ML090400697
From kanterella
Jump to navigation
Jump to search
ML090400697 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 07/01/2008 |
From: | - No Known Affiliation |
To: | NRC Region 1 |
References | |
Download: ML090400697 (15) | |
Similar Documents at Indian Point | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARML24156A1162024-06-0404 June 2024
[Table view]Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table ML17150A2562017-06-0505 June 2017 Entergy Fleet - 2017 Onsite Insurance Submittal Review for Entergy Operations, Inc., and Entergy Nuclear Operations, Inc. (CAC No. TM3058) ML16112A1722016-04-25025 April 2016 Indian Point Nuclear Generating Unit Nos. 2 And 3 Interim Staff Response To Reevaluated Flood Hazards Submitted In Response To 10 CFR 50.54 (f) Information Request Flood-Causing Mechanism Reevaluation (CAC NOS. MF3313 and MF3314) NL-16-035, Supplemental to Basis for Performance of the Mitigating Strategies Assessment with Flood Hazard Information & Report for Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid2016-04-0505 April 2016 Supplemental to Basis for Performance of the Mitigating Strategies Assessment with Flood Hazard Information & Report for Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports NL-15-019, Reply to Request for Additional Information 3.0.3-2 from Set 2014-01 for the Review of the License Renewal Application2015-03-10010 March 2015 Reply to Request for Additional Information 3.0.3-2 from Set 2014-01 for the Review of the License Renewal Application ML11221A3052011-08-0909 August 2011 Lr Hearing - NIA-078 NL-11-013, Revised Tables from Responses to Requests for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions2011-02-10010 February 2011 Revised Tables from Responses to Requests for Exemption from 10 CFR 50, Appendix R, Paragraph III.G.2 for Use of Operator Manual Actions ML0936409322009-12-30030 December 2009 Table I, Structural Heat Sinks, Table II, Containment Heat Sink Thermodynamic Data NL-09-151, Telephone Conference Call Regarding Met Tower Data for SAMA Analysis2009-11-16016 November 2009 Telephone Conference Call Regarding Met Tower Data for SAMA Analysis NL-09-018, Reply to Request for Additional Information - Miscellaneous Items2009-01-27027 January 2009 Reply to Request for Additional Information - Miscellaneous Items ML11221A3032008-12-22022 December 2008 Lr Hearing - NIA-077 NL-08-144, Program for Maintenance of Irradiated Fuel and Preliminary Decommissioning Cost Analysis in Accordance with 10 CFR 50.54 (Bb) and 10 CFR 50.75(f)(3)2008-10-23023 October 2008 Program for Maintenance of Irradiated Fuel and Preliminary Decommissioning Cost Analysis in Accordance with 10 CFR 50.54 (Bb) and 10 CFR 50.75(f)(3) ML0905604702008-08-31031 August 2008 Long-Term Monitoring Plan Position Paper ML11221A1262008-08-14014 August 2008 Lr Hearing - NIA-076, Table 1, Projections of the Population and Components of Change for Us: 2010 to 2050 ENOC-08-00040, Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses2008-07-28028 July 2008 Commitment Update Relating to Application for Order Approving Indirect Transfer of Control of Licenses ML0904006772008-07-0101 July 2008 Unit 3 SBO Event: Time Line to Energize Unit 3 Bus from App R Diesel Via Gt/Bt ML0904006972008-07-0101 July 2008 SBO Event: Time Line to Energize a 480V Bus from GT-25/26 and App R Diesel ML0904100382008-07-0101 July 2008 SBO Event: Time Line to Energize 480V Bus 6A from GT-25/26 and App R Diesel (Total Time: 47 Minutes) ML0904100962008-07-0101 July 2008 ECN 7385; Attachment 7.46 - Post MOD Test Plan ML0904104002008-06-17017 June 2008 Vendor Data for 24-Hr. Run; Entergy, Buchanan, Ny ML0814804812008-05-27027 May 2008 NRC Graphics - Indian Point ML0905101052008-05-0505 May 2008 Trend Report for Nuclides: Co-60, Cs-137, H-3, Ni-63, Sr-90 ML0905101062008-05-0505 May 2008 M10 Investigation Wells