Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24158A5222024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 2024-09-11
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ML22361A0702023-02-24024 February 2023 Issuance of Amendment No. 231 for Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ML23019A1752023-01-30030 January 2023 Issuance of Amendment No. 230 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23067A1482022-12-29029 December 2022 Operating License, Appendix C, Revision 078, Additional Conditions ML23067A1522022-12-29029 December 2022 67, Operating License Amendment Index ML23067A1512022-12-29029 December 2022 Facility Operating License, Table of Contents ML23067A1502022-12-29029 December 2022 Renewed Facility Operating License ML22301A0072022-12-0202 December 2022 Issuance of Amendment No. 229 to Revise Technical Specifications to Adopt TSTF-505, Revision 2, and TSTF-439, Revision 2 ML22220A1302022-10-21021 October 2022 Exemptions from the Requirements of 10 CFR 50.46 and 10 CFR Part 50 Appendix a, General Design Criteria 35, 38, and 41 (EPID L-2021-LLE-0021) (Cover Letter) ML22220A1322022-10-21021 October 2022 Issuance of Amendment No. 228 Re; Revise Technical Specifications to Address Generic Safety Isusue-191 and Respond to Generic Letter 2004-02 Using Risk-Informed Approach ML22220A2812022-08-15015 August 2022 Withdrawal of Requested Licensing Action LAR for TS Change and Exemption Request Transition to Allow Use of Framatome Gaia Fuel Submitted to NRC for Acceptance Review ML22053A2832022-04-0707 April 2022 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML21344A0052021-12-29029 December 2021 Issuance of Amendment No. 226 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML21195A2942021-06-22022 June 2021 78 to Operating License Appendix B - Environmental Protection Plan ML21195A2972021-06-22022 June 2021 64 to Operating License Amendment Index ML21195A2952021-06-22022 June 2021 Renewed Operating License ML21195A2932021-06-22022 June 2021 8 to Operating License Appendix C ML21053A1262021-03-24024 March 2021 Issuance of Amendment No. 225 to Revise Technical Specification Administrative Control 5.3.1 to Remove Details Specified for the Qualification of Certain Positions within the Unit Staff ML20218A4102020-11-0303 November 2020 Issuance of Amendment No. 224 Performance Based Method Alternative for Thermal Insulation Material ML20246G5702020-10-16016 October 2020 Issuance of Amendment No. 223 One-Time Deferral of the Steam Generator Tube Inspections ML19283C4812019-12-0606 December 2019 Issuance of Amendment No. 221 Main Turbine Control Slave Relay Testing ML20209A1162019-11-13013 November 2019 Operating License Regarding Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors ML20209A1522019-11-13013 November 2019 Operating License Re EA-12-051, Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation ML20209A1122019-11-13013 November 2019 Operating License Re Appendix C, Additional Conditions ML20209A1052019-11-13013 November 2019 Operating License, Table of Contents ML20209A1172019-11-13013 November 2019 Operating License, Appendix B, Environmental Protection Plan ML20209A1352019-11-13013 November 2019 Operating License Re EA-06-037, Issuance of Order Requiring Compliance with Updated Adversary Characteristic ML20209A1482019-11-13013 November 2019 Operating License Re NRC Order ML20209A1262019-11-13013 November 2019 Operating License Amendment Index ML20209A1072019-11-13013 November 2019 Operating License Re EA-13-237, Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Callaway Plant Independent Spent Fuel Storage Installation ML20209A1132019-11-13013 November 2019 Operating License Re Renewed Facility Operating License ML20209A1252019-11-13013 November 2019 Operating License Re EA-03-009 Errata, Issuance of Errata to Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors ML20209A1312019-11-13013 November 2019 Operating License Re EA-05-007, Issuance of Order for Additional Security Measures on the Transportation of Radioactive Material Quantities of Concern ML20209A1392019-11-13013 November 2019 Operating License Re Order Modifying Licenses (Effective Immediately), EA-02-026 ML20209A1412019-11-13013 November 2019 Operating License Re Issuance of Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel ML20209A1432019-11-13013 November 2019 Operating License Re