Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22257A0512022-11-0404 November 2022 Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML22014A2062022-05-0404 May 2022 Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation Monitors ML21347A9672022-02-0101 February 2022 Correction of Errors Incurred During Issuance of the Initial Facility Operating License, and Issuance of License Amendment Nos. 6, 21, and 39 ML21306A2872022-01-25025 January 2022 Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator Replacement ML21334A2952022-01-18018 January 2022 Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement ML21334A3892022-01-12012 January 2022 Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis ML21271A1372021-12-16016 December 2021 Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21189A3072021-11-0303 November 2021 Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21153A0492021-07-26026 July 2021 Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 ML21161A2392021-06-24024 June 2021 Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria ML21148A1002021-06-17017 June 2021 Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML21027A1672021-02-0909 February 2021 Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21005A1252021-01-12012 January 2021 Correction of Errors Incurred During Issuance of License Amendment Nos. 43 and 45 ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20245E4132020-12-0808 December 2020 Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20239A7912020-10-28028 October 2020 Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2 ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20238C0612020-09-21021 September 2020 Correction of Typographical Error Incurred During Issuance of License Amendment No. 104 ML20167A1482020-08-19019 August 2020 Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service Transformer ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve ML20076A1942020-04-30030 April 2020 Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants ML20057E2422020-03-30030 March 2020 Issuance of Amendment Nos. 133 and 37 Regarding Changes to Technical Specifications Pertaining to Diesel Generator Start Instrumentation (EPID-L-2020-LLA-0003) ML20028F7332020-02-28028 February 2020 Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML20024F8352020-02-24024 February 2020 Issuance of Amendment No. 35 Regarding One-Time Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML20015A4792020-01-30030 January 2020 Correction to Amendment No. 30 to Facility Operating License Npf-96 Regarding Use of Optimized Zirlo Fuel Rod Cladding ML19336C5192019-12-10010 December 2019 Issuance of Amendment Nos. 131 and 34 Regarding Correction to Unbalanced Voltage Relay Instrumentation Values ML19276E5572019-12-0909 December 2019 Issuance of Amendment Nos. 130 and 33 Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML19238A0052019-11-26026 November 2019 Issuance of Amendment Nos. 129 and 32 Regarding Changes to Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9 ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection 2024-01-29
[Table view] Category:Safety Evaluation
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22293A4082022-11-14014 November 2022 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22257A0512022-11-0404 November 2022 Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22272A5682022-10-12012 October 2022 Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML22014A2062022-05-0404 May 2022 Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation Monitors ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML22070A0022022-03-28028 March 2022 Review of the Fall 2021 Mid Cycle Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Report ML21306A2872022-01-25025 January 2022 Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator Replacement ML21334A2952022-01-18018 January 2022 Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement ML21334A3892022-01-12012 January 2022 Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis ML21271A1372021-12-16016 December 2021 Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21189A3072021-11-0303 November 2021 Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21153A0492021-07-26026 July 2021 Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 ML21161A2392021-06-24024 June 2021 Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria ML21148A1002021-06-17017 June 2021 Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21130A6012021-05-13013 May 2021 Correction of Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21110A0372021-04-29029 April 2021 Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21064A4082021-03-10010 March 2021 Correction of Safety Evaluation for License Amendment Nos. 143 and 50 (EPID L-2020-LLA-0005) (Non-Proprietary) ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML21027A1672021-02-0909 February 2021 Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20245E4132020-12-0808 December 2020 Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20239A7912020-10-28028 October 2020 Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2 ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20167A1482020-08-19019 August 2020 Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service Transformer ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve ML20076A1942020-04-30030 April 2020 Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants ML20057E2422020-03-30030 March 2020 Issuance of Amendment Nos. 133 and 37 Regarding Changes to Technical Specifications Pertaining to Diesel Generator Start Instrumentation (EPID-L-2020-LLA-0003) ML20028F7332020-02-28028 February 2020 Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML20024F8352020-02-24024 February 2020 Issuance of Amendment No. 35 Regarding One-Time Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML19336C5192019-12-10010 December 2019 Issuance of Amendment Nos. 131 and 34 Regarding Correction to Unbalanced Voltage Relay Instrumentation Values 2024-01-29
[Table view] |
Text
July 25, 2006 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 1 ISSUANCE OF AMENDMENT REGARDING TECHNICAL SPECIFICATION CHANGE TO INCREASE CONTAINMENT ICE CONDENSER ICE WEIGHT TO SUPPORT REPLACEMENT STEAM GENERATORS (TAC NO. MC9270)
Dear Mr. Singer:
The Commission has issued the enclosed Amendment No. 62 to Facility Operating License No. NPF-90 for Watts Bar Nuclear Plant, Unit 1. This amendment is in response to your application dated December 15, 2005 (TS-05-09), as supplemented by letter dated June 7, 2006. The amendment will revise Watts Bars Technical Specification Surveillance Requirements to increase the minimum required average ice basket weight and the corresponding total weight of the stored ice in the containment ice condenser. The changes to the ice basket and total ice weights are due to the additional energy associated with the replacement steam generators.
