|
---|
Category:Letter
MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01
[Table view] Category:Technical Specification
MONTHYEARRA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-04-0404 April 2023 License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0005, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis2021-09-0202 September 2021 Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis ML20237F4352020-09-0404 September 2020 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations RA-19-0039, License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes2020-04-13013 April 2020 License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2020-02-0606 February 2020 Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0282, Technical Specification Bases Changes2019-06-26026 June 2019 Technical Specification Bases Changes RA-18-0281, Technical Specification Bases Changes2019-06-25025 June 2019 Technical Specification Bases Changes RA-18-0023, License Amendment Request (2017-05) to Add a Surveillance Requirement to Technical Specification 3.8.1, AC Sources2018-05-17017 May 2018 License Amendment Request (2017-05) to Add a Surveillance Requirement to Technical Specification 3.8.1, AC Sources ONS-2018-013, Technical Specification Bases Changes2018-02-22022 February 2018 Technical Specification Bases Changes RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ONS-2017-050, Technical Specification Bases Change 2017-042017-07-21021 July 2017 Technical Specification Bases Change 2017-04 ONS-2017-043, Technical Specification Bases Change 2017-012017-07-20020 July 2017 Technical Specification Bases Change 2017-01 ONS-2017-052, Technical Specification Bases Change 2017-032017-07-20020 July 2017 Technical Specification Bases Change 2017-03 ML17095A5302017-03-30030 March 2017 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process; License Amendment Request No. 2015-03 ONS-2017-019, Technical Specification Bases Change 2015-092017-02-23023 February 2017 Technical Specification Bases Change 2015-09 ONS-2016-082, Technical Specification Bases Change for TS Bases 3.4.16, Steam Generator Tube Integrity2016-09-0808 September 2016 Technical Specification Bases Change for TS Bases 3.4.16, Steam Generator Tube Integrity ONS-2016-071, Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change2016-08-0404 August 2016 Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change ONS-2016-059, Technical Specification Bases Changes2016-07-11011 July 2016 Technical Specification Bases Changes RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ONS-2016-049, Technical Specification Bases Change2016-06-0606 June 2016 Technical Specification Bases Change ONS-2016-029, Technical Specification (TS) Bases Change2016-03-29029 March 2016 Technical Specification (TS) Bases Change ONS-2016-009, Technical Specification (TS) Bases Change2016-02-0909 February 2016 Technical Specification (TS) Bases Change ML16028A1912016-01-20020 January 2016 Technical Specification Base Change ONS-2015-106, Technical Specification (TS) Bases Change2015-10-26026 October 2015 Technical Specification (TS) Bases Change ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 ONS-2015-069, Technical Specification (TS) Bases Change2015-06-23023 June 2015 Technical Specification (TS) Bases Change ONS-2015-047, License Amendment Request (LAR) to Add High Flux Trip for 3 Reactor Coolant Pump Operation, License Amendment Request No. 2014-052015-05-19019 May 2015 License Amendment Request (LAR) to Add High Flux Trip for 3 Reactor Coolant Pump Operation, License Amendment Request No. 2014-05 ONS-2015-057, Technical Specification (TS) Bases Changes2015-05-18018 May 2015 Technical Specification (TS) Bases Changes ONS-2015-033, Technical Specification (TS) Bases Change2015-03-18018 March 2015 Technical Specification (TS) Bases Change ONS-2015-006, Technical Specification (TS) Bases Change2015-01-29029 January 2015 Technical Specification (TS) Bases Change ONS-2014-145, Submittal of Technical Specification Bases Change2014-11-20020 November 2014 Submittal of Technical Specification Bases Change ONS-2014-103, Technical Specification (TS) Bases Change2014-07-23023 July 2014 Technical Specification (TS) Bases Change RA-14-0001, License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area2014-07-21021 July 2014 License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area ONS-2014-093, Technical Specification (TS) Bases Change2014-07-10010 July 2014 Technical Specification (TS) Bases Change ONS-2014-079, Submittal of Technical Specification (TS) Bases Change2014-06-0303 June 2014 Submittal of Technical Specification (TS) Bases