ML090620376
| ML090620376 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 02/27/2009 |
| From: | Sherwin Turk NRC/OGC |
| To: | |
| SECY RAS | |
| Shared Package | |
| ML090620151 | List: |
| References | |
| 50-247-LR, 50-286-LR | |
| Download: ML090620376 (3) | |
Text
Attachment 2 - Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 1 - February 27, 2009 ID #
Accession Number Author Name/Affiliation Title/Description Document Date Document Type Comment Page Count DPP 001 ML090410670 John Richmond, NRC/RGN-I IP-2 License Renewal Station Blackout Diesel Generator Modification Inspection 6/17/2008 Notes Draft notes of scope of inspection 1
DPP 002 ML090410675 John Richmond, NRC/RGN-I IP-2 License Renewal Station Blackout Diesel Generator Modification Inspection.
7/1/2008 Notes Internal notes of adequacy of tests 5
DPP 003 ML090410680 John Richmond, NRC/RGN-I IP-2 License Renewal Station Blackout Diesel Generator Modification Inspection Closeout, Rev. 0 7/1/2008 Notes Draft internal notes of adequacy of tests 4
DPP 004 ML090410683 John Richmond, NRC/RGN-I IP-2 License Renewal Station Blackout Diesel Generator Modification Inspection Closeout, Rev. 1 7/1/2008 Draft internal notes of adequacy of tests 1
DPP 005 ML090410627 John Richmond, NRC/RGN-I IP-2 Draft Finding on Operating Procedures, Rev. 0.
7/1/2008 Draft findings related to adequacy of operating procedures 3
DPP 006 ML090410632 John Richmond, NRC/RGN-I IP-2 Draft Finding on Operating Procedures, Rev. 1.
7/1/2008 Draft findings related to adequacy of operating procedures 2
DPP 007 ML090410645 John Richmond, NRC/RGN-I IP-2 Draft Finding on Operating Procedures, Rev. 2.
7/1/2008 Draft findings related to adequacy of operating procedures 2
DPP 008 ML090410658 John Richmond, NRC/RGN-I IP-2 Draft Finding on Operating Procedures, Rev. 3.
7/1/2008 Draft findings related to adequacy of operating procedures 2
DPP 009 ML090410608 John Richmond, NRC/RGN-I IP-2 Draft Finding, Post Modification Test of Station Blackout Diesel Generator, Rev. 0.
7/1/2008 Draft findings related to adequacy of quality assurance requirements 2
DPP 010 ML090410619 John Richmond, NRC/RGN-I IP-2 Draft Finding, Post Modification Test of Station Blackout Diesel Generator, Rev. 1.
7/1/2008 Draft findings related to adequacy of quality assurance requirements 2
Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosures as predecisional, deliberative information. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the "deliberative process" privilege.
Page 1 of 3
- Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 1 - February 27, 2009 ID #
Accession Number Author Name/Affiliation Title/Description Document Date Document Type Comment Page Count DPP 011 ML090410622 John Richmond, NRC/RGN-I IP-2 Draft Finding, Post Modification Test of Station Blackout Diesel Generator, Rev. 2.
7/1/2008 Draft findings related to adequacy of quality assurance requirements 2
DPP 012 ML090410200 John Richmond, NRC/RGN-I IP-2 Diesel 24-Hour Endurance Run; Items to Observe or Verify.
7/1/2008 Notes Internal notes scoping inspection of diesel generator operation 1
DPP 013 ML090410604 John Richmond, NRC/RGN-I IP-2 Station Blackout Operating Procedure, Rev. 0.
7/1/2008 Notes Internal notes related operating procedures of Unit 2 1
DPP 014 ML090410581 John Richmond, NRC/RGN-I Notes from Follow-up Inspection 6/2-6/08, Station Blackout, Post-modification Testing 7/1/2008 Notes Internal notes related to testing, operating procedures 3
DPP 015 ML082180330 Glenn Meyer, Richard Conte, NRC/RGN-I IP LR Draft 1, Inspection Report - July 15, 2008 to Joseph Pollack, Entergy 7/15/2008 Letter/Inspection Report Draft report regarding scoping of non-safety related systems, structures, and components 32 DPP 016 ML082180332 Glenn Meyer, Richard Conte, NRC/RGN-I IP LR Draft 2, Inspection Report - July 22, 2008 to Joseph Pollack, Entergy 7/22/2008 Letter/Inspection Report Draft report regarding scoping of non-safety related systems, structures, and components 45 DPP 017 ML082180340 Glenn Meyer, Richard Conte, NRC/RGN-I IP LR Draft 3, Inspection Report - July 24, 2008 to Joseph Pollack, Entergy 7/24/2008 Letter/Inspection Report Draft report regarding scoping of non-safety related systems, structures, and components 45 DPP 018 ML082180764 Glenn Meyer, Richard Conte, NRC/RGN-I IP LR Draft 4, Inspection Report - July 29, 2008 to Joseph Pollack, Entergy 7/29/2008 Letter/Inspection Report Draft report regarding scoping of non-safety related systems, structures, and components 46 Page 2 of 3
- Indian Point License Renewal Hearing File Index Deliberative Process Privilege, Supplement 1 - February 27, 2009 ID #
Accession Number Author Name/Affiliation Title/Description Document Date Document Type Comment Page Count DPP 019 ML082180343 Glenn Meyer, Richard Conte, NRC/RGN-I IP LR Draft 6 Inspection Report - July 31, 2008 to Joseph Pollack, Entergy 7/31/2008 Letter/Inspection Report Draft report regarding scoping of non-safety related systems, structures, and components 45 DPP 020 ML090370055 Bryce Lehman, NRC/NRR IP 2 & 3 - Email/Attached Draft Request for Additional Information related to License Renewal to Richard Morante, NRC/Contractor 2/5/2009 Email Internal transmission of draft related to open items 6
Page 3 of 3