Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location ML23089A0942023-04-17017 April 2023 NRC to PSEG Hope Creek, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23087A1492023-04-17017 April 2023 NRC to PSEG Salem, Transmittal of the National Marine Fisheries Service'S March 24, 2023, Biological Opinion GAR-2020-02842 Concerning Salem and Hope Creek ML23103A3232023-04-13013 April 2023 Submittal of Updated Final Safety Analysis Report, Rev. 26, Summary of Revised Regulatory Commitments for Hope Creek, Summary of Changes to PSEG Nuclear LLC, Quality Assurance Topical Report, NO-AA-10, Rev. 89 ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23086A0912023-03-24024 March 2023 NMFS to NRC, Transmittal of Biological Opinion for Continued Operations of Salem and Hope Creek Nuclear Generating Stations RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 ML23034A1532023-02-0909 February 2023 Operator Licensing Examination Approval ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 2024-02-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML21295A2292021-11-15015 November 2021 Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing Definitions ML21202A0782021-09-0303 September 2021 Issuance of Amendment Nos. 338 and 320 Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21195A0622021-08-0303 August 2021 Issuance of Amendment No. 319 One-Time Request to Revise Technical Specification Action for Rod Position Indicators ML21110A0522021-07-19019 July 2021 Issuance of Amendment Nos. 337 and 318, Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec LR-N21-0030, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) Surveillance Requirements (SR) for Auxiliary Feedwater2021-06-17017 June 2021 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) Surveillance Requirements (SR) for Auxiliary Feedwater ML20338A0382021-02-23023 February 2021 Issuance of Amendment Nos. 336 and 317 Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection, and Pressurizer Surge Lines ML20191A2032020-08-0606 August 2020 Issuance of Amendment Nos. 335 & 316-Revise Minimum Required Channels, Mode Applicability, & Actions for Source Range/Intermediate Range Neutron Flux Reactor Trip System Instrumentation ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19330F1562020-01-14014 January 2020 Issuance of Amendment Nos. 331 and 312 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19275D6942019-11-18018 November 2019 Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position Requirements LR-N19-0047, License Amendment Request to Relocate Technical Specifications (TS) 3.9.3 and 3.9.12 to the Technical Requirements Manual (TRM)2019-06-28028 June 2019 License Amendment Request to Relocate Technical Specifications (TS) 3.9.3 and 3.9.12 to the Technical Requirements Manual (TRM) ML19105B1712019-05-31031 May 2019 Issuance of Amendment Nos. 329 and 310 Revise Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves, and Add New TS ML19077A3362019-04-11011 April 2019 Issuance of Amendment Nos. 328 and 309 Revise Technical Specifications to Extend Refueling Water Storage Tank Allowed Outage Time ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML19009A4772019-01-25025 January 2019 Issuance of Amendment Nos. 326 and 307 Revise Technical Specifications to Increase Vital Instrument Bus Inverter Allowed Outage Time ML18318A2662018-12-19019 December 2018 Issuance of Amendment Nos. 325 and 306 Revise TS Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation Test Times and Completion Times ML18040A7782018-04-18018 April 2018 Issuance of Amendment Nos. 323 and 304 Relocation of Reactor Coolant System Pressure Isolation Valve Tables ML18085B1982018-04-18018 April 2018 Issuance of Amendment Nos. 324 and 305 Revise Technical Specification Actions for Rod Position Indicators ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17349A1082018-01-18018 January 2018 Issuance of Amendments Containment Fan Coil Unit Allowed Outage Time Extension (CAC Nos. MF9364 and MF9365; EPID L-2017-LLA-0212) ML17227A0162017-11-14014 November 2017 Issuance of Amendments Accident Monitoring Instrumentation ML17165A2142017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule App. to Section 5.5 Testing ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16279A4052016-11-0202 November 2016 Issuance of Amendments Chilled Water System Modification ML16229A5192016-09-29029 September 2016 Issuance of Amendments Correct Non-Conservative Technical Specifications and Other Discrepancies ML16137A5792016-06-29029 June 2016 Issuance of Amendments Extension of Implementation Period for Salem, Unit No. 1, License Amendment No. 311, and Salem, Unit No. 2 License Amendment No. 292 ML16096A4192016-04-28028 April 2016 Issuance of Amendments Replacement of Source Range and Intermediate Range Neutron Monitoring Systems ML16054A0682016-03-28028 March 2016 Issuance of Amendments Regarding Revision to Reactor Trip System Instrumentation Technical Specifications ML16035A0872016-03-0707 March 2016 Issuance of Amendments New Technical Specifications to Isolate Unborated Water Sources in Mode 6 ML15245A6362015-09-0404 September 2015 Issuance of Emergency Amendment Regarding Removal of Pressurizer Power Operated Relief Valve Position Indication Instrumentation from Technical Specifications ML15153A2302015-07-30030 July 2015 Issuance of Amendments Adopting Technical Specification Task Force (TSTF)-510, Rev, 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection(Tac Nos. MF4574 & MF457 ML15141A2712015-06-17017 June 2015 and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating Licenses ML15063A2932015-03-30030 March 2015 Issuance of Amendments Revision to Power Distribution Limits for Axial Flux Difference and Heat Flux Hot Channel Factor ML14323A9742014-12-23023 December 2014 and Salem Nuclear Generating Station, Units 1 and 2, Issuance of Amendments Revision to Cyber Security Plan Implemenation Schedule and Conditions ML13301A1242013-11-27027 November 2013 Issuance of Amendments Regarding Change to PSEG Emergency Plan to Remove the Backup R45 Plant Vent Radiation Monitor Indications ML13171A0632013-07-17017 July 2013 Issuance of Amendments Revision to Technical Specification 3.7.6.1 (Unit 1) and 3.7.6 (Unit 2) Control Room Emergency Air Conditioning System. ML13072A1052013-03-28028 March 2013 Issuance of Amendments Revision to Technical Specification 6.8.4.i, Steam Generator Program, and Technical Specifications 6.9.1.10, Steam Generator Tube Inspection Report, for a Permanent Alternate ML12335A2212012-12-10010 December 2012 and Salem Nuclear Generating Station, Units 1 and 2 - Issuance of Amendments Approval of Change to Implementation Milestone 6 of Cyber Security Plan ML1120203592011-08-25025 August 2011 Issuance of Amendments Technical Specification Requirements for Snubbers ML1118615602011-07-28028 July 2011 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, License Amendment, Issuance of Amendments Approval of Cyber Security Plan 2023-08-14
[Table view] Category:Safety Evaluation
MONTHYEARML23192A8212023-08-14014 August 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location ML23139A1472023-06-0505 June 2023 Relief Request Associated with Fourth Interval In-service Inspection Limited Examinations of Weld Coverage ML23096A1842023-05-0909 May 2023 Issuance of Amendment No. 328 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML23081A4662023-05-0202 May 2023 Issuance of Amendment Nos. 346 and 327 Revise Technical Specifications to Extend Allowable Outage Time for Inoperable Emergency Diesel Generator ML23095A3682023-04-12012 April 2023 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Threshold Determination for Proposed Transfer of Land Ownership ML23044A1052023-03-13013 March 2023 Issuance of Amendment Nos. 345 and 326 Relocate Technical Specifications Requirements for Reactor Head Vents to Technical Requirements Manual ML23037A9712023-03-0909 March 2023 and Salem Nuclear, Unit Nos. 1 and 2 Issuance of Amendment Nos. 233, 344, and 325 Relocate Technical Specification Staff Qualification Requirements to the PSEG Quality Assurance Topical Report ML23019A3482023-02-0202 February 2023 Issuance of Relief Request No. SC-I5R-221 for the Alternative Repair for Service Water System Piping ML22130A7912022-05-24024 May 2022 Issuance of Relief Request No. S1-I4R-210 Fourth Inservice Inspection Interval Limited Examinations ML22061A0302022-04-0404 April 2022 Issuance of Amendment Nos. 343 and 324 Revise Technical Specifications Surveillance