NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Task Number: 2020040101 Start A Recirc Pump At Power Ap p rova Is:

I General Supervisor Date Operations Training (Designee)

Revision: NRC 2006 NA EXAM SECURITY I

General Supervisor Date Operations (Designee)

NA EXAM SECURITY I

Configuration Control Date Performer:

(ROISRO)

TrainedEvaluator:

Evaluation Method:

X Perform Simulate Eva I ua t ion Location :

Plant X

Simulator Expected Completion Time: 25 min Time Critical Task:

NO Alternate Path Task: NO Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Eva1 ua tors Sig nature:

Date:

Unit 1 JPM 1 NRC November2006

Recommended Start Location: (Completion time based on the start location)

Unit 1 Simulator Simulator Set-up (if required):

IC238 For Exam. This setup is for JPM 1 and 2 together. IC20 modified for 4 loop operation Recirc Pump 11 is shutdown, discharge valve closed and controller in MAN.

Core Flow is reduced to 50 Mlbm/hr Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec.

Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional I concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected.

Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a ".",
2. During Evaluated JPM:
3. During Training JPM:

Self checking shall be demonstrated.

Self checking shall be demonstrated.

Peer checking shall be demonstrated.

References:

1. NUREG 1123, 202001, A4.01, 3.7/3.7
2. N1-OP-1, H.4.0 Tools and Equipment:
1. None Unit 1 JPM 1 NRC November 2006

Task Standard:

Recirc Pump 11 started and controlled by master controller per N1-OP-1 Initial Conditions:

1. 4 loop power operations are in progress
2. Recirc Pump 11 is to be started and placed in service following corrective maintenance.
3. The pump is NOT in local manual or local lock.
4. All support personnel from Maintenance, I&C and Engineering are available to support the pump start.
5. All required briefings are complete.
6. Approved RMR is with SM and permission is granted to proceed with pump start.
7. Instructor to ask operator for any questions.

Initiating Cues:

RO : (Operators name), start Recirc Pump 11 per N1-OP-I, section H.4.0.

SRO : (Operators name), start Recirc Pump 11 per normal operating procedures.

Standard Grade Perform an ce Steps

1.

Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary.

RECORD START TIME

2.

Obtain a copy of the reference procedure and reviewhtilize the correct section of the procedure.

3.

Verify RESET the following:

n 86 GENERATOR LOCKOUT (Aux CR)

Cue: Report 86 generator lockout is reset.

PUMP MOTOR VIBRATION RESET (F Panel)

4.

IF selected RRP is in Local Manual or Local lock......

5.

Verify the following:

13 Depress the RR MG 11 SCOOP TUBE AIR FAILURE LOCK RESET pushbutton (F Panel) 0 RR MG 11 SCOOP TUBE AIR FAILURE LOCK light extinguished.

Proper communications used for repeat back (GAP-OPS-O1/ CNG-HU-1.Ol-1001)

SatlUnsat N1-OP-1 is obtained. Precautions &

limitations reviewed & section H.4.0 Sat/Unsat 0

0 0

0 0

Sat/Unsat Dispatches operator to Aux Control Room to verify lockout is reset.

Observes alarm F2-1-1 is cleared.

SatlUnsat Identifies step as NA Sat/Unsat Depresses RR MG 11 SCOOP TUBE AIR FAILURE LOCK RESET pushbutton (F Panel)

Sat/Unsat Observes RR MGI 1 SCOOP TUBE AIR FAILURE LOCK red light extinguished.

Sat/Unsat Unit 1 JPM 1 NRC November 2006

~

Performance Steps Standard Grade Verify Scoop Tube Position Meter (middle meter) is set at 40% by Control Room Indication.

6.

Confirm approximately 120 VAC across terminals 3 and 4 on Relay 31 VOLT REG REMOTE EXC (aux CR)

Cue: Voltage reading across terminal 3 and 4 is 120 VAC.

7.

Check physical condition of Relay 63X, (Aux CR) and verify contacts pulled in (relay energized).

Cue: Relay is energized with contacts pulled in.

8.

Directs the following steps be performed (in any order):

Cue: All conditions below are correct for the pump start.

Reactor Engineer notified....

Confirm exciter brushes not lifted Confirm I/P air pressure signal > 10 psig 0 Bailey Scoop tube positioner connected IF pump is isolated.....

Loop Flow instrument valved in

9.

If placing the 5'h loop in service, THEN verify electrical and mechanical stops adjusted for 5 loop operation.

Cue: Electrical and mechanical stops are adjusted for 5 loop operation.

IO. Confirm idle loop temperature is within 45°F of an operating loop by checking computer points.

Observe Scoop Tube Position Meter (middle meter) at 40% by Control Room Indication.

Requests voltage reading from Electrical Maintenance (EM) personnel.

Acknowledges report of terminal voltage.

Directs EM to check relay condition and verify contacts pulled in.

Acknowledges report of relay condition and relay energized.

Directs performance and acknowledges status for the following:

Step NA, pump is not isolated Instrument valved in Reactor Engineer notified Exciter brushes are properly installed Air pressure is above 10 psig Positioner is connected Directs verification of electrical and mechanical stops adjusted for 5 loop operation.

Acknowledges report of stop adjustments.

Calls up A427 and A428 for loop 11 Calls up points for any operating loop.

Compares temperatures Determines loops differential temperatures are within 45°F.

SatlUnsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat SatlU nsat Sat/Unsat SaWnsat SatlUnsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat Sat/U nsat Unit 1 JPM 1 NRC November 2006

,Performance Steps Standard Grade s

4

11. Verify recirculation flow is less than 50 Adjust RECIRG MASTER controller to Pass/Fail x 10' Ibm/hr.

establish flow is less than 50 x IO6 Ibm/hr. (E Console)

12. Verify Recirc Pump M/A station Observes/checks Verify Recirc Pump Sat/Unsat AUTO/BAL/MAN switch to MAN 11 M/A station AUTO/BAL/MAN switch in MAN.
13. Set RRECIRC PUMP 11 GEMAC Adjust RRECIRC PUMP 11 GEMAC PasslFail OUTPUT (BOTTOM METER) to match running pumps with a maximum of 50%.

maximum of 50%.

OUTPUT (BOTTOM METER) to match running pumps with a

14. Verify closed REACTOR R PUMP 11 Observe REACTOR R PUMP 11 Sat/U nsa t DISCHARGE VALVE DISCHARGE VALVE closed by green light indication (F Panel)
15. Verify open the following: valves:

REACTOR R PUMP 11 SUCTION Observe REACTOR R PUMP 11 SatlUnsat VALVE SUCTION VALVE open by red light indication (F Panel)

Sat/Unsat REACTOR R PUMP 11 BYPASS Observe REACTOR R PUMP 11 VALVE BYPASS VALVE open by red light indication (F Panel)

CAUTION: Failure to trip the generator when frequency drops to 0 hz could result in damage to the generator slip rings.

16. IF frequency drop to 0 hz........

IF Frequency drops to 0 Hz when field SatlUnsatl Frequency is NOT expected to drop to 0 NA breaker closes, THEN places REACTOR RP MOTOR 17 switch at F Unit 1 JPM 1 NRC November 2006

Performance Steps Standard Grade Panel to STOP. (Not expected)

NOTE: During start sequence, alarm F2-1-1 is expected to actuate. IF candidate begins to respond to this alarm inform candidate that a second operator will respond to this alarm.

17. Place in START REACTOR RP 0

Place REACTOR RP MOTOR 11 PasslFail MOTOR 11 switch at F Panel and observe auto sequencing to confirm proper operation:

switch at F Panel to START MG MOTOR starts MG Generator accelerates to 50-60 hz Generator Field Breaker closes Generator slows down toward 20%

or 11.5 hz WHEN speed (Frequency Meter) is between 30 and 25 hz, open REACTOR R PUMP 11 DISCHARGE VALVE.

IF reverse flow is observed as indicated by increasing Total Recirculation Flow and decreasing reactor power, THEN declare the APRMs inoperable and enter TS 3.6.2 (NOT expected)

IF desired THEN maintain Total Recirc Flow constant by reducing other pumps speeds.

Cue: CRS does NOT desire to maintain total Recirc flow constant.

21. Verify RRP 11 maintained within the following limits:

Generator MW < 0.790 Generator amps < 240 RRP Flow < 16.8 X IO6 Ibm/hr continuous Generator Frequency 11.5 to 56 Hz Observes start sequence:

MG MOTOR starts MG Generator accelerates to 50-60 hz Generator Field Breaker closes Generator slows down toward 20% or 11.5 hz Open REACTOR R PUMP 11 DISCHARGE VALVE.

Sat/Unsat PasdFail IF reverse flow conditions are observed, reports condition to SRO and notifies SRO of TS 3.6.2 entry requirement.

Sat/Unsat/

NA Acknowledges direction Sat/Unsat/

NA Observes parameters and ensures they are below values listed.

Sa t/U nsa t Unit 1 JPM 1 NRC November 2006

Perform an ce Steps Standard Grade

22. Adjust pumps speed to match other Adjust RECIRC PUMP 11 SPEED PasslFail pumps.

CONTROL MAN adjust knob such that pump speed matches speed of other pumps. (Approx 38 to 40Hz)

23. WHEN pump speed matches other WHEN pump speed matches other Pass/Fail pumps AND deviation (top meter) is at zero, place RRECIRC PUMP 11 SPEED CONTROL IN AUTO OR BALANCE. if desired.

pumps AND deviation (top meter) is at zero, place RRECIRC PUMP 11 SPEED CONTROL IN BAL.

Cue: Direct speed control placed in BAL

24. Verify P/F map on E Panel updated to loop requirements.

Panel.

5 loop P/F map is displayed at E Sat/U nsa t

25. Verify reset 50 SR PUMP MOTOR Dispatches operator to verify target is Sat/Unsat STALLED ROTOR target (Aux CR) reset.

Acknowledge report that target is reset.

Cue: Report target is reset.

26. IF recovering from 3 loop.....

Step is NA Sat/Unsat

27. Maintain Reactor Recirc MG Set Oil Dispatches operator to maintain oil Sat/U nsa t Cooler Outlet Temperatures 1 10 to 130°F by throttling oil cooler TBCLC outlet valves.

temperatures within limits per section F.3.0

28. Remove any off normal signs 0 Removes any off normal condition Sat/Unsat previously posted for pump started.

signs.

29. Report RRP 11 started to SRO.

Reports RRP started to SRO Sat/Unsat END OF JPM Terminating Cue:

Recirc Pump 11 started and controlled by master controller per N1-OP-1.

