Procedure Use Is:
Control Copy:
0 Continuous 0 Reference Effective Date " 1 -
r 0 Information Page 1 of 17 Nuclear Northeast I
0 AOI 27.1.9.2, Revision: 1 PROVIDING APPENDIX R POWER FROM UNIT 3 Team 2B Procedure Owner I
PARTIAL REVISION
PROVIDING APPENDIX R POWER FROM UNIT 3 AOI 27.1.9.2 REV. 1 REVISION
SUMMARY
1.O REASONS FOR REVISION 1.1 Incorporate EC-33794 IP2 Appendix R Diesel Generator Mod 2.0
SUMMARY
OF CHANGES 2.1 2.2 2.3 2.4 2.5 2.6 2.6 2.6 PURPOSE Section - Delete Gas Turbine reference since 3ARDG use will now be used prior to GTs.
ENTRY CONDITIONS Section - Update entry procedures.
Step 2.RNO -Delete EO-4087 reference since document is cancelled., Step 2& 4.RNO - Delete EO-4087 reference since document is cancelled., Step 3 CAUTION - Delete due to engineering analysis approved.
(No rev bar), Step d. - Add "OPEN Breaker OSP to list.
Figure 1, pg.16 - Update ASSS Distribution diagram.
Update procedures referenced to current names. (No rev bar)
Page 2 of 17
PROVIDING APPENDIX R POWER FROM UNIT 3 AOI 27.1.9.2 REV. 1 STEP NO TABLE OF CONTENTS DESCRIPTION PAGE NO 1.0PURPOSE..............................................................
4 2.0SYMPTOMS/ENTRY CONDITIONS..........................................
4 3.0AUTOMATIC ACTIONS...................................................
4 4.0lMMEDlATE OPERATOR ACTIONS.........................................
4 5.OOPERATOR ACTIONS....................................................
5 6.OREFERENCES..........................................................
7 6.1 DEVELOPMENT DOCUMENTS.........................................
7 6.1.1 PROCEDURES..................................................
7 6.1.2 TECHNICAL SPECIFICATIONS.....................................
7 6.2 NRCCOMMITMENTS................................................
7 6.3 UFSAR............................................................
7 ATTACHMENT 1 UNIT 3 APPENDIX R DIESEL GENERATOR START / UNIT ONE POWER 8
FIGURE 1 ELECTRICAL DISTRIBUTION FOR ASSS (EXCLUDING UNIT 3 APPENDIX R DIESEL GENERATOR) POWER................................
16 FIGURE 2 UNIT 3 APPENDIX R DIESEL GENERATOR...........................
17 Page 3 of 17
~~~
Number:
AOI 27.1.9.2 4.1. None
Title:
Revision:
PROVIDING APPENDIX R POWER FROM UNIT 3 REV. 1 Page 4 of 17
Umber Title AOI 27.1.9.2 PROVIDING APPENDIX R POWER FROM UNIT 3 STEP~ACTION/EXPECTED RESPONSE 1
RESPONSE NOT OBTAINED I
Revision REV. 1 5.0 OPERATOR ACTIONS
- 1. ASSEMBLE Personnel:
(a)
NOTIFY Unit 3 Central Control Room of need for Unit 3 Appendix R Diesel Generator to supply Unit 2
[Telephone 714-8277 (CRS) 71 4-8202 (RO) 714-8274 (STA)]
(b)
VERIFY all affected watch personnel have been contacted
- 2. SUPPLY Unit Three Appendix R power per Attachment 1, page 8.
- 3. ALIGN Alternate Safe Shutdown Power Supplies per 2-AOP-SSD-1, Control Room Inaccessibility Safe Shutdown Control (a)
MAINTAIN communications with Unit 3 Appendix R Diesel Generator Operator as ASSS Pumps are added (b)
WHEN Normal Unit 2 power has been restored, CONTINUE to Step 6 Page 5 of 17 (b)ESTABLISH communications with all affected watch personnel, including Unit 3, by telephone, OR radio
- 2. E Substation 12FD3 AND 12RW3 can NOT be energized, CONTACT the DO power alignment assistance.
[(212)-580-6754], AND REQUEST
Number AOI 27 1 9 2 Title Revision PROVIDING APPENDIX R POWER FROM UNIT 3 REV 1
- 4.
REPLACE ASSS Pumps with other pumps powered from Unit 2 480 Volt Buses using appropriate SOPS (a)
MAINTAIN communications with Unit 3 Appendix R Diesel Generator Operator as ASSS Pumps are removed WHEN all Unit 2 ASSS equipment powered from Unit 3 has been secured, RELEASE Unit 3 Appendix R Diesel for shutdown per 3-SOP-EL-01 3, (b)
Appendix R Diesel Generator Operation STEP END ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED Page 6 of 17
Number Tifie AOI 27 1 9 2 PROVIDING APPENDIX R POWER FROM UNIT 3 None Page 7 of 17 Revision I
REV 1
Number AOI 27.1.9.2 Title Revision PROVIDING APPENDIX R POWER FROM UNIT 3 REV. 1 STEP ACTION/EXPECTED RESPONSE
- 1. ALIGN UNIT 1,2, AND 3 BUSES, AND FEEDERS FOR START OF UNIT 3 APPENDIX R DIESEL GENERATOR WITH FEEDER 13W93:
(a)
ESTABLISH communication with District Operator (DO) (Tel.
