Email: (PA) Vernon Hydro Station Safety Reports - Operation Report
ML062850247
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/07/2006
From: Hamer M
Entergy Nuclear Vermont Yankee
To: Rowley J
NRC/NRR/ADRO
References
%dam200611, TAC MD2297
Download: ML062850247 (22)


Text

Richard Emch-Vernon Hydro Station Safety Reports Page qi From:

"Hamer, Mike" <mhamer@entergy.com>

To:

"Jonathan Rowley" <JGR@nrc.gov>

Date:

Thu, Sep 7, 2006 12:00 PM

Subject:

Vernon Hydro Station Safety Reports Please see attached.

ý Richard-Emch -Mail Page 1 11 Richard Emch - Mail Page 1 ii Date:

Fri, Sep 10, 2004 1:10 PM 2002 FERC Inspection...


Original Message -----

From: LOYD, LELAND [1]

Sent: Friday, September 10, 2004 11:02 AM To: Ragonese, John L.

Cc: RUCKER, ROGER B

Subject:

Vernon Station Safety Reports John Per our phone conversation, I am requesting the two reports (Vernon Station) you were speaking of, the one in 1992 by the outside consultant and the latest one by the FERC Staff. This is for the project I am working on for Vermont Yankee.

If you cannot send it electronically then send a CD to ENTERGY CORPORATION 1448 SR 333 Russellville, AR 72802 C/o Leland Loyd N-GSB-45 Thanks Leland Loyd Entergy Nuclear Inc.

lloyd90@entergy.com 479/858/4696

fRichardPEmch-Mail

".age 2

I OtempýGW)ooboi.TMP Page 1-i I 9;\\t~mp~GW1PPPQ1~TMP Page 1 ii Mail Envelope Properties (4500420F.7A8: 7: 1960)

Subject:

Creation Date From:

Created By:

Vernon Hydro Station Safety Reports Thu, Sep 7, 2006 11:59 AM "Hamer, Mike" <mhamer@entergy.com>

mhamer@entergy.com Recipients nrc.gov TWGWPO03.HQGWDO01 JGR (Jonathan Rowley)

Post Office TWGWPO03.HQGWDO01 Files MESSAGE TEXT.htm Mail HYDCT-REG-007.7.03.pdf Mime.822 Options Expiration Date:

Priority:

ReplyRequested:

Return Notification:

Concealed

Subject:

Security:

Route nrc.gov Size 23 1184 Date & Time Thursday, September 7, 2006 11:59 AM 1426138 1

None Standard No None No Standard Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled

.Rico;ýýd-_ETch - HYDCT-REG-007.7.01pot.,Richrd~mcl~- HDCT-EG-07.703.df age 1]1 OPERATION REPORT FEDERAL ENERGY REGULATORY COMMISSION New York Regional Office Forthe period October 28,1998 to June_24,2002 Licensee:

USGen New England, Inc. (USGen)

Project No.:

1904-VT/NH NATDAM No.: NH00097 Project Name:

Vernon Location:

Connecticut River WindhanVChesh ire VT/NH (Waterway or reservation)

(County)

(State)

License issued:

June25, 1979 Expires:

April 30, 2018 Type:

MON Date of last amendment: May 8, 2002 (Order Granting Extension of Time Under Article 301).

Inspected by:

Liza Vdlez and Michael Monahan Date:

June 24, 2002 Parts of project inspected:

Powerhouse, dam and fishway Weather:

Sunny: high 80's Accompanied by: Bruce Davin, Director of Hydro operation: Justin Donaghy, Hydro enqineer; Earl Brissete, Maintenance Planner; John Ragonese, FERC License Manager.

Summary The Vernon Project is located on the Connecticut River between Vernon, Vernont and Hinsdale, New Harrpshire. ByOrder issued February 27, 1998,the Cormmission approved transfer of the license from New England Power Company to USGen New England, Inc.

