Containment Spray and Cooling systems 3.6.6 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION D. Required Action and associated Completion D.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Time of Condition C not met.
AND D.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> E. Two containment spray E.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> trains inoperable.
AND OR E.2 Be in MODE 5.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Two containment cooling trains inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.6.1 Verify each containment spray manual, power 31 days operated, and automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in the correct position.
SR 3.6.6.2 Operate each containment cooling train fan unit for 31 days 2 15 minutes.
(continued)
I CALLAWAY PLANT 3.6-1 9 Amendment No. 171