Change ONS-2014-064, Technical Specification (TS) Bases Change2014-05-12012 May 2014 Technical Specification (TS) Bases Change ONS-2014-031, Technical Specification (TS) Bases Change2014-03-0404 March 2014 Technical Specification (TS) Bases Change ONS-2014-012, Submittal of Technical Specification Bases Change2014-02-0303 February 2014 Submittal of Technical Specification Bases Change ML13357A6742014-01-0808 January 2014 Issuance of Amendments Regarding the Temporary Technical Specification Change to Extend the Completion Time for an Inoperable Keowee Hydro Unit (TAC ME9021, ME9022, and ME9023) ONS-2013-006, Technical Specification Bases Change2013-11-13013 November 2013 Technical Specification Bases Change ML13234A3362013-08-0808 August 2013 Technical Specification Bases Change ML13211A2832013-07-24024 July 2013 Technical Specification Bases (Tsb) Change 2023-04-04
[Table view] Category:Bases Change
MONTHYEARRA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0005, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis2021-09-0202 September 2021 Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis RA-19-0039, License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes2020-04-13013 April 2020 License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes RA-18-0282, Technical Specification Bases Changes2019-06-26026 June 2019 Technical Specification Bases Changes RA-18-0281, Technical Specification Bases Changes2019-06-25025 June 2019 Technical Specification Bases Changes RA-18-0023, License Amendment Request (2017-05) to Add a Surveillance Requirement to Technical Specification 3.8.1, AC Sources2018-05-17017 May 2018 License Amendment Request (2017-05) to Add a Surveillance Requirement to Technical Specification 3.8.1, AC Sources ONS-2018-013, Technical Specification Bases Changes2018-02-22022 February 2018 Technical Specification Bases Changes ONS-2017-050, Technical Specification Bases Change 2017-042017-07-21021 July 2017 Technical Specification Bases Change 2017-04 ONS-2017-052, Technical Specification Bases Change 2017-032017-07-20020 July 2017 Technical Specification Bases Change 2017-03 ONS-2017-043, Technical Specification Bases Change 2017-012017-07-20020 July 2017 Technical Specification Bases Change 2017-01 ML17095A5302017-03-30030 March 2017 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process; License Amendment Request No. 2015-03 ONS-2017-019, Technical Specification Bases Change 2015-092017-02-23023 February 2017 Technical Specification Bases Change 2015-09 ONS-2016-082, Technical Specification Bases Change for TS Bases 3.4.16, Steam Generator Tube Integrity2016-09-0808 September 2016 Technical Specification Bases Change for TS Bases 3.4.16, Steam Generator Tube Integrity ONS-2016-071, Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change2016-08-0404 August 2016 Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change ONS-2016-059, Technical Specification Bases Changes2016-07-11011 July 2016 Technical Specification Bases Changes RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ONS-2016-049, Technical Specification Bases Change2016-06-0606 June 2016 Technical Specification Bases Change ONS-2016-029, Technical Specification (TS) Bases Change2016-03-29029 March 2016 Technical Specification (TS) Bases Change ONS-2016-009, Technical Specification (TS) Bases Change2016-02-0909 February 2016 Technical Specification (TS) Bases Change ML16028A1912016-01-20020 January 2016 Technical Specification Base Change ONS-2015-106, Technical Specification (TS) Bases Change2015-10-26026 October 2015 Technical Specification (TS) Bases Change ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 ONS-2015-069, Technical Specification (TS) Bases Change2015-06-23023 June 2015 Technical Specification (TS) Bases Change ONS-2015-047, License Amendment Request (LAR) to Add High Flux Trip for 3 Reactor Coolant Pump Operation, License Amendment Request No. 2014-052015-05-19019 May 2015 License Amendment Request (LAR) to Add High Flux Trip for 3 Reactor Coolant Pump Operation, License Amendment Request No. 2014-05 ONS-2015-057, Technical Specification (TS) Bases Changes2015-05-18018 May 2015 Technical Specification (TS) Bases Changes ONS-2015-033, Technical Specification (TS) Bases Change2015-03-18018 March 2015 Technical Specification (TS) Bases Change ONS-2015-006, Technical Specification (TS) Bases Change2015-01-29029 January 2015 Technical Specification (TS) Bases Change ONS-2014-145, Submittal of Technical Specification Bases Change2014-11-20020 November 2014 Submittal of Technical Specification Bases Change ONS-2014-103, Technical Specification (TS) Bases