The project consists of a concrete gravity dam and spillway section with an intake structure/powerh ouse at the right end that is contiguous with the dam. All project structures were inspected and found to be well operated and generally maintained. Acrack was found atthe top of the downstream end of the pier between Tainter Gates Nos.4 and 5. The licensee's representative stated that theywill investigate this condition. The surface of the spillway did exhibit some concrete deterioration, but not to the extent that immediate repairs are warranted.

Based on field observations, review of office data, and discussions with the Licensee's representatives, it appears that the Licensee is in compliance with the terms of the License as it pertains to the operation and maintenance of the project.

Submitted August 30, 2002 Liza M. V6Iez, COOP Student - Civil Engineer

Rjichard Emch -_HYDCT-REG-007.7.03.pdf.

Page 2 PERTINENT DATASHEET FERC.... D2SI.... New York Regional Office General Data Dam Numter: 01904-01-01 Project Name: Vernon Ucensee:

USGen New Englandl.n, Exemptee:

ApplicantVOh er: -

Developmert Vernon Lake Narem Vernon Dam Name: Vernon State, County-.

NH Cheshire USGS Ouac Laitude:

42.7717 Lorxtude 7M5133 River:

River Mie:

Drainage Area (sqo/i):

Seismic Zone:

D/S Hazard DS City:

DS City Distance (ri):

Dam Ccrnpletcn Date:

Connecticut RPver 212.4 6266 2

Low Vernon, Vt.

0 1909 Hydrologic Data Reservoir Data PW (cfs):

567,100 Srface Area (acres)

IDF(cfs): 567,100 laxirumin 100-YR Flood (cfs):

Normal: Z550 Flood of Record (cfs):

185,000 Mirnnun:

Date Flood of Record 321/1936 Pool Elevation (rms?)

Average Flow(cfs):

10,170 MAmurrzr 222.10 Widnun Flow Required (Y/N): Y Normal: 2M10 Mnirrum flow (cfs):

1250 MnirJnr Storage (acre-ft)

Maximum 54,000 Norrral:

18,300 Mruruin Proiect Works Safety Requirements Type d Dar Consultatls Safety Inspection Report Type 1: Corncrete Report Required (Y/N)

N Type 2 Gravity Latest Report Subertted Type a Frnwnv Atinn Plnn (EAPI EAP Status:

Exempted Dam Height (ft): 58 Dam Crest Elevaton (cra): 212.1 Length of Dam (ft): 956 Latest EAP/ EAP Modificaticn:

Flashboards Installed (Y/N): Y Flashtoard Elevation (nst): 220.1 Boat Restraining Barrier:

Moa Day Overflow Spillway Length (ft):

Required (Y/N):

Y Date In:

05 20 Overflow Spillway Crest Elev. (nst):

Date Out 10 01 Numrer of Gates:

14 Gate Count by Tvye Number of Powerhouses:

1 Authorized Gem Capacity (kW): 20,400 Tariner Vert Uft Slide Drumn Basoule Numter fGenerating Units: 8 6

0 8

0 0

Number of Penstocks:

0 Nurter dCanals:

0 Neede Rdler Valve Flap Other Nunber odTunnels:

0 0

0 0

0 0

Nurnbr of Locks:

0

Rihard Emch - HYDQT-REG-007.7.03.pdqf.

Page 311 Project No. 1904 NH/VT A. DOWNSTREAM HAZARD POTENTIAL The Vernon project had been classified as a low hazard structure based on the dam break analysis (see following paragraphs) and field observation. According to the analysis, the maximum rise in stage cause by a breach will not exceed 1.7 feet undereither the 50 yearor 100.yearflood conditions. The analysis concluded that if a dam failure occurs it would not cause a significant incremental impact to downstream structures.

A preliminary Dam Break Analysis indicated that a hypothetical failure of the dam during a sunny day condition and 100 year flood would have insignificant irrpact on downstream areas. By the NYRO's letter dated April 24,1984, the Vernon Project was exempted from filing an EAP.