RECORD STOP TIME Unit 1 JPM 1 NRC November 2006

Revision Date 0

8/9/06 Change LC1 05-01 NRC Exam G. Bobka 05-01 NRC Exam Driver Originator Description Created as new JPM for Unit 1 LC1 Unit 1 JPM 1 NRC November 2006 9/20/06 Validated with Ops Meier, Blum

RO Initial

1.
2.
3.
4.
5.
6.
7.

Conditions:

4 loop power operations are in progress Recirc Pump I 1 is to be started and placed in service following corrective mai n tenance.

The pump is NOT in local manual or local lock.

All support personnel from Maintenance, I&C and engineering are available to support the pump start.

All required briefings are complete.

Approved RMR is with SM and permission is granted to proceed with pump start.

Instructor to ask operator for any questions.

Initiating Cues:

RO : (Operators name), start Recirc Pump 1 I per N I -0P-I, section H.4.0.

Unit 1 JPM 1 NRC November 2006

SRO Initial

1.
2.
3.
4.
5.
6.
7.

Conditions:

4 loop power operations are in progress Recirc Pump I I is to be started and placed in service following corrective maintenance.

The pump is NOT in local manual or local lock.

All support personnel from Maintenance, I&C and engineering are available to support the pump start.

All required briefings are complete.

Approved RMR is with SM and permission is granted to proceed with pump start.

Instructor to ask operator for any questions.

Initiating Cues:

SRO : (Operators name), start Recirc Pump I 1 per normal operating procedures.

Unit 1 JPM 1 NRC November 2006

NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Restore Reactor Building Ventilation Following Automatic Isolation Revision:

NRC 2006 Task Number:

Approva Is :

7 NA EXAM SECURITY I

Generd&pervisol Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY I

Configuration Control Date Performer 1 (ROISRO)

Trainer/Evaluator:

Evaluation Method:

X Perform Simulate Evaluation Location:

Plant X

Simulator Expected Completion Time: 20 Minutes Time Critical Task: No Alternate Path Task: No Start Ti me:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail, Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

Unit 1 JPM 2 NRC February 2007

Recommended Start Location: (Completion time based on the start location)

Unit 1 Simulator Simulator Set-up (if required):

1. IC238 For Exam. This setup is for JPM 1 and 2 together. Run with JPM 1
2. Malfunctions RMGU and 6V RX BLDG VENT RAD MON 100% inserted to isolate system.

THEN cleared to allow system reset.

3. RB Vent fan switches placed in OFF (OP-10, H.2.0)
4. RBEVS system 12 manually secured (OP-10, H.2.0)

Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec.

Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Everv JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected.

Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor I Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a ".".
2. During Evaluated JPM:
3. During Training JPM:

0 Self checking shall be demonstrated.

Self checking shall be demonstrated.

Peer checking shall be demonstrated.

Unit 1 JPM 2 NRC February 2007

References:

1. N1-OP-IO Tools and Equipment:
1. None Task Standard: Reactor Building Normal Ventilation restored and both RBEVS trains returned to stand by.

Initial Conditions:

1. Reactor Building Normal Ventilation System isolated due to high RB Vent monitor radiation levels.
2. Actions have been completed for the automatic start of RBEVS system.
3. Cause of the high radiation condition is known and the condition is corrected.
4. Instructor to ask operator for any questions.

Initiating Cues:

RO :

(Operators name), shutdown RBEVS and restart Reactor Building Normal Ventilation system, with Supply and Exhaust Fan 11 components in SLOW speed per N1-OP-IO section G.

SRO: (Operators name), Restart Reactor Building Normal Ventilation system and return the ventilation system to normal configuration, with Supply and Exhaust Fan 11 components in SLOW speed.

Perform an ce Steps Standard Grade

1.

Provide repeat back of initiating cue.

Proper communications used for repeat SaVUnsat Evaluator Acknowledge repeat back providing correction if necessary.

back (GAP-OPS-01/0perations Manual)

RECORD START TIME

2. Obtain a copy of the reference procedure and reviewhtilize the correct section of the procedure.

N1-OP-10 obtained.

Sat/Unsat Precautions & limitations reviewed &

section G.2.0 (Shutdown RBEVS) and E.l.O (Place RB Normal Ventilation in Service) referenced.

Unit 1 JPM 2 NRC February 2007

Performance Steps Standard Grade Manual Shutdown of RBEVS per N1-OP-IO G.2.0

3.

IF RBEVS was automatically initiated At J Panel (Back panel) locate RX SatlUnsat AND initiating signal has cleared, BLDG VENT EXH RAD MON 11 AND

12.

THEN push the Reset Buttons on both Reactor Building Ventilation Radiation 0 Simultaneously depress SYSTEM PasslFail Monitors simultaneously.

RESET pushbutton on BOTH radiation monitors When both SYSTEM RESET pushbuttons are depressed, annunciator L 1-4-3 REACT BLDG VENT RAD MONITOR O f f NORMAL cle a rs,

4.

Notify Rad Protection the normal Notifes Rad Protection, the normal Sat/Unsat Reactor Building Ventilation system will be placed in service.

Reactor Building Ventilation system will be placed in service.

CUE: Acknowledge notification as Rad Protection.

5.

Place Reactor Building Ventilation in Go to section E.l.O to place Reactor Sat/Unsat service in accordance with Section E Building Normal Ventilation in service.

6.

Confirm the following:

Valve lineup complete per Electrical lineup complete per Control switch lineup complete Indicates step complete.

Sat/Unsat Unit 1 JPM 2 NRC February 2007

Performance Steps Standard Grade per Attachment 3 Stack Monitoring system operating OR Chemistry is taking grab samples Airborne activity monitor unit operating OR Rad Protection is taking grab samples CUE: Inform candidate that all of the above prerequisite actions are complete.

7.

Notify Rad Protection, the Normal Notifies Notify Rad Protection, the SatlU nsat/

Reactor Building Ventilation system will be placed in service.

Norma I Reactor Bu i Id i ng Ventilation system will be placed in service.

NA CUE: Acknowledge notification as Rad Protection.

8.

IF L1-4-3, RB VENT RAD MONITOR OFF NORMAL is alarming,THEN verify RB vent rad monitors 11 and 12 reset as follows:

NIA, Annunciator clear.....,( )

a.

Simultaneously depress Channel 11 and 12 RB vent rad monitor reset buttons on J panel b.Verify annunciator L1-4-3 clear Step should be now marked N/A, Sat/Unsat/

since action was performed earlier (JPM step 3)

If not already performed, THEN At J Panel (Back panel) locate RX BLDG VENT EXH RAD MON 11 AND 12.

NA Simultaneously depress SYSTEM Pass/Fail/

RESET pushbutton on BOTH NA radiation monitors 0 Verify Annunciator L1-4-3 is clear Sat/Unsat/

NA Unit 1 JPM 2 NRC February 2007

9.

Verify open the following blocking 0 At L Panel place 202-15, Pass/Fail valves:

REACTOR BLDG SUPPLY 202-1 5, REACTOR BLDG SUPPLY ISOLATION VALVE 11 202-1 6, REACTOR BLDG Observe for BOTH valves:

SUPPLY ISOLATION VALVE 202-15, REACTOR BLDG Sat/Unsat 12 SUPPLY ISOLATION ISOLATION VALVE 11 control switch to OPEN.

VALVE 11 red light ON and green light OFF.

0 202-16, REACTOR BLDG Sat/Unsat SUPPLY I SOLATION VALVE 12 red light ON and green light OFF.

202-32, REACTOR BLDG EXHAUST ISOLATION VALVE 11 202-31, REACTOR BLDG EXHAUST ISOLATION VALVE 12 When isolation valves are open annunciators L1-4-3 EMERG VENT SYS CH I I RELAY OPERATE and L 1-4-6 EMERG VENT SYS CH 12 RELAY OPERATE clear.

At L Panel place 202-32, REACTOR BLDG EXHAUST ISOLATION VALVE 11 control switch to OPEN.

Pass/Fail Observe for BOTH valves:

0 202-32, REACTOR BLDG Sa t/U nsa t EXHAUST I SOLATION VALVE 11 red light ON and green light OFF.

202-31, REACTOR BLDG SaWnsat EXHAUST ISOLATION VALVE 12 red light ON and green light OFF.

Unit 1 JPM 2 NRC February 2007

Performance Steps Standard Grade IO.

Place ventilation fans in service as follows:

Start REACTOR BLDG EXHAUST FAN 11 on SLOW speed Confirm open 202-08 REACTOR BLDG EXHAUST FAN 11 OUTLET DAMPER Place REACTOR BLDG EXHAUST Pass/Fail FAN 11 control switch to SLOW.

Observe middle red light ON and fan amps indicate fan started.

Observe 202-08 REACTOR BLDG Sat/Unsat EXHAUST FAN 11 OUTLET DAMPER red light ON and green light OFF.

Sat/Unsat Start REACTOR BLDG Place REACTOR BLDG SUPPLY FAN Pass/Fail SUPPLY FAN 1 Ion SLOW speed Observe middle red light ON and fan Sat/Unsat Confirm open FCV 202-03 Observe FCV 202-03 REACTOR Sat/Unsat 11 control switch to SLOW.

amps indicate fan started.

REACTOR BLDG SUPPLY FAN 11 (12) INLET DAMPER BLDG SUPPLY FAN 11 (12) INLET DAMPER red light ON and green light may be ON indicating throttling..

11. Adjust fan speeds to work in Indicates step complete. Fans are to conjunction with the inlet damper (preset to run in Auto) for maintaining Reactor Building/Atmosphere dP from

-0.25 to -0.4 inches of water, as well as moderate Reactor Building temperatures.

remain in SLOW speed.

0 Return to step G.2.4 to complete shutdown of RBEVS train.

Unit 1 JPM 2 NRC February 2007

Performance Steps Standard Grade

12. Stop any running RBEVS fans
13. Verify closed the following valves:

0 202-34, EM VENT EXHAUST FAN 11 OUTLET BV 202-35, EM VENT EXHAUST FAN 12 OUTLET BV

14. Verify the following control switches in AUTO:

202-37, EM VENTILATION LOOP 11 INLET BV 202-38, EM VENTILATION LOOP 12 INLET BV

15. Verify closed the following valves:

0 202-37, EM VENTILATION LOOP 11 INLET BV 202-38, EM VENTILATION LOOP 12 INLET BV Place 202-53 EVS FN 11 control switch to STOP then release.

PasslFail Observe 202-34, EM VENT EXHAUST FAN 11 OUTLET BV green light ON and red light OFF.

Observe 202-35, EM VENT EXHAUST FAN 12 OUTLET BV green light ON and red light OFF SatlUnsat SaUUnsat Place 202-37, EM VENTILATION Pass/Fail LOOP 11 INLET BV control switch to AUTO Verify 202-38, EM VENTILATION SatNnsat LOOP 12 INLET BV control switch in AUTO.

