5/12/04, Diablo Canyon, Units 1 & 2 - TS Pages - Issuance of Amendment Increasing Flexibility in Mode Restraints
ML041380151
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/12/2004
From:
NRC/NRR/DLPM
To:
Shukla G, NRR/DLPM/LPDIV-2/415-8439
Shared Package
ML041390030 List:
References
TAC MC0895, TAC MC0896
Download: ML041380151 (16)


Text

LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and LCO 3.0.7.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.

LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
b. MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and.
c. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.

When an LCO is not met, entry into a MODE or other specified LCO 3.0.4 condition in the Applicability shall only be made:

a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time;
b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications, or
c. When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

(continued)

DIABLO CANYON - UNITS 1 & 2 3.0-1 Unit 1 - Amendment No. 435. 169 Unit 2 - Amendment No. 435, 170

LCO Applicability 3.0 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY SR 3.0.1 SRs shall be met during the MODES or other specified conditions in the Applicability for individual LCOs, unless otherwise stated in the SR.

Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO. Failure to perform a Surveillande within the specified Frequency shall be failure to meet the LCO except as provided in SR 3.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

SR 3.0.2 The specified Frequency for each SR is met if the Surveillance is performed within 1.25 times the interval specified in the Frequency, as measured from the previous performance or as measured from the time a specified condition of the Frequency is met.

For Frequencies specified as "once," the above interval extension does not apply.

If a Completion Time requires periodic performance on a "once per ..."

basis, the above Frequency extension applies to each performance after the initial performance.

Exceptions to this Specification are stated in the individual Specifications.

SR 3.0.3 If it is discovered that a Surveillance was not performed within its specified Frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified Frequency, whichever is greater.

This delay period is permitted to allow performance of the Surveillance.

A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

When the Surveillance is performed within the delay period and the Surveillance is not met, the LCO must immediately be declared not met, and the applicable Condition(s) must be entered.

SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3.

When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

DIABLO CANYON - UNITS 1 & 2 3.0-3 Unit 1 -Amendment No. 435, 453,169 Unit 2 - Amendment No. 135, i53,170

SDM 3.1.1 3.1 REACTIVITY CONTROL SYSTEMS 3.1.1 SHUTDOWN MARGIN (SDM)

LCO 3.1.1 SDM shall be within the limits provided in the COLR.

APPLICABILITY: MODE 2 with keyf < 1.0, MODES 3, 4, and 5.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME I

A. SDM not within limit. A.1. Initiate boration to 15 minutes restore SDM to within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify SDM to be within limits. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> DIABLO CANYON - UNITS 1 & 2 3.1-1 Unit 1 -Amendment No. 4-5,169 Unit 2 - Amendment No. 135, 170

PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2 and 3.

ACTIONS LI YT

___ ___I--NL I t-I -

Separate Condition entry is allowed for each Function.

I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions with A.1 Restore required 30 days one required channel channel to OPERABLE inoperable. status.

B. Required Action and B.1 Initiate action in Immediately associated Completion accordance with Time of Condition A not Specification 5.6.8.

met.

C. - NOTE--- C.1 Restore all but one 7 days Not applicable to hydrogen channel to OPERABLE monitor channels. status.

One or more Functions with two or more required channels inoperable.

D. Two hydrogen monitor D.1 Restore one hydrogen 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> channels inoperable. monitor channel to OPERABLE status.

(continued)

DIABLO CANYON - UNITS 1 & 2 3.3-34 Unit 1 - Amendment No. 435,169 Unit 2 - Amendment No. 1-5,170

Remote Shutdown System 3.3.4 3.3 INSTRUMENTATION 3.3.4 Remote Shutdown System LCO 3.3.4 The Remote Shutdown System Functions in Table 3.3.4-1 shall be OPERABLE.

APPLI CABI LITY: MODES 1, 2 and 3.

ACTIONS

-- NOT f-----

Separate Condition entry is allowed for each Fur CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore required 30 days Functions inoperable. Function to OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion AND Time not met.

