May 20, 2007 LICENSEE: Wolf Creek Nuclear Operating Corporation FACILITY: Wolf Creek Generating Station, Unit 1

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MAY 2, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND WOLF CREEK NUCLEAR OPERATING CORPORATION, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE WOLF CREEK GENERATING STATION, UNIT 1, LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Wolf Creek Nuclear Operating Corporation held a telephone conference call on May 2, 2007, to discuss and clarify the staffs draft requests for additional information (D-RAIs) concerning the Wolf Creek Generating Station, Unit 1, license renewal application. The telephone conference call was useful in clarifying the intent of the staffs D-RAIs. provides a listing of the participants and Enclosure 2 contains a listing of the D-RAIs discussed with the applicant, including a brief description on the status of the items.

The applicant had an opportunity to comment on this summary.

/RA/

Verónica M. Rodríguez, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-482

Enclosures:

1. List of Participants
2. List of Draft Requests for Additional Information cc w/encls: See next page

ML071240286 OFFICE PM:RLRB:DLR LA:DLR BC:RLRB:DLR NAME VRodríguez YEdmonds RAuluck DATE 05/16/07 05/16/07 05/20/07 TELEPHONE CONFERENCE CALL WOLF CREEK GENERATING STATION, UNIT 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS MAY 2, 2007 PARTICIPANTS AFFILIATIONS Verónica M. Rodríguez U.S. Nuclear Regulatory Commission (NRC)

Samuel Miranda NRC Lorrie Bell Wolf Creek Nuclear Operating Corporation (WCNOC)

Bill Selbe WCNOC Eric Blocher Strategic Teaming and Resource Sharing Alliance (STARS)

Paul Crawley STARS Richard Geiger STARS Gordon Chen STARS Enclosure 1

DRAFT REQUESTS FOR ADDITIONAL INFORMATION WOLF CREEK GENERATING STATION, UNIT 1 LICENSE RENEWAL APPLICATION MAY 2, 2007 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Wolf Creek Nuclear Operating Corporation (WCNOC) held a telephone conference call on May 2, 2007, to discuss and clarify the following draft requests for additional information (D-RAIs) concerning the Wolf Creek Generating Station (WCGS), Unit 1, license renewal application (LRA).

Reactor Vessel and Internals D-RAI 2.3.1.1-1 LRA Table 2.3.1-1 indicates that the reactor vessel head vent pipe is within the scope of license renewal and that it has a pressure boundary intended function. The staff requests that the applicant clarify which portions of the reactor head vent system, shown in Updated Safety Analysis Report (USAR) Figure 18.2-1, are within the scope of license renewal. The staff requests that the applicant identify which license renewal criteria these components meet and their intended functions.

Discussion: The applicant indicated that the question is clear. The applicant clarified that although not specifically indicated in LRA Section 2.3.1.1, both, D-RAIs 2.3.1.1-1 and 2.3.1.1-2, reference the same license renewal drawing LR-WCGS-BB-M-12BB04. Based on the discussion with the applicant, the staff agreed to combine these D-RAIs and revise this question as follows. The revised question will be sent as a formal RAI.

USAR Figures 18.2-1 and 18.2-13 shows the reactor head vent system and the reactor vessel level instrumentation system, respectively. The staff requests that the applicant indicate which portions of the reactor head vent system are within the scope of license renewal. In addition, the applicant should clarify if the spare head penetration of the level instrumentation system is within the scope of license renewal. The staff requests that the applicant identify which license renewal criteria these components meet and their intended functions.

D-RAI 2.3.1.1-2 USAR Figure 18.2-13 shows the reactor vessel level instrumentation system. The staff requests that the applicant clarify if the spare head penetration of this system is within the scope of license renewal. If the penetration is not within the scope of license renewal, the staff requests that the applicant justify its response.

Discussion: This question has been combined with D-RAI 2.3.1.1-1. Therefore, this question is withdrawn and will not be sent as a formal RAI.