Observe 202-37, EM SatlUnsat VENTILATION LOOP 11 INLET BV green light ON and red light OFF.

Observe 202-38, EM VENTILATION SatlUnsat LOOP 12 INLET BV green light ON and red light OFF.

Unit 1 JPM 2 NRC February 2007

Performance Steps Standard Grade

16. Verify the following control switches in green flag position:

202-53, EVS FAN 11 Verify 202-53, EVS FN 11 control Sat/U nsat switch is green flagged.

0 202-33, EVS FAN 12 Place 202-33, EVS FN 12 control PasslFail switch to green flagged from PTL position.

17. IF LCO 3.4.4.e (7 day plant Notify Shift Manager that LCO can be SaUUnsat shutdown LCO when one train of exited.

EVS is inoperable) was entered due to an EVS fan in Pull To Lock, THEN notify the Shift Manager that the LCO may be exited at this time.

CUE: As SM acknowledge LCO can be exited.

18. Notify SRO that RBEVS is shutdown Proper communications used.

and Reactor Building Normal Ventilation is in service.

Sat/Unsat Cue: Acknowledge report.

END OF JPM Terminating Cue: Reactor Building Normal Ventilation restored and both RBEVS trains returned to standby.

RECORD STOP TIME Unit 1 JPM 2 NRC February 2007

REACTOR OPERATOR CUE SHEET Initial Conditions:

1. Reactor Building Normal Ventilation System isolated due to high RB Vent
2. Actions have been completed for the automatic start of RBEVS system.
3. Cause of the high radiation condition is known and the condition is
4. Instructor to ask operator for any questions.

monitor radiation levels.

corrected.

Initiating Cues:

RO : (Operators name), shutdown RBEVS and restart Reactor Building Normal Ventilation system, with Supply and Exhaust Fan 1 I components in SLOW speed per N1-OP-I 0 section G.

Unit 1 JPM 2 NRC February 2007

SENIOR REACTOR OPERATOR CUE SHEET Initial Conditions:

1. Reactor Building Normal Ventilation System isolated due to high RB Vent
2. Actions have been completed for the automatic start of RBEVS system.
3. Cause of the high radiation condition is known and the condition is
4. Instructor to ask operator for any questions.

monitor radiation levels.

corrected.

Initiating Cues:

SRO: (Operators name), Restart Reactor Building Normal Ventilation system and return the ventilation system to normal configuration, with Supply and Exhaust Fan 11 components in SLOW speed.

Unit 1 JPM 2 NRC February 2007

c NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Task Number: 20500301 01 Approvals:

Place 11 Shutdown Cooling Loop in Service I

General Supervisor Date Operations Training (Designee)

Revision: NRC 2006 NA EXAM SECURITY I

General Supervisor Date Operations (Designee)

NA EXAM SECURITY I

Con f ig u ra t ion Control Date Performer:

(ROISRO)

TrainedEvaluator:

Evaluation Method:

X Perform Si m u I a te Evaluation Location:

Plant X

Simulator Expected Completion Time: 15 min Time Critical Task:

NO Alternate Path Task: NO Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if anv critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

Unit 1 JPM 3 NRC January 2007

Recommended Start Location: (Completion time based on the start location)

Unit 1 Control Room Simulator Simulator Set-up (if required):

1. Initialize Simulator to IC-I 9 or similar. Use IC-245 for NRC Exam
2. Take Simulator out of Freeze.
3. Remove SDC from service:
a. Close TCVs
b. Trip operating SDC pumps
c. Close SDC IVs
d. Close loop inlet BVs
4. Remote SCOl SDC VALVE 38-01 BREAKER PB 17 OPEN
5. Remote SC02 SDC VALVE 38-02 FUSES DC VLV BRD 12 PULL
6. Remote SC03 SDC VALVE 38-13 BREAKER PB 17 OPEN Direct ions to the I ns t ru cto r/Eva I ua tor:

Prior to performance of this JPM, obtain SM I CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec.

Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Everv JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected.

Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas PasslFail. All steps are sequenced critical unless denoted by a o.
2. During Evaluated JPM:
3. During Training JPM:

Self checking shall be demonstrated.

Self checking shall be demonstrated.

Peer checking shall be demonstrated.

Unit 1 JPM 3 NRC January 2007

References:

1. NUREG 1123, 205000 A4.01 3.7/3.7
2. N1-OP-4 Tools and Equipment:

None Task Standard:

Shutdown Cooling Loop 11 placed in service and TCS temperature lowering.

Initial Conditions:

1. Reactor is shutdown with all rods in.
2. Reactor pressure is less than 120 psig.
3. N 1 -0P-4 has been completed up to and including step E.3.1.
4. Fuses and breakers for SDC Valves have not been installed
5. RPV level is being monitored by other operators.
6. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), place Shutdown Cooling Loop 11 in service and establish a cooldown rate not to exceed 75OF/hr.

P e rfo rm a n ce S t e ps Standard Grade

1.

Provide repeat back of initiating cue.

Evaluator A ckn o wle dge repeat back providing correction if necessary.

Proper communications used for repeat back (GAP-OPS-01/ CNG-HU-1.01-1001)

RECORD START TIME

02.

Obtain a copy of the reference procedure and reviewhtilize the correct section of the procedure.

N1-OP-4 obtained. Precautions &

limitations reviewed & section E.3.0 referenced.

3.

Open the following valves:

38-03, SDC VALVE 11.

Sat/Unsat Sat/Unsat Rotate 38-03 switch CW to OPEN.

Pass/Fai I Observe red light energized; green Unit 1 JPM 3 NRC January 2007

Performance Steps Standard Grade light extinguished.

38-04, SDC VALVE 12.

38-05, SDC VALVE 13.

0 Rotate 38-04 switch CW to OPEN.

Pass/Fail Observe red light energized; green light extinguished.

Rotate 38-05 switch CW to OPEN.

PasslFail Observe red light energized; green light extinguished.

4.

IF fuses and breakers are NOT installed, THEN perform the following:

Remove relay block for 27UV Dispatch operator to remove relay SaVUnsat block.

Relay for valve 38-02 at DC Valve Board 12 CONTACT SIM OPERATOR FOR REQUIRED REMOTE FUNCTION ACTIVATE F4-3-1 Crywolf (TRG 1)

CUE: Report relay block is removed.

(Sim operator then put F4-3-1 OFF on TRG2)

Install fuses for 38-02, SDC Dispatch operator to install fuses.

Sat/Unsat SYSTEM IN IV 12 DC Valve Board 12 CONTACT SIM OPERATOR FOR REQUIRED REMOTE FUNCTION ACTIVATE Remote SC02 SDC VALVE 38-02 FUSES DC VLV BRD 12 PULL AND Annunciator F4-3-1 OFF (TRG 2)

CUE: Report fuses are installed.

Unit 1 JPM 3 NRC January 2007

Standard Grade Unlock and close the following Dispatch operator to unlock and close Sat/Unsat PB167 breakers RB281 N breakers.

0 38-01 O

38-13 CONTACT SIM OPERATOR FOR REQUIRED REMOTE FUNCTION ACTIVATE Remotes SCOl SDC VALVE 38-01 and SC03 SDC VLV 38-13 (TRG 3 and TRG 4) BREAKER PI3167 CLOSE CUE: Report breakers are closed.

4.

Open 38-13, SDC SYSTEM OUT IV 1 Rotate 38-13 switch CW to OPEN.

PasslFail (INSIDE).

Observe red light energized; green I ig h t extinguished.

Observe RPV water level is NOT Observe RPV Water level indication Sat/Unsat lowering, while opening the isolation valves.

and determines water level is steady.

5.

Open 38-02, SDC SYSTEM IN IV 12 Rotate 38-02 switch CW to OPEN.

PasslFail (OUTS I DE)

Observe red light on, green light off.

6.

Open 38-01, SDC SYSTEM IN IV 11 Rotate 38-01 switch CW to OPEN.

PasslFail

( I NS I DE).

Observe red light on, green light off.

Cue:

Shutdown cooling pumps.

Unit 1 JPM 3 NRC January 2007

Performance Steps Stand a rd Grade Do not require venting Cue: Shutdown cooling heat exchangers. Do not require venting.

7.

Verify open:

38-134, SDC PUMP RECIRC Observe red light energized, green Sat/Unsat VALVE 11 light extinguished.

38-1 31, SDC PUMP RECIRC Observe red light energized, green Sat/Unsat 38-128, SDC PUMP RECIRC Observe red light energized, green Sat/Unsat VALVE 12 light extinguished.

VALVE 13 light extinguished.

8.

Start SDC pump as follows:

For SDC 11 verify SDC COOLING Observe TCV 11 is at 510% valve Pass/Fail TCV 11 manual controller selected for and adjust TCV 11 to indicate 0%.

Sat/Unsat Using local indication verify closed Dispatch operator to locally verify FCV 38-09, SDC FCV valve position.

CUE: If dispatched to verify valve positions locally, report local conditions are consistent with control room posit ion i nd ica t ions.

9.

Place SDC PUMP 11 Control Switch in Rotate switch to CW to START.

Pass/Fail START UNTIL SDC PUMP 11, running Observe red light energized and Sat/Unsat light illuminated.

green light extinguished.

Observe motor amps increasing.

Sat/Unsat Unit 1 JPM 3 NRC January 2007

Perform an ce Steps Standard Grade

10. Open 38-09, SDC Cooling TCV 11, Rotate knob on controller 38-09A CW Pass/Fail approximately 10%.

until 10% valve position is observed.

11.

If reactor water flashing occurs in SDC Pump amp indicator observed as SaUUnsat System, reduce reactor water flow via selected SDC cooling TCV and maximize RBCLC cooling water flow.

steady.

12. Adjust SDC COOLING TCV 11 for Rotate knob on controller 38-09A CW SaUUnsat gradual warmup of the system.

or CCW as required for a gradual warmup as indicated on 38-1 36B.

NOTE: Opening of TCV 1 I will be Establish a cooldown rate below PasslFail required to stop the RCS temperature rise and start a cooldown. TCV may have to be opened between 30 and 40% to turn temperature.

75"F/hr

13. Inform SM Shutdown Cooling Loop 11 Proper communications used in service.

Sat/Unsat Cue: Acknowledge report.

END OF JPM Terminating Cue:

lowering.

Shutdown Cooling Loop 11 is placed in service and RCS temperature is RECORD STOP TIME Unit 1 JPM 3 NRC January 2007

JPM HISTORY JPM HISTORY PAGE I

I Revision I Date 1 Change Driver 0

Originator G. Bobka i

Description Updated for Unit 1 LC1 05-01 NRC Exam. Bank JPM 01-OPS-SJE-205

01.