Change2014-07-23023 July 2014 Technical Specification (TS) Bases Change RA-14-0001, License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area2014-07-21021 July 2014 License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area ONS-2014-093, Technical Specification (TS) Bases Change2014-07-10010 July 2014 Technical Specification (TS) Bases Change ONS-2014-079, Submittal of Technical Specification (TS) Bases Change2014-06-0303 June 2014 Submittal of Technical Specification (TS) Bases Change ONS-2014-064, Technical Specification (TS) Bases Change2014-05-12012 May 2014 Technical Specification (TS) Bases Change ONS-2014-031, Technical Specification (TS) Bases Change2014-03-0404 March 2014 Technical Specification (TS) Bases Change ONS-2014-012, Submittal of Technical Specification Bases Change2014-02-0303 February 2014 Submittal of Technical Specification Bases Change ONS-2013-006, Technical Specification Bases Change2013-11-13013 November 2013 Technical Specification Bases Change ML13234A3362013-08-0808 August 2013 Technical Specification Bases Change ML13211A2832013-07-24024 July 2013 Technical Specification Bases (Tsb) Change ML12333A3152012-11-27027 November 2012 Technical Specification Bases (Tsb) Changes ML12319A4792012-11-12012 November 2012 Technical Specification Bases (Tsb) Changes ML12307A2192012-10-30030 October 2012 License Amendment Request for Approval to Operate a Reverse Osmosis System to Remove Silica from the Borated Water Storage Tanks and Spent Fuel Pools During Unit Operation and Associated Proposed Tech Specs and Bases.. ML12310A3822012-10-29029 October 2012 Technical Specification Bases (Tsb) Changes ML12243A4012012-08-29029 August 2012 Technical Specification Bases (Tsb) Change ML12221A1822012-08-0707 August 2012 Technical Specification Bases (Tsb) Changes 2023-02-16
[Table view] |
Text
BRUCE H HAMILTON Duke Vice President Oconee Nuclear Station Duke Energy Corporation ON01 VP / 7800 Rochester Highway Seneca, SC 29672 April 11, 2007 864 885 3487 864 885 4208 fax U. S. Nuclear Regulatory Commission Washington, D. C. 20555 bhhamilton@duke-energy.corn Attention: Document Control Desk
Subject:
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Oconee Nuclear Station Docket Numbers 50-269, 270, and 287 Technical Specification Bases (TSB) Change On March 19, 2007 Station Management approved revisions to TSB 3.7.4 to include discussion of credit for Atmospheric Dump Valve (ADV)flow path for Steam Generator Tube Rupture (SGTR) in addition to Small Break Loss of Coolant Accident. The ADVs for SGTR were addressed by TS Amendment 309, 309,& 309. The discussion of credit for SGTR was inadvertently not included in TS Amendment 314, 314, & 314.
Attachment 1 contains the new TSB pages, Attachment 2 contains the marked up version of the TSB pages.
If any additional information is needed, please contact Reene Gambrell at 864-885-3364.
Very truly yours, B. H. Hamilton, Vice President Oconee Nuclear Site www. duke-energy. com Moo
U. S. Nuclear Regulatory Commission April 11, 2006 Page 2 CC: Mr. L. N. Olshan Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission - Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Dan Rich Senior Resident Inspector Oconee Nuclear Station Mr. Henry Porter Director Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street Columbia, SC 29201 bcc: w/o attachments L. F. Vaughn Ken Ashe - MNS R. D. Hart - CNS R. L. Gill - NRI&IA w/attachments Document Management ELL NSRB MR Coordinator (Ron Harris)
Licensing Working Group
Attachment #1 Proposed Bases revision Remove Page Insert. Page B 3.7.4-1 B 3.7.4-1 B 3.7.4-2 B 3.7.4-2 B 3.7.4-3 B 3.7.4-3 B 3.7.4-4 B 3.7.4-4
ADV Flow Paths B 3.7.4 B 3.7 PLANT SYSTEMS B 3.7.4 Atmospheric Dump Valve (ADV) Flow Paths BASES BACKGROUND The ADV flow paths provide a method for cooling the unit to decay heat removal (DHR) entry conditions, should the preferred heat sink via the Turbine Bypass System to the condenser not be available, as discussed in the UFSAR (Ref. 2). This is done in conjunction with the secondary cooling water from the Emergency Feedwater (EFW) System.
The steam generator tube rupture (SGTR) analysis (Ref. 3) credits operator action to depressurize the steam generators by opening each of the ADV flow paths.
In addition, the ADV flow path for each steam generator is credited as a compensatory measure in Technical Specification (TS) 3.5.2, "High Pressure Injection (HPI)." In certain HPI configurations, the ADV flow path for one steam generator is credited to depressurize the steam generator and enhance primary-to-secondary heat transfer during certain small break loss of coolant accidents (LOCAs).