EA-12-049, Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML20209A1532019-11-13013 November 2019 Operating License Re Issuance of Order Requiring Compliance with Revised Design Basis Threat for Operating Power Reactors ML19158A2902019-07-30030 July 2019 Issuance of Amendment No. 220 Regarding Emergency Action Level Scheme Changes ML19073A0012019-04-18018 April 2019 Issuance of Amendment No. 219 to Add New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System ML18124A0262018-05-30030 May 2018 Issuance of Amendment No. 218 FSAR Revision Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection ML17236A0822017-09-15015 September 2017 Issuance of Amendment No. 217 Replacement of Methodology in Technical Specification 5.6.5, Core Operating Limits Report (Colr), ML16020A5162016-02-29029 February 2016 Issuance of Amendment No. 216, Revise Technical Specification (TS) 2.1.1.1 and TS 5.6.5, to Remove Uncertainties from Departure from Nucleate Boiling Ratio Safety Limit and Adopt WCAP-14565-P-A Methodology ML15324A1142016-02-0202 February 2016 Issuance of Amendment No. 215, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML15328A0592016-01-28028 January 2016 Issuance of Amendment No. 214, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15258A5102015-10-28028 October 2015 Issuance of Amendment No. 213, Adopt Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation 2024-01-18
[Table view] Category:Safety Evaluation
MONTHYEARML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML22361A0702023-02-24024 February 2023 Issuance of Amendment No. 231 for Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ML23019A1752023-01-30030 January 2023 Issuance of Amendment No. 230 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22301A0072022-12-0202 December 2022 Issuance of Amendment No. 229 to Revise Technical Specifications to Adopt TSTF-505, Revision 2, and TSTF-439, Revision 2 ML22220A1302022-10-21021 October 2022 Exemptions from the Requirements of 10 CFR 50.46 and 10 CFR Part 50 Appendix a, General Design Criteria 35, 38, and 41 (EPID L-2021-LLE-0021) (Cover Letter) ML22220A1322022-10-21021 October 2022 Issuance of Amendment No. 228 Re; Revise Technical Specifications to Address Generic Safety Isusue-191 and Respond to Generic Letter 2004-02 Using Risk-Informed Approach ML22053A2832022-04-0707 April 2022 Issuance of Amendment No. 227 Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529, Revision 4, Clarify Use and Application Rules ML21344A0052021-12-29029 December 2021 Issuance of Amendment No. 226 Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML21053A1262021-03-24024 March 2021 Issuance of Amendment No. 225 to Revise Technical Specification Administrative Control 5.3.1 to Remove Details Specified for the Qualification of Certain Positions within the Unit Staff ML20218A4102020-11-0303 November 2020 Issuance of Amendment No. 224 Performance Based Method Alternative for Thermal Insulation Material ML20246G5702020-10-16016 October 2020 Issuance of Amendment No. 223 One-Time Deferral of the Steam Generator Tube Inspections ML20230A3872020-08-31031 August 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20216A6812020-08-0606 August 2020 Operating Quality Assurance Manual Change Revision 34B (EPID L-2020-LLQ-0004 (COVID-19)) ML20141L7452020-06-0808 June 2020 Operating Quality Assurance Manual Change Revision 34A ML20107H9782020-04-20020 April 2020 COVID-19 Relief Request CC-01 Containment Tendon Inspection ML19283C4812019-12-0606 December 2019 Issuance of Amendment No. 221 Main Turbine Control Slave Relay Testing ML19158A2902019-07-30030 July 2019 Issuance of Amendment No. 220 Regarding Emergency Action Level Scheme Changes ML19073A0012019-04-18018 April 2019 Issuance of Amendment No. 219 to Add New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System ML19079A1482019-04-0101 April 2019 Request for Alternative I4R-05 to Reactor Vessel Nozzle Weld Examination Frequency Requirements (EPID L-2018-LLR-0051 ML18313A0692018-11-26026 November 2018 Request for Relief I4R-01 Related to the Inservice Inspection Program for Class 3 Buried High Density Polyethylene Piping ML18124A0262018-05-30030 May 2018 Issuance of Amendment No. 218 FSAR Revision Compliance with Regulatory Guide 1.106 Regarding MOV Thermal Overload Protection ML17262A7002017-10-0303 October 2017 Request for Alternative I4R-04 Applicable to