Letter Sequence Approval |
---|
TAC:MD2135, Steam Generator Tube Integrity (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000400/20240102024-12-0404 December 2024 Biennial Problem Identification and Resolution Inspection Report 05000400/2024010 IR 05000400/20240032024-11-0707 November 2024 Integrated Inspection Report 05000400/2024003 ML24290A1102024-10-24024 October 2024 Notification of Licensed Operator Initial Examination 05000400/2025301 05000400/LER-2024-001-01, Automatic Reactor Trip Due to Main Generator Lock-Out2024-10-23023 October 2024 Automatic Reactor Trip Due to Main Generator Lock-Out IR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 05000400/LER-2024-001, Automatic Reactor Trip Due to Main Generator Lock-Out2024-07-22022 July 2024 Automatic Reactor Trip Due to Main Generator Lock-Out ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter 05000400/LER-2022-006-02, Auxiliary Feedwater Pump Inoperability2023-07-11011 July 2023 Auxiliary Feedwater Pump Inoperability ML23135A7132023-05-15015 May 2023 – Notification of Licensed Operator Initial Examination 05000400/2024301 IR 05000400/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility 05000400/LER-1922-006-01, Auxiliary Feedwater Pump Inoperability2023-03-10010 March 2023 Auxiliary Feedwater Pump Inoperability IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 2024-09-10
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22126A0082022-08-0909 August 2022 Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7 ML22161B0332022-07-28028 July 2022 Issuance of Amendment No. 193 Regarding Revision of Surveillance Requirements to Remove Shutdown Limitation ML22010A2812022-03-0404 March 2022 Issuance of Amendments to Adopt TSTF-577, Rev. 1 Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0161 ML21351A4722022-02-10010 February 2022 Issuance of Amendment No. 190 Regarding Revision to Containment Spray Nozzle Test Frequency ML21320A0012022-01-20020 January 2022 Issuance of Amendment No. 189 to Regarding Administrative Change to Reflect Development of a Technical Requirements Manual ML21316A2482022-01-19019 January 2022 Issuance of Amendment No. 188, Regarding Revision of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22012A4192022-01-18018 January 2022 Correction to Amendment to Revise the Technical Specification for Engineered Safety Feature Actuation System Instrumentation ML21224A1012021-10-0707 October 2021 Issuance of Amendments to Revise the Technical Specification for Engineered Safety Feature Actuation System Instrumentation ML21155A2132021-08-26026 August 2021 Plant ML21116A2072021-05-0404 May 2021 Correction to Amendment No. 184 Regarding TSTF Traveler TSTF-505, Rev. 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4B ML21047A4702021-04-0808 April 2021 Issuance of Amendment No. 185 Regarding Reduction of Reactor Coolant System Minimum Flow Rate and Update to the Core Operating Limits Report References ML21047A3142021-04-0202 April 2021 Issuance of Amendment No. 184 Regarding Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times RITSTF Initiative 4B ML21033B0072021-03-22022 March 2021 Issuance of Amendment No, 183 to Correct Non-Conservative Technical Specification Related to Reactor Coolant System Pressure/Temperature Limits ML21035A1322021-03-16016 March 2021 Issuance of Amendment No. 182 Regarding Technical Specifications Related to Accident Monitoring Instrumentation, and Refueling Operations Instrumentation ML20259A5122020-12-0808 December 2020 Issuance of Amendment No. 181 Regarding Adoption of 10 CFR Part 50, Appendix J, Option B, for Type B and C Testing and for Permanent Extension of Type a, B, and C Leak Rate Testing Frequencies(L-2019-LLA-0256) ML20281A2792020-10-13013 October 2020 Correction Letter to Amendment No. 179 Regarding Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML20273A0232020-10-0909 October 2020 Correction Letter to Amendment No. 180 Issued September 4, 2020 ML20212L5942020-09-29029 September 2020 Issuance of Amendment No. 179 Regarding Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20237F4352020-09-0404 September 2020 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20099F5052020-06-29029 June 2020 Issuance of Amendment No. 177 Regarding Elimination of Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications ML20050D3712020-03-31031 March 2020 Issuance of Amendment No. 176 Regarding the Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications ML19225C0692019-09-19019 September 2019 Issuance of Amendment No. 175 Modify Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints ML19192A0122019-09-17017 September 2019 Issuance of Amendment No. 174 Adopt Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components ML19108A1732019-07-18018 July 2019 Issuance of Amendment No. 173 Regarding Emergency Plan Emergency Action Level Scheme Change ML18288A1392019-04-29029 April 2019 Issuance of Amendments 171, 263 Revising Technical Specifications to Support Self Performance of Core Reload Design and Safety Analyses ML19050A2972019-04-18018 April 2019 McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding Removal ML18347A3852019-03-29029 March 2019 Issuance of Amendment No. 169, Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML18262A3032018-11-19019 November 2018 Issuance of Amendment No. 168 Regarding License Amendment Request for Rod Control Movable Assemblies Technical Specifications Changes ML18204A2862018-10-22022 October 2018 Issuance of Amendment No. 167 Regarding (CAC MF9996; EPID 2017-LLA-0303) ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application HNP-18-039, Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses2018-04-13013 April 2018 Supplement to License Amendment Request Regarding Spent Fuel Storage Pool Criticality Analyses ML18060A4012018-04-10010 April 2018 Redacted Issuance of Amendments Revising TSs for Methodology Reports DPC-NE-3008-P, Revision 0, and DPC-NE-3009-P, Revision 0) (CAC Nos. MF8439 and MF8440; EPID L-2016-LLA-0012) ML17324B0482017-12-0606 December 2017 Correction to License Amendment No. 127 Regarding Changes to the Inservice Inspection and Testing Requirements and Establishment of a Technical Specifications Bases Control Program ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17074A6722017-05-25025 May 2017 Issuance of Amendment Relocation of Explosion Gas Monitoring Program Technical Specifications ML17048A1842017-05-24024 May 2017 Issuance of Amendment on Changes to Technical Specifications Section 3.8, Electrical Power Systems and Section 6.8. Procedures and Programs ML17102A9232017-05-18018 May 2017 Nonproprietary Issuance of Amendments Revising Technical Specifications for Methodology Reports DPC Ne 1008 P Revision 0, DPC Nf 2010 Revision 3 and DPC Ne 2011 P Revision 2 (CAC Nos. MF6648, MF6649, MF7693/MF7694) ML17055A6472017-05-0808 May 2017 Brunswick, Catawba, McGuire, Shearon Harris, and H. B. Robinson - Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422, MF8423, MF8424, MF8425, MF8426, MF8427, MF8428, and MF8429) ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML17066A2992017-03-28028 March 2017 2nd Correction to License Amendment No. 154 Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program 2024-08-02
[Table view] Category:Safety Evaluation
MONTHYEARML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22227A0682022-09-0202 September 2022 Alternative to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Code for Operation and Maintenance for Certain Target Rock Solenoid Valves ML22126A0082022-08-0909 August 2022 Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7 ML22161B0332022-07-28028 July 2022 Issuance of Amendment No. 193 Regarding Revision of Surveillance Requirements to Remove Shutdown Limitation ML22083A0272022-03-23023 March 2022 Safety Evaluation -Harris Safety Evaluation -EPID L-2021-LLA-0149 - Revise TS Related to Reactor Protection System ML22020A0072022-03-10010 March 2022 Issuance of Amendment No. 192 Regarding Removal of Extraneous Content and Requirements from the Renewed Facility Operating License and Technical Specifications ML22010A2812022-03-0404 March 2022 Issuance of Amendments to Adopt TSTF-577, Rev. 1 Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0161 ML21351A4722022-02-10010 February 2022 Issuance of Amendment No. 190 Regarding Revision to Containment Spray Nozzle Test Frequency ML21320A0012022-01-20020 January 2022 Issuance of Amendment No. 189 to Regarding Administrative Change to Reflect Development of a Technical Requirements Manual ML21316A2482022-01-19019 January 2022 Issuance of Amendment No. 188, Regarding Revision of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21155A2132021-08-26026 August 2021 Plant ML21113A0132021-05-0606 May 2021 Request for Use of a Later Edition of ASME Boiler and Pressure Vessel Code, Section XI for Repair and