Entergy Slides for the Annual Assessment Meeting for Indian Point Energy Center Performance Review of 2005 3/28/2006
ML060900433
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/28/2006
From:
Entergy Nuclear Northeast
To:
Office of Nuclear Reactor Regulation
References
Download: ML060900433 (11)


Text

March 28 Rev 5 Agenda Overview Fred Dacimo Plant Paul Rubin Performance Corrective Action Jim Comiotes Program Engineering Update John Ventosa Closing Fred Dacimo 2

Progress at Indian Point Solid operational run at both units Received INPO Continuous Improvement Award Achieved highest Plant Performance Index in IPEC history Unit 3 achieved its shortest refueling outage ever -- 26 days, 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Opened new Joint Information Center m

-Entezgy 3 2

I Cababilitv Factor Capability Factor I Jan 05- Feb 06 Jan 05- Feb 06 I Corrective Maintenance IPEC Corrective Maintenanc e Backlog Jan 05-Feb 06 3

Elective Maintenance IPEC Elective Maintenance Backlog Jan 05- Feb 06 Operations Operator Aggregate Operator Aggregate rn "Entegy Index 8

Index 4

Injury Rate Jan 05- Feb 06 RIR = number of recordable Team One T - Training E - Expectations and Standards A-ALARA M - Material Condition 0 - Operational Focus N - Nuclear and Industrial Safety E - Engineering Excellence 10 5

Infrastructure Improvements Naval Militia at IPEC's refurbished dock 11 Corrective Program Jim Comiotes 6

Corrective Action Program Station Improvements Continue Cornerstone for Excellence Improved Condition Report Evaluation Quality Reduction in Significant Events

- 38 in 2003, 15 in 2004, 9 in 2005 Reduction in Higher Level Non-significant Events

- 8.8% in 2003, 6% in 2004, 4.7% in 2005 Condition Report Inventory Reduced While Generation Remains Healthy Closure of Problem Identification and Resolution Cross-cutting Issue 13 Continued Condition Report Inventory Reduction 7

In Summary Continue Focus on Program Improvements Implementation Consistency Still Requires Attention Management Oversight Remains Focused

- Independent Reviews

- Effectiveness Reviews

- Self-assessments 15 Engineering John Ventosa Director, Engineering 8

Engineering Excellence Plan INPO 05-06 Engineering Success Factors Expectations, Roles and Responsibilities Technical Conscience Configuration Management Learning Environment Personnel Development and Staffing Communications Project Management a

h "Entqy 18 9

2006 Focus Areas Engineering Quality Human Performance Progran Backlog Reduction Long Term Staffing 19 Closing Fred Dacimo 10

Closing Remarks Unit 2s Maintenance and Refueling Outage begins in April Signed Contract with New Siren System Vendor Siren Installation by January 2007 Continue Groundwater Investigation 21 11