The NYRO reviewed the adequacy of the EAP exerrption status for the Licensee's low hazard darms on the Connecticut and Deerfield Rivers in 1992. By NYRO letter dated Decerrber 30, 1992, the Licensee was directed to satisfactoril y demonstrate the consequences of a failure by submitting reports that fully document all reconnaissance and studies performed to determine that failure of the darms will not present a hazard to human life or cause significant property damage under all flow conditions up to the Probable Maximum Flood (PMF).

On December 29, 1993, the Licensee filed a report entitled Dam Failure Analysis of Emergency Action Plan Exerrption Status. The report was found byNYRO staff to be deficient in the letter of April 23, 1996. Inthat letter, the Licensee was requested to fine tune the Dam Break Analysis including documenting the "n" values used in the Dam Break Analysis for the Vernon Project. On June 21, 1996, the Licensee submitted a revised dam break analysis with the Manning "n" values used in all dam break analysis.

After review of the final revised Dam Break Analysis, the NYRO agreed with the consultants assessment that no reasonably foreseeable project emergencies at the Vernon Dam would endanger downstream life, health or property.

Field observations indicated that the downstream river channel is wide open and no structures would be imrrediately irrpacted by the project's dam breach which confirmed the project's low hazard classification.

B. PROJECTS SAFETY AND MAINTENANCE

1. Dams, Dikes and Appurtenant Structures The Vernon Project is located on the Connecticut River between Vernon, Vermont and Hinsdale, New Hampshire (Figure 1). The project consists of a concrete gravity damand a spillway section with an intake structure/powerh ouse at the right end that is contiguous with the dam (Figure 2). The dam has a maximum height of 58 ft, and a spillway facility of 956 ft-long that includes six tainter gates and eight sluice gates, hinged flashboards and stanchions.

During the inspection, itwas observed that the concrete spillway did exhibit sorre concrete erosion deterioration (Photo No. 1). Since the concrete appears to be structurally sound and the erosion was insignificant with regard to the stability of the spillway, the structure does not need irrnediate repair. A sloped crack was found on top of a downstream pier between Tainter Gates Nos. 4 and No.5. The crack

Riýoard-Emch.- HYDCT-REG-007.7.03.pdt

,..........R E 7....7, I....fPage" Project No. 1904 NHNT does not appear to be threatening any gate structural support mermbers and the Licensee's representative stated that they will investigate this condition (Photo No. 2). Soree concrete surface erosion deterioration was observed in the stanchion flashboard section (Photo No 3), but nothing that needs irnmediate repair.

The left upstream abutment retaining wall was also in good condition, no sign of cracking or lateral displacement (Photo No. 4). Some spalling at the base of the left downstream training wall of the trash sluice was observed. However, the spalling is insignificant with regard to the integrity of the structure (Photo No. 5).

The Vernon Neck, a natural ridge atthe left abutment, was inspected bywalking along the crest, the downstream and upstream slopes. The crest and the slopes of the Vernon Neck were found to be in good condition, with no sign of lateral displacement, settlement or cracking (Photo No. 6 and 7). Brush control on the Vernon Neck is performed by the maintenance crews on a periodic basis of 3 to 5 years. Erosion along the left bank just downstream of the Vernon Dam spillway is monitored biannually (Photo No 8).

The last survey report was review by NYRO on March 4, 2002. The licensee indicates that the erosion was minor and relatively uniform along the base of the bank. Their next report is scheduled to be submitted by December 31,2003.

Minor water leakage was noted through a crack in the wall of the spillway gallery where the sluice gate operators are located.. The Licensee has successfully grouted other leaks in the past and will do the same with this leak when the conditions warrant repair. The valve packing on Unit 5 that was leaking into the gallery during the 1999 inspection was replaced (Photo No. 9).