Requirements for Auxiliary Feedwater ML22012A4352022-02-14014 February 2022 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Nos. 230, 342, and 323 Delete Definition in 10 CFR 20 and Figures of Site and Surrounding Areas ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21295A2292021-11-15015 November 2021 Issuance of Amendment Nos. 340 and 321 Revise Technical Specifications to Adopt TSTF 569, Revision of Response Time Testing Definitions ML21230A0182021-10-0808 October 2021 Issuance of Amendment No. 339 Revise and Relocate Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to Pressure and Temperature Limits Report ML21202A0782021-09-0303 September 2021 Issuance of Amendment Nos. 338 and 320 Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21195A0622021-08-0303 August 2021 Issuance of Amendment No. 319 One-Time Request to Revise Technical Specification Action for Rod Position Indicators ML21110A0522021-07-19019 July 2021 Issuance of Amendment Nos. 337 and 318, Revise Technical Specifications to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21145A1892021-06-10010 June 2021 Authorization and Safety Evaluation for Alternative Request No. SC-I4R-200 ML20338A0382021-02-23023 February 2021 Issuance of Amendment Nos. 336 and 317 Leak-Before-Break for Accumulator, Residual Heat Removal, Safety Injection, and Pressurizer Surge Lines ML20224A2982020-08-20020 August 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20191A2032020-08-0606 August 2020 Issuance of Amendment Nos. 335 & 316-Revise Minimum Required Channels, Mode Applicability, & Actions for Source Range/Intermediate Range Neutron Flux Reactor Trip System Instrumentation ML20104A1862020-04-20020 April 2020 Issuance of Alternative Request SC-I4R-192 for Examination of ASME Code, Section XI, Steam Generator and Pressurizer Nozzle Inside Radius Sections ML20099E2332020-04-20020 April 2020 Issuance of Alternative Request S1-I4R-191 for the Fourth 10-Year Inservice Inspection Interval ML20091K7302020-04-13013 April 2020 Issuance of Relief Request SC-I4R-190 for the Fourth 10-Year Inservice Inspection Interval ML20034E6172020-02-27027 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 222, 333, and 314 Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19352F2312020-02-18018 February 2020 and Salem Nuclear Generating Station, Unit Nos. 1 and 2; Issuance of Amendment Nos. 221, 332, and 313 Revise Emergency Plan Staffing Requirements ML19330F1562020-01-14014 January 2020 Issuance of Amendment Nos. 331 and 312 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML19275D6942019-11-18018 November 2019 Issuance of Amendment Nos. 330 and 311 Revise Technical Specifications to Adopt TSFT-547, Clarification of Rod Position Requirements ML19105B1712019-05-31031 May 2019 Issuance of Amendment Nos. 329 and 310 Revise Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation, Main Steam Isolation Valves, and Add New TS ML19077A3362019-04-11011 April 2019 Issuance of Amendment Nos. 328 and 309 Revise Technical Specifications to Extend Refueling Water Storage Tank Allowed Outage Time ML19044A6272019-03-0606 March 2019 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 214, 327, and 308 Revise Technical Specifications to Adopt TSTF-529 ML19050A3702019-03-0606 March 2019 Alternative to Reactor Vessel Nozzle Welds Examinations Inspection Interval (EPID-L-2018-LLR-0110) ML19009A4772019-01-25025 January 2019 Issuance of Amendment Nos. 326 and 307 Revise Technical Specifications to Increase Vital Instrument Bus Inverter Allowed Outage Time ML18318A2662018-12-19019 December 2018 Issuance of Amendment Nos. 325 and 306 Revise TS Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation Test Times and Completion Times ML18142B1262018-05-29029 May 2018 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML18040A7782018-04-18018 April 2018 Issuance of Amendment Nos. 323 and 304 Relocation of Reactor Coolant System Pressure Isolation Valve Tables ML18085B1982018-04-18018 April 2018 Issuance of Amendment Nos. 324 and 305 Revise Technical Specification Actions for Rod Position Indicators ML17355A5702018-02-16016 February 2018 Issuance of Amendment Nos. 322, 303, & 210, to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 (CAC Nos. MF9268/MF9269/MF9270; EPID