MONTHYEARIR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 L-24-025, Submittal of the Updated Final Safety Analysis Report, Revision 352024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 the Associated Independent Spent Fuel Storage Installations IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000346/20234012023-09-13013 September 2023 Security Baseline Inspection Report 05000346/2023401 (Public) 2024-09-06
[Table view] Category:Safety Evaluation
MONTHYEARML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML22269A3582022-11-15015 November 2022 Issuance of Amendment No. 305 Revising the Emergency Plan ML22277A6012022-10-14014 October 2022 Issuance of Amendment No. 304 Revising the Design Basis for the Shield Building Containment Structure ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22147A1492022-06-0202 June 2022 Relief Request RP-3 Regarding Fuel Oil Transfer Pump Testing ML22136A1092022-05-24024 May 2022 Proposed Alternative Request RP-2 Regarding the Inservice Testing of Certain Pumps ML22118B0382022-05-0505 May 2022 Proposed Alternative Request RP-4 Regarding the Inservice Testing of High-Pressure Injection Pumps ML22096A3162022-04-12012 April 2022 Proposed Alternative Request RP-1 Regarding Digital Instrumentation for Inservice Testing ML22082A2532022-03-29029 March 2022 Correction Letter - Issuance of Authorization of Proposed Alternative to Use ASME OM Code Case OMN-27 ML22012A2972022-01-21021 January 2022 Proposed Alternative to Use ASME OM Code Case OMN-27 ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML20280A8272020-11-0303 November 2020 Issuance of Amendment No. 301 to Relocate Specific Surveillance Frequencies to a Licensee-Controlled Program ML20279A4402020-10-0808 October 2020 Energy Harbor Fleet-Beaver Valley Power Station; Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant - Request to Use a Provision of a Later Edition of the ASME Engineers Boiler and Pressure Vessel Code, Section XI ML20213C7262020-08-24024 August 2020 Issuance of Amendment No. 300 to Revise the Containment Leakage Rate Testing Program ML19305B1312019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Enclosure 6, Non-Proprietary Safety Evaluation, Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19100A3062019-06-21021 June 2019 Issuance of Amendment No. 298 to Adopt National Fire Protection Association Standard 805 ML19028A0302019-04-11011 April 2019 FENOC - Beaver Valley Power Station, Unit 1 & 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Approval of Certified Fuel Handler Training and Retraining Program ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) ML17270A1122017-10-19019 October 2017 Issuance of Amendment Revising Technical Specification Requirements for Ultrasonic Flow Meter Outage Time (CAC No. MF9080; EPID L-2017-LLA-0167) ML17256B1902017-10-12012 October 2017 Time-Limited Aging Analysis for the Reactor Vessel Internals Loss of Ductility at 60 Years ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML17017A3402017-01-31031 January 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-051 and EA-12-049 ML16328A1252017-01-23023 January 2017 Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) (TAC No. MF7780 - MF7783) ML16342C9462017-01-12012 January 2017 Issuance of Amendment Revising Emergency Action Level Scheme ML16298A3492017-01-11011 January 2017 Issuance of Amendment Revising Technical Specification Requirements for the Radioactive Effluent Controls Program ML16040A0842016-06-0707 June 2016 FENOC, Beaver Valley Power Station, Unit Nos. 1 and 2; and Davis-Besse Nuclear Power Station, Unit No. 1 - Issuance of Amendments Revision to Technical Specification 5.3.1, Unit Staff Qualifications ML16083A4812016-04-27027 April 2016 Issuance of Amendment Revising Emergency Diesel Generator Minimum Voltage and Frequency Acceptance Criteria ML15302A0752016-03-0808 March 2016 Issuance of Amendment Revising the Completion Date for Milestone 8 of the Cyber Security Plan ML15251A0462015-10-20020 October 2015 Issuance of Amendment Revising Containment Spray Nozzle Surveillance Requirement ML15211A1612015-10-16016 October 2015 FENOC-Beaver Valley Power Station, Unit No. 1; Beaver Valley Power Station ISFSI, Davis-Besse Nuclear Power Station ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI Annual Financial Test for a Parent Company Guarantee ML15239B2932015-10-0909 October 2015 Issuance of Amendment Related to Containment Leakage Rate Testing Program ML15182A1912015-07-16016 July 2015 Annual Financial Test for a Parent Company