REFERENCES PROVIDED TO THE CANDIDATES FOR THE 2007 NRC EXAM Reactor Operator Examination
References:
I Question RO-64 RO-65 Reference Provided C-l8015-C, REACTOR VESSEL INSTRUMENT P & I DIAGRAM (With set points removed)
Power to Flow Maps (3-Loop, 4-Loop & 5-LOOP)
~~
N1-SOP-33A.1, LOSS OF 115KV N1-OP-25, CONDENSER AIR REMOVAL AND OFF-GAS SYSTEM, Section F only ARP L2-3 Power to Flow Maps (%LOOP, 4-LOOP & 5-Loop)
N1-EOP-2T (With the ent conditions removed), RPV
!Y CONTROL, & Nl-EOP-8, RPV BLOWDOWN N1 -EOP-3', FAILURE TO SCRAM N1 -EOP-5'. SECONDARY CONTAINMENT CONTROL
-~
1 RO-75
'Enlarged EOP graphs and tables are also provided because they can be hard to read.
Senior Reactor 01 Question Number SRO-1 SRO-2 SRO-6 SRO-7 SRO-8 SRO-10 SRO-12 SRO-13 SRO-14 SRO-17 SRO-18 SRO-20 brator Examination
References:
Reference Provided EPIP-EPP-01, EAL MATRIX N1 -EOP-4' with the entry conditions removed), PRIMARY CONTAINMENT CONTROL EPIP-EPP-01, EAL MATRIX Nl-EOP-3', FAILURE TO SCRAM N1-EOP-2' (With the entry conditions removed), RPV CONTROL The steam tables and Technical Specifications 3.1.5*, 3.2.9*
and 3.6.1 1
- Technical Specification 3.6.2" Technical Specifications 3.1.5* and 3.6.2*
N1-EOP-2' (With the entry conditions removed), RPV CONTROL, N1 -EOP-4T (With the entry conditions removed),
BLOW DOWN PRIMARY CONTAINMENT CONTROL, & N1 -EOP-8T, RPV Technical Specifications 3.1.4* and 3.6.3*
N1 -SOP-29.1, EOP KEY PARAMETER - ALTERNATE INSTRUMENTATION & Technical Specifications 3.6.1 1
- and 3.6.1 3*
N1-EOP-2' (With the entry conditions removed), RPV (With the entry conditions removed), PRIMARY CONTAINMENT CONTROL CONTROL, N1 -EOP-3T, FAILURE TO SCRAM Nl-EOP-4T
SRO-21 SRO-22 N1 -EOP-2' (With the entry conditions removed), RPV CONTROL N l -EOP-4T (With the entry conditions removed), PRIMARY CONTAINMENT CONTROL, & N1 -EOP-ST, STEAM COOLING TEnlarged EOP graphs and tables are also provided because they can be hard to read.
SRO-24 SRO-25 T.S. 3.2.3" Nl-EOP-5', SECONDARY CONTAINMENT CONTROL