L-2017-LLA-0173) ML17349A1082018-01-18018 January 2018 Issuance of Amendments Containment Fan Coil Unit Allowed Outage Time Extension (CAC Nos. MF9364 and MF9365; EPID L-2017-LLA-0212) ML17227A0162017-11-14014 November 2017 Issuance of Amendments Accident Monitoring Instrumentation ML17304A9432017-11-0101 November 2017 Use of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Inservice Inspection Activities ML17219A1862017-08-17017 August 2017 Safety Evaluation of Relief Request SC-I4R-171 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17172A5872017-07-17017 July 2017 Safety Evaluation of Relief Request S1-I4R-160 Regarding the Fourth 10-Year Interval of the Inservice Inspection Program ML17165A2142017-06-28028 June 2017 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule App. to Section 5.5 Testing ML17132A0052017-05-19019 May 2017 Alternative Request to Adopt American Society of Mechanical Engineers Code Case OMN-20 (CAC Nos. MF8313 and MF8314) ML17093A8702017-05-16016 May 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendments Revised PSEG Nulcear LLC Cyber Security Plan Milestone 8 Implementation Schedule ML17012A2922017-02-0606 February 2017 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Issuance of Amendments ML16351A1822017-01-19019 January 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16229A5192016-09-29029 September 2016 Issuance of Amendments Correct Non-Conservative Technical Specifications and Other Discrepancies ML16137A5792016-06-29029 June 2016 Issuance of Amendments Extension of Implementation Period for Salem, Unit No. 1, License Amendment No. 311, and Salem, Unit No. 2 License Amendment No. 292 2023-08-14
[Table view] |
Text
November 15, 2007 Mr. William Levis President & Chief Nuclear Officer PSEG Nuclear LLC - N09 Post Office Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2, ISSUANCE OF AMENDMENTS RE: REVISION TO LICENSING BASIS - NET POSITIVE SUCTION HEAD METHODOLOGY FOR EMERGENCY CORE COOLING SYSTEM PUMPS (TAC NOS. MD6353 AND MD6354)
Dear Mr. Levis:
The Commission has issued the enclosed Amendment Nos. 285 and 268 to Facility Operating License Nos. DPR-70 and DPR-75 for the Salem Nuclear Generating Station (Salem),
Unit Nos. 1 and 2, in response to your application dated August 15, 2007, as supplemented by letter dated September 6, 2007.
The amendments revise the licensing basis, as described in Appendix 3A of the Salem Updated Final Safety Analysis Report, regarding the method of calculating the net positive suction head available for the emergency core cooling system and containment heat removal system pumps.
These changes to the Salem licensing basis relate to issues associated with Generic Letter 2004-02, APotential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.@
A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/ra/
Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-272 and 50-311
Enclosures:
- 1. Amendment No. 285 to License No. DPR-70
- 2. Amendment No. 268 to License No. DPR-75
- 3. Safety Evaluation
cc w/encls: See next page
ML072841247 OFFICE LPL1-2/PM LPL1-2/LA SCVB/BC SSIB/BC OGC LPL1-2/BC NAME REnnis ABaxter RDennig MScott SUttal HChernoff DATE 10/12/07 10/17/07 10/23/07 10/25/07 11/13/07 11/15/07 Salem Nuclear Generating Station, Unit Nos. 1 and 2 cc:
Mr. Thomas Joyce Township Clerk Senior Vice President - Operations Lower Alloways Creek Township PSEG Nuclear Municipal Building, P.O. Box 157 P.O. Box 236 Hancocks Bridge, NJ 08038 Hancocks Bridge, NJ 08038 Mr. Paul Bauldauf, P.E., Asst. Director Mr. Dennis Winchester Radiation Protection Programs Vice President - Nuclear Assessment NJ Department of Environmental PSEG Nuclear Protection and Energy P.O. Box 236 CN 415 Hancocks Bridge, NJ 08038 Trenton, NJ 08625-0415 Mr. Robert Braun Mr. Brian Beam Site Vice President - Salem Board of Public Utilities PSEG Nuclear 2 Gateway Center, Tenth Floor P.O. Box 236 Newark, NJ 07102 Hancocks Bridge, NJ 08038 Regional Administrator, Region I Mr. Carl Fricker U.S. Nuclear Regulatory Commission Vice President - Operations Support 475 Allendale Road PSEG Nuclear King of Prussia, PA 19406 P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Salem Nuclear Generating Station Mr. George Gellrich U.S. Nuclear Regulatory Commission Plant Manager - Salem Drawer 0509 PSEG Nuclear Hancocks Bridge, NJ 08038 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. James Mallon Manager - Licensing PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Steven Mannon Manager - Salem Regulatory Assurance PSEG Nuclear P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Jeffrie J. Keenan, Esquire PSEG Nuclear - N21 P.O. Box 236 Hancocks Bridge, NJ 08038