A copy of the safety evaluation is also enclosed. Notice of issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosures:
- 1. Amendment No. 62 to NPF-90
- 2. Safety Evaluation cc w/enclosures: See next page
July 25, 2006 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 1 ISSUANCE OF AMENDMENT REGARDING TECHNICAL SPECIFICATION CHANGE TO INCREASE CONTAINMENT ICE CONDENSER ICE WEIGHT TO SUPPORT REPLACEMENT STEAM GENERATORS (TAC NO. MC9270)
Dear Mr. Singer:
The Commission has issued the enclosed Amendment No. 62 to Facility Operating License No. NPF-90 for Watts Bar Nuclear Plant, Unit 1. This amendment is in response to your application dated December 15, 2005 (TS-05-09), as supplemented by letter dated June 7, 2006. The amendment will revise Watts Bars Technical Specification Surveillance Requirements to increase the minimum required average ice basket weight and the corresponding total weight of the stored ice in the containment ice condenser. The changes to the ice basket and total ice weights are due to the additional energy associated with the replacement steam generators.
A copy of the safety evaluation is also enclosed. Notice of issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosures:
- 1. Amendment No. 62 to NPF-90
- 2. Safety Evaluation cc w/enclosures: See next page DISTRIBUTION:
PUBLIC LPL2-2 r/f RidsNrrDorlLpl2-2 RidsNrrPMDPickett RidsNrrLACSola RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDssSpwb G. Hill, OIS (2) RidsRgn2MailCenter RidsNrrDorlDpr RidsNrrDorl G. Tesfaye, NRR S. Crane, NRR RidsNrrDssScvb Package: ML061830006 Amendment: ML061830005 Tech Spec: ML062190045 *No Legal Objections NRR-058 OFFICE LPL2-2 LPL2-2/PM SCVB/BC SPWB/BC LPL2-2/LA OGC LPL2-2/BC NAME SCrane DPickett RDennig as JNakoski RSola MZobler* L.Raghavan signed on for MMarshall DATE 07/14/06 07/18/06 06 /27 /06 07/18/06 07/14/06 07/21/06 07/25/06 OFFICIAL RECORD COPY
Mr. Karl W. Singer Tennessee Valley Authority WATTS BAR NUCLEAR PLANT cc:
Mr. Ashok S. Bhatnagar, Senior Vice President Mr. Paul L. Pace, Manager Nuclear Operations Licensing and Industry Affairs Tennessee Valley Authority Watts Bar Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, TN 37381 Mr. Larry S. Bryant, Vice President Mr. Jay Laughlin, Plant Manager Nuclear Engineering & Technical Services Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Spring City, TN 37381 Chattanooga, TN 37402-2801 Senior Resident Inspector Mr. Robert J. Beecken, Vice President Watts Bar Nuclear Plant Nuclear Support U.S. Nuclear Regulatory Commission Tennessee Valley Authority 1260 Nuclear Plant Road 6A Lookout Place Spring City, TN 37381 1101 Market Street Chattanooga, TN 37402-2801 County Executive 375 Church Street Mr. Michael D. Skaggs Suite 215 Site Vice President Dayton, TN 37321 Watts Bar Nuclear Plant Tennessee Valley Authority County Mayor P.O. Box 2000 P. O. Box 156 Spring City, TN 37381 Decatur, TN 37322 General Counsel Mr. Lawrence E. Nanney, Director Tennessee Valley Authority Division of Radiological Health ET 11A Dept. of Environment & Conservation 400 West Summit Hill Drive Third Floor, L and C Annex Knoxville, TN 37902 401 Church Street Nashville, TN 37243-1532 Mr. John C. Fornicola, Manager Nuclear Assurance and Licensing Ms. Ann P. Harris Tennessee Valley Authority 341 Swing Loop Road 6A Lookout Place Rockwood, Tennessee 37854 1101 Market Street Chattanooga, TN 37402-2801 Mr. Glenn W. Morris, Manager Corporate Nuclear Licensing and Industry Affairs Tennessee Valley Authority 4X Blue Ridge 1101 Market Street Chattanooga, TN 37402-2801
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-390 WATTS BAR NUCLEAR PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 62 License No. NPF-90
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Tennessee Valley Authority (the licensee) dated December 15, 2005, as supplemented by letter dated June 7, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-90 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. , and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. TVA shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date of its issuance, and shall be implemented prior to Mode 4 at startup to begin Cycle 8 fuel cycle.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Michael L. Marshall, Jr., Branch Chief Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to Operating License No. NPF-90 and the Technical Specifications Date of Issuance: July 25, 2006
ATTACHMENT TO AMENDMENT NO. 62 FACILITY OPERATING LICENSE NO. NPF-90 DOCKET NO. 50-390 Replace page 3 of Operating License No. NPF-90 with the attached page 3.