Guarantee Given by Firstenergy Solutions Corporation and Firstenergy Corporation ML14142A2922014-09-12012 September 2014 BVPS, Unit No. 1, BVPS (ISFSI) Davis-Besse Nuclear Power Station ISFSI, Perry Nuclear Power Plant, Unit 1, and Perry Nuclear Power Plant ISFSI - Annual Financial Test for Firstenergy Nuclear Operating Company Parent Company Guarantee (MF374 ML14030A5742014-03-31031 March 2014 Safety Evaluation Concerning Comprehensive Pump Testing Relief Request (TAC No. MF0756) (L-13-067) ML14023A7662014-03-31031 March 2014 Issuance of Amendment Related to Steam Generator Inventory Change (TAC No. MF0536)(L-13-040) ML14030A5922014-02-10010 February 2014 Safety Evaluation for Relief Requests RR-A1 and RR-B1 ML14002A4442014-02-0505 February 2014 Safety Evaluation for Relief Request RP-3 (TAC No. MF0757)(L-13-076) ML14003A2662014-01-27027 January 2014 Davis-besse Nuclear Power Station, Unit 1, Safety Evaluation for Relief Requests RP-1 and RP-1A ML13210A4672013-08-0101 August 2013 Safety Evaluation for Relief Requests RP-6 and RV-1 ML13121A4042013-05-0808 May 2013 Safety Evaluation in Support of Proposed Alternative Regarding Post-Repair Pressure Testing Requirements ML12221A4132012-10-0202 October 2012 Issuance of Amendments Change of the Name of a Owner Licensee to Firstenergy Nuclear Generation, LLC ML12242A4992012-09-11011 September 2012 Safety Evaluation in Support of 10 CFR 50.55a Requests RP-2 and RP-4 Regarding Inservice Pump Testing ML1210706862012-05-11011 May 2012 Safety Evaluation Regarding the Reactor Coolant System Pressure and Temperature Limits Report, Revision 1 ML1208604472012-04-18018 April 2012 Issuance of Amendment Modification of the Special Visual Inspection Requirement of TS 5.5.8 Steam Generator Program ML1207504812012-04-0909 April 2012 Safety Evaluation in Support of 10 CFR 50.55a Request RR-A35, Proposed Alternative to System Leakage Test Requirements ML1124305562011-09-22022 September 2011 Request for Threshold Determination Under 10 CFR 50.80 - Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1 ML1118903222011-07-11011 July 2011 Review of the Steam Generator Tube Inspections Performed During Refueling Outage No. 16 in 2010 2024-01-17
[Table view] |
Text
v\..~p.1\ UNITED STATES
~.;:, NUCLEAR REGULATORY COMMISSION
..J:
0(
WASHINGTON, D.C. 20555-0001
~ July 11, 2011
~ ~
~ .f'i
~? ~o
Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 - REVIEW OF THE STEAM GENERATOR TUBE INSPECTIONS PERFORMED DURING REFUELING OUTAGE NO. 161N 2010 (TAC NO. ME5261)
Dear Mr. Allen:
By letters to the U.S. Nuclear Regulatory Commission (NRC) dated June 18, 2010, December 17, 2010, and May 27, 2011 (Agencywide Document Access Management System (ADAMS) Accession Nos. ML101740055, ML103610313, and ML111510643, respectively).
FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2010 steam generator (SG) tube inspections at the Davis-Besse Nuclear Power Station, Unit No.1 (DBPNS) during refueling outage No. 16 (RFO 16).
In addition to the enclosed report, the NRC staff summarized a conference call regarding the 2010 SG tube inspections at DBNPS in a letter dated April 12, 2010 (ADAMS Accession No. ML100970031).
The NRC staff has completed its review of the information summarizing the results of the 2010 SG tube inspections at DBPNS during RFO 16 and concludes that the licensee provided the information required by the DBNPS Technical Specifications. No additional follow up is required at this time.
If you have any questions, contact me at (301) 415-3867 or michael.mahoney@nrc.gov.
w;J/J Michael Mahoney, Proj Plant Licensing Brancli 111-2 anager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
As stated cc w/encl: Distribution via Listserv
STAFF EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE STEAM GENERATOR TUBE INSPECTIONS PERFORMED DURING THE 2010 REFUELING OUTAGE NO. 16 DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 DOCKET NUMBER 50-346 By letters to the U.S. Nuclear Regulatory Commission (NRC) dated June 18, 2010, December 17, 2010, and May 27, 2011 (Agencywide Document Access Management System (ADAMS) Accession Nos. ML101740055, ML103610313, and ML111510643, respectively),
FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2010 steam generator (SG) tube inspections at Davis-Besse Nuclear Power Station, Unit No.1 (DBNPS) during refueling outage No. 16 (RFO 16). In addition to this report, the NRC staff summarized a conference call about the 2010 SG tube inspections at DBNPS in a letter dated April 12, 2010 (ADAMS Accession No. ML100970031).