VERIFY Breaker F3 OPEN (At Buchanan Substation, Bus 3A)
(1)
REQUEST Notification from 21 2-580-6754)
(b)
DO as soon as F3-1 has been opened VERIFY Breaker B3 OPEN (c)
RESPONSE NOT OBTAINED I
Page 8 of 17 j
i
~
NOTE Figure I, Page 16, Electrical Distribution For ASSS (Excluding Unit 3 Appendix R Diesel Generator) Power, and Figure 2, Page 17, Unit 3 Appendix R Diesel Generator, should be referred to while using this attachment.
IF control power is lost, Attachment 2, Page 15, Local Operation of 13.8 KV Breakers, should be referred to.
~
... ~
~._..
~
~-
~~
~.~
~
~~~
~
~
Number Title AOI 27 1 9 2 PROVIDING APPENDIX R POWER FROM UNIT 3 Revision REV 1 ATTACHMENT 1 UNIT 3 APPENDIX R DIESEL GENERATOR START I UNIT ONE POWER (Continued)
STEP ACTlONiEXPECTED RESPONSE (d)
VERIFY the following 6.9 KV Breakers - OPEN 0
52GT/BT 6.9 KV GT-1 to Unit 3 Breaker (Unit 3) 0 52GT-CP(Unit 3) 0 52GT-35 (Unit 3) 0 52GT-36 (Unit 3)
VERIFY Breaker 52GT-2F - CLOSED (e)
START UNIT 3 APPENDIX R DIESEL GENERATOR:
(a)
- 2.
REQUEST Unit 3 to Start Unit 3 Appendix R Diesel Generator, per 3-SOP-EL-01 3, Appendix R Diesel CHECK Unit 3 Appendix R Diesel Generator - RUNNING AND Output Breaker CLOSED assistance (a) E Feeder 13W93 unavailable, OR Breaker 52GT-2F can NOT be closed, GO TO Step 3, this Attachment Generator Operation (b)
(b) CONTACT the DO [(212)-580-6754],
AND REQUEST power alignment RESPONSE NOT OBTAINED I
Page 9 of 17
Number Title AOI 27 1 9 2 PROVIDING APPENDIX R POWER FROM UNIT 3 Revision REV 1 ATTACHMENT 1 UNIT 3 APPENDIX R DIESEL GENERATOR START/ UNIT ONE POWER (Continued)
STEP NOTE The specifics of tagging the equipment to prevent operation is performance of steps to restore Appendix R Power. The tagging details are to be addressed separate from this procedure.
to interfere with
~
~
ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED (c)
CHECK the following (c) OPEN the following Breakers (Unit 1 Breakers - OPEN Light and Power Room -
(Unit 1 Light and Power Room), Page 15) 0 Breaker SBI-T 0
Breaker SBI-T 0
Breaker SB1-4 0
Breaker SBI-4
- 1.
SELECT LOCAL on breaker INITIATE Tagging Breaker LOCAUREMOTE switch SB1 -T, and SBI-4 OPEN
- 2.
PLACE Breaker Control Switch (1) to OPEN 1
NOTE Feeder 13W93 should be energized at this time. Closing Breaker B3-3 will energize Substation 12FD3 and 12RW3.
(d)
CLOSE Breaker B3-3 (e)
EXIT this Attachment Page 10 of 17
r Number Title Revision AOI 27.1.9.2 PROVIDING APPENDIX R POWER FROM UNIT 3 REV. 1 ATTACHMENT 1 UNIT 3 APPENDIX R DIESEL GENERATOR START / UNIT ONE POWER (Continued)
STEP ACTION/EXPECTED RESPONSE
- 3. ALIGN UNIT 1, 2, AND 3 BUSES, AND FEEDERS FOR START OF UNIT 3 APPENDIX R DIESEL GENERATOR WITH FEEDER 13W92:
RESPONSE NOT OBTAINED (a)
PLACE the 52CS GENERATOR BREAKER Switch to TRIP/PULLOUT NOTE Operator Aid 95-17 need NOT be observed when shifting the GT-I/GT-2 CONTROL LOCATION SELECTOR LOCAU REMOTE Switch to LOCAL, since Breaker GT-1, and GT-2 will be Opened in the next step.
