IR 05000219-04-009, on 08/23-26/2004 and 08/27-11/29/2004; Oyster Creek Generating Station; IP 71114, Emergency Preparedness and IP 71151, Performance Indicators
ML050120053
Person / Time
Site: Oyster Creek
Issue date: 01/11/2005
From: Lanning W
Division of Reactor Safety I
To: Crane C
AmerGen Energy Co
References
EA-04-213 IR-04-009
Download: ML050120053 (19)


See also: IR 05000219/2004009

Text

January 11, 2005

EA-04-213

Mr. Christopher M. Crane

President and CEO

AmerGen Energy Company, LLC

200 Exelon Way, KSA 3-E

Kennett Square, PA 19348

SUBJECT: OYSTER CREEK NRC EMERGENCY PREPAREDNESS PROGRAM

INSPECTION REPORT 05000219/2004009; PRELIMINARY WHITE FINDING

Dear Mr. Crane:

On November 29, 2004, the U. S. Nuclear Regulatory Commission (NRC) completed an

inspection of your Oyster Creek Generating Station, which began during the week of

August 23, 2004, with in-office review continuing until November 29, 2004. The enclosed

inspection report documents the inspection findings, which were discussed with

Mr. B. Swenson, Site Vice President, and other members on your staff during the exit meetings

on August 26 and November 29, 2004.

The inspection examined activities conducted under your license as they relate to safety and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed procedures and records, observed activities, and interviewed

personnel.

The report discusses a finding that appears to have low to moderate safety significance. As

described in Section 1EP4 of this report, this finding involved untimely actions to change an

Emergency Action Level (EAL), namely Fission Product Barrier Matrix threshold value used for

making a General Emergency (GE) and/or Site Area Emergency (SAE) declaration. This

finding was assessed using the emergency preparedness significance determination process

dated March 6, 2003, and was preliminarily determined to be White, i.e., a finding with some

increased importance to safety which may require additional NRC inspection. The finding has

low to moderate safety significance because a Risk Significant Planning Standard (RSPS)

function was degraded. Specifically, it was degraded because an incorrect EAL scheme could,

under certain circumstances, delay actions directed by State and local response plans.

AmerGen did not properly ensure that the EALs used for making a GE and/or SAE declaration

were correct following a change made to the Minimum Steam Cooling Reactor Water Level

(MSCRWL) threshold value in the Emergency Operating Procedures (EOP). The MSCRWL

value of minus 30" from top of active fuel is a part of the EAL scheme and it was incorrect for a

period of nine days until it was identified and corrected by the licensee. The correct value was

minus 20" from top of active fuel. The limit ensures adequate core cooling during certain leak

scenarios; and, if the limit is projected to be exceeded in accident conditions, a radiation

release might be imminent warranting onsite and offsite actions. During this time for a narrow

Mr. Christopher M. Crane 2

range of scenarios, the situation of the EOPs and EALs having two different limits, albeit a

small difference, may have delayed the proper emergency classification. Oyster Creek

personnel would have had to rely upon operator recognition of the inconsistency between the

EALs and the EOPs instead of being presented appropriate classification guidance consistent

with the EOPs. Although only a very small portion of the EAL scheme was affected by this

inconsistency, this situation is contrary to the NRCs requirements that accurate EALs be in

place. There were several program implementation and human performance deficiencies that

were contributing factors to this finding. More specifically, a configuration change process was

not properly used to ensure that the responsible AmerGen department was aware of a plant

configuration change that would require a simultaneous change to an affected EAL related to

the emergency declaration.

Upon notification, your staff implemented immediate corrective actions, including reducing

reactor power in order to support the rod pattern change to satisfy the previous MSCRWL limit

and correcting the EAL threshold value. Therefore, the finding does not present an immediate

safety concern. We understand that long-term corrective and preventive measures are being

developed.

The finding is an apparent violation of NRC requirements (10 CFR 50.54(q), 50.47(b)(4), and

TS 6.8, along with associated implementing procedures) and is being considered for escalated

enforcement action in accordance with the General Statement of Policy and Procedure for the

NRC Enforcement Actions (Enforcement Policy) NUREG-1600. The current policy is included

on the NRCs website at http://www.nrc.gov/reading-rm/adams.html.

We believe we have sufficient information to make a final risk significance determination on this

issue. However, before we make a final decision on this matter, we are providing you an

opportunity to: (1) present to the NRC your perspectives on the facts and assumptions, used

by the NRC to arrive at the finding and its significance, at a Regulatory Conference, or (2)

submit your position on the finding to the NRC in writing. If you request a Regulatory

Conference, it should be held within 30 days of the receipt of this letter and we encourage you

to submit supporting documentation at least one week prior to the conference in an effort to

make the conference more efficient and effective. If a Regulatory Conference is held, it will be

open for public observation and a press release will be issued announcing it. If you decide to

submit only a written response, such submittal should be sent to the NRC within 30 days of the

receipt of this letter.