B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> DIABLO CANYON - UNITS I & 2 3.3-38 Unit 1 - Amendment No. 4-M, 169 Unit 2 - Amendment No. 435,170

RCS Loops - MODE 5, Loops Not Filled 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 RCS Loops-MODE 5, Loops Not Filled LCO 3.4.8 Two residual heat removal (RHR) loops shall be OPERABLE and one RHR loop shall be in operation.

-NOTIES---

1. All RHR pumps may be removed from operation for 5 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided:
a. The core outlet temperature is maintained at least 10 0F below saturation temperature.
b. No operations are permitted that would cause a reduction of the RCS boron concentration; and
c. No draining operations to further reduce the RCS water volume are permitted.
2. One RHR loop may be inoperable for 5 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided that the other RHR loop is OPERABLE and in operation.

APPLICABILITY: MODE 5 with RCS loops not filled.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR loop inoperable. A.1 Initiate action to restore Immediately RHR loop to OPERABLE status.

B. Required RHR loops B.1 Suspend all operations Immediately inoperable. involving reduction in OR RCS boron concentration.

AND No RHR loop in operation. B.2 Initiate action to restore Immediately one RHR loop to OPERABLE status and operation.

DIABLO CANYON - UNITS 1 & 2 3.4-14 Unit 1 - Amendment No. 435,169 Unit 2 - Amendment No. 435,170

Pressurizer PORVs 3.4.11 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.11 Pressurizer Power Operated Relief Valves (PORVs)

LCO 3.4.11 Each PORV and associated block valve shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS

--- NOTE -------- -

Separate Condition entry is allowed for each POF CONDITION REQUIRED ACTION COMPLETION TIME A. One or more PORVs A.1 Close and maintain 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable and capable of power to associated being manually cycled. block valve.

B. One PORV inoperable and B.1 Close associated block 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> not capable of being valve:

manually cycled. AND B.2 Remove power from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated block valve.

AND B.3 Restore the Class I 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> PORV to OPERABLE status.

C. One block valve inoperable. -- ENOTE - 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Actions do not apply when block valve is inoperable solely as result of complying with Required Actions B.2 or E.3.

C.1 Place associated PORV in manual control.

AND (continued)

DIABLO CANYON - UNITS I & 2 3.4-19 Unit 1 - Amendment No. 4-35 ; 169 Unit 2 - Amendment No. 435 ,170

LTOP System 3.4.12 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.12 Low Temperature Overpressure Protection (LTOP) System LCO 3.4.12 An LTOP System shall be OPERABLE with no safety injection pumps and a maximum of one centrifugal charging pump capable of injecting into the RCS and the accumulators isolated and one of the following pressure relief capabilities:

a. Two Class I power operated relief valves (PORVs) with lift settings within the limits specified in the PTLR, or
b. The RCS depressurized and an RCS vent of 2 2.07 square inches.

-I~1

1. Two charging pumps may be made capable of injecting for
  • 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> for pump swap operation.
2. Accumulator may be unisolated when accumulator pressure is less than' the maximum RCS pressure for the existing RCS cold leg temperature allowed by the P/T limit curves provided in the PTLR.

APPLICABILITY: MODE 4, when any RCS cold leg temperature is s LTOP arming temperature specified in the PTLR, MODE 5, MODE 6, when the reactor vessel head is on and the vessel head closure bolts are not fully de-tensioned.

ACTIONS K I ^rr

___ __ _-NtJi I r7 LCO 3.0.4b is not applicable when entering MODE 4.

I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more safety A.1 Initiate action to verify Immediately injection pumps capable of zero safety injection injecting into the RCS. pumps are capable of injecting into the RCS.

B. Two centrifugal charging B.1 Initiate action to verify a Immediately pumps capable of injecting maximum of one into the RCS. centrifugal charging pump is capable of injecting into the RCS.