(b)
PLACE GT-l/GT-2 CONTROL LOCATION SELECTOR LOCAU REMOTE switch in LOCAL (GT-1 Local Control Panel - Far Right Side)
(c)
VERIFY the following 13.8 KV to 6.9 KV Breakers - OPEN e
Breaker GT-1 0
Breaker GT-2 e
52GT-25 e
52GT-26 e
52GT-CP(Unit 3) e 52GT-35 (Unit 3) e 52GT-36 (Unit 3) 1 Page 11 of 17
Number Tilie A0127 1 9 2 PROVIDING APPENDIX R POWER FROM UNIT 3 ATTACHMENT 1 UNIT 3 APPENDIX R DIESEL GENERATOR START / UNIT ONE POWER (Continued)
(d)
OBTAIN District Operator and Unit 3 Concurrence, &Q ALIGN 6.9 KV Bus to provide power to Unit 1, 13.8 KV Bus as follows, using Telephone, OR radios, as available
[Telephone - (212)-580-6754 (DO) 714-8277 (U3 CRS) 714-8202 (U3 RO) 714-8274 (U3 STA)]:
VERIFY Breaker F2-3 (At Buchanan Substation, Bus 2A) OPEN
- 1. REQUEST Notification (1) from DO as soon as F2-3 hasbeenopened (2)
VERIFY Breaker 62-2 OPEN OPEN Breaker B3-3 OPEN Breaker SBI-1 OPEN Breaker SBI-4 (3)
(4)
Revision REV 1 I
Page 12 of 17 STEP ACTlONiEXPECTED RESPONSE RESPONSE NOT OBTAINED
Number AOI 27 I 9 2 Title Revision PROVIDING APPENDIX R POWER FROM UNIT 3 REV 1 NOTE The specifics of tagging the equipment to prevent operation is NOT to interfere with performance of steps to restore Appendix R Power. The tagging details are to be addressed separate from this procedure.
STEP (7)
INITIATE Tagging of Breakers B3-3, SB1-1, SB 1-4 and OSP OPEN (8)
CLOSE Breaker SBI-2 (9)
CLOSE Breaker SBl-T (IO)
VERIFY Breaker SB1-3 (1 1)
CLOSE Breaker GT-2 (12)
CLOSE Breaker GT-1 CLOSED ACTlONiEXPECTED RESPONSE RESPONSE NOT OBTAINED (e)
(f)
NOTIFY Unit 3 to OPEN 52GT-2F NOTIFY Unit 3 to CLOSE 52GT/BT
- 4. START UNIT 3 APPENDIX R DIESEL GENERATOR:
(a)
REQUEST Unit 3 to Start Unit 3 Appendix R Diesel Generator, per 3-SOP-EL-01 3, Appendix R Diesel Generator ODeration (b) CHECK Unit 3 Appendix R Diesel Generator - RUNNING u Output Breaker CLOSED Page 13 of 17 (b) CONTACT the DO [(212)-580-6754],
AND REQUEST power alignment assistance
Number AOI 27.1.9.2 Title Revision PROVIDING APPENDIX R POWER FROM UNIT 3 REV. 1 STEP (c)
CLOSE Breaker 82-2 (d)
EXIT this Attachment ACTlONiEXPECTED RESPONSE RESPONSE NOT OBTAINED END OF ATTACHMENT 1 I
~
Page 14 of 17 Feeder 13W92 should be energized at this time. Closing Breaker 82-2 will energize Substation 12FD3 and 12RW3.
Number AOI 27 1 9.2 Title Revision PROVIDING APPENDIX R POWER FROM UNIT 3 REV. 1
- 1.
- 2.
- 3.
STEP ATTACHMENT 2 LOCAL OPERATION OF 13.8 KV BREAKERS VERIFY all Unit 1 Light and Power buses ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED de-energ ized CHECK 13.8 KV breaker - REQUIRED OPEN (a)
OPEN breaker door (b)
REMOVE the TRIP fuses AND the CLOSE fuses (c)
PRESS TRIP pushbutton (d)
CLOSE breaker door CHECK 13.8 KV breaker - REQUIRED CLOSED (a)
OPEN breaker door (b)
REMOVE the TRIP fuses AND the CLOSE fuses (c)
PRESS CLOSE pushbutton (d)
CLOSE breaker door
- 2. G O T 0 Step 3 END OF ATTACHMENT 2 Page 15 of 17
Number Title AOI 27 I 9 2 PROVIDING APPENDIX R POWER FROM UNIT 3 FIGURE 1 ELECTRICAL DISTRIBUTION FOR ASSS (EXCLUDING UNIT 3 APPENDIX R DIESEL GENERATOR) POWER 138KV.FDR 95631 To Bucham Milhood 138KV 3% UV. STA FOA 95951 VY\\TR.TAd Milhvaod 138 KV FOR 96952 FDR P P Z LaIM lndisl bin NO. i lndien binf No. 2
-1 EmVgenCi GenerB1MP Revision REV 1 Page 16 of 17
Number Title AOI 27 1 9 2 PROVIDING APPENDIX R POWER FROM UNIT 3 FIGURE 2 UNIT 3 APPENDIX R DIESEL GENERATOR Revision REV 1 TO BKR BGT-2 AT i
ENTERGY IP 2 - 1 9 8 7 GAS TURBZNE-1 I
SUBSTATION f
1 1
AUTO TR 20 MVA 13.8/6.9 KV To UNIT 3 6.9 KV
- Buses, Page 17 of 17