Please contact Mr. Richard Conte at (610) 337-5183 within 10 business days of the date of this

letter to notify the NRC of your intentions. If we have not heard from you within 10 business

days, we will continue with our significance determination and enforcement decision and you

will be advised by separate correspondence of the results of our deliberations on this matter.

Since the NRC has not yet made a final determination in this matter, no Notice of Violation is

being issued for these inspection findings at this time. In addition, please be advised that the

characterization of the apparent violation described in the enclosed report may change as a

result of further NRC review.

Mr. Christopher M. Crane 3

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure, and your response if any will be made available electronically for public inspection in

the NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

(Note: Public access to ADAMS has been temporarily suspended so that security reviews of

publicly available documents may be performed and potentially sensitive information removed.

Please check the NRC website for updates on the resumption of ADAMS access.)

Should you have any questions concerning this inspection, I will be pleased to discuss them

with you.

Sincerely,

/RA/

Wayne D. Lanning, Director

Division of Reactor Safety

Docket No. 50-219

License No. DPR-16

Enclosure: Inspection Report 05000219/2004009

cc w/encl:

Chief Operating Officer, AmerGen

Site Vice President, Oyster Creek Nuclear Generating Station, AmerGen

Plant Manager, Oyster Creek Generating Station, AmerGen

Regulatory Assurance Manager Oyster Creek, AmerGen

Senior Vice President - Nuclear Services, AmerGen

Vice President - Mid-Atlantic Operations, AmerGen

Vice President - Operations Support, AmerGen

Vice President - Licensing and Regulatory Affairs, AmerGen

Director Licensing, AmerGen

Manager Licensing - Oyster Creek, AmerGen

Vice President, General Counsel and Secretary, AmerGen

T. ONeill, Associate General Counsel, Exelon Generation Company

J. Fewell, Assistant General Counsel, Exelon Nuclear

Correspondence Control Desk, AmerGen

J. Matthews, Esquire, Morgan, Lewis & Bockius LLP

Mayor of Lacey Township

J. Lipoti, Ph.D., Assistant Director of Radiation Programs, State of New Jersey

K. Tosch - Chief, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection

R. Shadis, New England Coalition Staff

N. Cohen, Coordinator - Unplug Salem Campaign

W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch

E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance

J. Picciano, Acting Regional Director, FEMA Region II

Mr. Christopher M. Crane 4

Distribution w/encl: (VIA E-MAIL)

S. Collins, RA

J. Wiggins, DRA

P. Eselgroth, DRP

R. Barkley, DRP

R. Summers, DRP, Senior Resident Inspector

J Herrera, DRP, Resident Inspector

J. DeVries, DRP, Resident OA

J. Jolicoeur, RI OEDO

R. Laufer, NRR

P. Tam, PM, NRR

T. Colburn, NRR

Region I Docket Room (with concurrences)

W. Kane, NRR

B. Sheron, NRR

D. Dambly, OGC

S. Figueroa, OE

D. Holody, EO, RI

R. Urban, ORA, RI

D. Corlew, ORA, RI

F. Congel, OE (OEMAIL)

K. Farrar, RI, RC

R. Kahler, NSIR/EPD

S. LaVie, NSIR/EPD

W. Lanning, DRS

R. Conte, DRS

N. McNamara, DRS

DOCUMENT NAME: E:\Filenet\ML050120053.wpd

SISP Review Complete: RJC (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE RI/DRS RI/DRS RI/DRP RI/DRS/SRA RI/OE

NAME NMcNamara (NTM) RConte (RJC) PEselgroth (PWE) WSchmidt (WLS) RUrban (RJU)

DATE 12/04/04 01/04/05 12/17/04 01/05/05 12/17/04

OFFICE NSIR/EPD RI/DRS

NAME LaVie (via email) WLanning (WDL)

DATE 12/26/05 01/11/05 01/ /05 01/ /05 01/ /05

OFFICIAL RECORD COPY

U. S. NUCLEAR REGULATORY COMMISSION

REGION I

Docket No. 50-219

License No. DPR-16

Report No. 05000219/2004009

Licensee: AmerGen Energy Company, LLC (AmerGen)

Facility: Oyster Creek Generating Station

Location: Forked River, New Jersey

Dates: August 23 - 26, 2004 (onsite)

August 27 - November 29, 2004 (in-office)

Inspector: Nancy T. McNamara, Emergency Preparedness Inspector

Approved by: Richard J. Conte, Chief

Operational Safety Branch

Division of Reactor Safety

Enclosure

SUMMARY OF FINDINGS

IR 05000219/2004-009; 08/23-08/26/2004 and 08/27-11/29/2004; Oyster Creek Generating

Station; IP 71114, Emergency Preparedness and IP 71151, Performance Indicators.

