Issue date | Title | Topic | |
---|---|---|---|
ML24032A476 | 1 February 2024 | Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve | |
ML24032A020 | 31 January 2024 | NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 | |
ML23319A245 | 29 January 2024 | Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML24023A280 | 23 January 2024 | Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump | |
ML24008A246 | 18 January 2024 | Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule | Aging Management Pressure and Temperature Limits Report Tritium Producing Burnable Absorber Rods License Renewal |
CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions | 17 January 2024 | Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions | |
ML24018A014 | 17 January 2024 | Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 | |
ML24016A304 | 16 January 2024 | Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump | |
CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 | 11 January 2024 | Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 | EVT-1 |
IR 05000327/2023442 | 11 January 2024 | 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter | |
ML24011A316 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), August 2023 | |
ML24011A317 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), September 2023 | |
ML24011A318 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), October 2023 | |
ML24011A319 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), November 2023 | |
ML24011A320 | 11 January 2024 | Submittal of Discharge Monitoring Report (Dmr), December 2023 | |
ML24010A213 | 10 January 2024 | CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers | |
CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) | 10 January 2024 | Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) | |
CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability | 9 January 2024 | Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability | Time of Discovery Fire Barrier Tornado Missile Internal Flooding Probabilistic Risk Assessment Incorporated by reference Turbine Missile |
CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) | 8 January 2024 | Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) | Anticipated operational occurrence Qualified Offsite Circuit Surveillance Frequency Control Program Offsite Circuit |
ML24018A095 | 4 January 2024 | Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 | |
ML24004A033 | 3 January 2024 | Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter | |
ML24004A040 | 3 January 2024 | Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation | |
ML23346A138 | 3 January 2024 | Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods | Tritium Producing Burnable Absorber Rods |
ML24022A173 | 3 January 2024 | Receipt and Availability of the Subsequent License Renewal Application | |
ML23319A199 | 3 January 2024 | Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves | Incorporated by reference Surveillance Frequency Control Program |
ML23355A206 | 21 December 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 21 December 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 21 December 2023 | Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | |
IR 05000390/2023441 | 21 December 2023 | Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public | Affidavit |
CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) | 18 December 2023 | Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) | Safe Shutdown Anticipated operational occurrence |
IR 05000390/2023404 | 14 December 2023 | Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 | |
ML23348A394 | 14 December 2023 | Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve | |
CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) | 13 December 2023 | Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) | Boric Acid Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program Process Control Program Fuel cladding |
ML23346A122 | 12 December 2023 | Annual Non-Radiological Environmental Operating Report - 2023 | |
IR 05000259/2023010 | 11 December 2023 | Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 | Commercial Grade Dedication |
ML23293A057 | 6 December 2023 | Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | Cyber Security Surveillance Frequency Control Program Safeguards Contingency Plan Fire Protection Program |
ML23335A072 | 1 December 2023 | Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump | |
ML23334A249 | 30 November 2023 | Site Emergency Plan Implementing Procedure Revision | |
IR 05000390/2023010 | 30 November 2023 | RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation | Commercial Grade Dedication Past operability Significance Determination Process Large early release frequency Fire Protection Program |
CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan | 29 November 2023 | Submittal of Fifth 10-Year Interval Inservice Testing Program Plan | Safe Shutdown High Radiation Area Stroke time Anchor Darling Incorporated by reference Locked High Radiation Area FLEX B.5.b Scram Discharge Volume Large early release frequency Excess Flow Check Valve Power Operated Valves Grace period Weak link |
IR 05000327/2023420 | 28 November 2023 | Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 | Affidavit |
CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | 27 November 2023 | Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | |
ML23331A253 | 27 November 2023 | Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions | |
ML23325A110 | 21 November 2023 | Anchor Darling Double Disc Gate Valve Commitment Revision | Anchor Darling |
ML23320A254 | 16 November 2023 | Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump | |
IR 05000259/2023003 | 13 November 2023 | Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 | Safe Shutdown High Radiation Area Stroke time Enforcement Discretion Coatings Temporary Modification Functionality Assessment FLEX Corrosion bonding Significance Determination Process Operability Determination Pressure Boundary Leakage Pressure boundary leak Through Wall Leak Fire Protection Program Fire Watch Hourly Fire Watch Substantial potential for overexposure Flow Induced Vibration Power Uprate Overexposure |
IR 05000390/2023003 | 13 November 2023 | Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation | Safe Shutdown Unanalyzed Condition Boric Acid Fire Barrier Internal Flooding Past operability Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment FLEX Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Fire Protection Program GOTHIC Siren |