Replace the following page of the Appendix A Technical Specifications with the attached page.
The revised page is identified by amendment number and contains vertical lines indicating the areas of change.
Remove Page Insert Page 3.6-29 3.6-29
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 62 TO FACILITY OPERATING LICENSE NO. NPF-90 TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 1 DOCKET NO. 50-390
1.0 INTRODUCTION
By application dated December 15, 2005, as supplemented by letter dated June 7, 2006, the Tennessee Valley Authority (TVA, the licensee) proposed an amendment to the Technical Specifications (TS) for the Watts Bar Nuclear Plant (WBN), Unit 1. The requested changes would revise the TS Surveillance Requirements (SRs) to increase the minimum required average ice basket weight, and the corresponding total weight of ice in the WBN ice condenser.
The changes to the ice basket and total ice weights are due to the additional energy associated with the Replacement Steam Generators (i.e., increased metal mass, primary and secondary volumes, and heat transfer areas).
Specifically, the licensee proposed changes to TS Section 3.6.11, "Ice Bed," SR 3.6.11.2 and SR 3.6.11.3 to raise the minimum required average ice basket weight from 1110 pounds (lbs) to 1237 lbs, and the corresponding total weight of the stored ice in the ice condenser from 2,158,000 lbs to 2,404,500 lbs. In addition, the licensee proposed editorial changes to SRs 3.6.11.2, 3.6.11.3 and 3.6.11.4 to replace inequality signs with words (i.e., # is replaced by less than or equal to and $ is replaced by greater than or equal to) and replace the % sign with the word percent.
The WBN containment ice bed consists of ice stored in 1944 baskets within the ice condenser.
The primary purpose of the ice condenser is to provide a large heat sink in the event of a release of energy from a design-basis loss-of-coolant accident (LOCA) or other high energy line break in the containment. The LOCA requires the greatest amount of ice compared to other accident scenarios; therefore, the increase in ice weight is based on the LOCA analysis.
The ice would absorb energy and limit the containment peak pressure and temperature during a postulated accident. Limiting the pressure and temperature reduces the release of fission product radioactivity from containment to the environment in the event of a design-basis accident. The design-basis ice mass is supported by the containment integrity analysis documented in the WBN Updated Final Safety Analysis Report (UFSAR), Section 6.2, "Containment Systems." The TS surveillance limits on total ice weight, and average basket ice weight by row-group, are intended to ensure that sufficient ice is present in an appropriate
distribution to perform this function. The TS surveillance limits are currently an "as-left" measurement and include margin for ice sublimation.
In Enclosure 4 of the amendment request package, the licensee provided a LOCA long-term containment mass and energy release, and containment integrity analysis to support the steam generator replacement at WBN Unit 1. The stated objective of this effort was to provide revised containment mass and energy release data using current WBN specific information and the calculated reactor coolant system inventory based upon the new steam generators. The licensee stated that the analysis used the Westinghouse mass and energy release model which was documented in WCAP-10325-PA, "Westinghouse LOCA Mass and Energy Release Model for Containment Design," and approved by the NRC in a Safety Evaluation to Westinghouse dated February 17, 1987.
The licensees letter dated June 7, 2006, provided clarifying information that did not change the initial proposed no significant hazards consideration determination.