This announced inspection was conducted by a regional emergency preparedness inspector.

One potentially greater than Green finding and apparent violation was identified. The

significance of most findings is indicated by their color (Green, White, Yellow, Red) using

Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP). The

NRCs program for overseeing the safe operation of commercial nuclear power reactors is

described in NUREG-1649, Reactor Oversight Process, Revision 3, dated July 2000.

A. NRC-Identified Findings

Cornerstone: Emergency Preparedness (EP)

  • White (Preliminary). An apparent violation associated with emergency planning

standard 10 CFR 50.47(b)(4) and Technical Specification 6.8, along with its

associated implementing procedures related to configuration control, was

identified which has low to moderate safety significance because the Emergency

Action Level, Fission Product Barrier Matrix contained an incorrect threshold

value used for making a General Emergency and/or Site Area Emergency

declaration.

The finding is more than minor because it is associated with the EP cornerstone

attribute of standard emergency classification and action level scheme and

offsite EP. It affects the cornerstone objective of ensuring the capability to

implement measures to protect the health and safety of the public during an

emergency. The finding is potentially greater than very low safety significance

because an untimely General Emergency could delay actions directed by State

and local response plans. (1EP4)

B. Licensee-Identified Findings

Four violations of very low safety significance which were identified by the licensee were

reviewed by the inspector. Corrective actions taken or planned by the licensee have

been entered into the licensees corrective action program. These violations are listed in

Section 40A7 of this report.

ii Enclosure

REPORT DETAILS

3. REACTOR SAFETY

Cornerstone: Emergency Preparedness

1EP2 Alert and Notification System (ANS)

a. Inspection Scope (71114.02 - 1 Sample)

An onsite review of the licensees ANS was conducted to ensure prompt notification of

the public for taking protective actions. The inspection included a review of the

2003/2004 siren test and maintenance records and the following procedures:

(1) EP-MA-121-1002, ANS Description Testing Maintenance and Performance Trending

Program; (2) EP-MA-121-1004, Exelon East ANS Corrective Maintenance; and

(3) EP-MA-121-1006, Exelon East ANS Siren Monitoring Troubleshooting and Testing.

The inspector interviewed the siren program manager and reviewed the 2003/2004

associated Corrective Action Process (CAP) reports to determine if the failures were

being immediately assessed and if inoperable sirens were being expediently repaired.

The inspection was conducted in accordance with NRC Inspection Procedure 71114,

Attachment 02, and the applicable planning standard, 10 CFR 50.47(b)(5) and its

related 10 CFR 50, Appendix E requirements were used as reference criteria.

b. Findings

No findings of significance were identified.

1EP3 Emergency Response Organization (ERO) Augmentation

a. Inspection Scope (71114.03 - 1 Sample)

An onsite review of Oyster Creeks ERO augmentation staffing requirements and the

process for notifying the ERO was conducted to ensure the readiness of key staff for

responding to an event and timely facility activation. The inspector reviewed the

2003/2004 communication pager test records and associated CAP reports. Also, the

Emergency Plan (E-Plan) qualification records for key ERO positions were reviewed to

ensure qualifications were current. Finally, the inspector attended a meeting conducted

by the plant manager for ERO staff in response to a negative trend in failures to respond

to unannounced pager tests. The inspection was conducted in accordance with NRC

Inspection Procedure 71114, Attachment 03, and the applicable planning standard,

10 CFR 50.47(b)(2) and its related 10 CFR 50, Appendix E requirements were used as

reference criteria.

The inspector reviewed CAP No. 02004-2296 that was generated during the inspection

regarding inadequate responses to ERO pager tests and unannounced drive-in drills.

Enclosure

2

b. Findings

The Oyster Creek E-Plan staffing requirements did not appear to meet the

NUREG-0654, Table B-1, minimum staffing criteria. The licensees E-Plan commits to

five on-shift Radiation Protection (RP) Technicians/Personnel and two on-shift repair

and corrective action personnel with no dedicated number of the required nine (9)

60-minute responders delineated in Table B-1, Emergency Response Organization.

This constituted a potential inadequate plan in meeting planning standard 10 CFR

50.47(b)(2) concerning the adequacy of augmentation staff to respond to emergencies.

