ML073300214

From kanterella
Jump to navigation Jump to search
Notice of Cancelled Meeting with Duke Power Co, Oconee Units 1, 2, & 3, to Discuss License Amendment Request Dated October 16, 2007 That Proposes Modifications to Mitigate Water Hammers
ML073300214
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/26/2007
From: Olshan L
NRC/NRR/ADRO/DORL/LPLII-1
To: Marinos E
NRC/NRR/ADRO/DORL/LPLII-1
Olshan L N, NRR/DORL, 415-1419
References
Download: ML073300214 (5)


Text

C November 26, 2007 MEMORANDUM TO: Evangelos C. Marinos, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

A Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

N FORTHCOMING MEETING WITH DUKE POWER COMPANY LLC (DUKE), OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)

DATE & TIME: Wednesday, November 28, 2007 LOCATION:

C 10:30 a.m. - 2:30 p.m.

U.S. Nuclear Regulatory Commission (NRC)

Two White Flint North 11545 Rockville Pike, Room T-09F5 Rockville, Maryland PURPOSE:

E To discuss the license amendment request dated October 16, 2007 (ADAMS Accession No. ML072920449) that proposes modifications to mitigate water hammers CATEGORY 1:

  • L This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

L E

MEETING CONTACTS: Leonard N. Olshan, NRR John F. Stang, NRR 301-415-1419 301-415-1345 lno@nrc.gov jfs2@nrc.gov D

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002

E. Marinos PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of New Reactors (NRO)

C NRC DUKE J. Wilson (NRO) R. Gambrell J. Tatum (NRO) P. Earnhardt S. Mazumdar (NRR) H. Harling A

K. Scales (NRR) T. Brown L. Olshan (NRR) T. Glenn Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Agenda N

cc w/encl: See next page C

E L

L E

D

E. Marinos PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of New Reactors (NRO)

C NRC DUKE J. Wilson (NRO) R. Gambrell J. Tatum (NRO) P. Earnhardt S. Mazumdar (NRR) H. Harling A

K. Scales (NRR) T. Brown L. Olshan (NRR) T. Glenn Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

Agenda N

cc w/encl: See next page C

Distribution:

PUBLIC E J. Wilson, NRO LPL2-1 R/F J. Tatum, NRO RidsNrrDorl (TMcGinty) S. Mazumdar, NRR L

RidsNrrdorlLpl2-1 (EMarinos) K. Scales, NRR RidsNrrPMLOlshan (hard copy) Receptionist (OWFN and TWFN)

RidsNrrLAMOBrien (hard copy) RidsRgn2MailCenter (JMoorman)

RidsOpaMail RidsAcrsAcnwMailCenter T. Liu, NRR RidsNrrAdro S. Campbell, EDO, Rgn II RidsOgcMailCenter K. Clark, OPA Rgn II PMNS L

Receptionist (OFWN and TFWN) (hard copy)

Accession Number: ML073300214 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME DATE LOlshan:nc 11/26/07 MOBrien 11/26/07 EMarinos 11/26/07 E OFFICIAL RECORD COPY D

FORTHCOMING MEETING ON NOVEMBER 28, 2007, WITH DUKE POWER COMPANY LLC, TO DISCUSS THE OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, OCTOBER 16, 2007, LICENSE AMENDMENT REQUEST THAT PROPOSES MODIFICATION TO MITIGATE WATER HAMMERS C AGENDA 10:30 a.m. - 10:45 a.m. Introductions A

10:45 a.m. - 11:15 a.m. Oconee Generic Letter 96-06 history 11:15 a.m. - 11:45 a.m. Oconee water hammer analysis 11:45 a.m. - 12 noon Break 12 noon N

- 12:30 p.m. Discuss of water hammer modifications 12:30 p.m. - 11:15 p.m. Lunch break 11:15 p.m. - 1:45 p.m. Continue discussion of water hammer modifications 1:45 p.m. - 2:30 p.m. C Questions and answers 2:30 p.m. Adjourn E

L L

E D

Enclosure

Oconee Nuclear Station, Units 1, 2, and 3 cc:

C Mr. Bruce H. Hamilton Vice President, Oconee Site Mr. R. L. Gill, Jr.

Manager - Nuclear Regulatory Duke Power Company LLC Issues and Industry Affairs 7800 Rochester Highway Duke Power Company LLC Seneca, SC 29672 526 S. Church St.

A Mail Stop EC05P Ms. Lisa F. Vaughn Charlotte, NC 28202 Associate General Counsel and Managing Attorney Division of Radiation Protection Duke Energy Carolinas, LLC NC Dept of Environment, Health, & Natural 526 South Church Street - EC07H Resources N

Charlotte, North Carolina 28202 3825 Barrett Dr.

Raleigh, NC 27609-7721 Manager, LIS NUS Corporation Mr. Peter R. Harden, IV 2650 McCormick Dr., 3rd Floor VP-Customer Relations and Sales C

Clearwater, FL 34619-1035 Westinghouse Electric Company 6000 Fairview Road Senior Resident Inspector 12th Floor U.S. Nuclear Regulatory Commission Charlotte, NC 28210 7812B Rochester Highway Seneca, SC 29672 E Mr. Henry Barron Group Vice President, Nuclear Generation Mr. Henry Porter, Director and Chief Nuclear Officer Division of Radioactive Waste Management P.O. Box 1006-EC07H Bureau of Land and Waste Management Charlotte, NC 28201-1006 L

Dept. of Health and Env. Control 2600 Bull St. Mr. Charles Brinkman Columbia, SC 29201-1708 Director, Washington Operations Westinghouse Electric Company Mr. Michael A. Schoppman 12300 Twinbrook Parkway, Suite 330 Framatome ANP Rockville, MD 20852 1911 North Ft. Myer Dr.

Suite 705 L Ms. Kathryn B. Nolan Rosslyn, VA 22209 Senior Counsel Duke Energy Carolinas, LLC Mr. B. G. Davenport 526 South Church Street - EC07H Regulatory Compliance Manager Oconee Nuclear Site E Charlotte, NC 28202 Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Mr. Leonard G. Green D

Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602