Replacement Activities ML21047A4702021-04-0808 April 2021 Issuance of Amendment No. 185 Regarding Reduction of Reactor Coolant System Minimum Flow Rate and Update to the Core Operating Limits Report References ML21047A3142021-04-0202 April 2021 Issuance of Amendment No. 184 Regarding Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times RITSTF Initiative 4B ML21033B0072021-03-22022 March 2021 Issuance of Amendment No, 183 to Correct Non-Conservative Technical Specification Related to Reactor Coolant System Pressure/Temperature Limits ML21069A0642021-03-18018 March 2021 Alternative to ASME Section XI Code Requirements to Defer Repair of Emergency Service Water System Socket Weld ML21035A1322021-03-16016 March 2021 Issuance of Amendment No. 182 Regarding Technical Specifications Related to Accident Monitoring Instrumentation, and Refueling Operations Instrumentation ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20259A5122020-12-0808 December 2020 Issuance of Amendment No. 181 Regarding Adoption of 10 CFR Part 50, Appendix J, Option B, for Type B and C Testing and for Permanent Extension of Type a, B, and C Leak Rate Testing Frequencies(L-2019-LLA-0256) ML20300A2062020-11-0909 November 2020 Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20281A2792020-10-13013 October 2020 Correction Letter to Amendment No. 179 Regarding Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML20212L5942020-09-29029 September 2020 Issuance of Amendment No. 179 Regarding Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20237F4352020-09-0404 September 2020 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20099F5052020-06-29029 June 2020 Issuance of Amendment No. 177 Regarding Elimination of Certain Technical Specification Requirements in Alignment with Improved Standard Technical Specifications ML20050D3712020-03-31031 March 2020 Issuance of Amendment No. 176 Regarding the Extension of the Essential Services Chilled Water System Allowed Outage Time and Removal of an Expired Note from Technical Specifications ML19225C0692019-09-19019 September 2019 Issuance of Amendment No. 175 Modify Reactor Trip System and Engineered Safety Features Actuation System Instrumentation Trip Setpoints ML19192A0122019-09-17017 September 2019 Issuance of Amendment No. 174 Adopt Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components ML19254A6202019-09-17017 September 2019 Duke Energy Fleet (Brunswick, Catawba, Robinson, McGuire, Oconee, and Shearon Harris) - Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19108A1732019-07-18018 July 2019 Issuance of Amendment No. 173 Regarding Emergency Plan Emergency Action Level Scheme Change ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs ML19128A3262019-06-20020 June 2019 Alternative to Depth Sizing Qualification Examination of Welds ML18288A1392019-04-29029 April 2019 Issuance of Amendments 171, 263 Revising Technical Specifications to Support Self Performance of Core Reload Design and Safety Analyses ML19050A2972019-04-18018 April 2019 McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding Removal ML18347A3852019-03-29029 March 2019 Issuance of Amendment No. 169, Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis ML19018A0252019-02-26026 February 2019 Relief Request I3R-18, Regarding Alternative Repair and Replacement Testing Requirements for the Containment Building Equipment Hatch Sleeve Weld, Inservice Inspection Program for Containment, Third Ten-Year Interval ML18303A0482018-12-0404 December 2018 Extension of Reactor Pressure Vessel Surveillance Report for Capsule Z ML18283B5442018-11-20020 November 2018 Relief from the Requirements of the ASME Code, Section XI, Reactor Vessel Closure Head Penetration Nozzle Repair Technique 2024-08-02
[Table view] |
Text
March 16, 2007 Mr. Robert J. Duncan II, Vice President Shearon Harris Nuclear Power Plant Carolina Power & Light Company Post Office Box 165, Mail Code: Zone 1 New Hill, North Carolina 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - ISSUANCE OF AMENDMENT ON STEAM GENERATOR TUBE SURVEILLANCE PROGRAM (TAC NO. MD2135)
Dear Mr. Duncan:
The Nuclear Regulatory Commission has issued Amendment No. 124 to Facility Operating License No. NPF-63 for the Shearon Harris Nuclear Power Plant, Unit 1. This amendment changes the technical specifications in response to your application dated May 23, 2006, as supplemented by letters dated October 3, 2006 and October 24, 2006.