NUREG-0654 FEMA-REP-1, Revision 1, Criteria for Preparation and Evaluation of

Radiological Emergency Response Plans and Nuclear Power Plants, Table B-1,

describes the minimum staffing guidance for nuclear power plant emergencies. The

table specifically delineates 11 RP Technician/Personnel positions (on-shift and

60-minute augmentation) for performing onsite surveys, in-plant surveys, and in-plant

protective actions. The inspector determined that the licensees E-Plan requirements

met the required on-shift complement (5); however, the E-Plan did not have a committed

number of responders (6) to fulfill the 60-minute requirement. In addition, the E-Plan

does not commit to the three required 60-minute responders in the area of mechanical

maintenance, Rad Waste Operator and Electrical Maintenance. For the expected

60-minute responders, the E-Plan states personnel numbers depend on the type and

extent of the emergency.

The inspector determined that the 60-minute responder positions, described above, are

not part of the ERO pager system and the licensee stated the call-out process for those

positions has never been exercised during an off-hours drive-in drill for meeting the

intent of a timely response. There was no EP implementing procedure that described

the process for notifying those responders or for determining the adequate number of

personnel needed to respond. Finally, at the time of the inspection, AmerGen was not

able to locate an emergency response duty roster for these positions to ensure the

availability of response personnel to fill emergency positions.

The licensees E-Plan staffing requirements were inconsistent with those prescribed in

NUREG-0654, a licensing standard used by the NRC staff in order to evaluate a plan for

meeting planning standard 10 CFR 50.47(b)(2). This planning standard states, in part,

that adequate staffing to provide initial facility accident response in key functional areas

is maintained at all times, and timely augmentation of response capabilities is available.

It is uncertain when or if the plan change reflecting the above augmentation problem

was approved by the NRC. This issue is unresolved pending further review of the

licensing basis for this section of the E-Plan, subsequent changes approved by the NRC

or the licensee, and a review of the original NRC-approved Oyster Creek E-Plan and

procedures establishing a protocol for notifying the subject responders during an

emergency event. The issue was entered into the corrective action system (CAP

No. 02004-2296). (URI 05000219/200409-01)

Enclosure

3

1EP4 Emergency Action Level (EAL) and Emergency Plan Changes

a. Inspection Scope (71114.04 - 1 Sample)

A regional in-office review was conducted of licensee-submitted revisions to the E-Plan,

implementing procedures and EALs that were received by the NRC during the period of

April through December 2004. A thorough review was conducted of plan aspects

related to the Risk Significant Planning Standards (RSPS), such as classifications,

notifications and protective action recommendations. The non-RSPS portions were also

reviewed. However, in July 2004, AmerGen issued a new standard E-Plan for the

Oyster Creek site. The 10 CFR 50.54(q) reviews associated with the specific

changes/deletions made from the original E-Plan to the current E-Plan will continue to

be reviewed and assessed in-office to ensure that AmerGen did not decrease the

effectiveness of the original E-Plan during the transition. The inspection was conducted

in accordance with NRC Inspection Procedure 71114, Attachment 04, and the

applicable requirements in 10 CFR 50.54(q) were used as reference criteria.

On July 30, 2004, the licensee identified that an EAL, Fission Product Barrier Matrix,

contained an incorrect threshold value used for making a General Emergency (GE)

and/or Site Area Emergency (SAE) declaration. The inspector reviewed the licensees

prompt analysis investigation report, root cause evaluation, several associated CAP

reports, 10 CFR 50.54(q) change analysis and conducted interviews to determine the

adequacy of the licensees assessment and corrective actions related to this issue.

b. Findings

Introduction. An apparent violation (AV) associated with emergency planning standard

10 CFR 50.47(b)(4) was identified. The inspector determined that a performance

deficiency existed in that an inadequate EAL for GE or SAE levels was in-place in July

2004 that could have delayed an emergency declaration, and potentially resulted in a

delay by State and local response agencies in taking minimum initial offsite response

measures. This performance deficiency was apparently caused by the improper use of

the configuration control process. Specifically, an EAL contained an incorrect threshold

value used for making a GE and/or SAE declaration and this EAL corresponds to the

Minimum Steam Cooling Reactor Water Level (MSCRWL) threshold value in the

Emergency Operating Procedures (EOPs) and is related to Fuel Clad Barrier Loss. As

a result of this inconsistency, Oyster Creek personnel would have had to rely upon

operator recognition of the inconsistency between the EALs and the EOPs instead of

being presented appropriate classification guidance consistent with the EOPs. By not

having an accurate EAL scheme for use in making a GE and/or SAE declaration, the

licensee failed to satisfy planning standard 10 CFR 50.47(b)(4).