Unit 1 JPM 3 NRC January 2007

Initial Conditions:

1. Reactor is shutdown with all rods in.
2. Reactor pressure is less than 120 psig.
3. N1-OP-4 has been completed up to and including step E.3.1.
4. Fuses and breakers for SDC Valves have not been installed
5. RPV level is being monitored by other operators.
6. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), place Shutdown Cooling Loop 11 in service and establish a cooldown rate not to exceed 75F/hr.

Unit 1 JPM 3 NRC January 2007

SA ES-301. Rev. 9 Control Room/ln-Plant Svste)ms Oufiine Form ES-301-2 Facility: Nine Mile Point Unit 1 Date of Examination: March 12, 2007 Exam Level: RO SRO-I Operating Test No.: NRC EXAMINATION 11 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function JPM 1 Recircl Start a Recirc Pump At Power Proc N1-OP-I H.4 0 REACTIVITY CONTROL JPM 3 Shutdown Cooling/ Place Shutdown Cooling Loop In Service Proc N1-OP-4 E.3.0 KA 205000 A4.01 3.713.7 l

4 HEAT REMOVAL to autostart and manual start is required. While implementing SOP, an EDG trips and alternate SOP actions are taken to crosstie PB 17B with 17A).

, Proc N1 -SOP-33A. 1 KA 262001 A2.03 3.914.3 ELECTRICAL F WL C to automatic control, level transmitter fails downscale, requiring 1 manual level control)

Proc N1 -PM-Q8, N 1 -0P-I 6

'Proc N1-OP-9 H.l.O RO Only. This JPM is not performed by SRO-I Proc N1-SOP-1 3

MSlVs at Power REACTOR Proc Nl-ST-Q26, Sections 8.2 and 8.3 PRESSURE CONTROL JPM 8 Main Steam/ Perform NI-ST-Q26 Partial Stroke Test of Two KA 239001 A4 01 4 2/4 0 REACTOR WATER INVENTORY CONTROL INSTRUMENTATION LC1 05-01 NRC Exam 2006 Submittal 02/22/07 1 1 :I 1 AM 1 of2

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

-1 Attachment 12 KA 295031 EA1.08 3.8/3.9 REACTIVITY BanklPrevious 0 1 -OPS-PJE-1-21/NRC 2002 JPM 9 CONTROL will fail fo transfer to UPS I62B, resulting in Loss of RPS Bus 7 1. SOP-40. I is entered which directs entry info N1-OP-40 to transfer RPS Bus I 1 to alternate supply, I&C Bus 130)

Proc N1-OP-40 F.l 0 and H 1.O and N1-SOP-40.1 KA 212000 A2 02 3 713.9 Evacuation (During local EDG operation a HOT ENGINE condition occurs, requiring local engine shutdown).

Proc N1 -SOP-21.2 Control Room E Actions KA 295016 AAI 04 3 113.2 Bank 0 1 -0PS-PJE-200-1-78 n, IVI, M INSTRUMENTATION R,

D, A 6

ELECTRICAL All RO and SRO-1 control room (and in-plant) systems must be different and serve different safety functions; all SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

Planned Simulator JPM Combinations JPM 1 and 2 JPM 5 and 6 JPM 7 standalone (RO Only)

JPM 4 standalone JPM 3 standalone JPM 8 standalone LC1 05-01 NRC Exam 2006 Submittal 02/22/07 11 : I 1 AM 2 o f 2

P r

NINE MILE POINT NUCLEAR S TATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Loss of Offsite Power with EDG Failures (Alternate Path)

Revision: NRC 2006 Task Number:

Approvals:

I General Supervisor Date Operations Training (Designee)

NA EXAM SECURITY

/

General Supervisor Date Operations (Designee)

NA EXAM SECURITY I

Configuration Control Date Perfor mer:

(RO/SRO)

Trainer/Evaluator:

Evaluation Method:

X Perform Simulate Eva1 ua tion Location :

Plant X

Simulator Expected Completion Time: 20 min Time Critical Task:

NO Alternate Path Task: YES Start Ti me:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

Unit 1 JPM 4 NRC January 2007

~

Recommended Start Location: (Completion time based on the start location)

Unit 1 Simulator Simulator Set-up (if required):

NRC Exam IC 239. IC-20 with the following:

EDOIA, LOSS OF OFSSITE 115KV LINE 4, (PRESET)

ED01 B, LOSS OF OFFSITE 11 5KV LINE 1, (PRESET)

DG04A, EDGl02 AUTO START FAILURE, (PRESET)

DG02B, DIESEL GENERATOR TRIP 103, TRG 2 Ensure BOTH 86-16 and 86-17 are tripped. Manually trip the devices inside the panel, if necessary.

Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec.

Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected.

Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas PasdFail. All steps are sequenced critical unless denoted by a 0.
2. During Evaluated JPM:
3. During Training JPM:

Self checking shall be demonstrated.

Self checking shall be demonstrated.

Peer checking shall be demonstrated.

References:

1. N1 -SOP-33A. 1 Unit 1 JPM 4 NRC January 2007

Tools and Equipment:

1. None Task Standard:

returned to service.

PB 17B cross tied and reenergized from PB 17A and waiting for a 11 5KV line to be Initial Conditions:

1. The plant is operating at power.
2. A loss of Offsite Power occurred.
3. Actions are complete for the tripped Recirc Pump.
4. No other actions have been taken for the power loss.
5. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), execute the Special Operating Procedure for the loss of offsite power.

Grade Perform an ce Steps Standard

1.

Provide repeat back of initiating cue.

Proper communications used for repeat Sat/Unsat Evaluator Acknowledge repeat back providing correction if necessary.

back (GAP-OPS-Oll CNG-HU-1.01-1001)

RECORD START TIME

2. Obtain a copy of the reference procedure and reviewhtilize the correct section of the procedure.

N1-SOP-33A.1 is obtained and Sat/Unsat entered.

3. Notify SM to review EPIP-EPP-01 for Notifies SM to review EPIP-EPP-01 SatlUnsat cI ass if i ca t ion of erne rg e ncy for classification of emergency.

Cue: Acknowledge direction to review for classification of emergency.

4. Verify start of both Emergency Diesel Generators AND confirm the following has occurred:

Unit 1 JPM 4 NRC January 2007

(ALTERNATE PATH)

DGO4A EDGlO2 has failed to start during the power loss.

EDG 102 SUPPLY BKR R1022 has closed Powerboards 102 AND 16B are energized After manually sfarting EDG 102, voltage and frequency rise and EDG 102 SUPPLY BKR 1022 automatically closes. Power is restored to PB 102 and PB 16B.

Grade Observe and report the following for EDG 102:

EDG 102 SUPPLY BKR R1022 is SatlUnsat open Powerboards 102 AND 16B are SatlUnsat deenergized EDG 102 is NOT running Sat/Unsat Manually start EDG 102 from A Panel by placing control switch to START Observe and report the following for EDG 102:

EDG 102 SUPPLY BKR R1022 is closed Powerboards 102 AND 16B are energized EDG 102 is running Pass/Fail Sat/Unsat Sat/Unsat Sat/U nsat Observe the following for EDG 103:

EDG 103 SUPPLY BKR R1032 has EDG 103 SUPPLY BKR R1032 is Sat/Unsat closed closed Powerboards 103 AND 176 are Powerboards 103 AND 17B are Sa t/U nsa t energized energized EDG 103 is running Sat/Unsat NOTE: Per the override step: IF Main Generator OR any Diesel Generator trips THEN re-enter N1 -SOP-33A. 1 at this point.

(Before the step to determine if PBI 1 and Unit 1 JPM 4 NRC January 2007

Standard Grade PI3 12 are energized).

5. Are PB 11 AND 12 energized?
6. Is any EDG running?

Determine PBI 1 and PB12 are Sat/U nsat energized by observing volt meters on panels A4 and A5 mobserve Circuit Breakers R113 and R122 are closed.

Determines BOTH EDGs are running Sat/Unsat from performance of previous steps.

Continues at E on SOP page 6 for Sat/Unsat PB 11 & 12 ENERGIZED BOTH EDGs RUNNING

7. Restore PB 16B and PB 178 loads as follows:

Reset Lockout 86-16 At K Panel rotates 86-16 handle Pass/Fail Annunciator K3-4-3 PWR 5 D 16 BKR LOCKOUT RELAY 86-16 clears.

clockwise to reset device.

Reset Lockout 86-17 At K Panel rotates 86-17 handle Pass/Fail Annunciator K3-4-8 PWR BD 17 BKR LOCKOUT RELAY 86-17 clears.

clockwise to reset device.

Start RBCLC 12 and/or 13 At H Panel, starts RBCLC Pump 12 or PasslFail

13.

ALTERNATE PATH After starting an RBCLC pump and silencing the cleared alarms, Simulator Console Operator inserts malfunction DG026, DIESEL GENERATOR TRIP 103, by activating TRG 2 Unit 1 JPM 4 NRC January 2007

Performance Steps Standard Grade EDG 103 trips. PB I03 and PB I 7B deenergize. Applicant must re-enter SOP-33A. 1 as directed by override step on page

3.
8. Are PB 11 AND 12 energized?
9. Is any EDG running?

I O. Restore PB 16B loads as follows:

Reset Lockout 86-16 Start RBCLC Pump 13 Verify CRD Pump 11 started.

Verify the following:

MG Set 167, Transfers back to AC drive.

UPS 162 re-energizes.

Determine PBI 1 and PB12 are Sat/Unsat energized by observing volt meters on panels A4 and A5 mobserve Circuit Breakers R113 and R122 are closed.

Determines only EDG 102 is running Sat/Unsat from performance of previous steps.

[7 Continues at D SOP page 6 for PB Sat/Unsat I 1 & 12 ENERGIZED EDG 102 RUNNING Observes 86-16 is reset.

Observe RBCLC Pump 13 running At F panel Observe CRD Pump 11 red light ON and green light OFF.

Observe motor amps rising at F Panel.

May place CONTROL ROD DRIVE PUMP 11 switch to AUTO AFTER START (red flagged).

Annunciators F1-3-8 extinguished.

162A mimic white and red lights are lit Sat/U nsa t Sat/Unsat Sat/Unsat Sat/Unsat Sat/Unsat/

NA Sat/Unsat Unit 1 JPM 4 NRC January 2007

Performance Steps Standard Grade SBC 161 re-energizes.

Annunciator A3-3-2 extinguished.