The powerhouse and intake structure appeared to be in good condition and well maintained. (Photo Nos. 10 thru 11). The fish ladder on the downstream side of the powerhouse was also in good condition (Photo No. 13).

2. Spillway Gates, Operation and Standby Power By letter dated December 27,2001, the Licensee confirmed successful operation of the 20 foot and 10 foot high by50 foot wide Spillway Gates at the Vernon darn. The following information was reported in the Licensee's letter:

Tainter Gate Date of last full opening (30 ft)

Date of last Operation - gate No.

opening (ft) 1 3/28/2000 4/14/2001 1

20' 2

3/28/2000 4/14/2001 20' 3

3/8/2000 4/13/2001 10, 4

3/9/2000 4/11/2001 10' 5

3/10/2000 4/10/2001

(

10' 6

I 3/10/2000 1 4/10/2001 I

10, The gate load test is performed annually and non-load test at least bi-weekly. The letter was submitted on May 31, 2001. They tested Tainter Gates Nos. 1 and 2 using both normal and standby power.

The other gates including the eight 9 foot high by 7 foot wide slide gates were only tested with normal power.

During the inspection, Tainter Gate No. 2 was operated bythe emergency generator (Photo No. 12).

I ý.icýpýo:Emcý---tý,ýPQT-REG-007.7.03.pdf Richrd.Ech

-HYDT-RE-0077.03pdfPa gq_§.

Project No. 1904 NH/VT No problems occurred during the gate operation. An automatic Emergency Generator test is performed once per month. At the tirme of the inspection, all gates were reported to be operational. They appeared to be structurally sound. Rust spots were observed on the tainter gate that will be painted during the 2003 maintenance season.

3. Power Plants Automation of the station was cormpleted by the end of 1998. The Vernon Station is remotely controlled and monitored fromthe Wilder Station.

The upgraded generator automation equipment was observed during June 24, 2002 inspection. Also a powerhouse ventilation systemand a transformer roomautornatic fire protector door were installed during the reporting period (Photo No. 14 and No. 15).

Due to alignment problems, Unit No. 10 experienced an unscheduled shutdown during December 10, 2001 thru February 8, 2002. The powerhouse appeared to be in good condition and well maintained.

4. Reservoir Condition There were no major problems at the reservoir. The reservoir shores were in sound condition. There were no signs of erosion, slides at or around the rims of the reservoirs. At the tirm of the inspection the reservoir elevation was at 220.1 ft MSL.
5. Instrumentation and Monitorina Cracks in the powerhouse are monitored by gages and trammel points. The Sixth Independent Consultants Safety Inspection Report recomrrmnded terrrination of the crack monitoring program since no detrimental trends have been detected. The licensee maintains these devices, but they are only read after felt earthquakes and major floods.

The Licensee also performs biannually cross-section surveys and soundings of the erosion along the left bank just downstream of the Vernon Dam spillway (Photo No 8). The last survey report was review by NYRO on March 4, 2002. The licensee indicates that the erosion was minor and relatively uniform along the base of the dam. Their next report is scheduled to be submitted by December 31,2003.

The Licensee has rmnitored the seepage conditions at the sluice gate operator gallery and the spillway inspection gallery since 1984. The amount of leakage has been greatly reduced as a result of past grouting.

6. Licensee's Inspection Program Maintenance personnel conduct a daily visual inspection of all the project facilities. The plant is attended byseveral operations crew daily. Engineering staff performs an annual inspection of all the project structures. Divers make a thorough inspection once every five year on both the upstream and downstream side.

The inspection program appears to be effective and adequate.

,Richardd Emch - HYDCT-REG-007.7.03.p.f Page6 l Project No. 1904 NH/VT 7. Emergency Action Plan Byletter dated August 6, 1996,the NYRO concluded that the project=s exerrption status fromfiling an EAP for this low hazard dam.