Description. In February 2004, AmerGens Operations Department issued a CAP report

discussing the potential change of the MSCRWL from minus 30" top of active fuel (TAF)

to minus 20" TAF based upon analysis errors discovered by General Electric. This

water level is utilized to preclude fuel damage when Reactor Pressure Vessel (RPV)

water level is below the TAF. The minus 20" TAF threshold value is specifically used for

meeting Oyster Creeks EAL threshold value for making a GE and/or SAE declaration as

described in EP-OC-1010 EAL Matrix, Fission Product Barrier Status, Fuel Clad Barrier,

Enclosure

4

RPV Water level. The CAP report further stated that, should the analysis be validated,

changes would be needed to the EOPs, the E-Plan EALs, and the associated EAL basis

document. The final review of this issue was completed in June 2004, which stated that

minus 20" TAF was the correct value upon implementation of an end of cycle rod pattern

configuration change. The licensee issued a CAP report to change the associated EOPs

and again stated that an EAL change would be necessary.

On July 15, 2004, a CAP report was issued to the EP Department to make the

associated changes to the EAL and the action was assigned a due date of August 30,

2004. On July 23, 2004, the EOP change and the related end of cycle rod pattern

change were completed, however, the corresponding EAL change was not made prior to

the configuration change.

On July 28, 2004, a training instructor questioned if the EAL change had been made.

The change had not occurred and no CAP report was submitted indicating that the

urgency for the EAL change was not recognized. On July 30, 2004, a Nuclear Oversight

(NOS) auditor found the EAL was in error and no compensatory actions were in place as

a result of the revised basis document. To correct the situation, the licensee performed

a rod pattern adjustment to restore bundle power peaking to the previously analyzed

levels for minus 30" TAF MSCRWL. On July 31, 2004, the licensee appropriately

revised the EAL to the appropriate threshold (minus 20" TAF), which restored

consistency between the EOPs and the EP EAL such that the operators could properly

declare a SAE and/or GE for a postulated loss of fuel barrier integrity. At that time,

reactor power was reduced in order to support the rod pattern change to satisfy the

MSCRWL limit of minus 30" TAF.

The inspector determined that, during the period of July 23-31, 2004, AmerGens EAL

scheme no longer ensured that the GE and/or SAE classifications would be based upon

the minimum reactor water level for steam cooling limit in effect at the time ( minus 20"

TAF). Instead, an accurate classification would have relied upon operator recognition of

the inconsistency between the EALs and EOPs and judgment to use the property water

level limit. AmerGen did not properly implement the configuration change process for

ensuring the EAL change was made concurrent with the EOP change prior to

implementation.

The inspector noted there were multiple examples over a five-month period of

program/procedure and human performance deficiencies as noted below that resulted in

several missed opportunities to ensure the EAL was revised in a timely manner.

1. The process used to change this critical plant parameter and evaluation of its

impact on other station plans and programs was not properly used. A procedure

change process was used, versus a configuration control type process, that

would have provided a larger spectrum of program evaluations.

2. The corrective action review process failed to assign resolution actions to the

Emergency Planning organization, which is responsible for maintaining the

E-Plan and EALs current, in spite of the fact that for about five months it was

common knowledge that the EALs would have to be changed if the MSCRWL

value changed.

Enclosure

5

3. The CAP Coordinator for the Training Department is a participant in the CAP

review process. The Training Department has responsibility for the Emergency

Planning Department. Yet the Training Department CAP Coordinator who

reviewed the CAP failed to recognize that the EP Manager wasnt assigned as

part of the CAP.

4. The station PORC reviewed and approved the EOP procedure change.

However, the station PORC failed to recognize the need for similar EAL

procedure changes in spite of the fact that the PORC members were all senior

ERO members who have frequently been required to classify emergency

conditions, have received training on EAL use and bases, and understood the

significance of event classification.

5. The individuals or committees involved in the EOP change failed to review the

10 CFR 50.54(q) process for making E-Plan changes or failed to contact the EP

staff to ensure that the EAL change needed to coincide with the EOP change

and, more importantly, prior to changing the core bundle power peaking.

6. There was a lack of understanding of the urgency to have the EAL accurate for

responding to an emergency event by assigning a 30-day time frame for making

the EAL change.

In addition to the above, the NRC Resident Inspector identified AmerGens extent-of-

condition review failed to identify that the appropriate changes to certain functional

guidelines/notes that required the operators to ascertain if core damage had occurred

still contained the MSCRWL value as minus 30" TAF, as an indication of core damage.

The incorrect EAL threshold value could have directly impacted the following under

emergency conditions:

1. The PAR would have been impacted because under a loss of two barriers and

the potential loss of a third barrier, the PAR would be to evacuate 0-2 miles;

however, under the revised MSCRWL, the fuel clad barrier would be considered

lost once the RPV level drops below minus 20" TAF resulting in a PAR to

evacuate 0-5 miles.

