Correction to Amendment No. 258 Dated May 12, 2005
ML051730005
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/24/2005
From: Spaulding D
NRC/NRR/DLPM/LPD3
To: Peifer M
Nuclear Management Co
Spaulding, D W, NRR/DLPM, 415-2928
Shared Package
ML051730006 List:
References
TAC MC2023
Download: ML051730005 (4)


Text

June 24, 2005 Mark A. Peifer Site Vice President Duane Arnold Energy Center Nuclear Management Company, LLC 3277 DAEC Road Palo, IA 52324-0351

SUBJECT:

DUANE ARNOLD ENERGY CENTER - CORRECTION TO AMENDMENT NO. 258 DATED MAY 12, 2005 (TAC NO MC2023)

Dear Mr. Peifer:

On May 12, 2005, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 258 to Facility Operating License No. DPR-49 for the Duane Arnold Energy Center (DAEC). The Amendment consisted of revising Technical Specifications 1.4, Frequency, 5.5.2, Primary Coolant Sources Outside Containment, and 5.5.11, Safety Function Determination Program, in response to your application dated January 28, 2004. Through an administrative error, pages 1.4-3, 1.4-4, 1.4-6, 1.4-7, 1.4-8, 5.0-8, and 5.0-18 were not included with the issued amendment. This letter transmits those pages. Additionally, through a review of the amendment package, it was noted that there were four typographical errors in the NRC staff safety evaluation. On the third line of page 3, the word the should be a. On the 31st line of page 3, 5.5.12" should be 5.5.11." On page 6 lines 16 - 21, (beginning with Situations and ending with performed) are redundant to lines 22 - 27, (beginning with Situations and ending with performed). On line 16 of page 7, 3.3.1.a should be 3.2.1.a. The typographical errors did not affect the NRC staff conclusion.

If there are any questions concerning this letter, please contact Deirdre W. Spaulding at (301) 415-2928.

Sincerely,

/RA/

Deirdre W. Spaulding, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-331

Enclosures:

As stated cc w/encls: See next page

ML051730006 LETTER ACCESSION NUMBER: ML051730005 TS ACCESSION NUMBER: ML051740431 OFFICE PM:PDIII-1 LA:PDIII-1 SC:PDIII-1 NAME DSpaulding THarris LRaghavan DATE 06/24/05 06/24/05 06/24/05 Duane Arnold Energy Center cc:

Mr. John Paul Cowan Chairman, Linn County Executive Vice President & Board of Supervisors Chief Nuclear Officer 930 1st Street SW Nuclear Management Company, LLC Cedar Rapids, IA 52404 700 First Street Hudson, MI 54016 Craig G. Anderson Senior Vice President, Group Operations John Bjorseth 700 First Street Plant Manager Hudson, WI 54016 Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 Steven R. Catron Manager, Regulatory Affairs Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 U. S. Nuclear Regulatory Commission Resident Inspectors Office Rural Route #1 Palo, IA 52324 Regional Administrator U. S. NRC, Region III 801 Warrenville Road Lisle, IL 60532-4531 Jonathan Rogoff Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Bruce Lacy Nuclear Asset Manager Alliant Energy/Interstate Power and Light Company 3277 DAEC Road Palo, IA 52324 Daniel McGhee Utilities Division Iowa Department of Commerce Lucas Office Buildings, 5th floor Des Moines, IA 50319

ERRATA TO LICENSE AMENDMENT NO. 258 FACILITY OPERATING LICENSE NO. DPR-49 DOCKET NO. 50-331 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Remove Insert 1.4-3 1.4-3 1.4-4 1.4-4 1.4-6 1.4-7 1.4-8 5.0-8 5.0-8 5.0-18 5.0-18