the Fourth 10-Year Inspection Program Interval ML17254A1202017-09-25025 September 2017 Request for Alternative No. PR-07 from the Requirements of the ASME Code for the Fourth 10-Year Inservice Testing Interval ML17236A0822017-09-15015 September 2017 Issuance of Amendment No. 217 Replacement of Methodology in Technical Specification 5.6.5, Core Operating Limits Report (Colr), ML17170A3202017-06-20020 June 2017 Safety Evaluation Input - for Ameren Missouri Request to Amend Callaway Plant, Unit 1, Technical Specification 5.6.5, Core Operating Limits Report - ML17058A4432017-03-0606 March 2017 Request for Alternative I4R-03 Applicable to the Fourth 10-Year Inservice Inspection Program Interval ML17010A3322017-02-0202 February 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16223A7122016-08-30030 August 2016 Relief Request No. 13R-08 from Code Case N-460, Alternative Examination Coverage for Class 1 and Class 2 Welds, for Piping Welds, Third 10-Year Inservice Inspection Interval ML16089A1672016-04-0101 April 2016 Review and Approval of Quality Assurance Plan Change Per Nuclear Energy Institute (NEI) 14-05A, Revision 1 ML16055A4642016-03-17017 March 2016 Relief Requests 13R-09 (Steam Generator Tubesheet Weld), 13R-11 (Pressurizer Welds) from Code Case N-460 and 13R-18 (SG Weld), from Appendix Viii Requirements, Third 10-Year Inservice Inspection Interval (CAC MF6735-MF6737) ML16020A5162016-02-29029 February 2016 Issuance of Amendment No. 216, Revise Technical Specification (TS) 2.1.1.1 and TS 5.6.5, to Remove Uncertainties from Departure from Nucleate Boiling Ratio Safety Limit and Adopt WCAP-14565-P-A Methodology ML15324A1142016-02-0202 February 2016 Issuance of Amendment No. 215, Adopt Technical Specification Task Force (TSTF) Traveler TSTF-510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML16027A1582016-01-29029 January 2016 Relief Request I4R-02 from Requirements of ASME Code Section XI, Table IWF-2500-1 for 100% Visual Examination of Class 1 Supports, Fourth 10-Year Inservice Inspection Interval ML15328A0592016-01-28028 January 2016 Issuance of Amendment No. 214, Request to Revise Operating License Condition Related to Cyber Security Plan Milestone 8 Full Implementation Date ML15258A5102015-10-28028 October 2015 Issuance of Amendment No. 213, Adopt Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15251A4932015-10-0707 October 2015 Issuance of Amendment No. 212, Request to Upgrade the Emergency Action Level Scheme by Adopting Nuclear Energy Institute NEI 99-01, Revision 6 ML15064A1252015-05-12012 May 2015 Request for Relief I4R-01 from ASME Code Requirements for Replacement of Class 3 Essential Service Water Buried Piping with High Density Polyethylene Piping, for the Fourth 10-year Inservice Testing Interval ML15064A0282015-03-31031 March 2015 Issuance of Amendment No. 211, Request to Revise Final Safety Analysis Report Standard Plant Section 3.6 for High Density Polyethylene (Hdpe) Crack Exclusion ML15035A1482015-02-10010 February 2015 Relief Request 13R-17, Proposed Alternative to ASME Code, Section XI Requirements, Which Extends Reactor Vessel Inservice Inspection Frequency from 10 to 20 Years, Third 10-Year Interval ML14350B2392015-01-20020 January 2015 Issuance of Amendment No. 210, Revise Technical Specification LCO 3.4.12, Cold Overpressure Mitigation System (Coms), to Clarify No Limitation on Normal Charging Pump Use During Modes 4-6 ML14234A4512014-09-0404 September 2014 Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval ML14178A7692014-07-15015 July 2014 Requests for Relief PR-01, PR-02, PR-03, PR-04, and PR-06 (PR-05 Withdrawn), ASME OM Code Cases for Group a and B Pumps for Fourth 10-Year Inservice Testing Interval ML14175A3902014-07-0101 July 2014 Issuance of Amendment No. 209, Adoption of Technical Specification Task Force Change Traveler TSTF-522-A, Revision 0, Revise Ventilation System to Operate for 10 Hours Per Month, Using CLIIP ML14027A0572014-01-29029 January 2014 Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval 2024-01-18
[Table view] |
Text
March 28, 2006 Mr. Charles D. Naslund Senior Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1 - ISSUANCE OF AMENDMENT RE:
CONTAINMENT SPRAY AND COOLING SYSTEMS (TAC NO. MC8841)
Dear Mr. Naslund:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 171 to Facility Operating License No. NPF-30 for the Callaway Plant, Unit 1.