2. The dose assessment model, which also used the MSCRWL minus 30" TAF

value as an input condition, would have had to be manually overridden to avoid

dose assessment errors assuming dose assessment was aware of the

MSCRWL discrepancy.

3. A late declaration would have a direct impact on the timeliness for providing a

PAR to the State and local response agencies for taking minimum initial offsite

response measures.

Following the identification of this issue, AmerGen took immediate corrective actions

that included: (1) the reactor power was reduced in order to support the rod pattern

change to satify the previous MSCRWL limit of minus 30" TAF; (2) a 10 CFR 50.54(q)

review was conducted to ensure the change would not decrease the effectiveness of the

Enclosure

6

plan; and (3) the EAL change was reviewed by PORC and approval was obtained from

the State of New Jersey, Bureau of Nuclear Engineering prior to implementation.

Analysis. The performance deficiency is that the E-Plan EAL threshold value used for

making an emergency declaration was inadequate which is contrary to 10 CFR 50.54(q)

and 50.47(b)(4) in that it did not accurately reflect an EOP change for MSCRWL, which

is used as a threshold for declaring a GE and/or SAE. This performance deficiency

apparently resulted from not properly using the configuration control process which is

contrary to TS 6.8 and associated facility procedures. AmerGens EAL scheme no

longer ensured that the GE/SAE classifications would be based upon the associated

EOP parameter. Instead, an accurate classification would have relied upon operator

recognition of the inconsistency between the EALs and EOPs.

The performance deficiency is more than minor because it affects the EP cornerstone

objective and the attribute of procedure quality (having standard emergency

classification and action level scheme). The attribute of offsite EP is also affected in

that, an incorrect EAL scheme may delay actions directed by State and local response

plans, which rely on timely and accurate information for taking minimum initial offsite

response measures.

This finding was processed using Inspection Manual Chapter 0609, Appendix B,

Emergency Preparedness Significance Determination Process, Sheet 1, Failure to

Comply in responding yes to the SDP screening operation: Is this finding associated

with a failure to meet or implement a regulation requirement? The finding was

determined to have low to moderate safety significance because the non-compliance

resulted in the RSPS function being degraded, but not lost. The function was degraded

in that the timeliness of the declaration was affected more so than the capability of

making a declaration.

Enforcement. 10 CFR 50.54(q) requires that the facility licensee shall follow and

maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b).

10 CFR 50.47(b)(4) requires that emergency response plans include A standard

emergency classification and action level scheme, the bases of which include facility

system and effluent parameters, is in use by the nuclear facility licensee, and State and

local response plans call for reliance on information provided by facility licensees for

determinations of minimum initial offsite response measures.

Contrary to the above, for the period of July 23-31, 2004, an EAL, Fission Product

Barrier Matrix contained an incorrect threshold value used for making a GE and/or SAE

declaration. As a result, an inadequate EAL scheme could potentially delay taking

minimum initial offsite response measures for the general public as directed by State

and local response plans because these response plans rely on correct information

provided by the facility licensee.

In addition, Technical Specification 6.8 requires written procedures shall be

implemented covering the applicable procedures in Appendix "A" of Regulatory Guide 1.33 as referenced in the Oyster Creek Operational Quality Assurance Program.

Chapter 6 of the Exelon Quality Assurance Topical Report, NO-AA-10, Revision 72,

dated March 8, 2004, describes that the Company has in place programmatic controls,

Enclosure

7

which ensure that procedures are technically correct before use and that procedures are

reviewed and revised as needed, when pertinent source material is changed, when the

plant design is changed, or when deficiencies are identified and corrected. In

implementing these measures, Procedure, CC-AA-104, "Document Change Requests,"

requires use of procedure, CC-AA-102, "Design Input and Configuration Change Impact

Screening," for necessary procedure changes. Procedure, CC-AA-102, directs the

responsible engineer to "identify procedure changes per direction in CC-AA-102

Attachment 9," which requires responsible departments to identify the procedures within

their scope of responsibility that are affected by the configuration change and to create

action requests to track the procedure changes. Also, Step 4.1.30 of procedure

CC-AA-102, directs the responsible engineer to determine the effect of the configuration

change on the general station emergency response plans or scenarios.

Contrary to the above, in February 2004, the licensee did not follow the configuration

control process for implementing the necessary changes to station procedures when the

pertinent source material changed (MSCRWL value), resulting in the failure to make the

necessary changes to the EALs, as well as to EOP flow chart procedure,

2000-EMG-3200.12, "Secondary Containment and Reactivity Release Control," Table

14, and to the Emergency Plan Implementing Procedure, EP-OC-123-1006,

"Radiological Assessment Computer Program Technical Basis. These configuration

control deficiencies and inadequate EAL are considered to be an apparent violation of

10 CFR 50.47(b)(4) and Technical Specification 6.8. (AV 05000219/2004009-02)

The licensee is pursuing long term corrective actions to prevent recurrence. The

licensee has entered this issue into their corrective action process under CAP

No. 02004-1986 and 02004-2098.