(continued)

DIABLO CANYON - UNITS 1 & 2 3.4-23 Unit 1 - Amendment No. 435,169 Unit 2 - Amendment No. 435,170

RCS Leakage Detection Instrumentation 3.4.15 3.4.15 RCS Leakage Detection Instrumentation LCO 3.4.15 The following RCS leakage detection instrumentation shall be OPERABLE:

a. Both containment structure sumps and the reactor cavity sump level and flow monitor system,
b. One containment atmosphere particulate radioactivity monitor and,
c. Either a containment fan cooler unit (CFCU) condensate collection monitor or the containment atmosphere gaseous radioactivity monitor.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS I CONDITION REQUIRED ACTION COMPLETION TIME A. Required containment - NOTE sump monitors inoperable.

Not required until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation.

A.1 Perform SR 3.4.13.1. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND A.2 Restore required 30 days containment sump monitor to OPERABLE status.

B. Required containment B.1.1 Analyze grab samples of Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> atmosphere particulate the containment radioactivity monitor atmosphere.

inoperable. OR (continued)

DIABLO CANYON - UNITS I & 2 3.4-32 Unit 1 - Amendment No. 4A5,169 Unit 2 - Amendment No. 4-5,170

RCS Specific Activity 3.4.16 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.16 RCS Specific Activity LCO 3.4.16 The specific activity of the reactor coolant shall be within limits.

APPLICABILITY: MODES 1 and 2, MODE 3 with RCS average temperature (Ta.s) 2 5000F.

ACTIONS .

CONDITION REQUIRED ACTION COMPLETION TIME A. DOSE EQUIVALENT 1-131 -NOTE--

specific activity LCO 3.0.4c is applicable.

> 1.0 pCi/gm. I A.1 Verify DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT 1-131 specific activity within the acceptable region of Figure 3.4.16-1.

AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 specific activity to within limit.

B. Gross specific activity of the B.1 Be in MODE 3 with Tavg 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> reactor coolant < 5000 F.

100/E pCi/gm.

C. Required Action and C.1 Be in MODE 3 with Ta., 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion to < 5000 F.

Time of Condition A not met.

OR DOSE EQUIVALENT 1-131 specific activity in the unacceptable region of Figure 3.4.16-1.

DIABLO CANYON - UNITS 1 & 2 3.4-35 Unit 1 - Amendment No. 45,169 Unit 2 - Amendment No. 435 ,170

ECCS - Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS - Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.

_ I _VTf

~r~JtJ' I r-An RHR train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.

APPLICABILITY: MODE 4.

ACTIONS NOTE LCO 3.0.4b is not applicable to ECCS Centrifugal Charging Pump subsystem.

I CONDITION REQUIRED ACTION COMPLETION TIME A. Required ECCS residual A.1 Initiate action to restore Immediately heat removal (RHR) required ECCS RHR subsystem inoperable. subsystem to OPERABLE status.

B. Required ECCS B.1 Restore required ECCS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Centrifugal Charging Pump Centrifugal Charging subsystem inoperable. Pump subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 5. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time of Condition B not met.

SURVEILLANCE REQUIREMENTS _

SURVEILLANCE FREQUENCY SR 3.5.3.1 The following SRs are applicable for all equipment In accordance with required to be OPERABLE: applicable SRs SR 3.5.2.1 SR 3.5.2.7 SR 3.5.2.3 SR 3.5.2.8 SR 3.5.2.4 DIABLO CANYON - UNITS 1 & 2 3.5-6 Unit I - Amendment No. 4.5,169 Unit 2 - Amendment No. 4,35 170

ADVs 3.7.4 3.7 PLANT SYSTEMS 3.7.4 10% Atmospheric Dump Valves (ADVs)

LCO 3.7.4 Four ADV lines shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required ADV line A.1 Restore required ADV line 7 days inoperable. to OPERABLE status I B. Two required ADV lines B.1 Restore at least one ADV 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. line to OPERABLE status.