The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated October 26, 2005 (ULNRC-05174).
The amendment revises Required Action D.1, in TS 3.6.6, "Containment Spray and Cooling Systems," to require plant shutdown if both containment cooling trains are out of service, which is more conservative than the previous requirement that allowed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore one of the inoperable trains. There are also changes to other required actions in TS 3.6.6 to reflect the revision to Required Action D.1.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Jack Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosures:
- 1. Amendment No. 171 to NPF-30
- 2. Safety Evaluation cc w/encls: See next page
March 28, 2006 Mr. Charles D. Naslund Senior Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1 - ISSUANCE OF AMENDMENT RE:
CONTAINMENT SPRAY AND COOLING SYSTEMS (TAC NO. MC8841)
Dear Mr. Naslund:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 171 to Facility Operating License No. NPF-30 for the Callaway Plant, Unit 1.
The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated October 26, 2005 (ULNRC-05174).
The amendment revises Required Action D.1, in TS 3.6.6, "Containment Spray and Cooling Systems," to require plant shutdown if both containment cooling trains are out of service, which is more conservative than the previous requirement that allowed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore one of the inoperable trains. There are also changes to other required actions in TS 3.6.6 to reflect the revision to Required Action D.1.
A copy of the related Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Jack Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 DISTRIBUTION:
PUBLIC GHill (2)
Enclosures:
- 1. Amendment No. 171 to NPF-30 LPLIV Reading RidsNrrDorlDpr
- 2. Safety Evaluation RidsNrrDorl (CHaney/CHolden)
RidsNrrDorlLplg (DTerao) cc w/encls: See next page RidsNrrPMJDonohew RidsNrrLALFeizollahi RidsOgcRp RidsAcrsAcnwMailCenter RidsRegion4MailCenter (BJones)
TBoyce ACCESSION NO.:
OFFICE NRR/LPL4/PM NRR/LPL4/LA ITSB/BC OGC NRR/LPL4/BC NAME JDonohew LFeizollahi TBoyce Suttal (NLO) DTerao DATE 1/17/06 1/17/06 2/2/06 3/15/06 3/27/06 OFFICIAL RECORD COPY
UNION ELECTRIC COMPANY CALLAWAY PLANT, UNIT 1 DOCKET NO. 50-483 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 171 License No. NPF-30
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Union Electric Company (UE, the licensee) dated October 26, 2005, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-30 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 171 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This amendment is effective as of its date of issuance, and shall be implemented within 90 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
David Terao, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 28, 2006
ATTACHMENT TO LICENSE AMENDMENT NO. 171 RENEWED FACILITY OPERATING LICENSE NO. NPF-30 DOCKET NO. 50-483 Replace the following page of the Appendix A Technical Specifications with the attached revised page. The revised page is identified by an amendment number and contains marginal lines indicating the areas of change.