Sat/Unsat Observe SBC 161 A-B AC BKR Sat/Unsat closed Cue: Aux Operator will reset trouble alarm on UPS 162 Simulator Operator: Toggle remote RP21 to RESET annunciator.

11. Verify CRD Pump 12 in PTL.
12. Verify IAC 12 in PTL.
13. At PB 176 verify the following:

B to C Tie Bkr open A to B Tie Bkr closed.

Cue:

In-plant operator dispatched to complete in-plant actions. Report these actions complete.

At F Panel rotate c/s CCW and pull Pass/Fail lock.

Observe red and green lights OFF.

Sat/Unsat 0 At L Panel rotate c/s CCW and pull Pass/Fail lock.

Observe red and green lights OFF.

Sat/Unsat Dispatch operator to verify electrical Sat/Unsat lineup.

14. Restore PB 17B loads as follows:

Place PB103 Supply breaker R-1013 At A5 Panel rotate c/s CCW and pull PasslFail in PTL.

to lock.

AnnunciaforA5-1-2 TRANS 101s AUX Observe red and green lights OFF on Sat/Unsat FDR 103 R1013 TRIP clears PTL.

Unit 1 JPM 4 NRC January 2007

Performance Steps Standard Reset Lockout 86-17.

Annunciator K3-4-8 PWR BD 17 BKR LOCKOUT RELAY 86-17 clears.

Trip R-1053, PB17B Supply breaker Close R-I 052, PB17A-B Tie Breaker.

Annunciator A5-4-7 POWER BD 17 LOWBUS VOLT Verify the following:

MG Set 167 transfer back to AC Drive (if on PB17B).

UPS 172 re-energizes.

0 SBC 171A re-energizes (after 100 seconds).

15. Notify CRS/SM that waiting for 115 KV to be returned to service.

END OF JPM Rotate c/s CW.

Observe K3-4-8 clear At A5 Panel rotate c/s CCW until green light flagged.

Observe red light OFF and green light ON.

At A5 Panel rotate c/s CW until red flagged.

Observe red light ON and green light OFF.

Observe volts on PB17B on A5 Panel.

Observe F1-3-8 clear Dispatch operator to reset alarms on UPS 172.

Observe A3-1-3 clear.

SBC 171A-B AC breaker red light ON and green light OFF.

Observe A3-2-4 and A3-3-3 clear.

Proper communications used.

Grade Pass/Fail Sat/Unsat Pass/Fail Sat/Unsat Pass/Fail Sat/Unsat Sat/Unsat Sat/Unsat SatlUnsat Sat/Unsat SaUUnsat SaVUnsat Sat/Unsat Terminating Cue:

be returned to service.

PB 17B cross tied anc reenergized from PB 17A and waiting ldr a 115KV line to RECORD STOP TIME Unit 1 JPM 4 NRC January 2007

Initial Conditions:

1. The plant is operating at power.
2. A loss of Offsite Power occurred.
3. Actions are complete for the tripped Recirc Pump.
4. No other actions have been taken for the power loss.
5. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), execute the Special Operating Procedure for the loss of p o we r.

Unit 1 JPM 4 NRC January 2007

NINE MILE POINT NUCLEAR Sl -ATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Exercising RPV Pressure/Level Column Control Switches Revision: NRC 2006 Task Number: 2590060101 Approvals:

NA EXAM SECURITY I

Genkral Supervisor Date/

General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY I

Configuration Control Date Performer:

(ROISRO)

Trainer/Evaluator:

Evaluation Method:

X Perform Simulate Evaluation Location:

Plant X

Simulator Expected Completion Time: 20 min Time Critical Task:

NO Alternate Path Task: YES Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

Unit 1 JPM 5 NRC November 2006

Unit 1 Simulator Simulator Set-up (if required):

IC230 is equivalent to IC20. For Exam run with JPM 6 Run bat n06jpm5.bat file to setup triggers listed below.

RR55 trigger from ZDFWMST3==1 (MASTER in BAL). See attached bat file for 2 conditional trigger.

Directions to the InstructorlEvaluator:

Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec.

Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional I concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected.

Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas PasdFail. All steps are sequenced critical unless denoted by a 0.
2. During Evaluated JPM:
3. During Training JPM:

Self checking shall be demonstrated.

Self checking shall be demonstrated.

Peer checking shall be demonstrated.

References:

1. Nl-PM-Q8, Section 8.13
2. N1-OP-16, Section F.10.0 Tools and Equipment:
1. None Unit 1 JPM 5 NRC November 2006

Task Standard:

scram is avoided.

RPV level control established in manual and high level turbine trip and low level Initial Conditions:

1. Plant is at rated conditions.
2. Feedwater Level Control is in normal automatic three element control
3. Whenever RPV water level is being controlled in manual, the level band is 70 to 75 inches.
4. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), perform N1 -PM-Q8 section 8.13 for exercising RPV Pressure/Level Columns and Feedwater Mode Control switches.

Performance Steps Standard Grade

1.

Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary.

RECORD START TIME

2. Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.

FROM N 1 -PM-Q8 8.13

3.

Confirm 29-01, Turbine Driven Feed Water Pump 13 is running Proper communications used for repeat back (GAP-OPS-01/ CNG-HU-1.01-1001)

Nl-PM-Q8, 8.13 and N1-OP-16, F.10.0 are obtained and reviewed.

Observes FWP 13 is running at F Panel FEEDWATER PUMP 13 FLO FWP 13 VALVE CONTROL signal Red Clutch Engagement lights Sat/U nsat Sat/Unsat Sat/Unsat

5.

Record initial control switch positions Record initial control switch positions Sat/Unsat for:

for (E Console):

Feedwater Level Column 11 or 12 FEEDWATER LEVEL COL as Reactor Pressure Column 11 or 12 REACT PRESS as 11 11 Feedwater Mode 3 FEEDWATER MODE as 3 Unit 1 JPM 5 NRC November 2006

I r

Grade

5.

Perform Section F.10 of N1-OP-16 Go to N1-OP-16 Steps 10.1 through Sat/Unsat Steps 10.1 through 10.6 10.6

6.

Perform the following:

IF three Feedwater pumps Indicates step I O. I.

1 is NA, since Sat/Unsat running.....

three pumps are not running.

IF shaft driven FWP in service.......

Verifies and indicates in step 10.1.2 Only one motor FWP is running Sat/Unsat Standby FWP 11 VALVE Sat/Unsat CONTROL is in MAN and fully closed.

Cue: When asked report MFLCPR is 0.872 0

MFLCPR is less than 1.0 Sat/Unsat

7. Balance the FWP VALVE CONTROL M/A station (1 3) which is in AUTO by performing the following:

At F panel Place respective FWP 13 Pump Rotate FWP 13 Pump VALVE Pass/Fail VALVE CONTROL M/A station mode switch to BAL.

CONTROL M/A station mode switch to BAL.

Null respective deviation meter to Adjust FWP 13 VALVE CONTROL Pass/Fail 50% (red dot) with manual knob.

M/A station manual knob to get needle to 50% (nulled).

8.

Take manual control of vessel level by Rotate FWP 13 VALVE CONTROL Pass/Fail placing FWP 13 VALVE CONTROL M/A station mode switch to MAN.

M/A station mode switch to MAN.

9.

Control reactor vessel level by Control reactor vessel level by Pass/Fai I/

adjusting FWP 13 VALVE CONTROL M/A station manual knob as necessary.

adjusting FWP 13 VALVE CONTROL M/A station manual knob as necessary. No adjustment should be necessary.

NA NOTE:

Switching level columns may result in Annunciator F2-3-3 REACT VESSEL LEVEL HIGH-LOW, due to circuit interruption.

Unit 1 JPM 5 NRC November 2006

Performance Steps Standard Grade The same channel of level and pressure should be selected.

I O. Shift reactor pressure/level columns or This should be the actual exercising of Feedwater modes as necessary.

the switches step.

Cycles switches and returns to original positions.

Cue: If asked direct each switch cycled THREE times and restore to original positions.

FEEDWATER LEVEL COL as 11 PasslFaillNA REACT PRESS as 11 FEEDWATER MODE as 3 PasslFaillN A PasslFaillNA

11. Maintenance and/or testing can now THEN returns to Nl-PM-Q8 at step Sat/Unsat be conducted on feedwater pressure/level columns or feedwater mode with no effect on level control.

8.13.3 and initials as complete.

NOTE:

SM will direct final position of RPV Pressure/Level Control Switches.

Cue: If necessary, direct RPV Pressure/Level Control Switches returned to their original positions.

IF cycled in JPM step I O, THEN skip step 12 and proceed to JPM step 13.

12. Exercise RPV Pressure/Level Control Switches as follows:

Record final RPV Pressure/Level Control Switch positions Feedwater Level Column 11 or 12 Reactor Pressure Column 11 or 12 Cycle Feedwater Mode Control Switch Position If switches were not cycled in JPM step I O, they are PASS/FAIL critical steps here.

If not cycled in JPM step 10, cycles switches here leaves in column 11 position and records final position.

If not cycled in JPM step 10, cycles switches here leaves 3 position and records position.

Sat/Unsat/

NA or PASWFAIL

/NA Sat/Unsat/

NA or Feedwater Mode 3 PASSlFAl L

/NA Unit 1 JPM 5 NRC November 2006

~

Performance Steps Stand a rd Grade

13. Complete N1-OP-I 6, Section F. 10 by performing Step F. 10.7.
14. WHEN testing is complete return reactor vessel level control to AUTO by performing the following:

Place FEEDWATER MASTER CONTROL M/A station mode to MAN.

Null out FWP 13 VALVE CONTROL by adjusting the FEEDWATER MASTER CONTROL M/A station output with the manual knob UNTIL the deviation meter indicates 50% (red dot) on FWP 13 VALVE CONTROL GEMAC.

Place FWP 13 VALVE CONTROL M/A station mode to BAL.

Control reactor vessel level with manual knob at FEEDWATER MASTER LBS/HR controller in MAN mode Null FEEDWATER MASTER CONTROL setpoint error by adjusting the thumb/setpoint tape to align manual setpoint (orange arrow) directly under automatic setpoint (green band).

Place FEEDWATER MASTER CONTROL M/A station mode to AUTO or BAL. Level is now control led automat ica I I y by Master Controller.

ALTERNATE PATH WHEN FEEDWATER MASTER CONTROL M/A station mode is moved to AUTO or BAL, malfunction RR55 Level transmitter Go to N1-OP-16 and performs 10.7 (all steps). These are listed below in JPM step 14.

Rotate FEEDWATER MASTER Pass/Fail CONTROL MIA station mode to MAN.

(E Console)

Adjust FEEDWATER MASTER Sat/U mat CONTROL MIA station (E Console) output with the manual knob UNTIL the deviation meter indicates 50%

(red dot) on FWP 13 VALVE CONTROL GEMAC (F Panel).