The amendment revises the existing steam generator tube surveillance program.
A copy of the related Safety Evaluation is enclosed. Notice of Issuance will be included in the Commission's regular biweekly Federal Register notice.
Sincerely,
/RA/
Chandu P. Patel, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosures:
- 1. Amendment No. 124 to NPF-63
- 2. Safety Evaluation cc w/enclosures: See next page
ML070510525 NRR-058 OFFICE LPL2-2/PM LPL2-2/LA ITSB/BC LPL2-2/BC (A)
NAME CPatel RSola TKobetz (by memo dated) SBailey DATE 3/15/07 3/15/07 11/20/06 3/15/07 CAROLINA POWER & LIGHT COMPANY, et al.
DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.124 License No. NPF-63
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Carolina Power & Light Company (the licensee), dated May 23, 2006, as supplemented by letters dated October 3, 2006 and October 24, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-63 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. , are hereby incorporated into this license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Stewart N. Bailey, Acting Branch Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Operating License No. NPR-63 and the Technical Specifications Date of Issuance: March 16, 2007
ATTACHMENT TO LICENSE AMENDMENT NO. 124 FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace page 4 of Facility Operating License No. NPF-63 with the attached revised page 4.
Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Pages Insert Pages Index Page vii Index Page vii Index Page xiii Index Page xiii Index Page xix Index Page xix 1-3 1-3 1-4 1-4 3/4 4-13 3/4 4-13 3/4 4-14 3/4 4-15 3/4 4-16 3/4 4-17 3/4 4-18 3/4 4-19 3/4 4-21 3/4 4-21 3/4 4-23 3/4 4-23 3/4 4-24 3/4 4-24 6-19d 6-19d 6-19e 6-19e 6-19f 6-19f 6-24c 6-24c 6-24d 6-24d 6-25
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 124 TO FACILITY OPERATING LICENSE NO. NPF-63 CAROLINA POWER & LIGHT COMPANY, et al.
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400
1.0 INTRODUCTION
By letter dated May 23, 2006 (ML061520433 [Agencywide Document Access and Management System Accession Number]), as supplemented by letters dated October 3, 2006 (ML062850259), and October 24, 2006 (ML063050173), the Carolina Power & Light Company (the licensee) submitted a request for changes to the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), Technical Specifications (TS). The requested changes would revise the existing steam generator (SG) tube surveillance program. The changes are modeled after TS Task Force (TSTF) traveler TSTF-449, Revision 4, Steam Generator Tube Integrity, and the model safety evaluation prepared by the Nuclear Regulatory Commission (NRC) and published in the Federal Register on March 2, 2005 (70 FR 10298). The scope of the application includes changes to the definition of leakage, changes to the primary-to-secondary leakage requirements, changes to the SG tube surveillance program (SG tube integrity), changes to the SG reporting requirements, and associated changes to the TS Bases.
The October 3, 2006, and October 24, 2006, letters provided clarifying information that did not expand the scope of the application, and did not change the initial proposed no significant hazards consideration determination.
2.0 REGULATORY EVALUATION
The background, description, and applicability of the proposed changes associated with the SG tube integrity issue and the applicable regulatory requirements were included in the NRC staffs model safety evaluation (SE) published in the Federal Register on March 2, 2005 (70 FR 10298). The Notice of Availability of Model Application Concerning Technical Specification Improvement To Modify Requirements Regarding Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process was published in the Federal Register on May 6, 2005 (70 FR 24126), and made the model SE available for licensees to reference.