REMOVE INSERT 3.6-19 3.6-19
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 171 TO FACILITY OPERATING LICENSE NO. NPF-30 UNION ELECTRIC COMPANY CALLAWAY PLANT, UNIT 1 DOCKET NO. 50-483
1.0 INTRODUCTION
By application dated October 26, 2005 (Agencywide Documents Access Management System Accession No. ML053110157), Union Electric Company (the licensee) requested changes to Facility Operating License No. NPF-30 for the Callaway Plant, Unit 1 (Callaway). The licensee is proposing to revise Technical Specification (TS) 3.6.6, "Containment Spray and Cooling Systems," to change Required Action D.1 that currently allows 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of operation with both containment cooling trains out of service as long as both containment spray trains are operable.
The required action would be revised to impose the more stringent requirement of requiring plant shutdown if both containment cooling trains are out of service instead of allowing the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore an inoperable train. There are also changes to other required actions in TS 3.6.6 to reflect the revision to Required Action D.1, including the required action for two containment spray trains being inoperable.
2.0 REGULATORY EVALUATION
For the TSs, Section 50.36 of Title 10 of the Code of Federal Regulations (10 CFR 50.36),
"Technical specifications," the Nuclear Regulatory Commission (NRC) established its regulatory requirements related to the content of TSs. Pursuant to 10 CFR 50.36, TSs include items in the following five specific categories related to station operation: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation (LCOs);
(3) surveillance requirements; (4) design features; and (5) administrative controls. The rule does not specify the particular requirements to be included in a plants TSs. As stated in 10 CFR 50.36(c)(2)(i), the "Limiting conditions for operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility. When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the technical specifications..."
The remedial actions in the TSs are specified in terms of conditions, required actions, and completion times (CTs) to complete the required actions. When an LCO is not being met, the CTs specified in the TSs are the amount of time allowed in the TSs for completing the specified LCO required actions. The conditions and required actions specified in the TSs must be acceptable remedial actions for the LCO not being met, and the CTs must be reasonable for completing the required actions.
3.0 TECHNICAL EVALUATION
3.1 Proposed Changes to the TSs In its application, the licensee proposed the following changes to TS 3.6.6:
- 1. Delete the current Condition D for two containment cooling trains inoperable with the Required Action D.1 to restore one containment cooling train to operable status within the CT of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
- 2. Renumber current Condition E for the required action and associated CT of current Conditions C or D not being met. Also, renumber the current Required Actions E.1 and E.2. The current Condition D is deleted from current Condition E, but the required actions and the CT are not changed.
- 3. Renumber the current Condition F for "Two containment spray trains inoperable OR Any combination of three or more trains inoperable."
- 4. Replace the second part of the current Condition F, for "Any combination of three or more trains inoperable," by "Two containment cooling trains inoperable."
- 5. Replace the current Required Action F.1 by the current Required Actions E.1 and E.2 and associated CTs. Keep the required actions numbered E.1 and E.2 because current Condition F would be renumbered by the deletion of current Condition D.
3.2 Description of Containment Spray and Cooling Systems The licensee described the containment spray and cooling systems in its application. It stated that both systems mitigate accident conditions in that they provide containment atmosphere cooling to limit the post-accident containment pressure and temperature to less than the design values. Also, the containment spray would remove radioiodine from containment, and this and the reduction in containment pressure would reduce the release of radioiodines from containment to the environment to within the guidelines specified in 10 CFR Part 100. Because of this safety function, the containment spray and cooling systems are classified as engineered safety features.
As stated in the current Bases for TS 3.6.6, the containment spray system consists of two separate trains, each of equal capacity and capable of providing 100 percent of the required design basis containment atmosphere cooling and iodine removal. Each train includes a spray pump, spray headers, nozzles, valves, and piping. There is an injection phase of spraying water into containment where the water collects in the containment sumps, and a re-circulation phase where the water in the sumps is re-circulated from the sumps through containment spray and the residual heat removal heat exchangers to remove heat from containment. For the containment cooling system, there are also two trains, each of which is capable of providing 100 percent of the required design-basis cooling. Each train has two fan units supplied with cooling water from a separate train of essential service water and this cooling water also removes heat from containment.