NL-08-074, Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074)2008-04-30030 April 2008 Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074) ML0905401352008-01-10010 January 2008 Ground Water Monitoring Well Information Table ML0905102022008-01-0808 January 2008 Groundwater Investigation - Summary NYS Results as of 01/08/2008 ML0736200892007-12-20020 December 2007 Report for Analysis or Eight Water Samples from Set 6 from the Indian Point Power Station, Buchanan, New York Dated December 20, 2007 ENOC-07-00036, Entergy Operations, Inc. - Supplemental Information in Support of Application for Order Approving Indirect Transfer of Control of Licenses2007-10-31031 October 2007 Entergy Operations, Inc. - Supplemental Information in Support of Application for Order Approving Indirect Transfer of Control of Licenses ML0731801672007-10-18018 October 2007 Report for Analysis of Seven Water Samples from Set Five from the Indian Point Power Station, Buchanan, New York, Dtd October 18, 2007 ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0729502532007-10-10010 October 2007 Siren Schedule 11 X 17 Dtd 10/10/07 ML0728403122007-07-31031 July 2007 Report for Analysis for Samples from Set Twenty-Four from the Indian Point Power Station, Buchanan, New York. Dtd. July 31, 2007 ML0728402552007-05-0303 May 2007 Interim Report for Completed Analysis for Samples from Set Twenty-One from the Indian Point Power Station, Buchanan, New York. Dtd. May 3, 2007 ML0713102862007-03-20020 March 2007 E-Mail from D. Winslow of GZA to M. Barvenik of GZA, J. Noggle of USNRC and J. Adler of Entergy, Regarding GZA Results ML0713100562007-02-15015 February 2007 E-Mail from T. Rice of NYSDEC to Various, Regarding Latest State Results ML0713100452007-02-12012 February 2007 E-Mail from P. Donahue of Entergy to T. Rice of NYSDEC, Regarding Split Sample Data ML0713005932007-01-24024 January 2007 E-Mail from D. Gray of Entergy to J. Noggle of USNRC, Regarding Historical Sr Data ML0709405042007-01-12012 January 2007 Ltr from Orise Dtd 01/12/2007, Final Letter Report for Requested Analyses of Six Water Samples, Set Eleven, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006-007) (Rfta No. 06-001) IR 05000247/20060072007-01-0404 January 2007 Ltr from Orise Dtd 01/04/2007, Final Letter Report for Requested Analyses of Nine Water Samples, Set Nine, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001) ML0709406182007-01-0404 January 2007 Ltr from Orise Dtd 01/04/2007, Final Letter Report for Requested Analyses of Nine Water Samples, Set Nine, from the Indian Point Power Station, Buchanan, New York (Inspection Report No. 05000247/2006007) (Rfta No. 06-001) ML0701105612006-12-15015 December 2006 Interim Report for Completed Analyses for Samples from Sets Fifteen and Sixteen, from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-001) ML0704003112006-12-0404 December 2006 E-Mail from T. Rice of Department of Environmental Conservation to J. Adler of Entergy, and J. Noggle and J. White of USNRC, Regarding Latest State Data ML0704002992006-11-28028 November 2006 E-Mail from T. Rice of Department of Environmental Conservation to Various, Regarding Latest State Results ML0701105482006-11-17017 November 2006 Interim Report for Requested Analyses for Samples from Sets Eleven Through Fourteen, from the Indian Point Power Station, Buchanan, New York. (Inspection Report No. 050-247/2006-007) (Rfta No. 06-001) ML0628302122006-06-15015 June 2006 E-mail from R. Lavera of Entergy to J. Noggle of NRC, Regarding Sample Log ML0618605182006-04-26026 April 2006 E-mail from R. Sachatello of Entergy to M. Barvenik and D. Sinslow of GZA, Regarding Pressure Test Discussion with GZA ML0620001512006-04-13013 April 2006 E-mail from K. Mcmullian, Entergy, to J. Boska, NRR, Et Al., IPEC Status Report April 13 ML0610006912006-03-27027 March 2006 Units 1 & 2 Tritium History (GL-80-10), in Nci/Ml 2024-06-04 Category:Operating Procedures MONTHYEARML12024A3772011-12-28028 December 2011
