E-Mail: (PA) Nov 6 Telecon Summary (VY)
ML070030327
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/22/2006
From: Rowley J
NRC/NRR/ADRO/DLR/REBB
To: Hamer M
Entergy Nuclear Operations
References
%dam200702, TAC MD2297
Download: ML070030327 (5)


Text

rage i 01 1 Jonathan Rowley - Nov 6 telecon summary From:

Jonathan Rowley To:

mhamer@entergy.com Date:

11/22/2006 3:18 PM

Subject:

Nov 6 telecon summary Mike Please review and provide any comments the VY staff may found appropriate.

I will be out of the office on Friday (11/24). 1 will contact you on Monday (11/27) for a LR status update.

fi le://C:\\temp\\GW }00002.HTM 1/020 12/20/2006

JLJonathan Fýowlleyý- Summary of Telephone Conference - November 6, 2qO výpq fý (YYL Page 11 ILjonathan Rowley - Summary of Telephone Conference

- November 6, 2006 (VY).wpd PaQe 1 LICENSEE:

Entergy Nuclear Operations, Inc.

FACILITY:

Vermont Yankee Nuclear Power Station

SUBJECT:

SUMMARY

OF A TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 6, 2006, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY NUCLEAR OPERATIONS, INC., CONCERNING INFORMATION PERTAINING TO THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., held a telephone conference call on November 6, 2006, to discuss and clarify the staff's requests for additional information concerning the Vermont Yankee Nuclear Station license renewal application. The conference call was useful in clarifying the staff's questions. provides a listing of the conference call participants. Enclosure 2 contains a listing of the issues discussed with the applicant, including a brief discussion of the items' status.

The applicant had an opportunity to comment on this summary.

Jonathan Rowley, Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosures:

As stated cc w/encls: See next page

11,4qmýtha"owley - Summary of Telephone Conterence - November 6, 2006 (VYý.wRdl Page 2 11 j~Jonathan Rowley-Summary of T~ephone Conference - November 6, 2006 (VY).wpd PaQe 2 LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL TO DISCUSS THE VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION November 6, 2006 PARTICI PANTS Jonathan Rowley Rajender Auluck Duo Nguyen Kaihwa Hsu Amar Pal John Ma Jon Dreyfuss David Mannai Alan Cox Dave Lach Michael Hamer Michael Metel Lynn Dewald David Lewis AFFILIATIONS U.S. Nuclear Regulatory Commission (NRC)

NRC NRC NRC NRC NRC Entergy Nuclear Operations, Inc. (ENO)

ENO ENO ENO ENO ENO ENO ENO

IJo4natha~n Rfowltey -Summary of ITelephone Uonterence -November 6,2UUb(yy)*wpd1 Page '

VERMONT YANKEE NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION November 6, 2006 The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of Entergy Nuclear Operations, Inc., held a telephone conference call on November 6, 2006, to discuss and clarify the staff's requests for additional information (RAls) and other issues concerning the Vermont Yankee Nuclear Power Station (VYNPS) license renewal application (LRA). The following issues were discussed during the telephone conference call:

RAI 3.5-7 Section 3.5.2.2.1.1 of the VYNPS LRA states that the below-grade environment is not aggressive. The staff requests that the applicant provide actual values of pH, chlorides, and sulfates in the groundwater/soil adjacent td structures in order to verify the claim of a non-aggressive below-grade environment.*

Discussion: The staff requested.clarification of the applicant's response in their October 31, 2006, letter (License Renewal Application-, Amendment 19) to this RAI. The staff requested the applicant provide additional data in order for the staff to determine a trend which could help confirm whether or not the groundwater is aggressive. The applicant stated that data since 2003 will be provided. The applicant will also provide information on the distance between each sampling well.

RAI 3.3.1-68-K-03 Beginning on Page 3.3-206 of the VYNPS LRA, loss of material from carbon steel components is managed using One-Time Inspection (OTI). Please justify the use of OTI for carbon steel exposed to raw water as opposed to a periodic inspection.

Discussion: The staff requested clarification of the applicant's response in their October 31, 2006, letter (License Renewal Application, Amendment 19) to this RAI. The staff disagreed with the applicant's assertion that carbon steel is not expected to experience significant aging effects in an environment that contains dissolved oxygen. The staff suggested that the statement be removed from the response. The applicant will take the staff's suggestion into consideration and adjust the response accordingly.

RAI 3.6.2.2-N-08-2 Electrical components for the VHS include 2 black-start turbine generators, cables and buses for power transmission, instrumentation and control components and their associated cables

[Jonathan Rowley - bummary of I eleprione Uonference - November 6, 2UUb_(VY).wpd C1 i

Haae 4 11 and connections. The audit team found that there is an aging management program (AMP) for underground cables from Vernon tie breaker routed to Vermont Yankee. However, there appears to be no AMPs for electrical components from the tie breaker to VHS generators.

Please describe how aging effects on the rest of the electrical components will be managed during the period of extended operation.

Discussion: The staff requested clarification of the applicant's response in their October 20, 2006, letter (License Renewal Application, Amendment 17) to this RAI. The applicant cited redundancy not required by regulations as justification for not having an aging management program. The staff's position is that redundancy and reliability can not be used as justification for omitting an aging management program. A technical basis for not requiring a aging management program is needed. The staff request the applicant provide a technical basis if they choose to hold the position of not requiring an aging management program for the underground cables at the VHS. The applicant is also to provide thermography schedule, results, and process performed on the VHS switchyard.

Additional issues:

The applicant sent revision 3 of the license renewal commitment list in its October 20, 2006, letter (License Renewal Application, Amendment 17). The staff noticed that commitment 29 on the list required additional wording to be acceptable.

,Discussion: The applicant remarked that revision 4 of the list W'ill contain t~he additional wording discussed.

The applican~tsubmittedl its Bolting Integrity Program in its October 17, 2006, letter (License.

Renewal Application, Amendment 16). The staff requested verification that the program was going to be credited for the loss of pre-load aging effect.

Discussion: The applicant will provide an answer in a forth coming letter.