C. Three or more required C.1 Restore at least two ADV 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ADV lines inoperable. lines to OPERABLE status.

D. Required Action and D.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion AND Time not met.

D.2 Be in MODE 4 without 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> reliance upon steam generator for heat removal.

DIABLO CANYON - UNITS I & 2 3.7-8 Unit 1 - Amendment No. 4A5, 169 Unit 2 - Amendment No. 445,170

AFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Three AFW trains shall be OPERABLE.

~NOTES-Only one AFW train, which includes a motor driven pump, is required to be OPERABLE in MODE 4.

APPLICABILITY: MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.

ACTIONS kI ^IIV NILJ'Ia r_---

LCO 3.0.4b is not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW pump OPERABLE status.

inoperable. AND 10 days from discovery of failure to meet the LCO B. One AFW train inoperable B.1 Restore AFW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in MODE 1, 2 or 3 for . OPERABLE status.

reasons other than AND Condition A. 10 days from discovery of failure to meet the LCO C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion AND Time for Condition A or B AND not met. C.2 Be in MODE 4. 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> OR Two AFW trains inoperable in MODE 1,2 or 3.

(continued)

DIABLO CANYON - UNITS 1 & 2 3.7-10 Unit 1 - Amendment No. 445,169 Unit 2 - Amendment No. 435. 170

AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources - Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:

a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System; and
b. Three diesel generators (DGs) capable of supplying the onsite Class 1E power distribution subsystem(s); and
c. Two supply trains of the diesel fuel oil (DFO) transfer system.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS

___ _ TN, OTE-LCO 3.0.4b is not applicable to DGs.

CONDITION REQUIRED ACTION COMPLETION TIME A. One required offsite circuit A.1 Perform SR 3.8.1.1 for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. required OPERABLE AND offsite circuit.

Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

AND A.2 Restore required offsite 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> circuit to OPERABLE AN status. AND 10 days from discovery of failure to meet LCO.

(continued)

DIABLO CANYON - UNITS 1 & 2 3.8-1 Unit 1 - Amendment No. 435,169 Unit 2 - Amendment No. 435,17 0

Boron Concentration 3.9.1 3.9 REFUELING OPERATIONS 3.9.1 Boron Concentration LCO 3.9.1 Boron concentrations of all filled portions of the Reactor Coolant System, the refueling canal, and the refueling cavity, that have direct access to the reactor vessel, shall be maintained within the limit specified in the COLR.

APPLICABILITY: MODE 6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Boron concentration not A.1 Suspend CORE Immediately

-within limit. ALTERATIONS.

AND A.2 Suspend positive Immediately reactivity additions.

AND A.3 Initiate action to restore Immediately boron concentration to within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.1.1 Verify boron concentration is within the limit 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> specified in COLR.

DIABLO CANYON - UNITS 1 & 2 3.9-1 Unit 1 - Amendment No. 4-5,169 Unit 2 - Amendment No. 4g5,170

RHR and Coolant Circulation - Low Water Level 3.9.6 3.9 REFUELING OPERATIONS 3.9.6 Residual Heat Removal (RHR) and Coolant Circulation - Low Water Level LCO 3.9.6 Two RHR loops shall be OPERABLE, and one RHR loop shall be in operation.

APPLICABILITY: MODE 6 with the water level < 23 ft above the top of reactor vessel flange.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Less than the required A.1 Initiate action to restore Immediately number of RHR loops required RHR loops to OPERABLE. OPERABLE status.

OR A.2 Initiate action to Immediately establish 2 23 ft of water above the top of reactor vessel flange.

B. No RHR loop in operation. B.1 Suspend operations Immediately involving a reduction in reactor coolant boron concentration.

AND B.2 Initiate action to restore Immediately one RHR loop to operation.

AND B.3 Close all containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetrations providing direct access from containment atmosphere to outside atmosphere.

DIABLO CANYON - UNITS 1 & 2 3.9-6 Unit I -Amendment No. 135,169 Unit 2 - Amendment No. 135,170