[Table view]State-of-the-Art Reactor Consequence Analyses, Staff Interface with Stakeholders NL-08-154, Supplement to Reply to Request for Additional Information Regarding Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance2008-10-0303 October 2008 Supplement to Reply to Request for Additional Information Regarding Proposed Changes to Technical Specifications Regarding Diesel Generator Endurance Test Surveillance ML0904006972008-07-0101 July 2008 SBO Event: Time Line to Energize a 480V Bus from GT-25/26 and App R Diesel ML0904100382008-07-0101 July 2008 SBO Event: Time Line to Energize 480V Bus 6A from GT-25/26 and App R Diesel (Total Time: 47 Minutes) ML0904007732008-07-0101 July 2008 Entergy Nuclear Northeast - 2-PT-M110, Revision 0; Appendix R DG Functional Test ML0904100402008-07-0101 July 2008 Condition Report CR-IP2-2008-02938 Dated 06/05/2008; Pages 1-7 ML0904006772008-07-0101 July 2008 Unit 3 SBO Event: Time Line to Energize Unit 3 Bus from App R Diesel Via Gt/Bt ML0904103602008-06-13013 June 2008 Entergy Nuclear Northeast - 2-SOP-27.6, Revision: 1; Unit 2 Appendix R Diesel Generator Operation Dtd 6/13/08 ML0904008672008-06-13013 June 2008 Entergy Nuclear Northeast - 2-SOP-27.6, Revision: 1; Unit 2 Appendix R Diesel Generator Operation ML0904008812008-06-13013 June 2008 Entergy Nuclear Northeast Procedure No. 2-TOP-011, Revision 0; Appendix R DG Test (Pages 1-30) ML0904007902008-06-12012 June 2008 Entergy Nuclear Northeast - 2-PT-M110, Revision 1; Appendix R DG Functional Test ML0904100322008-06-0606 June 2008 Condition Report CR-IP2-2008-02917; Operability; Version 4 Dated 06/06/2008 ML0904008102008-04-24024 April 2008 Entergy Nuclear Northeast - 2-SOP-27.6, Revision: 0; Unit 2 Appendix R Diesel Generator Operation ML0904007372008-04-23023 April 2008 Entergy Nuclear Northeast - 2-ECA-0.0, Revision: 2; Loss of All AC Power ML0904007172008-04-23023 April 2008 Entergy Nuclear Northeast - 2-AOP-SSD-1, Revision: 12; Control Room Inaccessibility Safe Shutdown Control ML0904100262008-04-23023 April 2008 Entergy Nuclear Northeast - Aoi 27.1.9.2, Revision: 1; Providing Appendix R Power from Unit 3 ML0904101472008-03-27027 March 2008 EN-WM-102, Rev. 2; Work Implementation and Closeout ML0904007512008-03-19019 March 2008 Entergy Nuclear Northeast - 2-OSP-27.6, Revision: 0; Support Procedure - Unit 2 Appendix R Diesel Generator Operation ML0904101482008-02-11011 February 2008 EN-WM-105, Rev. 3, Planning ML0904101432008-02-0101 February 2008 EN-WM-101, Rev. 3, On-line Work Management Process ML0904101072008-01-28028 January 2008 EN-DC-167, Rev. 1; Classification of Structures, Systems, and Components ML0904101032008-01-28028 January 2008 EN-DC-117, Rev. 1, Post Modification Testing and Special Instructions ML0905405612008-01-0808 January 2008 IPEC Site Management Manual, Radiological Ground Water Monitoring Program ML0713100412007-02-0808 February 2007 E-Mail from J. Adler of Entergy to J. White and J. Kottan of USNRC, Regarding Ni-63 ML0706801542006-02-13013 February 2006 (2) ENN-NDE-10.01, Rev. 2; VT-1 Examination, 02/13/2006 ML0706801572006-02-0202 February 2006 (3) ENN-NDE-10.03, Rev. 1; VT-3 Examination, 02/02/2006 ML0812002952005-08-0909 August 2005 (1) 2-PT-3Y009, Flow Test for Underground Service Water Line 408, Performed on 8-16-2005 (2) 2-PT-3Y010, Flow Test for Underground Service Water Line 409, Performed on 9-19-2005 ML0513202612005-04-15015 April 2005 Revision 0 to IP-SMM-AD-103 ML0431504202004-10-23023 October 2004 Technical Specification Bases ML0427204292004-09-0202 September 2004 IPEC Site Management Manual, Revision 0, IP-SMM-AD-103 ML0706801532004-03-0808 March 2004 (1) ENN-EP-S-001, Rev. 0; IWE General Visual Containment Inspection, 03/08/2004 2011-12-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML090400697&oldid=989557"