2.0 REGULATORY EVALUATION
Containment integrity analysis is performed during nuclear plant design to ensure that the pressure and temperature inside the containment will remain below the containment building design conditions if a high-energy line break inside the containment should occur during plant operation. The analysis ensures that the containment heat removal capability is sufficient to remove the maximum possible discharge of mass and energy to the containment from the Nuclear Steam Supply System without exceeding the acceptable criteria (design pressure and temperature).
In Section 5.2, Enclosure 1 of the amendment request package, the licensee stated that it has evaluated [the proposed] change against the applicable NRC regulations and criteria. The change in the TS ice bed weights will not change the ice condenser function to respond as designed. These TS changes are, therefore, considered safe and meet the applicable regulatory requirements.
The staffs review was based on the acceptance criteria discussed in NUREG-0800, Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants, Section 6.2.1.1.B, Ice Condenser Containments. According to Section 6.2.1.1.B of the SRP, the licensee must meet General Design Criteria (GDC) 16, 38, and 50, as described in Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix A.
GDC 16 requires the containment to be designed as an essentially leak tight barrier that will withstand the most extreme accident conditions for the duration of any postulated accident.
The containment must be able to withstand accidents because it is the final barrier against an uncontrolled release of radioactivity to the environment.
GDC 38 requires the establishment of a containment heat removal system that will rapidly reduce containment pressure and temperature following a LOCA. The containment heat removal system supports the containment function by minimizing the duration and intensity of the pressure and temperature increase following a LOCA, thus, lessening the challenge to containment integrity.
GDC 50 requires the containment structure and associated heat removal system to be designed with margin to accommodate any LOCA such that the containment design leak rate is not exceeded. A LOCA potentially causes the greatest pressure surge and release of fission products when compared to any other accident. Since it is the most severe challenge expected, the containment must be designed to withstand this accident. GDC 50 will ensure that containment integrity is maintained under the most severe accident conditions, thus, precluding an uncontrolled release of radioactivity to the environment.
Conformance with GDC Nos. 16, 38, and 50 is demonstrated by showing that the containment design pressure is not exceeded at any time during the accident transient and the containment heat removal systems function to rapidly reduce containment pressure and temperature.
3.0 TECHNICAL EVALUATION
The operability of the WBN ice condenser beds requires that the ice inventory be distributed evenly throughout the ice condenser bays in the containment and contain sufficient heat removal capability to condense the reactor coolant system volume released during a LOCA.
Sufficient pressure suppression capability from the ice in the ice condenser is necessary to limit the containment peak pressure transient during a LOCA. The design pressure of the WBN containment is 13.5 pounds per square inch gauge (psig). The ice inventory is contained in 1944 ice baskets throughout the ice condenser.
Current TS SR 3.6.11.2 requires verification that the total weight of stored ice is greater than or equal to 2,158,000 lbs at a 95 percent confidence level. This is accomplished by weighing a representative sample of a minimum of 144 ice baskets and verifying that each basket contains a minimum of 1110 lbs of ice. The current 1110-lb TS limit is based on the licensees analysis included in its application dated September 7, 2001, that was approved by the NRC in Amendment No. 33 to the WBN license dated November 29, 2001. That analysis assumes an even distribution of 1044 lbs per basket throughout the ice condenser at the time of a LOCA.
The 1110 lbs per basket TS limit contains a 6 percent allowance for ice loss through sublimation during the surveillance interval. Average sublimation over 3 operating cycles is approximately 3.42 percent.
The licensee is proposing to increase the TS limits for the minimum average ice basket weight and the corresponding minimum total weight of ice in the ice condenser baskets to accommodate the additional energy associated with the replacement steam generators. The licensee stated that it has evaluated those postulated design-basis accidents that credit the ice condenser using the revised design-basis parameters. The licensee further states that the analysis provides assurance that containment heat removal capability is sufficient to remove the maximum calculated discharge of mass and energy to the containment without exceeding the containment pressure and temperature acceptance criteria. As indicated above, in Enclosure 4 of the amendment request package, the licensee provided a LOCA long-term containment mass and energy release and containment integrity analyses to support the proposed increase.
The staff notes that the licensee has used the same methodology and computer codes for the revised mass and energy release and containment integrity analyses as in the previously approved September 7, 2001, analysis.
The SATAN VI, WREFLOOD, FROTH, and EPITOME computer codes were used to calculate the mass and energy analysis and the LOCTIC-1 computer code was used to calculate the
containment pressure response. The staff noted that the EPITOME computer code was not mentioned in the mass and energy release analysis in the 2001 analysis. In a supplemental letter dated June 7, 2006, the licensee confirmed that although not called out previously, EPITOME code has always been part of the Westinghouse methodology for mass and energy release analysis, including the September 7, 2001, analysis. The licensee indicated that the EPITOME code continues the FROTH post-reflood portion of the transient from the time at which the secondary side equilibrates to containment design pressure to the end of the transient.