1EP5 Correction of Emergency Preparedness Weaknesses and Deficiencies

a. Inspection Scope (71114.05 - 1 Sample)

The inspector reviewed corrective actions pertaining to findings from 2003/2004 EP

drill/exercise reports and the associated CAPs to determine the significance of the

issues and to determine if repeat problems were occurring. Interviews were conducted

with the EP Director to understand repetitive issues found in exercise reports and to

ensure the EP staff was aggressively pursuing actions that will keep these issues from

recurring in future drill/exercises. A list of CAPs are contained in an attachment to this

report. Also, the 2003/2004 quality assurance audit reports were reviewed to assess

AmerGens ability to identify issues, assess repetitive issues and the effectiveness of

corrective actions through their independent audit process. This inspection was

conducted according to NRC Inspection Procedure 71114, Attachment 05, and the

applicable planning standard, 10 CFR 50.47(b)(14) and its related 10 CFR 50, Appendix

E requirements were used as reference criteria.

b. Findings

No findings of significance were identified.

4. OTHER ACTIVITIES [OA]

Enclosure

8

4OA1 Performance Indicator (PI) Verification

a. Inspection Scope (71151 - 3 Samples)

The inspector reviewed the licensees procedure for developing the data for the EP PIs

which are: (1) Drill and Exercise Performance (DEP); (2) ERO Drill Participation; and

(3) ANS Reliability. The inspector reviewed documentation from drills in 2003 and 2004,

and ANS testing results to verify the accuracy of the reported data. EP PI Data

generated for the period of September 2003 - June 2004, was reviewed during this

inspection. The review of these performance indicators was conducted in accordance

with NRC Inspection Procedure 71151. The acceptance criteria used for the review

were 10 CFR 50.9 and NEI 99-02, Revision 2, Regulatory Assessment Performance

Indicator Guidelines.

a. Findings

In June 2003, AmerGen increased the frequency of their ANS testing from quarterly

growl tests to monthly and biweekly silent tests to weekly for aligning the testing

frequency for all the Exelon East plants (Peach Bottom/Limerick/Three Mile

Island/Oyster Creek). A review of the PI data indicated the Oyster Creek ANS was

operating within the 97-98% green response band and no negative operability trends

were noted prompting the change. However, this change in testing methodology was

not submitted to the Federal Emergency Management Agency (FEMA) for approval prior

to implementation. Also, Exelon did not inform the NRC of the testing change as stated

in Frequently Asked Question (FAQ) No. 358, dated February 19, 2004, regarding

changing ANS testing methodologies. The FAQ response states, if prior to this FAQ

response, a plant changed their testing methodology, it is not necessary to recalculate

their past PI data from the time of the change. However, those plants still need to

update the affected PI data report by noting the change in the comment section. This

issue is being treated as an Unresolved Item (URI 05000219/2004009-03) pending

FEMAs review of the testing methodology change and an update to the NRC with the

licensees PI data submittal. (CR No. 00248572 and CAP No. 02004-2399)

40A6 Meetings, including Exit

On August 26, 2004, the inspector presented the results of the inspection to this

licensee staff in a preliminary exit. At that time, there was one unresolved item involving

the preliminary White finding. On November 29, 2004, the NRC re-exited with

Mr. B. Swenson, Vice President and other members of your staff, via a conference call

indicating the preliminary resolution of the item. The licensee had no objections to the

NRCs observations. The inspector confirmed that proprietary information was not

provided or examined during the inspection.

40A7 Licensee-Identified Violations

The following findings of very low significance were identified by Exelon and are

violations of NRC requirements which meet the criteria of Section VI of the NRC

Enforcement Policy, NUREG-1600 for being dispositioned as Non-Cited Violations.

Enclosure

9

Offsite Facility did not contain a radiation monitoring system as described in the

stations Updated Final Safety Analysis Report (UFSAR) and the E-Plan. This

issue was discovered during a NOS audit. (CAP No. 02004-2004)

made available to local services personnel. Media kits were not provided to the

media in 2003. This issue was discovered during a NOS audit.