The current TS LCO 3.6.6 requires that two containment spray trains and two containment cooling trains are required to be operable in reactor Modes 1, 2, 3, and 4. The current Condition D for TS LCO 3.6.6 of two containment cooling trains being operable allows 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (i.e., current Required Action D.1) to restore one such train to operable status. In its application, the licensee stated that based on evaluations for Callaway this allowance to restore an inoperable containment cooling train is not conservative.
3.3 Evaluation of the Proposed TS Changes 3.3.1 Delete Current Condition D and Revise Current Condition F The licensee stated that if both containment cooling systems are inoperable, the design heat removal capacity required during the post-accident period cannot be met. This is because, although containment spray system complements the containment cooling systems in reducing containment pressure and temperature in an accident, the containment spray system is not redundant to the containment cooling system in removing heat from containment (i.e., one containment spray train can not remove 100 percent of the design basis required containment cooling).
The licensee stated that if both containment cooling trains are inoperable, Callaway is not within its analyzed operating conditions and the plant should be shut down and placed in a reactor mode where TS LCO 3.6.6 does not apply (i.e., Mode 5). However, the current TS LCO 3.6.6 Condition D for two inoperable cooling trains allows 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for one inoperable train to be restored to operable status. This is before requiring the plant to start shutting down if an inoperable train cannot be restored to operable status. The licensee stated that, for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the plant could be without a system that is capable of removing the design basis required heat removal from containment during an accident and keeping the containment pressure and temperature within the design values. The licensee proposed to change the required actions in the current TS LCO 3.6.6 Condition D to require the plant to be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in Mode 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
In reviewing the application, the NRC staff had a conference call with the licensee on January 27, 2006, to find out if one containment spray train and one containment cooling train were sufficient in themselves to provide 100 percent of the required design basis containment atmosphere cooling and iodine removal. The licensee stated that the case of only one containment spray train and one containment cooling train being operable is addressed in the Callaway Final Safety Analysis Report (FSAR). FSAR Sections 6.2.1.3 and 6.2.1.4 discuss the containment response to a postulated loss-of-coolant accident (LOCA) and to a postulated secondary pipe (i.e., a steam line) rupture, respectively, inside containment. This is also addressed in FSAR Table 6.1.1-3, "Engineered Safety Features Design Parameters for Containment Analysis." The most severe single active failure is loss of one diesel generator, which is the same as loss of one containment spray train and one containment cooling train.
With two containment spray and cooling trains provided, this means that for the worst single active failure there is only one containment spray train and one containment cooling train that is operable. For this case, by the FSAR, there is 100 percent of the required design basis containment atmosphere cooling and iodine removal.
The licensee's proposed required actions and CTs are the same as those specified in the current TS LCO 3.6.6 for Condition E. The current Condition E is for the case of not restoring an inoperable containment cooling train in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> when both trains are inoperable.
Therefore, for two containment cooling trains inoperable, the licensee has proposed to delete the allowance of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to restore an inoperable train to operable status and to immediately enter required actions to be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, which is appropriate for a loss of containment cooling function. These proposed required actions are more conservative than the required action and CTs for LCO 3.0.3, which provides required actions when an LCO is not met, and either the associated required actions are not met or no applicable required actions are specified.
Because the proposed containment spray system is not redundant to the containment cooling system in maintaining the containment pressure and temperature within design limits in an accident, the NRC staff concludes that the current Condition D is not sufficiently conservative to protect the containment when both containment cooling trains are inoperable. However, because the proposed required actions to be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in Mode 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> are more conservative than the required actions and CTs in LCO 3.0.3, the NRC staff concludes that the proposed required actions and CTs for both containment cooling trains inoperable are acceptable.