3.0 TECHNICAL EVALUATION
3.1 Overview The licensee proposed changes to the TSs that are modeled after TSTF-449, Steam Generator Tube Integrity. There were minor differences between TSTF-449 and the licensee's
application. These included differences in the facility licensing basis (than that discussed in TSTF-449) and differences in TS format and numbering (than that assumed in TSTF-449).
With respect to the differences in the facility licensing basis, the differences did not invalidate the technical evaluation on TSTF-449; rather they resulted in the licensee having to slightly deviate from some of the modifications discussed in TSTF-449. For example, in the Bases section for Reactor Coolant System Operational Leakage, the licensee refers to upset conditions rather than the TSTF language of upset or abnormal conditions. In addition, in the bases of TSTF-449, the accident radiological analysis for an SG tube rupture (SGTR) assumes that the ruptured SG secondary fluid is only briefly released to the atmosphere via safety valves and that the majority is discharged to the main condenser. However, in the bases for HNP (page 5 of 7 of Insert 3/4.4.5 Bases), the accident radiological analysis for a SGTR assumes that the secondary fluid from the ruptured SG tube is released directly to the atmosphere due to a failure of the SG power-operated relief valve in the open position. Another difference from the TSTF is that due to HNPs adoption of the alternate source term, the HNP TS Bases reference Title 10 of the Code of Federal Regulations (10 CFR) 50.67 rather than 10 CFR Part 100 for the acceptance limits related to radiological dose consequences. In addition to these differences, some of the proposed information included in the TS Bases is not from the TSTF, but it is from the existing TS Bases and from other non-Improved Technical Specifications submittals. Since these differences were minor in nature, they were consistent with the plant's licensing basis, and they were consistent with the intent of TSTF-449, the NRC staff determined they were acceptable.
With respect to the differences in the numbering of the technical specifications, these differences were administrative in nature and did not affect the technical adequacy of the submittal. As a result, the NRC staff determined they were acceptable.
With respect to the differences in the format of the TS, the licensee provided many of the specifications in a paragraph format rather than the tabular format in the TSTF. Since the version proposed by HNP is identical in meaning to the version in the TSTF, the NRC staff determined that these differences were acceptable.
As a result of adopting TSTF-449, the licensee also proposed changes to the TS Bases pertaining to reactor coolant system operational leakage. These changes were necessary to facilitate adopting the proposed changes in TSTF-449. Since these proposed TS changes pertaining to reactor coolant system operational leakage were generally consistent with the standard TS and were consistent with the plant's licensing basis, the NRC staff determined that the proposed changes were acceptable.
The remainder of the application is consistent with, or more limiting than, TSTF-449. In summary, the NRC staff determined that the model safety evaluation is applicable to this review and finds the proposed changes acceptable.
Consistent with TSTF-449, the proposed TS changes include: (1) a revised definition of LEAKAGE and PRESSURE BOUNDARY LEAKAGE, (2) a new TS 3/4.4.5, "Steam Generator (SG) Tube Integrity," (3) a revised TS TS 3/4.4.6.1, Reactor Coolant System Leakage Detection Systems, (4) a revised TS 3/4.4.6.2, Reactor Coolant System Operational Leakage, (5) a new TS 6.8.4.l, Steam Generator (SG) Program, (6) a new TS 6.9.1.7,
"Steam Generator Tube Inspection Report," and (7) a revised Table of Content pages to reflect the proposed changes.
3.2 Summary The proposed TS changes establish a programmatic, largely performance-based regulatory framework for ensuring SG tube integrity. The NRC staff finds that it addresses key shortcomings of the current framework by ensuring that SG programs are focused on accomplishing the overall objective of maintaining tube integrity. It incorporates performance criteria for evaluating tube integrity that the NRC staff finds consistent with the structural margins and the degree of leak tightness assumed in the current plant licensing basis. The NRC staff finds that maintaining these performance criteria provides reasonable assurance that the SGs can be operated safely without increase in risk.