(CR No. 00213917)

brochures for emergency response actions to operators of recreational areas in

the 10 Mile EPZ were not made available. This issue was discovered during a

NOS audit. (CAP No. 02004-1056)

  • 10 CFR 50.54(t), results of the annual program review must be made available to

State and local governments. During a NOS audit, it was found that the 2002

and 2003 audits were not made available to the State and local governments

within the yearly requirement. (CAP 2003-1168 and CAP 2004-1042)

ATTACHMENT: SUPPLEMENTAL INFORMATION

Enclosure

A-1

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

J. Karkoska, Exelon, MAROG EP Manager

K. Poletti, EP Manager

J. Cohen, Lead NOS Auditor

New Jersey State Department of Environmental Protections

R. Russell, Nuclear Engineer, Bureau of Nuclear Engineering (BNE)

D. Zannoni, Supervisor, Nuclear Engineering, BNE

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened/Closed

05000219/2004009-01 URI Inconsistencies in Table B-1 Staffing

(Section 1EP3)05000219/2004009-02 AV Incorrect EAL Due to EOP Change.

(Section 1EP4)05000219/2004009-03 URI FEMA Approval of Siren Testing Change

(Section 1EP2)

Discussed

None

LIST OF DOCUMENTS REVIEWED

Section 1EP3: ERO Augmentation

Exelon Standardized Emergency Plan

Oyster Creek Annex Emergency Plan

Oyster Creek Emergency Plan Implementing Procedures

Attachment

A-2

Section 1EP4: Emergency Action Level and Emergency Plan Changes

Oyster Creek Generation Station Prompt Investigation Report

Table D-2: OCNS EAL Technical Basis, Recognition Category Fission Product Barrier

Regulatory Analysis, OCNS Failure to Revise EALs with Corresponding EOP Revision

Exelon Nuclear Procedure CC-AA-102, Design Input and Configuration Change Impact

Screening, Rev. 8

Exelon Nuclear Procedure AD-AA-101-1002, 50.54(q) analysis

PORC Meeting (04-28) Report dated July 27, 2004

PORC Meeting (04-30) Minutes

Section 1EP5: Correction of Emergency Preparedness Weaknesses and Deficiencies

Augmentation Drill Report, Dated 11/24/03

OC April 30, 2003 Drill Evaluation Report

OC July 30 and August 6, 2003 Drill Evaluation Reports

OC September 9, 2003 Graded Exercise Evaluation Report

OC November 12, 2002 Training Drill Evaluation Report

OC May 6, 2004 Drill Findings and Observation Report

Memorandum dated August 16, 2004, Ineffective or Declining Functional Area Performance

at the Oyster Creek Station

Memorandum dated August 19, 2004, pager test response needs continued improvement

CAP No. 02004-1986, Recent Changes to the EOP were not incorporated in the

associated EAL.

CAP No. 02004-0346, Potential non-conservative value for EOP limit due to error in

GE calculation

CAP No. 02004-0346-5, If EOF Changes, submit a change to the E-Plan if required, 8/2/04

CAP No. 02004-1986-7, Identify the RAC computer issues associated with recent EOP change

CAP No.02004-1986-5, Review what guidance exists relative to changes in critical plant

parameters and their impact to Plans and Programs

CAP No. 02004-2098, Significance of EAL not being changed with EOP

CAP No. 02004-1120, ERO participation PI value less than stations expectations

CAP No. 02004-1099, Trend in on-duty ERO members not responding to pager tests

CAP No. 02004-1817, ERO qualification status in ETUDE does not agree with LOTUS notes

CAP No. 02004-1057, ERO qualification documentation deficiencies

CAP No. 02004-1042, 2002 50.54(t) audit not provided to State in accordance to regulation

CAP No. 02004-1168, 2003 50.54(t) audit not provided to state in accordance to regulation

CAP No. 02004-2296, NRC Inspection Unresolved Item, Table B-1 staffing

CAP No. 02004-2357, NRC Inspection Observation, ERO pager responses

CAP No. 02004-2399, NRC Inspection Observation, PI record keeping

CR No. 00248572, NRC Inspection Unresolved Item, FEMA not informed of siren testing

change

Attachment

A-3

LIST OF ACRONYMS

ANS Alert and Notification System

AV Apparent Violation

CAP Corrective Action Process

DER Deviation/Evaluation Report

DEP Drill and Exercise Performance

EAL Emergency Action Level

EP Emergency Preparedness

E-Plan Emergency Plan

EOP Emergency Operating Procedure

ERO Emergency Response Organization

FAQ Frequently Asked Question

FEMA Federal Emergency Management Agency

GE General Emergency

MSCRWL Minimum Steam Cooling RPV Water Level

PI Performance Indicator

RP Radiation Protection

RPV Reactor Pressure Vessel

RSPS Risk Significant Planning Standard

SAE Site Area Emergency

SDP Significant Determination Process

TAF Top of Active Fuel

URI Unresolved Item

Attachment