For each steam generator, the ADV flow path is comprised of the atmospheric dump block valve bypass (1" bypass), the atmospheric vent valve (a 12" block valve), the atmospheric dump control valve (i.e., throttle valve), and the atmospheric vent block valve (i.e., isolation valve). The throttle valve and the isolation valve are in parallel and are located downstream of the atmospheric vent valve.
The atmospheric vent valve should be opened prior to opening the throttle valve or isolation valve. This is accomplished by first opening the atmospheric dump block valve bypass.
This equalizes the differential pressure across the atmospheric vent valve.
Once the atmospheric vent valve is opened, the cool down rate is controlled using the throttle valve. If additional relief capacity is needed, the isolation valve can be opened. The capacity of the throttle or isolation valve exceeds decay heat loads and is sufficient to cool down the plant.
OCONEE UNITS 1, 2, & 3 B3,7.4-1 BASES REVISION DATED 04/02/2007 1
ADV Flow Paths B 3.7.4 BASES APPLICABLE The SGTR analysis credits operator action to depressurize the steam SAFETY ANALYSIS generators by opening both ADV flow paths (i.e., the ADV flow path for each steam generator) within 40 minutes of identifying the ruptured steam generator. Within this 40-minute time period, the operators are only required to open the bypass valve, the block valve, and the throttle valve.
However, later in the event, the analysis also assumes that the operators will open the isolation valves in each ADV flow path.
Operator action to depressurize a steam generator via its ADV flow path is credited in the analysis of certain small break LOCAs with THERMAL POWER < 75% RTP and the plant operated with a degraded HPI System.
This event credits operator action to open one ADV flow path within 25 minutes of an Engineered Safeguards Protective System (ESPS) actuation.
If enhanced steam generator cooling is not credited in the small break LOCA analysis, two HPI trains are required to mitigate specific small break LOCAs. However, if equipment not qualified as QA-1 (i.e., an ADV flow path for a steam generator) is credited for enhanced steam generator cooling, the safety analyses have determined that the capacity of one HPI train is sufficient to mitigate a small break LOCA on the discharge of the reactor coolant pumps if THERMAL POWER is*< 75% RTP.
The analysis for degraded HPI credits an ADV flow path for one steam generator as a compensatory measure in the event an HPI train is inoperable and THERMAL POWER is < 75% RTP. During this situation, the ADV flow path for one steam generator is credited during certain small break LOCAs to depressurize the steam generator and enhance primary-to-secondary heat transfer. This is done in conjunction with the EFW System providing cooling water to the steam generator. The ADV flow path is comprised of manual valves. Operator action is credited for establishing the ADV flow path within 25 minutes of an ESPS signal.
Additionally, the ADV flow path for each steam generator is credited as a compensatory measure in TS 3.5.2, "High Pressure Injection (HPI)."
Typically, single failures are not considered once the plant has entered a condition defined in the TS. However, the Completion Time permitted when the HPI system is degraded, is an extended period of time. In the event an accident occurred during this extended Completion Time and a single failure were to occur in the degraded HPI system, the ability of a plant to mitigate the consequences of specific small break LOCAs continues to be assured by the ADV flow path for one steam generator.
The ADV flow paths satisfy Criterion 3 of 10 CFR 50.36 (Ref. 1).
OCONEE UNITS 1, 2, & 3 B 3.7.4-2 BASES REVISION DATED 04/02/2007
ADV Flow Paths B 3.7.4 BASES LCO The ADV flow path for each steam generator is required to be OPERABLE.
The failure to meet the LCO can result in the inability to depressurize the steam generators following, a SGTR.
The ADV flow path for each steam generator is required to be OPERABLE.
Failure to meet the LCO can result in the inability to depressurize a steam generator following a small break LOCA. This function is required to support operation with a degraded HPI System when THERMAL POWER is*< 75% RTP.
An ADV flow path is considered OPERABLE when it is capable of providing a controlled relief of the main steam flow, and each valve which comprises the ADV flow path is capable of opening and closing.