Although the Vernon Project has been granted an exermption from filing an emergency action plan, notification procedures are required as part of the comprehensive emergency action plan for the Licensee's four hydro projects on the Connecticut River. A current Emergency Action plan was posted in the powerhouse control room. During the inspection, the operator on duty was asked to display his knowledge of the EAP. The operator was familiar with the emergency notification procedures.

The reprinted Emergency Action Plan (EAP) was submitted to the NYRO on December 7, 2001.

On a letter dated January 23,2002, NYRO staff approved the 2001 Emnergency Action Plan and deterrrined to be in corrpliance with current Commiission Guidelines.

The proximity of the Vernon Yankee Nuclear Plant makes the Vernon Project subject to Radiological Response procedures. Drills are therefore conducted in cooperation with personnel of the Vernon Nuclear Plant to test the response procedures. These drills are conducted in conjunction with the testing of the conventional EAP. The latest drill exercise conducted was on June 12, 2002.

8. Status of Part 12-D Report The Sixth Independent Consultants Safety Inspection was submitted to the NYRO October 29,1992 and was approved by the NYRO on August 9, 1994.

As recommended by the Consultant in the Sixth Report, superficial concrete erosion repairs on the spillway at tainter gate Nos. 3 to 6, and the spillway floodgates were scheduled to be corrpleted by the end of 1999. At that tirme, the Licensee's Chief Engineer, Steve Doret informed the NYRO that there is no current schedule for making specific repairs; however, money will be budgeted for annual concrete repairs.

No concrete repairs have been made to date.

By letter dated August 6, 1997,the project was issued an exerription from performing future Part-12 Inspections based on its low hazard classification.

9. Status of Previous Operation Inspection As it was noted during the October 28,1999 inspection, the spillway surface exhibits some concrete deterioration. These conditions are not threatening to the integrity of the structure. There is still no current schedule for making these repairs.
10. Records The licensee keeps copies of drawings that cover all civil works, and other project related documents at the powerhouse office.

C. ENVIRONMENTAL REQUIREMENTS The Licensee maintains recreation areas along the Connecticut River which are used by the general

I FricoaýqEmch - HYDCT-RiHG-007.7.O3.gdL Richrd Ench-HYDT-RE-0077.03pdfPage T

Project No. 1904 NH/VT public. As a result of the Environmental and Public Use inspection conducted on July 19, 1999, the project facilities were found to be in compliance with the approved plans, including ninimrum flow requirements.

The next EPUI has notbeen scheduled.

D. Public Safety Plan The Public Safety plan was lastsubnitted on December 8, 1999 and was accepted as satisfying the filing requirements of Section 12.4 of the Corrmission's regulations on December 30, 1999. The facility provides five recreational sites that include picnic, fishing, and swinmmring areas, boats ramps and canoe portages. The Licensee has installed buoysor boatersafety devices, warning signs,and fences at the project.

Field observations confirmed that the public safety devices are consistent with the layout in the Public Safety Plan.

Based on field observations, the installation of public safety devices conformed to the public safety plan. The project is fenced off and signsare posted to warn the public of the dam. There are no additional devices orsigns needed at the present tirme.

The project security was discussed during the current Operation Inspection and any follow-up was provided as needed.

E. PROJECT COMPLIANCE

1.

Unauthorized Proiect Maintenance or Uses According to the Licensee's representatives and field observation, there were no unauthorized project maintenance or uses during this report period.

2.

License Compliance By Order Amending License, dated June 12, 1992, the Cormrrission authorized the Licensee to replace four existing 2-MW units (Unit Nos. 5 through 8) with two new 14-MW units (Unit Nos. 11 and 12) and to upgrade the powerhouse. The proposed change would increase the Project's total installed capacity from 24.4 MW to 44.4 MW and increase the total hydraulic capacity from 15,530 cfs to 20,930 cfs. The deadlines for the start and completion of the construction were June 11, 1994 and June 11, 1996, respectively. The Conrrission Order issued on May 08, 2002 a fifth extension of time for corrmmencing and completing the construction to June 11, 2004 and June 11,2006, respectively.