The licensee calculated a new maximum containment pressure of 11.01 psig, up from 10.64 psig, for the design-basis LOCA analysis, assuming an ice bed weight of 2.26 million pounds. This pressure is less than the design pressure of 13.5 psig and, therefore, supports the proposed increase in the TS minimum required average ice basket weight from 1110 lbs to 1237 lbs, and the corresponding total weight of the stored ice in the ice condenser from 2,158,000 lbs to 2,404,500 lbs. The staff has verified that, consistent with WBNs current licensing basis, the proposed TS minimum values includes a 6 percent margin to bound expected sublimation over one cycle. The pressure peak occurred at approximately 6,562.8 seconds, with ice bed melt-out at approximately 3,685.1 seconds.
In addition to examining the bounding containment peak pressure and temperature events, the licensee addressed the following events:
- There is no adverse impact on the main steamline break (MSLB) accident analysis.
This is because the MSLB does not melt the entire initial ice mass assumed in the MSLB analysis which is less than the ice melt calculated for the containment LOCA analysis. Thus, the LOCA analysis bounds the MSLB accident analysis and the proposed increase in total ice mass would have no effect on the MSLB accident analysis.
- There is no adverse impact on the LOCA peak clad temperature (PCT) analyses. This is because only a relatively minor amount of ice would be melted when the PCT is reached. Therefore, the proposed increase in total ice mass would have no effect on PCT.
- The post-LOCA subcriticality calculation conservatively assumes a maximum initial ice mass in the ice bed in order to minimize the sump boron concentration. However, since the new total ice weight remains substantially less than the value assumed in the calculation, the proposed increase in ice inventory would have no effect.
- The licensee has concluded that the minimum post-LOCA sump pH value will remain above 7.5. The sump pH above this value will not create a corrosion issue, and is acceptable with respect to minimizing the potential for chloride induced stress corrosion cracking and maintaining iodine retention in the sump solution.
- The staff reviewed the licensees calculations that determined the maximum post-accident containment water level. The licensee calculated the maximum containment water level for the bounding LOCA analysis based upon the revised reactor coolant system volume and the increased mass of ice. The total analytical ice mass is being increased to 2,404,500 lbs. However, the licensees calculation conservatively
assumed a value of 3,000,000 lbs. for flood level considerations. As a result of the increase in the reactor coolant system, the equilibrium level has increased from elevation 717.2 to 717.3 feet. The licensee evaluated all design changes to determine that no components required for safety are installed in this area. The maximum transient flood level inside the crane wall remains at elevation 720.0 feet. Therefore, the increased ice mass and reactor coolant system inventory do not cause any internal containment post-accident flooding concerns.
- Small break LOCA analysis are bounded by the design-basis large-break LOCA analysis. Therefore, the proposed increase in ice mass would have no effect.
Finally, the licensee has proposed editorial changes to SRs 3.6.11.2, 3.6.11.3 and 3.6.11.4 to replace mathematical signs with words. The inequality symbol # will be replaced by the words less than or equal to, the inequality symbol $ will be replaced by the words greater than or equal to, and the % sign will be replaced by the word percent. These proposed changes are editorial in nature and are acceptable to the staff.
In summary, the licensee performed a new LOCA long-term containment mass and energy release analysis and a containment integrity analysis as part of its steam generator replacement activities at WBN. These analysis indicated that the TS required minimum average ice basket weight must be increased in order to ensure conformance with GDCs 16, 38, and 50 is maintained (i.e the containment design pressure is not exceeded at any time during a design-basis accident transient, and containment heat removal systems function properly to rapidly reduce the containment pressure and temperature). The staff has determined that the licensee has used previously approved methodologies in accordance with the criteria in Standard Review Plan Section 6.2.1.1.B, for ice condenser containment.
Therefore, the staff finds the licensees proposal to raise the TS minimum required average ice basket weight from 1110 lbs to 1237 lbs, and the corresponding total weight of the stored ice in the ice condenser from 2,158,000 lbs to 2,404,500 lbs to be acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Tennessee State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes surveillance requirements. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (71 FR 7814). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Getachew Tesfaye, NRR Date: July 25, 2006