Rotate FWP 13 VALVE CONTROL M/A station mode to BAL. (F panel...

NOT E Console)

Pass/Fail Control reactor vessel level with manual knob at FEEDWATER MASTER LBS/HR controller in MAN mode (E Console)

Pass/Fail Adjust the thumb/setpoint tape to align manual setpoint (orange arrow) directly under automatic setpoint (green band) (E Console)

Sat/Unsat Rotate FEEDWATER MASTER Pass/Fail CONTROL M/A station mode to AUTO or BAL (E Console)

Unit 1 JPM 5 NRC November 2006

~

Grade Performance Steps Stand a rd FAILS DOWNSCALE activates.

Level Transmitter and indication lD59A goes downscale. Annunciator F2-2-2 REACTOR WATER LEVEL HIGH LOW alarms.

Feedwater flow rises and actual level begins to rise.

15. Recognize and report rising water level cond it ion.
16. Enter N1-SOP-16.1 Note: IF ARP F2-2-2 actions are taken, manual control would also be established.

This is also an acceptable basis for taking manual control. The SOP is the higher tier document.

WHEN either controller is placed in MAN, an immediate reduction in feedwater flow occurs because the MAN signal is still at the correct signal for the pre-transient condition, since deviation meters were nulled.

Performs one of the following to prevent high level turbine trip and scram:

Place FEEDWATER MASTER Pass/Fai I/

CONTROL M/A station mode to MAN. (E Console)

OR NA Place FWP 13 VALVE CONTROL Pass/Fail/

M/A station mode to MAN. (F Panel).

NA

17. Controls RPV water level in MANUAL to Adjusts FEEDWATER MASTER PasdFail prevent high RPV water level trips and low RPV water scram.

CONTROL, FWP 13 VALVE CONTROL or FWP 12 VALVE CONTROL M/A station mode in MAN to prevent high and low RPV water level trips.

18. Notify SRO that Feedwater level Control is in MANUAL and level is stabilized.

Proper communications used.

Sat/Unsat END OF JPM Terminating Cue:

scram is avoided.

RPV level control established in manual and high level turbine trip and low level RECORD STOP TIME Unit 1 JPM 5 NRC November 2006

"jpm 5 bat file n06jpm5.bat "to auto trigger the rr55 malfunction to be true when master controller is "placed back in auto, a double condtion must occur.

"first, the master must be placed in MAN (zdfwmst4==1), per the test. When this happens "the green light on A Panel MOD 93 turns on by override (2a4ds7100219)

""now, with the green light hzlegmodo on when the master is placed in AUTO zdfwmst2 or BAL zdfwmst3, the rr55 activates failing the transmitter downscale.

"rst 20 trgset 1 "zdfwmst4==1 I' trg 1 "ior 2a4ds7100219 (1 0) on" trgset 2 "zdfwmst3==1 && hzlegmodo(2)==1" trg 2 "imf rr55 (2 0:02)"

"!! zdfwmst2==l "end setup Unit 1 JPM 5 NRC November 2006

Initial Conditions:

1. Plant is at rated conditions.
2. Feedwater Level Control is in a normal automatic three element control
3. Whenever RPV water level is being controlled in manual, the level band is 70 to 75 inches.
4. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), perform N 1 -PM-Q8 section 8.13 for exercising RPV Pressure/Level Columns and Feedwater Mode Control switches.

Unit 1 JPM 5 NRC November 2006

p, NINE MILE POINT NUCLEAR STATION OPERATOR JOB PERFORMANCE MEASURE

Title:

Task Number: 2239010401 Ap p rova Is :

Vent the Drywell During Power Operation I

General Supervisor Date Operations Training (Designee)

Revision: NRC 2006 NA EXAM SECURITY I

General Supervisor Date Operations (Designee)

NA EXAM SECURITY I

Configuration Control Date Performer:

(RO/SRO)

Train er/Eva I ua to r:

Evaluation Method:

X Perform Simulate Eva I ua t ion Location :

Plant X

Simulator Expected Completion Time: 20 min Time Critical Task:

NO Alternate Path Task: NO Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if unsat or individual competency area unsat requires a comment, critical step is graded as fail. Any grade of Comments:

Evaluators Signature:

Date:

Unit 1 JPM 6 NRC November 2006

Recommended Start Location: (Completion time based on the start location)

Unit 1 Simulator Simulator Set-up (if required):

IC20 Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec.

Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected.

Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas Pass/Fail. All steps are sequenced critical unless denoted by a ".".
2. During Evaluated JPM:
3. During Training JPM:

Self checking shall be demonstrated.

Self checking shall be demonstrated.

Peer checking shall be demonstrated.

References:

1. N1-OP-9, H.l.O Tools and Equipment:
1. None Task Standard:

Drywell vent lineup is established per N1-OP-9.

Unit 1 JPM 6 NRC November 2006

Initial Conditions:

1. Drywell Pressure is 1.75 psig VENTILATION SYSTEM is in progress and is being performed by another operator.

3. Instructor to ask operator for any questions.
2. N1 -ST-VI, VENTING/PURGING PRIMARY CONTAINMENT THROUGH REACTOR BUILDING Initiating Cues:

(Operators name), Vent the Drywell using RBEVS train 11, in accordance with N1-OP-9. Establish flow rate between 500 and 1600 scfm. Lower Drywell pressure to 1.2 psig, then secure the lineup.

Performance Steps Standard Grade

1.

Provide repeat back of initiating cue.

Proper communications used for repeat Sat/Unsat Evaluator Acknowledge repeat back providing correction if necessary.

back (GAP-OPS-OIl CNG-HU-1.01-1001)

RECORD START TIME

2.
3.
4.
5.
7.

Obtain a copy of the reference procedure and review/utilize the correct section of the procedure.

N1-OP-9 is obtained. Precautions &

Limitations reviewed & section H.l.O Sat/Unsat Perform N1-ST-VI within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Check off step complete. Initial SatlUnsat PRIOR to the start and at least once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during venting/purging.

conditions are N1 -ST-VI is complete.

Vent the primary containment as Proceeds to step 1.3, Drywell Venting SatlUnsat follows:

Drywell venting, refer to Drywell Ve n t i n g section Verify in STOP position 201-35 201-35 DRYWELL & TORUS VENT &

SatlUnsat DRYWELL &TORUS VENT & PURGE FAN control switch.

PURGE FAN control switch in STOP Notify SM to enter LCO 3.4.4 (f) in SM Log Book.

Notifies SM of requirement to enter LCO in log book.

SatlU nsat CUE: As SM, acknowledge requirements to enter LCO and enter in the log book.

8.

Verify closed the following valves:

Closed by observing green position indicating lights 201-21 DRYWELL & TOR VENT &

201-21 DRYWELL & TOR VENT SatlUnsat PURGE FAN INLET BV

& PURGE FAN INLET BV Unit 1 JPM 6 NRC November 2006

~

Pe rfo r ma n ce S te ps Standard Grade 201-22 DRYWELL & TOR VENT &

0 201-22 DRYWELL & TOR VENT Sat/Unsat PURGE FAN OUTLET BV

& PURGE FAN OUTLET BV 201.2-33 TORUS N2 MAKE-UP &

0 201.2-33 TORUS N2 MAKE-UP Sat/Unsat BLEED ISOL VALVE 11

& BLEED ISOL VALVE 11 201.2-06 TORUS N2 MAKE-UP &

201.2-06 TORUS N2 MAKE-UP Sat/Unsat BLEED ISOL VALVE 12

& BLEED ISOL VALVE 12 n 201.2-32 DRYWELL N2 MAKE-UP 0 201.2-32 DRYWELL N2 MAKE-Sat/Unsat

& BLEED ISOL VALVE 11 UP & BLEED ISOL VALVE 11 201.2-03 DRYWELL N2 MAKE-UP 201.2-03 DRYWELL N2 MAKE-Sat/Unsat

& BLEED ISOL VALVE 12 UP & BLEED ISOL VALVE 12 201.2-136 P SYS DISCH ROUTE 201.2-1 36 P SYS DISCH Sat/U nsat ROUTE 0 201-1 1 TORUS VENT TO 201-1 1 TORUS VENT TO Sat/Unsat CONDENSER CONDENSER NOTE: Candidate will likely identify component label in simulator is as "TORUWDRYWELL

.... I '

201 -47EM VENTILATION TIE BV 201-47EM VENTILATION TIE Sat/Unsat BV 202-36 EM VENTILATION FROM Closes 202-36 EM Pass/Fail REACTOR BLDG BV VENTILATION FROM REACTOR BLDG BV using control switch observes green light on and red light off.

Unit 1 JPM 6 NRC November 2006

Performance Steps Standard Grade 201-16 TORUS N2 VENT &

201-16 TORUS N2 VENT &

Sat/Unsat PURGE ISOLATION VALVE 11 PURGEISOLATION VALVE 11 201-17 TORUS N2 VENT &

I3 201 -1 7 TORUS N2 VENT &

SatlUnsat PURGE ISOLATION VALVE 12 PURGE ISOLATION VALVE 12

9.

I O.

11.
12.
13.
14.
15.
16.

Open 201-18 EM VENTLATION 201-18 EM VENTLATION FROM Pass/Fail FROM DW & TORUS BV DW & TORUS BV open using cs Open EM VENTILATION LOOP INLET 0

202-37 EM VENTILATION LOOP 11 Pass/Fail BV of selected system (System 11):

INLET BV open 0 202-37 EM VENTILATION LOOP 11 INLET BV Open 201-32 DW N2 VENT & PURGE 0 201-32 DW N2 VENT & PURGE Pass/Fail ISOLATION VALVE 11 ISOLATION VALVE 11 open Start EM VENT EXHAUST FAN of EM VENT EXHAUST FAN started PasslFail selected system (System 1 1 )

Throttle open 201-31 DW N2 VENT &

0 201-31 DW N2 VENT & PURGE PasslFail PURGE ISOLATION VALVE 12, using Pull-to-Stop feature.

ISOLATION VALVE 12 throttles open and establishes flow between 500 and 1600 scfm.

Verify flow rate I 1600 CFM 0 201-31 DW N2 VENT & PURGE Sat/Unsat ISOLATION VALVE 12 throttled open with <I600 CFM established.

