/2008 Notes procedures 3 Draft report regarding scoping of non-safety Glenn Meyer, related systems, DPP Richard Conte, IP LR Draft 1, Inspection Report - July 15, Letter/Inspection structures, and 015 ML082180330 NRC/RGN-I 2008 to Joseph Pollack, Entergy 7/15/2008 Report components 32 Draft report regarding scoping of non-safety Glenn Meyer, related systems, DPP Richard Conte, IP LR Draft 2, Inspection Report - July 22, Letter/Inspection structures, and 016 ML082180332 NRC/RGN-I 2008 to Joseph Pollack, Entergy 7/22/2008 Report components 45 Draft report regarding scoping of non-safety Glenn Meyer, related systems, DPP Richard Conte, IP LR Draft 3, Inspection Report - July 24, Letter/Inspection structures, and 017 ML082180340 NRC/RGN-I 2008 to Joseph Pollack, Entergy 7/24/2008 Report components 45 Draft report regarding scoping of non-safety Glenn Meyer, related systems, DPP Richard Conte, IP LR Draft 4, Inspection Report - July 29, Letter/Inspection structures, and 018 ML082180764 NRC/RGN-I 2008 to Joseph Pollack, Entergy 7/29/2008 Report components 46 Page 2 of 3

Attachment 2 - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 1 - February 27, 2009 Accession Author Document Page ID # Number Name/Affiliation Title/Description Date Document Type Comment Count Draft report regarding scoping of non-safety Glenn Meyer, related systems, DPP Richard Conte, IP LR Draft 6 Inspection Report - July 31, Letter/Inspection structures, and 019 ML082180343 NRC/RGN-I 2008 to Joseph Pollack, Entergy 7/31/2008 Report components 45 IP 2 & 3 - Email/Attached Draft Request for Internal transmission DPP Bryce Lehman, Additional Information related to License of draft related to open 020 ML090370055 NRC/NRR Renewal to Richard Morante, NRC/Contractor 2/5/2009 Email items 6 Page 3 of 3