By letter dated on January 28, 2002, the licensee certified compliance with the project Article 34 Minimum flow requirement of 1250 cfs. There are water level sensors installed by a computer that reads transducers elevation data to calculate inflows and outflows atthe project every hour.

F. FI NDI NGS AND FOLLOW-UP ACTIONS As the result of the June 24, 2002 inspection, a crack was observed at the top of a downstream pier between Tainter Gate Nos. 4 and 5. The Licensee's representative stated that they will monitor this crack and investigate this condition. Future inspections should monitor the need for concrete repairs to the spillway. There were no other items identified as a result of this inspection that require irmmdiate action by

_Riqlýjaýckf Tch - HYDCT-REG-007.7.03.p-df" Paqe 8 ýJ Richard Emch - HYDQT-REG-007.7.03.pdf Paqe 84 Project No. 1904 NH/VT the Licensee.

Based on files review and field inspection, the project is well rmintained and appears to be operated in accordance with the terms of the License.

Descriptive Sheet Site Location Map (Fig. 1)

Photo Location Plan (Fig. 2)

Photographs (15)

CC: FERC-NYRO Liza M. Vdlez

Richard. Emch - HYDCT-REG-007.7.03.pdf Page 9 1 Project No. 1904 NH/VT IRichard-Emch.-' HYDCT-REG--007.7.03.pdf

'Page loil N0 qo

~

7 8 E I.

S S

ii

Richard Em~ch - HYDCT-REG-007.7.03.Odf__

Pg 1

Project No. 1904 NH/VT Photo No. 1 - Weephole on the spillway surface (Tainter Gate No. 4). Note the concrete deterioration.

Photo No. 2 - Crack found In downstream pier between Tainter Gate Nos. 4 and 5.

Rihr mhHYDCT-REG-0Q7.7.03.pdf.

Page 121 Project No. 1904 NH/VT Photo No. 3-The stanchion flashboard section.The downstream surface exhibits minor concrete deterioration.

Photo No. 4-Looking across the upstream side of the spillway towards the left abutment.

IRýiharc[Emch-HYDCT-REG-007.7.03.pdf...

Page 131 Project No. 1904 NH/VT Photo No. 5-Minor concrete spalling along the left downstream trainIng wall of the trads sluIce.

Photo No. 6-Looking along downstream slope of Vernon Neck. Vegetation control is performed on both the upstream and downstream sides.

[Richard-Ech - HYDCT-REG-007.7.03.pdf_

-PAe14 Project No. 1904 NH/VT Photo No. 7-Looking east along Vernon Neck. There are no signs of lateral displacement or settlement.

Photo No. 8 - View of the eroded area located on the downstream left bank. Erosion is monitored by biannual surveys.

Richard.Emch - HYDQT-REG-007.7.03.pdf Page 15, Project No. 1904 NH/VT Photo No. 9 - The valve packing of Unit No. 5 operator was replaced.There were no visible leakage coming from the operator.

Photo No. 10 - Looking across the upstream side of the powerhouss/intake structure.

_fRichard Emch-HYD CT-REG-007.7.03:Pqf..

Page 16.

Project No. 1904 NH/VT Photo No. 11 - Looking from the fish ladder towards the downstream side of the powerhouse.

Photo No. 12 - A typical Tainter Gate. This Is Gate No. 2 being operated using power from Emergency Generator. Some rust spots were noted. The Licensee'srepresentative stated the rust spots will be painted during the 2003 maintenance season.

Richard Ernob : HYDCT-REG,-007.7.0.d ae1 Project No. 1904 NH/VT Photo No. 13-Looking downstream along the fish ladder.

Photo No. 14 - The emergency generator.

Richaard Emch-HYDCT-REG-007.7.03.pdf. --..-

Page 18:

Project No. 1904 NH/VT Photo No. 15-The new transformer room automatic fire protection door.