PSEG NUCLEAR LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 285 License No. DPR-70
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by PSEG Nuclear LLC, acting on behalf of itself and Exelon Generation Company, LLC (the licensees) dated August 15, 2007, as supplemented by letter dated September 6, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR), Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, this license amendment authorizes changes to Appendix 3A of the Updated Final Safety Analysis Report as shown in Attachment 2 to the licensee's letter dated September 6, 2007.
- 3. This license amendment is effective as of its date of issuance and shall be implemented by December 31, 2007.
FOR THE NUCLEAR REGULATORY COMMISSION
/ra/
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Date of Issuance: November 15, 2007
PSEG NUCLEAR LLC EXELON GENERATION COMPANY, LLC DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 268 License No. DPR-75
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by PSEG Nuclear LLC, acting on behalf of itself and Exelon Generation Company, LLC (the licensees) dated August 15, 2007, as supplemented by letter dated September 6, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in Title 10 of the Code of Federal Regulations (10 CFR), Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, this license amendment authorizes changes to Appendix 3A of the Updated Final Safety Analysis Report as shown in Attachment 2 to the licensee's letter dated September 6, 2007.
- 3. This license amendment is effective as of its date of issuance and shall be implemented by December 31, 2007.
FOR THE NUCLEAR REGULATORY COMMISSION
/ra/
Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Date of Issuance: November 15, 2007
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 285 AND 268 TO FACILITY OPERATING LICENSE NOS. DPR-70 AND DPR-75 PSEG NUCLEAR LLC EXELON GENERATION COMPANY, LLC SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311
1.0 INTRODUCTION
By letter dated August 15, 2007, as supplemented by letter dated September 6, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession Nos.
ML072350209 and ML072610603, respectively), PSEG Nuclear LLC (PSEG or the licensee) submitted a license amendment request for Salem Nuclear Generating Station (Salem), Unit Nos. 1 and 2. The proposed amendment would revise the licensing basis, as described in Appendix 3A of the Salem Updated Final Safety Analysis Report (UFSAR), regarding the method of calculating the net positive suction head (NPSH) available for the emergency core cooling system (ECCS) and containment heat removal system pumps.
The available NPSH (NPSHa) is a measure of the specific energy, or head, of the liquid available at the centerline of the pump suction flange. It indicates the capability of the flow into the pump to overcome losses within the pump and avoid pump cavitation.
The required NPSH (which is determined by test for a given pump) is the head at the pump suction flange that produces a given (acceptable) amount of cavitation (measured as reduction in pump discharge head). For satisfactory operation of a centrifugal pump, NPSHa should exceed or equal the required NPSH. The difference between the available and required NPSH of a pump is referred to as the NPSH margin.
NPSHa can be determined from the following equation:
NPSHa = hatm + hstatic - hloss - hvapor where:
hatm = head on the liquid surface. In a containment, hatm would be the head due to the pressure of the containment atmosphere.
hstatic = head due to the height of the liquid surface above the pump suction centerline.
hloss = head loss due to fluid friction and fittings (valves, bends in piping, etc.) in the flow path to the pump.
hvapor = head due to the vapor pressure of the liquid at the temperature of the liquid.