There are two Babcock and Wilcox once-through SGs (OTSG), designated 1-B and 2-A, at DBNPS. Each SG has approximately 15,500 Alloy 600 tubes in the mill-annealed condition. The tubes have a nominal outside diameter of 0.625 inches and a nominal wall-thickness of 0.037 inches. Both OTSG 1-B and 2-A contain tubes with sleeves and tubes with shop re-rolls.
The licensee provided the scope, extent, methods, and results of the SG tube inspections in the documents referenced above. In addition, the licensee described corrective actions, such as tube plugging, taken in response to the inspection findings.
After reviewing the information provided by the licensee, the NRC staff has the following comments/observations:
- 1. The number and severity of crack-like indications found increased slightly from 2008 to 2010. All tubes in both SGs met the SG performance criteria.
- 2. Based on bobbin coil examination data, the licensee reported that the auxiliary feedwater (AFW) headers had not moved during operating cycle 16. Visual examinations of the internal AFW header in SG 1-B identified no recordable indications.
ENCLOSURE
-2
- 3. The NRC staff review did not identify any issues with the best-estimate, primary-to-secondary leakage expected for a large-break, loss-of-coolant accident (LBLOCA). This best estimate determination was performed to satisfy a license condition to permit the use of a re-roll repair process for the DBNPS SGs. The NRC conducted an audit of the approach for ensuring SG tube integrity following a LBLOCA in 2010. The audit results are summarized in a letter dated June 17,2011 (ADAMS Accession No. ML111400365).
Based on a review of the information provided by the licensee, the NRC staff concludes that the licensee provided the information required by DBPNS's technical specifications. In general, the SG tube inspections at DBNPS appear to be consistent with the objective of detecting potential tube degradation, and the inspection results appear to be consistent with industry operating experience at similarly-designed and operated units. The NRC staff's review did not reveal any issues warranting follow-up action by the NRC.
ENCLOSURE
July 11, 2011 Mr. Barry S. Allen Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1- REVIEW OF THE STEAM GENERATOR TUBE INSPECTIONS PERFORMED DURING REFUELING OUTAGE NO. 161N 2010 (TAC NO. ME5261)
Dear Mr. Allen:
By letters to the U.S. Nuclear Regulatory Commission (NRC) dated June 18,2010, December 17, 2010, and May 27, 2011 (Agencywide Document Access Management System (ADAMS) Accession Nos. ML101740055, ML103610313, and ML111510643, respectively),
FirstEnergy Nuclear Operating Company (the licensee) submitted information summarizing the results of the 2010 steam generator (SG) tube inspections at the Davis-Besse Nuclear Power Station, Unit No.1 (DBPNS) during refueling outage No. 16 (RFO 16).
In addition to the enclosed report, the NRC staff summarized a conference call regarding the 2010 SG tube inspections at DBNPS in a letter dated April 12, 2010 (ADAMS Accession No. ML100970031).
The NRC staff has completed its review of the information summarizing the results of the 2010 SG tube inspections at DBPNS during RFO 16 and concludes that the licensee provided the information required by the DBNPS Technical Specifications. No additional follow up is required at this time.
If you have any questions, contact me at (301) 415-3867 or michael.mahoney@nrc.gov.
Sincerely, IRA!
Michael Mahoney, Project Manager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL3-2 RlF RidsNrrDorlLpl3-2 Resource RTaylor. NRR RidsNrrPMDavis-Besse Resource RidsNrrLASRohrer Resource RidsNrrDciCsgb Resource RidsAcrsAcnw_MailCTR Resource RidsOgcRp Resource RidsRgn3MailCenter Resource RidsNrrDorlDpr Resource KKarwoski. NRR AJohnson. NRR ADAMS Accession No ML111890322 "Memo Dated NRR-088 OFFICE LPL3-21PM LPL3-2/LA DCI/CSGB LPL3-2/BC NAME MMahoney SRohrer RTaylor JZimmerman DATE 7/11/11 7/11/11 6/2812011" 7111111 OFFICIAL RECORD COpy