Enclosure 2

Reactor Makeup Water System D-RAI 2.3.2.6-1 LRA Section 2.3.2.6-1 states that the reactor makeup water system provides containment isolation for penetration P-25. The staff requests that the applicant specifically identify the components (and their functions) affected by the containment isolation. In addition, the staff requests that the applicant clarify if these components are within the scope of license renewal.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

High Pressure Coolant Injection System D-RAI 2.3.2.10-1 License renewal drawing LR-WCGS-EM-M-12EM01 shows the refueling water storage tank within the scope of license renewal. However, the piping and components EBN01A, EBN01B and EBN01C, which are entirely enclosed by this tank, are not. The staff requests that the applicant justify why these components are not within the scope of license renewal in accordance with Title 10 Code of Federal Regulations Part 54.4(a)(2) (10 CFR 54.4(a)(2).

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Chemical and Volume Control System D-RAI 2.3.3.7-1 License renewal drawing LR-WCGS-BG-M-12BG03 shows the volume control tank (TBG05) within the scope of license renewal. The staff requests that the applicant explain why the piping and spray nozzles are not included within the scope of license renewal in accordance with 10 CFR 54.4(a)(2).

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 2.3.3.7-2 LRA Table 2.3.3-7 does not lists component type of pumps and tanks supports. The staff requests that the applicant clarify if the pumps and tanks supports are within the scope of license renewal. If the supports are not within the scope of license renewal the staff requests that the applicant justify its response; if they are, the applicant should indicate where these components are discussed.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

D-RAI 2.3.3.7-3 License renewal drawing LR-WCGS-BG-M-12BG04 shows the spent resin storage tanks outside the scope of license renewal; however, all their connecting lines were included within the scope. The staff requests that the applicant explain and justify this inconsistency.

Discussion: The applicant indicated that the question is clear. This D-RAI will be sent as a formal RAI.

Letter to Wolf Creek Nuclear Operating Corporation, from V. Rodriguez, dated May 20, 2007

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON MAY 2, 2007, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND WOLF CREEK NUCLEAR OPERATING CORPORATION, CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE WOLF CREEK GENERATING STATION, UNIT 1, LICENSE RENEWAL APPLICATION DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RWeisman SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDci RidsNrrDra RidsNrrDe RidsNrrDeEemb RidsNrrDeEeeb RidsNrrDss RidsOgcMailCenter RidsNrrAdes VRodriguez CJacobs JDonohew GPick, RIV SCochrum, RIV CLong, RIV SMiranda

Wolf Creek Generating Station cc:

Jay Silberg, Esq. Supervisor Licensing Pillsbury Winthrop Shaw Pittman, LLP Wolf Creek Nuclear Operating Corporation 2300 N Street, NW P.O. Box 411 Washington, DC 20037 Burlington, KS 66839 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Resident Inspectors Office/Callaway Plant 611 Ryan Plaza Drive, Suite 400 8201 NRC Road Arlington, TX 76011-7005 Steedman, MO 65077-1032 Senior Resident Inspector Kevin J. Moles, Manager U.S. Nuclear Regulatory Commission Regulatory Affairs P.O. Box 311 Wolf Creek Nuclear Operating Corporation Burlington, KS 66839 P.O. Box 411 Burlington, KS 66839 Chief Engineer, Utilities Division Kansas Corporation Commission Lorrie I. Bell, Project Manager 1500 SW Arrowhead Road Wolf Creek Nuclear Operating Corporation Topeka, KS 66604-4027 P.O. Box 411 Burlington, KS 66839 Office of the Governor State of Kansas Mr. James Ross Topeka, KS 66612 Nuclear Energy Institute 1776 I Street, NW, Suite 400 Attorney General Washington, DC 20006-3708 120 S.W. 10th Avenue, 2nd Floor Topeka, KS 66612-1597 County Clerk Coffey County Courthouse 110 South 6th Street Burlington, KS 66839 Thomas A. Conley, Section Chief Radiation and Asbestos Control Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366 Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839