Appendix 3A of the Salem UFSAR describes the licensee positions regarding applicable Nuclear Regulatory Commission (NRC or Commission) Regulatory Guides (RGs). The proposed amendment would revise the portion of UFSAR Appendix 3A pertaining to RG 1.1 (Safety Guide 1), ANet Positive Suction Head for Emergency Core Cooling and Containment Heat Removal System Pumps,@ dated December 1, 1970 (ADAMS Accession No. ML003739925).
Currently, the method described in UFSAR Appendix 3A for calculating the NPSHa assumes that the containment pressure is equal to the vapor pressure of the sump fluid, thus excluding the initial containment air pressure. The proposed amendment would change the methodology described in the UFSAR to credit the pre-accident partial air pressure of the containment atmosphere in determining the NPSHa and would include the static head of water above the containment floor in the NPSHa determination.
PSEGs application dated August 15, 2007, indicated that the change in methodology is needed as a result of ECCS containment sump strainer modifications and associated analysis performed by the licensee to address the issues in NRC Generic Letter (GL) 2004-02, APotential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors,@ dated September 13, 2004 (ADAMS Accession No. ML042360586).
During the injection phase of a loss-of-coolant accident (LOCA) the ECCS and containment heat removal system pumps take suction from the refueling water storage tank (RWST) and credit for containment pressure is not an issue. During the recirculation phase, only the residual heat removal (RHR) pumps take suction from the containment sump. Because of the possibility of increased head loss at the sump screens due to debris and chemical effects (increasing hloss) and the high temperature of the sump water (increasing hvapor), it is important to ensure adequate NPSHa is maintained.
The supplement dated September 6, 2007, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the NRC staff=s original proposed no significant hazards consideration determination as published in the Federal Register on September 11, 2007 (72 FR 51866).
2.0 REGULATORY EVALUATION
General Design Criterion (GDC) 35, Emergency core cooling, in Appendix A of Title 10 of the Code of Federal Regulations (10 CFR) requires that the ECCS provide abundant core cooling so that fuel and clad damage that could interfere with continued effective core cooling is prevented, and so that clad metal-water action is limited to negligible amounts. Adequate NPSH margin is necessary to ensure abundant core cooling.
GDC 38, Containment heat removal, requires that a system to remove heat from the reactor containment be provided whose safety function is to reduce rapidly, consistent with the functioning of other associated systems, the containment pressure and temperature following a
LOCA. Adequate NPSH margin is necessary to ensure that the containment spray pumps can cool the post-LOCA containment atmosphere.
RG 1.1 provides the following guidance on determining NPSHa:
Emergency core cooling and containment heat removal systems should be designed so that adequate net positive suction head (NPSH) is provided to system pumps assuming maximum expected temperatures of pumped fluids and no increase in containment pressure from that present prior to postulated loss of coolant accidents.
NUREG-0800, Standard Review Plan (SRP) Section 6.2.2, Containment Heat Removal Systems, Revision 5, dated March 2007 (ADAMS Accession No. ML070160661), states that, with respect to GDC 38, the licensees analysis should demonstrate that NPSHa is greater than or equal to the required NPSH. The SRP also cites RG 1.82, Revision 3 as describing methods acceptable to the NRC staff for evaluating the NPSH margin.
Regulatory Position 1.3.1.1 of RG 1.82, Water Sources for Long-Term Recirculation Cooling Following a Loss-Of-Coolant Accident, Revision 3, dated November 2003 (ADAMS Accession No. ML033140347), states, in part, that NPSHa for ECCS and containment heat removal system pumps should be determined assuming the maximum expected temperature of pumped fluid and no increase in containment pressure from that present prior to the postulated LOCA.
These considerations are consistent with RG 1.1.
Regulatory Position 1.3.1.1 of RG 1.82 also provides guidance with respect to one method to ensure that credit is not taken for containment pressurization during the transient (i.e., LOCA).
This method is to assume that the containment pressure equals the vapor pressure of the sump water (i.e., hatm equals hvapor in the above equation). This method is consistent with the current Salem licensing basis as described in UFSAR Appendix 3A.