WHEN pressure in torus is in the normal range (refer to Att 6), close the following valves:

When DW pressure is 1.2 psig, closes valves to stop purge:

201-32 DW N2 VENT & PURGE 201-32 DW N2 VENT & PURGE Pass/Fail ISOLATION VALVE 11 ISOLATION VALVE 11 closed 201-31 DW N2 VENT & PURGE 0

201-31 DW N2 VENT & PURGE Pass/Fail ISOLATION VALVE 12 ISOLATION VALVE 12 closed Stop EM VENT EXHAUST FAN EM VENT EXHAUST FAN stopped Sat/Unsat (System 11)

Unit 1 JPM 6 NRC November 2006

T-Performance Steps St and a rd Grade

17. WHEN Drywell venting is complete, verify closed the following valves:

201 -1 8 EM VENTLATION FROM 201-18 EM VENTLATION FROM DW Pass/Fail DW & TORUS BV

& TORUS BV 202-37 EM VENTILATION LOOP 0

202-37 EM VENTILATION LOOP 11 Pass/Fail 11 INLET BV INLET BV 202-38 EM VENTILATION LOOP 202-38 EM VENTILATION LOOP 12 Pass/Fail 12 INLET BV INLET BV

18. Open 202-36 EM VENTILATION I3 202-36 EM VENTILATION FROM PasslFail FROM REACTOR BUILDING BV REACTOR BUILDING BV open
19. Notify SM to exit LCO 3.4.4 (f) in SM Log Book SM notified to exit LCO SatlUnsat
20. Report status to SRO.

Reports completion of DW venting to Sat/Unsat SRO.

END OF JPM Terminating Cue:

RECORD STOP TIME Drywell vent lineup is established per N1-OP-9.

Unit 1 JPM 6 NRC November 2006

JPM HISTORY I

Change Revision Date Driver LC1 05-01 0

8/3/06 NRC Exam Originator G. Bobka 811 8/06 iG E Description Created as new JPM for Unit 1 LC1 05-01 NRC Exam Test ran with Ops. Have sim support check 201-31 response to throttling.

Its awful touchy and sensitive. Hard to establish flow, even with a wide band. Also, figure out best way to hand le ST-VI su rvei I lance.

MichaudIDann.

911 9/06 Validated Meier, Blum I

I Unit 1 JPM 6 NRC November 2006

Initial Conditions:

1. Drywell Pressure is 1.75 psig
2. N1 -ST-VI, VENTING/PURGING PRIMARY CONTAINMENT THROUGH RESCTOR BUILDING VENTILATION SYSTEM is in progress and is being performed by another operator.
3. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), Vent the Drywell using RBEVS train 11, in accordance with N1-OP-9. Establish flow rate between 500 and 1600 scfm. Lower Drywell pressure to 1.2 p i g, then secure the lineup.

Unit 1 JPM 6 NRC November 2006

OPERATOR JOB PERFORMANCE MEASURE

Title:

Reset RPS and ARI logic After High Drywell Pressure Scram Revision: NRC 2006 Task Number: 2000330401 Approvals:

NA EXAM SECURITY I

Date General Supervisor Date Operations Training (Designee)

Operations (Designee)

NA EXAM SECURITY I

Configuration Control Date Performer:

(ROISRO)

TrainerIEvaluator:

Evaluation Method:

X Perform Simulate Eva I ua t ion Location :

Plant X

Simulator Expected Completion Time: 15 min Time Critical Task:

NO Alternate Path Task: NO Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

Unit 1 JPM 7 NRC November 2006

Unit 1 Simulator Simulator Set-up (if required):

lC229. Post scram conditions stabilized High DWP pressure scram received and DWP is now below 3.0 psig ARI manually initiated Ensure Feedpump is operating for level control with low flow valve in auto SOP-I should be marked up indicating which actions are completed.

An instructor should be on the floor to monitor level and acknowledge any other alarms Directions to the lnstructor/Evaluator:

Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec.

Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected.

Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas PasslFail. All steps are sequenced critical unless denoted by a ".".
2. During Evaluated JPM:
3. During Training JPM:

Self checking shall be demonstrated.

Self checking shall be demonstrated.

Peer checking shall be demonstrated.

References:

1. N1-SOP-1
2. ARP F1 Unit 1 JPM 7 NRC November 2006

Tools and Equipment:

1. None Task Standard:

position 00.

RPS and ARI logic channels reset and the SDV is draining. All rods settled to Initial Conditions:

1. Plant scram from full power occurred on high drywell pressure about 20 minutes ago.
2. Three control rods did not insert, so ARI was manually initiated.
3. The three rods did insert.
4. NI-SOP-1 Reactor Scram is being implemented.
5. All immediate actions are complete.
6. Scram confirmation actions are complete.
7. IRM and SRM detectors were just inserted.
8. Recovery actions are in progress and conditions have stabilized.
9. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), Reset the scram and verify all rods at position 00.

Performance Steps Standard Grade

1.

Provide repeat back of initiating cue.

Proper communications used for repeat SatlUnsat Evaluator Acknowledge repeat back providing correction if necessary.

back (GAP-OPS-O1/ CNG-HU-1.01-1001)

RECORD START TIME

2.

Obtain a copy of the reference procedure and reviewhtilize the correct section of the procedure.

N1-SOP-1 is obtained.

THESE may be performed out of sequence. Acceptable to reset RPS before resetting ARI, as long as both are reset and rods are verified to be at position 00.

03. (SOP-I) IF ARI initiated, THEN Reset 0 At F Panel, reset ARI using ARI. (SOP-I) pushbutton When ARI is reset, the following occurs:

ARI INITIATlON CH I 1 and CHI2 red lights extinguish.

VALVE POSlTlON SOVl13-229A red VENT light extinguishes and Sat/Unsat Pass/Fail Unit 1 JPM 7 NRC November 2006

c Perform an ce Steps Stand a rd

.4.

05.

green NORMAL light comes on.

VALVE POSITION SOVI 13-229B red VENT light extinguishes and green NORMAL light comes on (SOP-I) IF all rod motion has stopped, THEN place both SCRAM DISCHARGE VOLUME HIGH LEVEL BYPASS switches in BYPASS 0

(SOP-I) IF auto initiated scram signals have cleared THEN 0

Verify at least 1 CRD pump in 0

service Reset Reactor scram AND verify 0

ALL control rods inserted to position 04 or beyond by observing one or more of the following:

o At M Panel When CONTAINMENT HIGH PRESSURE A and C are reset, relay I I K I O resets (energizes). Annunciator FI-1-5, RPS CH I ? DRYWELL PRESS HIGH clears. Fl-3-5 RPS CH 11 C 0 N TA I N ME N T IS0 LA TI0 N PURGE VALVES and FI-4-6 RPS CH I I CORE SPRAY AUTO OPERATION also clear.

CONTAINMENT ISOLATION F1-4-5 At M Panel When CONTAINMENT HIGH PRESSURE B and D are reset, relay 12K IO resets (energizes), A nnuncia for F4-1-4 RPS CH 12 DRYWELL HIGH PRESS clears. F4-3-4 RPS CH 12 CONTAINMENT Isolation and F4 3 RPS CH 12 CORE SPRAYAUTO OPERATION also clear.

At F Panel, place both key-lock bypass switches to BYPASS Recognizes that high DWP signal is sealed in and must be reset at M Panel to reset RPS logic. (ARP F l - l -

5 and F4-1-4)

Verify one CRD pump running at F Panel by observing red light.

At M panel, reset CONTAINMENT HIGH PRESSURE A and C AND B and D Pushbuttons (ARP F1-1-5 and F4-1-4).

Grade Pass/Fail Sat/Unsat Pass/Fail Unit 1 JPM 7 NRC November 2006

Performance Steps Standard Grade When RPS is reset, White Pilot At E Console, depress PasdFail lights on M and F Panels illuminate. All rods indicate 00 position on Full Core Display.

REACTOR TRIP RESET pushbutton All rods verified into at least position 04 by observing one or more of the following:

Full Core Display Full Core Display (All rods Demand new OD-7 Option 2 Demand new OD-7 Option 2 indicate 00 position)

Sat/U nsat K104A&B red LED lights lit K104A&B red LED lights lit (1 S20 (1 S20 Aux CR) (NOT EXPECTED)

Aux CR) (NOT EXPECTED)

All Rods In light illuminated All Rods In light illuminated (Remote Shutdown Panel)

(NOT EXPECTED)

EXPECTED)

(Remote Shutdown Panel) (NOT Confirm the following valves open:

At F Panel observes:

Sat/Unsat 44.2-15 and 44.2-16 44.2-15 and 44.2-16 CONTROL ROD DRIVE DUMP VOL VENT CONTROL ROD DRIVE DUMP VOL VENT VALVE VALVE red lights on.

Sat/Unsat 44.2-17 and 44.2-18 44.2-17 and 44.2-1 8 CONTROL ROD DUMP VOL DRAIN IV red CONTROL ROD DUMP VOL DRAIN IV lights on.

Sat/Unsat Confirm F3-2-4 CRD DRAIN-VENT Observes F3-2-4 CRD DRAIN-VENT VALVE CLOSED clear.

VALVE CLOSED clear.

6.

Reports status to SRO.

Report complete.

Sat/Unsat END OF JPM Terminating Cue:

position 00.

RPS and ARI logic channels reset and the SDV is draining. All rods settled to RECORD STOP TIME Unit 1 JPM 7 NRC November 2006

Initial I.

2.
3.
4.
5.
6.
7.
8.
9.

Conditions:

Plant scram from full power occurred on high drywell pressure about 20 minutes ago.

Three control rods did not insert, so ARI was manually initiated.

The three rods did insert.

N1 -SOP-I Reactor Scram is being implemented.

All immediate actions are complete.

Scram confirmation actions are complete.

IRM and SRM detectors were just inserted.

Recovery actions are in progress and conditions have stabilized.

Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), Reset the scram and verify all rods at position 00.

Unit 1 JPM 7 NRC November 2006

OPERATOR JOB PERFORMANCE MEASURE

Title:

MSlV Stroke Test and Limit Switch Test (NI-ST-Q26)

Revision:

NRC 2006 Task Number: 239901 0201 N/A, NRC EXAM SECURITY /

Ope rat ions (Designee)

Generd Supervisor Date General Supervisor Date Operations Training (Designee)

N/A, NRC EXAM SECURITY

/

Con f ig u ra t ion Control Date Performer:

(RO/SRO)

Trainer/Evaluator:

Evaluation Method:

X Perform Simulate Evaluation Location:

Plant X

Simulator Expected Completion Time: 20 Min.

Time Critical Task:

NO Alternate Path Task: NO Start Time:

Stop Time:

Completion Time:

JPM Overall Rating:

Pass Fail NOTE: A JPM overall rating of fail shall be given if a critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluators Signature:

Date:

Unit 1 JPM 8 NRC October 2006

Unit 1 Control Room Simulator Simulator Set-up (if required):

1. Initialize the simulator to IC-20 or equivalent.
2. Take the simulator out of freeze.
3. An instructor may be used on simulator floor, if allowed, to perform as an extra operator, for confirming some indications during valve stroking. Monitoring the valve mimic, as an extra operator is appropriate.