APPLICABILITY The ADV flow path for each steam generator is required to be OPERABLE in MODES 1, 2, and 3, and in MODE 4, when a steam generator is being relied upon for heat removal. In MODE 4, steam generators are relied upon for heat removal whenever an RCS loop is required to be OPERABLE or operating to satisfy LCO 3.4.5, "RCS Loops - MODE 4" or available to transfer decay heat to satisfy LCO 3.4.7, "RCS Loops - MODE 5, Loops Filled." The steam generators do not contain a significant amount of energy in MODE 4 when the unit is not relying upon a steam generator for heat transfer, and MODES 5 and 6; therefore, the ADV flow paths are not required to be OPERABLE in these MODES and condition.
With the ADV flow paths required to be OPERABLE at all times that the steam generators are being relied upon for heat removal, it is assured that the ADV flow paths will be available for use for mitigation of a SBLOCA and a SGTR. These are the only two conditions in which the use of the ADV flow paths is credited in the analyses of any accident.
OCONEE UNITS 1, 2, & 3 B 3.7.4-3 BASES REVISION DATED 04/02/2007 1
ADV Flow Paths B 3.7.4 BASES ACTIONS A.1 and A.2 With one or both of the ADV flow path(s) inoperable, the Unit must be placed in a condition in which the LCO does not apply. To achieve this status, the Unit must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and at least MODE 4 without reliance on a steam generator for heat removal within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The Completion Times are reasonable, based on operating experience, to reach the required Unit conditions from full power conditions in an orderly manner and without challenging Unit systems.
SURVEILLANCE SR 3.7.4.1 REQUIREMENTS To perform a controlled cool down of the RCS, the valves that comprise the ADV flow path for each steam generator must be able to perform the following functions:
a) the atmospheric dump block valve bypass and the atmospheric vent valve must be capable of being opened and closed; and b) the atmospheric dump control valve and atmospheric vent block valve must be capable of being opened and throttled through their full range.
This SR ensures that the valves that comprise the ADV flow path for each steam generator are cycled through the full control range at least once per 18 months. Performance of inservice testing or use of an ADV flow path during a unit cool down satisfies this requirement. This surveillance does not require the valves to be tested at pressure. Operating experience has shown that these components usually pass the Surveillance when performed at the 18 month Frequency. Therefore, the Frequency is acceptable from a reliability standpoint.
REFERENCES 1. 10 CFR 50.36.
- 2. UFSAR, Section 10.3.
- 3. UFSAR, Section 15.9.
- 4. UFSAR, Section 15.12
- 5. UFSAR, Section 15.14 OCONEE UNITS 1, 2, &3 B 3.7.4-4 BASES REVISION DATED 04/02/2007
Attachment #2 Markup of current Bases I
ADV Flow Paths B 3.7.4 BASES LCO The ADV flow path for each steam generator is required to be OPERABLE.
The failure to meet the LCO can result in the inability to depressurize the steam generators following a SGTR.
The ADV flow path for each steam generator is required to be OPERABLE.
Failure to meet the LCO can result in the inability to depressurize a steam generator following a small break LOCA. This function is required to support operation with a degraded HPI System when THERMAL POWER is <75% RTP.
An ADV flow path is considered OPERABLE when it is capable of providing a controlled relief of the main steam flow, and each valve which comprises the ADV flow path is capable of opening and closing.
APPLICABILITY The ADV flow path for each steam generator is required to be OPERABLE in MODES 1, 2, and 3, and in MODE 4, when a steam generator is being relied upon for heat removal. In MODE 4, steam generators are relied upon for heat removal whenever an RCS loop is required to be OPERABLE or operating to satisfy LCO 3.4.5, "RCS Loops - MODE 4" or available to transfer decay heat to satisfy LCO 3.4.7, "RCS Loops - MODE 5, Loops Filled." The steam generators do not contain a significant amount of energy in MODE 4 when the unit is not relying upon a steam generator for heat transfer, and MODES 5 and 6; therefore, the ADV flow paths are not required to be OPERABLE in these MODES and condition.
Irddgn the ADV flow path for each steam generator is reaia e OPERABLE w en re " o 3.5.2, "High Pressure In' For all o1 e s, the ADV flow paths for I enits are not credited in the analyses of any a-oda INSERT 1 With the ADV flow paths required to be OPERABLE at all times that the steam generators are being relied upon for heat removal, it is assured that the ADV flow paths will be available for use for mitigation of a SBLOCA and aSGTR. These are the only two conditions that use of the ADV flow paths is credited in the analyses of any accident.
OCONEE UNITS 1, 2, & 3 B 3.7.4-3 BASES REVISION DATED ,4.4-,