Regulatory Position 1.3.1.2 of RG 1.82 states that for certain operating pressurized water reactors (PWRs) for which the design cannot be practicably altered, conformance with Regulatory Position 1.3.1.1 may not be possible. For these cases, credit for containment accident pressure may be allowed. Since the licensee is requesting credit for only the containment pressure present prior to the LOCA, the licensee is not proposing to credit containment accident pressure.
Nuclear Energy Institute (NEI) report NEI 04-07, Pressurized Water Reactor Sump Performance Evaluation Methodology dated May 28, 2004 (ADAMS Accession No. ML041550661), including a revision dated July 13, 2004 (ADAMS Accession No. ML042030528), contain a discussion regarding the role of containment pressure in determining NPSHa. Specifically, Section 6.4.7.1, NPSH Available, states, in part, that:
Typically for PWRs that do not credit containment overpressure in the design basis analyses, the basic assumption is to conservatively assume that containment pressure equals the vapor pressure of the liquid in the sump. In reality, this assumes that there is no air partial pressure in containment prior to the event, or that the air pressure is non-mechanistically lost during the event. A more realistic assumption is that at the time of safety injection recirculation the containment partial steam pressure is equal to sump fluid vapor pressure plus an air partial pressure equal to the containment air pressure
prior to the event. The air pressure prior to the event is to be calculated assuming 100%
relative humidity at a containment temperature corresponding to the maximum normal temperature experienced at the plant. Alternatively, the pre-event minimum containment pressure minus the partial steam pressure at the dew point temperature for the cooling water temperature can be assumed for the air pressure. The recognition of the pre-event air pressure acknowledges the thermal-hydraulic condition of containment prior to the event without crediting containment overpressure based on the accident scenario.
The NRC staff safety evaluation (SE) on NEI 04-07 dated December 6, 2004 (ADAMS Accession No. ML043280007), found the discussion of NPSH with respect to containment pressure to be acceptable.
For both Salem units, the RHR pumps are the only ECCS pumps taking suction from the containment sump during recirculation. The Salem UFSAR (Section 6.2.2.1.2) states that recirculation of water from the containment sump is provided by the diversion of a portion of the recirculation flow from the discharge of the RHR heat exchangers to the containment spray header after injection from the RWST has been terminated.
The licensee application dated August 15, 2007, indicated that the proposed license amendment was being requested because, consistent with the requirements of 10 CFR 50.59(c)(2)(viii), a license amendment is necessary to implement a proposed change that would result in a departure from a method of evaluation described in the FSAR (as updated) used in establishing the design bases or in the safety analyses.
3.0 TECHNICAL EVALUATION
3.1 Credit for Pre-accident Containment Pressure The current Salem licensing basis, with respect to the containment pressure assumed in determining the NPSHa for the ECCS and containment heat removal system pumps, is described in UFSAR Appendix 3A (page 3A-2) as follows:
It is assumed that the vapor pressure of the liquid in the sump (corresponding to the temperature of the liquid at the onset of recirculation) is equal to the containment pressure. This assumption assures that the actual available NPSH is always greater than the calculated value determined from the reduced equation:
NPSHavailable = (h)static head - (h)loss The licensee proposes to replace the above text with the following:
The containment pressure value will be equal to the initial air pressure in containment prior to the LOCA (i.e., the pre-accident partial air pressure in containment). However, when the containment sump vapor pressure exceeds the containment initial pressure, then the following will be assumed (h)containment pressure = (h)vapor pressure
The containment air pressure value used in the NPSHa calculation is based on the containment conditions prior to the accident only and does not include any credit for accident pressure conditions, is conservatively determined based on minimum containment initial pressure, and maximum temperature and relative humidity conditions.
The calculation also accounts for further reduction of the initial air pressure based on possible maximum cooldown of the containment environment post-LOCA.
The vapor pressure term used in the NPSHa for the sump water being pumped, is based on the highest temperature of the sump fluid for the condition being evaluated.