Directions to the Instructor/Evaluator:

Prior to performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec.

Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, the use of applicable methods of verification and checking are expected.

Therefore, either another individual or I will act as the independent verifier or peer checker.

Notes to Instructor / Evaluator:

1.
2.
3.

Critical steps are identified in grading areas PasslFail. All steps are sequenced critical unless denoted by a 0.

During Evaluated JPM:

During Training JPM:

Self checking shall be demonstrated.

Self checking shall be demonstrated.

Peer checking shall be demonstrated.

References :

1. NUREG 239001 A4.01 RO 4.2 SRO 4.0
2. NMP Unit One Task Analysis 239901 0201, 3.0 (RO)

Unit 1 JPM 8 NRC October 2006

3. Nl-ST-Q26 Tools and Equipment:

None Task Standard:

N1 -ST-Q26 completed for MSlV 01 -03, Main Steam Isolation Valve 1 12.

Initial Conditions:

1. Plant is operating at 100% power with no inoperable equipment.
2. All prerequisites for the test are completed.
3. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), test Main Steam Line Isolation Valve 112 & 121 in accordance with N1-ST-Q26, Section 8.2 & 8.3.

Grade Performance Steps Standard

1.

Provide repeat back of initiating cue.

Evaluator Acknowledge repeat back providing correction if necessary.

RECORD START TIME

2.
3.
4.
05.
06.

Obtain a copy of the reference procedure and reviewhtilize the correct section of the procedure.

Prepare to initiate a half scram on CHANNEL 11.

Verify no RPS Half Scram exists Notify the CSO that the following steps will initiate the half scram on RPS CH 11 Place Main Steam Isolation Valve 7%

Test Switch to the 112 position.

Confirm 01-03 MSlV 11 2 white test light ON.

Confirm 01-03 MSlV 112 yellow test light OFF.

Proper communications used for repeat back (GAP-OPS-Ol/Operations Manual)

SatlUnsat N1 -ST-Q26 obtained and applicable SaWnsat sections reviewed.

0 Unit 1 JPM 8 NRC Verify by all scram solenoid lights en erg ized Proper communications used.

Test switch is rotated to the 112 position.

White test light for MSlV 112 is verified energized.

Yellow light is extinguished for MSlV 112.

October 2006 Sat/Unsat Sat/Unsat PasslFail Sat/Unsat Satfunsat

NOTE to Evaluator:

JPM steps 7 to 14 will occur in rapid sequence. An additional person may perform as an extra operator as necessary for verifications.

7.
08.
9.

I O.

11.
12.
13.
14.
15.

Momentarily place control switch for MSlV 112 to CLOSE position.

Check RPS Channel 11 half scram indications as follows:

CH 11 SCRAM SOLENOID GROUPS 1,2,3,4 White Light OFF CH 11 B.U. SCRAM S.D.V. VENT AND DRAIN VALVE Light OFF Annunciator F1-1-7, RPS CH 11 MNSM LINE I I ISOL Valve CLOSED, alarms.

Annunciator F1-2-1, RPS CH 11 AUTO REACTOR TRIP, alarms.

Confirm 01-03, MSIV-112 automatic partial closure indications as follows:

01-03 MSIV-112 Green Light ON 01-03 MSIV-112 Red Light ON 01 -03 MSIV-112 Mimic Light ON Confirm after approximately 20 seconds Yellow light for MSlV 112 is brightly illuminated.

Confirm 01 -03 MSIV-112 automatic opening indications as follows:

01-03 MSIV-112 Green Light OFF 01-03 MSIV-112 Red Light ON 01 -03 MSIV-112 Mimic Light OFF Place MSlV 7% Test Switch to the OFF position.

Confirm 01-03 MSlV 112 White Test Light OFF.

Confirm 01 -03 MSlV 11 2 Yellow Light OFF.

Depress REACTOR TRIP RESET at Panel E.

Rotate switch for MSlV 112 Pass/Fail momentarily to CLOSE then release.

Verify the following:

0 CH 11 SCRAM SOLENOID SatlUnsat GROUPS 1,2,3,4 White Light OFF.

AND DRAIN VALVE Light OFF MNSM LINE II ISOL Valve CLOSED, alarms.

AUTO REACTOR TRIP, alarms.

CH 11 B.U. SCRAM S.D.V. VENT Sat/Unsat Annunciator F1-1-7, RPS CH 11 Sat/U nsat 0 Annunciator F1-2-1, RPS CH 11 Sat/ Unsat Verify the following:

01-03 MSIV-112 Green Light ON Sat/Unsat 01-03 MSIV-112 Red Light ON 01-03 MSIV-112 Mimic Light ON Yellow light for MSlV is verified Sat/U nsat BRIGHT.

Verify the following:

01-03 MSIV-112 Green Light OFF 01-03 MSIV-112 Red Light ON 01-03 MSIV-112 Mimic Light OFF Rotate Test Switch to OFF.

PasdFail Observe White Test Light for MSIV-Sat/Unsat 112 is OFF.

Observe Yellow Light for MSIV-112 is Sat/Unsat OFF.

Depress Rx Trip RESET Button on E-PasslFail console.

Unit 1 JPM 8 NRC October 2006

Performance Steps Standard

16. Check RPS Channel 11 Half-Scram is CLEARED:

CHANNEL 11 SCRAM SOLENOID Groups 1,2,3,4 White Light ON.

CHANNEL 11 BACKUP SCRAM VALVE Red Light ON.

Annunciator F1-1-7, RPS CH 11 MN STM LINE 11 ISOL VALVE CLOSED, Clear Annunciator F1-2-1, RPS CH 11 AUTO REACTOR TRIP, Clear Verify the following:

CHANNEL 11 SCRAM SOLENOID SatlUnsat CHANNEL 11 BACKUP SCRAM Sat/Unsat Annunciator F1-1-7, RPS CH 1 1 MN Sat/Unsat Groups 1,2,3,4 White Light ON.

VALVE Red Light ON.

STM LINE 11 ISOL VALVE CLOSED, Clear AUTO REACTOR TRIP, Clear Annunciator F1-2-1, RPS CH 11 Sat/Unsat

17. Condition Monitoring Group confirm all Contact Condition Monitoring Group Sat/Unsat scram pilot valve solenoids are energized by thermography.

for confirmation that all scram pilot valve solenoids are energized by the rmog rap h y.

Cue: As Condition Monitoring Group, report all scram solenoids have been confirmed to be energized by thermography.

18. Prepare to initiate a half scram on CHANNEL 12.

Verify no RPS Half Scram exists Verify by all scram solenoid lights Sat/Unsat Notify the CSO that the following Proper communications used.

Sat/Unsat energized steps will initiate the half scram on RPS CH 12.

19. Place Main Steam Isolation Valve 7%

Test switch is rotated to the 121 PasslFail Test Switch to the 121 position.

position.

20. Confirm 01-02 MSlV 121 white test White test light for MSlV 121 is Sat/Unsat light ON.

verified energized.

21. Momentarily place 01 -02 MSIV-121 Rotate switch for MSlV 121 PasslFail control switch to CLOSE position.

momentarily to CLOSE then release.

Unit 1 JPM 8 NRC October 2006

c Standard Performance Steps Grade e22

23.
24.
25.
26.
27.
28.

END OF JPM Check RPS Channel 12 half scram indications as follows:

CH 12 SCRAM SOLENOID GROUPS 1,2,3,4 White Light OFF.

CH 12 B.U. SCRAM S.D.V. VENT AND DRAIN VALVE Light OFF Annunciator F4-1-2, RPS CH 12 MNSM LINE 12 ISOL Valve CLOSED, alarms.

Annunciator F4-2-8, RPS CH 12 AUTO REACTOR TRIP, alarms.

Confirm 01 -02, MSIV-121 automatic partial closure indications as follows:

01-02 MSIV-121 Green Light ON 01-02 MSIV-121 Red Light ON 01-02 MSIV-121 Mimic Light ON Place MAIN STEAM ISOLATION position.

VALVE 7% TEST switch to OFF Confirm 01-02 MSlV 121 White Test Light OFF.

Depress REACTOR TRIP RESET at Panel E.

Check RPS Channel 12 half scram are cleared:

CH 12 SCRAM SOLENOID GROUPS 1,2,3,4 White Light ON.

CH 12 B.U. SCRAM S.D.V. VENT AND DRAIN VALVE Light ON Annunciator F4-1-2, RPS CH 12 MNSM LINE 12 ISOL Valve CLOSED, clear.

Annunciator F4-2-8, RPS CH 12 AUTO REACTOR TRIP, clear.

Notifies SRO of status Verify the following:

SatlUnsat CH 12 SCRAM SOLENOID GROUPS 1,2,3,4 White Light OFF.

CH 12 B.U. SCRAM S.D.V. VENT AND DRAIN VALVE Light OFF Annunciator F4-1-2, RPS CH 12 MNSM LINE 12 ISOL Valve CLOSED, alarms.

Annunciator F4-2-8, RPS CH 12 AUTO REACTOR TRIP, alarms.

Verify the following:

Sat/Unsat 01-02 MSIV-121 Green Light ON 01-02 MSIV-121 Red Light ON 01-02 MSIV-121 Mimic Light ON Test switch is rotated to the OFF PasslFail position White Test Light for MSIV-121 is OFF.

SatlUnsat Depress REACTOR TRIP RESET Pass/Fail Button on E-console.

Verify the following:

0 CH 12 SCRAM SOLENOID Sat/Unsat CH 12 B.U. SCRAM S.D.V. VENT Sat/Unsat 0 Annunciator F4-1-2, RPS CH 12 SatlUnsat GROUPS 1,2,3,4 White Light ON.

AND DRAIN VALVE Light ON MNSM LINE 12 ISOL Valve CLOSED, clear.

AUTO REACTOR TRIP, clear.

Annunciator F4-2-8, RPS CH 12 Sat/Unsat Proper communication used Sat/Unsat Terminating Cue:

RECORD STOP TIME Nl-ST-Q26 completed for MSlV 01-03 & MSlV 01-02 Unit 1 JPM 8 NRC October 2006

c.

Initial Conditions:

1. Plant is operating at 100% power with no inoperable equipment.
2. All prerequisites for the test are completed.
3. Instructor to ask operator for any questions.

Initiating Cues:

"(Operator's name), test Main Steam Line Isolation Valve 1 I 2 & 121 in accordance with Nl-ST-Q26, Section 8.2 & 8.3."

Unit 1 JPM 8 NRC October 2006