The revised TSs will contain limited specific details concerning how the SG Program is to achieve the required objective of maintaining tube integrity; the intent being that the licensee will have the flexibility to determine the specific strategy for meeting this objective. However, the NRC staff finds that the revised TSs include sufficient regulatory constraints on the establishment and implementation of the SG Program such as to provide reasonable assurance that tube integrity will be maintained.
Failure to meet the performance criteria will be reportable pursuant to the requirements in 10 CFR Parts 50.72 and 50.73. The NRC reactor oversight process provides a process by which the NRC staff can verify that the licensee has identified any SG Program deficiencies that may have contributed to such an occurrence and that appropriate corrective actions have been implemented.
In conclusion, the NRC staff finds that the TS changes proposed by the licensee in its May 23, 2006, application and October 3, 2006 and October 24, 2006, supplements conform to the requirements of 10 CFR 50.36 and establish a TS framework that will provide reasonable assurance that SG tube integrity is maintained without undue risk to public health and safety.
The licensee included in its application the revised TS Bases to be implemented with the TS change. The NRC staff finds that the TS Bases Control Program is the appropriate process for updating the affected TS Bases pages and has, therefore, not included the affected Bases pages with this amendment.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the State of North Carolina official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The
Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (71 FR 75991, December 19, 2006). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
7.0 REFERENCES
A complete list of references used to complete this review can be found in the NRCs model SE published in the Federal Register on March 2, 2005 (70 FR 10298).
Principal Contributor: Trent L. Wertz Date: March 16, 2007
Mr. R. J. Duncan II Shearon Harris Nuclear Power Plant Carolina Power & Light Company Unit 1 cc:
David T. Conley Mr. Chris L. Burton Associate General Counsel II - Director of Site Operations Legal Department Shearon Harris Nuclear Power Plant Progress Energy Service Company, LLC Carolina Power & Light Company Post Office Box 1551 Post Office Box 165, Mail Zone 1 Raleigh, North Carolina 27602-1551 New Hill, North Carolina 27562-0165 Resident Inspector/ Harris NPS Mr. Robert P. Gruber c/o U. S. Nuclear Regulatory Commission Executive Director 5421 Shearon Harris Road Public Staff NCUC New Hill, North Carolina 27562-9998 4326 Mail Service Center Raleigh, North Carolina 27699-4326 Ms. Margaret A. Force Assistant Attorney General Chairman of the North Carolina State of North Carolina Utilities Commission Post Office Box 629 Post Office Box 29510 Raleigh, North Carolina 27602 Raleigh, North Carolina 27626-0510 Public Service Commission Mr. Herb Counsel, Chair State of South Carolina Board of County Commissioners Post Office Drawer 11649 of Wake County Columbia, South Carolina 29211 P. O. Box 550 Raleigh, North Carolina 27602 Ms. Beverly Hall, Section Chief Division of Radiation Protection Mr. Tommy Emerson, Chair N.C. Department of Environment Board of County Commissioners and Natural Resources of Chatham County 3825 Barrett Drive P. O. Box 87 Raleigh, North Carolina 27609-7721 Pittsboro, North Carolina 27312 Mr. J. Paul Fulford Mr. Thomas J. Natale, Manager Manager Support Services Performance Evaluation and Shearon Harris Nuclear Power Plant Regulatory Affairs PEB 5 Carolina Power & Light Company Carolina Power & Light Company P. O. Box 165, Mail Zone 1 Post Office Box 1551 New Hill, North Carolina 27562-0165 Raleigh, North Carolina 27602-1551 Mr. David H. Corlett, Supervisor Mr. Eric McCartney Licensing/Regulatory Programs Plant General Manager Shearon Harris Nuclear Power Plant Shearon Harris Nuclear Power Plant Carolina Power & Light Company Carolina Power & Light Company P. O. Box 165, Mail Zone 1 P. O. Box 165, Mail Zone 3 New Hill, NC 27562-0165 New Hill, North Carolina 27562-0165 Mr. John H. ONeill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW.
Washington, DC 20037-1128