The NRC staff finds that the above proposed changes to the Salem NPSHa methodology are based on assumptions that: (1) will conservatively estimate the containment pressure prior to a postulated LOCA and (2) are consistent with the guidance in RG 1.1 and RG 1.82. Based on these findings, the NRC staff concludes that there is reasonable assurance that the ECCS and containment heat removal pumps will have adequate NPSH margin following a postulated LOCA. As such, the NRC staff also concludes that GDC 35 and GDC 38 will continue to be met since the ECCS and containment spray pumps will be capable of performing their design functions.
This NRC staff evaluation did not make a finding as to the acceptability of the calculation methods used to determine pre-LOCA containment pressure or post-LOCA sump temperature.
Only the criterion for determining NPSHa was evaluated.
3.2 Revision to Static Head Assumed in NPSHa Calculation In addition to the proposed change in crediting pre-accident containment pressure discussed in SE Section 3.1, the licensee also proposes to delete the following discussion from UFSAR Appendix 3A regarding how the static head term in the NPSHa calculation is determined:
Added conservatism is introduced into the NPSH calculation by calculating the static head from the elevation of the top of the sump instead of the available water level above the sump.
In place of the deleted text, the licensee proposes to add the following to UFSAR Appendix 3A:
The static head term in the NPSHa is calculated using the minimum available water inventory in the containment for recirculation operation. This minimum water inventory ensures that the containment sump strainers are fully submerged prior to initiation of the recirculation phase.
PSEGs application dated August 15, 2007, explained that since 1997 (and contrary to the current description in the UFSAR), the water level for the static head term has been determined as a minimum calculated value rather than the level at the top of the sump. Specifically, the licensees application stated that:
The current Salem RHR pump recirculation operation NPSHa calculation, originally issued in 1997, uses the minimum sump pool water level required for recirculation operation for determination of the static head available for NPSHa concerns. This water
level was determined to be at plant elevation 80'-10", which is approximately 2'-1" above the top of the ECCS containment sump curb. The ECCS containment sump water level is monitored with float type level instrumentation and the level is displayed in the control room. Salem Emergency Operating Procedures (EOP's) require that operations personnel verify that the ECCS containment sump level is adequate, i.e., it has reached this minimum level required (accounting for instrument uncertainty) to provide adequate NPSHa for operation of the RHR pumps in recirculation mode, prior to initiating the switchover of the ECCS system from injection to recirculation operation. Therefore, the added conservatism is not required and the current calculation deviation from the UFSAR does not impact the plant safety.
The new ECCS containment sump strainers, which were installed to meet GSI [Generic Safety Issue]-191 concerns, were designed and installed to ensure that with this minimum water level in the containment the new strainers would have a minimum of 3" of water cover. As a result of the previously existing configuration, and the design of the new ECCS containment sump strainers, the removal of this statement from the Salem UFSAR is acceptable.
Since the method of determining the static head term in the NPSHa calculation is based on a minimum available water inventory this method is conservative (i.e., smaller hstatic term results in smaller NPSHa). Therefore, the NRC staff finds that this change is acceptable.
The NRC staff did not review the licensee=s calculation of water level in containment as part of this amendment review.
Note, as discussed above, the licensees methodology for determining the static head term changed in 1997 (i.e., to use a minimum calculated value rather than the level at the top of the sump). However, it does not appear that a license amendment request for the change was submitted until the current application dated August 15, 2007. As such, the change was not reflected in the UFSAR consistent with the requirements in 10 CFR 50.71(e). It appears that the change in methodology was made as a result of GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal Pumps, dated October 7, 1997 (ADAMS Accession No. ML031110062). This issue may be assessed further by NRC Region I staff.
3.3 Technical Evaluation Conclusion Based on the discussion in SE Sections 3.1 and 3.2, the NRC staff concludes that the proposed amendment is acceptable.
Note, this SE does not address the adequacy of the licensees corrective actions for GL 2004-02. The NRC staff will review those corrective actions in its review of the licensees response to the GL.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New Jersey State official was notified of the proposed issuance of the amendments. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (72 FR 51866). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: R. Lobel R. Ennis Date: November 15, 2007