In proposing to delete the current TS LCO 3.6.6 Condition D for two containment cooling trains inoperable, the licensee has proposed to replace the second actions condition in current TS LCO 3.6.6 Condition F for any combination of three or more trains of the containment spray and cooling systems by the condition of two containment cooling trains inoperable. With current Condition D deleted, then the plant will not be operated with two containment cooling trains being inoperable and there is no need for the condition of any combination of three or more trains being inoperable. The NRC staff agrees with this conclusion. Therefore, the licensee has proposed to replace the second condition in the current LCO 3.6.6 Condition F with the condition of two containment cooling trains being inoperable. In doing this and proposing the required actions stated above of being in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, the licensee is also proposing to have the same required actions for the condition of two containment spray trains inoperable. These required actions and CTs are more conservative than the current required action of entering LCO 3.0.3 for two containment spray trains inoperable. Based on this, the NRC staff concludes that (1) the proposed replacement of "Any combination of three or more trains inoperable" by "Two containment cooling trains inoperable" and (2) the change in the required action and CT for the condition of "Two containment spray trains inoperable" are acceptable.
3.3.2 Renumber LCO 3.6.6 Conditions E and F By deleting current LCO 3.6.6 Condition D, the other LCO 3.6.6 conditions need to be renumbered. Current Condition E would become new Condition D and the reference to Condition D in the condition would also be deleted because that Condition D has been deleted.
The current Required Actions E.1 and E.2 would be renumbered Required Actions D.1 and D.2, but the required actions and the CTs would not be changed. Also, the current LCO 3.6.6 Condition F would then be renumbered new Condition E and its required actions would be numbered Required Actions E.1 and E.2. The new required actions for the current Condition F were addressed in Section 3.3.1 of this safety evaluation.
3.3.3 Conclusion Because the revision to the conditions, required actions, and CTs for LCO 3.6.6 are acceptable as discussed above, the NRC staff concludes that they meet 10 CFR 50.36 and, therefore, the proposed amendment is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Missouri State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (71 FR 2597; published January 17, 2006). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Jack Donohew Date: March 28, 2006
Callaway Plant, Unit 1 cc:
Professional Nuclear Consulting, Inc. Mr. Dan I. Bolef, President 19041 Raines Drive Kay Drey, Representative Derwood, MD 20855 Board of Directors Coalition for the Environment John ONeill, Esq. 6267 Delmar Boulevard Shaw, Pittman, Potts & Trowbridge University City, MO 63130 2300 N. Street, N.W.
Washington, D.C. 20037 Mr. Lee Fritz, Presiding Commissioner Callaway County Court House Mr. Mark A. Reidmeyer, Regional 10 East Fifth Street Regulatory Affairs Supervisor Fulton, MO 65151 Regulatory Affairs AmerenUE Mr. David E. Shafer P.O. Box 620 Superintendent, Licensing Fulton, MO 65251 Regulatory Affairs AmerenUE U.S. Nuclear Regulatory Commission P.O. Box 66149, MC 470 Resident Inspector Office St. Louis, MO 63166-6149 8201 NRC Road Steedman, MO 65077-1302 Mr. Keith D. Young Manager, Regulatory Affairs Mr. Les H. Kanuckel AmerenUE Manager, Quality Assurance P.O. Box 620 AmerenUE Fulton, MO 65251 P.O. Box 620 Fulton, MO 65251 Mr. Keith G. Henke, Planner Division of Community and Public Health Missouri Public Service Commission Office of Emergency Coordination Governor Office Building 930 Wildwood P.O. Box 570 200 Madison Street Jefferson City, MO 65102 Jefferson City, MO 65102-0360 Certrec Corporation Regional Administrator, Region IV 4200 South Hulen, Suite 630 U.S. Nuclear Regulatory Commission Fort Worth, TX 76109 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Director, Missouri State Emergency Management Agency Mr. H. Floyd Gilzow P.O. Box 116 Deputy Director for Policy Jefferson City, MO 65102-0116 Missouri Department of Natural Resources P. O. Box 176 Jefferson City, MO 65102-0176 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839