MSSVs 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Main Steam Safety Valves (MSSVsJ LCO 3.7.1 The MSSVs shall be OPERABLE as specified in Table 3.7.1-1 and Table 3.7.1-2.

APPLICABILITY: MODES1, 2, and 3.

ACTIONS

_I NOTE------------------------------------

separat~-~ond;;ion-e~~~~-~~-~~~~~~d for each MSSV.

__________________________l__________l__-------------------------------------

CONDITION RIEQUIRED ACTION COMPLETION TIME A. One or more steam A.1 Reduce THERMAL POWERto 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> generators with one < 50 % RTP.

MSSV inoperable and the Moderator Temperature Coefficient (MTC) zero or negative at all power levels.

(continued)

HBRSEP Unit No. 2 3.7-l Amendment No. 196

MSSVs 3.7.1 CONDITION REQUIRED ACTION COMPLETIONTIME B. One or more steam B.l Reduce THERMAL POWER 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> generators with two or to less than or equal more MSSVs inoperable. to the Maximum Allowable  % RTP OR specified in Table 3.7.1-1 for the One or more steam number of OPERABLE generators with one MSSVs.

MSSV inoperable and MTC positive at any power level.

B.2 . . . . . . . . . NOTE. . . . . . . .

Only required in MODE 1 Reduce the Power 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Range Neutron Flux -

High reactor trip setpoint to less than or equal to the Maximum Allowable  %

RTP specified in Table 3.7.1-1 for the number of OPERABLE MSSVs.

C. Required Action and c-1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND OR c.2 Be in MODE4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> One or more steam generators with = 3 MSSVs inoperable.

HBRSEP Unit No. 2 3.7-2 Amendment No. 176

MSSVs 3.7.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.1.1 ...........

&ly.required to beN~~~;,r,,~.;,.Moo;S.;..

and 2.

Verify each required MSSV lift setpoint per In accordance Table 3.7.1-2 in accordance with the with the Inservice Testing Program. Following Inservice testing, lift setting shall be within 21%. Testing Program HBRSEP Unit No. 2 3.7-3 Amendment No. 176

MSSVs 3.7.1 Table 3.7.1-1 (page 1 of 1)

OPERABLE Main Steam Safety Valves versus Maximum Allowable Power NUMBEROF OPERABLE MSSVs MAXIMUMALLOWABLEPOWER PER STEAM GENERATOR (% RTP) 3 = 46 2 = 24 HBRSEP Unit No. 2 3.7-4 Amendment No. 176

MSSVs 3.7.1 Table 3.7.1.2 (page 1 of 1)

Main Steam Safety Valve Lift Settings VALVE NUMBER STEAM GENERATOR-1 L~~i~E~~~~

C SVl-1A SVl-1B SVl-1c 1085 SVl-2A SVl-2B SVl-2c 1110 SVl-3A SVl-3B SVl-3c 1125 SVl-4A SVl-4B SVl-4c 1140 HBRSEP Unit No. 2 3.7-5 Amendment No. 176

MSIVs 3.7.2 3.7 PLANT SYSTEMS 3.7.2 Main Steam Isolation Valves (MSIVs)

LCO 3.7.2 Three MSIVs shall be OPERABLE.

APPLICABILITY: MODE 1, MODES2 and 3 except when all MSIVs are closed.

ACTIONS CONDITION f1EQUIREDACTION COMPLETIONTIME A. One MSIV inoperable in A.1 Restore MSIV to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> MODE 1. OPERABLE status.

B. Required Action and B.l Be in MODE2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion

  • _,_ : Time of Condition A not met.

C. . . . . . . . ..N()TE......... c.1 Close MSIV. .8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Separate Condition entry is allowed for each MSIV.

...................... c.2 Verify MSIV is Once per closed. 7 days One or more MSIVs inoperable in MODE 2 or 3.

(continued)

HBRSEP Unit No. 2 3.7-6 Amendment No. 176

MSIVs 3.7.2 f ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETIONTIME D. Required Action and D.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition C AND not met.

D.2 Be in MODE4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1 and 2.

Verify closure time of each MSIV is In accordance

= 5 seconds on an actual or simulated with the actuation signal. I nservice Testing Program HBRSEP Unit No. 2 3.7-7 Amendment No. 176

MFIVs, MFRVs, and Bypass Valves 3.7.3 3.7 PLANT SYSTEMS 3.7.3 Main Feedwater Isolation Valves (MFIVs), Main Feedwater Regulation Valves (MFRVs). and Bypass Valves LCO 3.7.3 Three MFIVs. three MFRVs, and three bypass valves shall be OPERABLE.

APPLICABILITY: MODES1. 2, and 3 except when MFIV. MFRV, or bypass valve is closed or isolated by a closed manual valve.

ACTIONS

. . . . . . . . . . . . . . . . . . ..__I______________ NOTE.....................................

Separate Condition entry is allowed for each valve.

CONDITION R.EQUIREDACTION COMPLETION TIME A. One or more MFIVs A.1 Close or isolate 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. MFIV.

A.2 Verify MFIV is closed Once per or isolated. 7 days B. One or more MFRVs B.l Close or isolate 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. MFRV.

AND 8.2 Verify MFRV is closed Once per or isolated. 7 days (continued)

HBRSEP Unit No. 2 3.7-8 Amendment No. 176

MFIVs, MFRVs, and Bypass Valves 3.7.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. One or more bypass C.l Close or isolate bypass 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> valves inoperable. valve.

C.2 Verify bypass valve is Once per 7 days closed or isolated.

D Two valves in the D.l Isolate affected flow 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> same flow path path.

inoperable.

E. Required Action and E.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

E.2 Be in MODE4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.3.1 Verify the closure time of each MFRV and In accordance bypass valve is < 20 seconds on an actual or with the simulated actuation signal. Inservice Testing Program SR 3.7.3.2 Verify the closure time of each MFIV is In accordance

< 50 seconds on an actual or simulated with the actuation signal. Inservice Testing Program HBRSEP Unit No. 2 3.7-9 Amendment No. 196

AFW System 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Auxiliary Feedwater (AFW) System LCO 3.7.4 Four AFW flow paths and three AFW pumps shall be OPERABLE.

. . . . . . . . . . . . . . . . . . . . . . . . . . .N(-jTE.........................

Only one AFW flow path with one motor driven pump is required to be OPERABLE in MODE4.

APPLICABILITY: MODES 1. 2, and 3, MODE4 when steam generator is being used for heat removal.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. One AFW pump A.1 Restore AFW pump or 7 days inoperable in MODE 1, flow path(s) to

2. or 3. OPERABLE status.

OR 8 days from discovery of One or two AFW flow failure to paths inoperable in meet the LCO MODE 1, 2. or 3.

B. Two motor driven AFW B-1 Restore one motor 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> pumps inoperable in driven AFW pump or MODE 1, 2, or 3. one flow path to OPERABLE status.

OR 8 days from discovery of Three motor driven AFW failure to flow paths inoperable meet the LCO in MODE 1, 2. or 3.

(continued)

HBRSEP Unit No. 2 3.7-10 Amendment No. 176

AFW System 3.7.4 CONDITION REQUIRED ACTION COMPLETIONTIME C. Required Action and c.1 13e in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time for Condition A fiNJ or B not met.

c.2 13e in MODE4. 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> D. Steam driven AFW pump D-1 l3e in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> or flow path inoperable in MODE 1, AND

2. or 3.

D.2 l3e in MODE4. 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> One motor driven AFW pump or flow path inoperable in MODE 1, 2, or 3.

E. Four AFW flow paths -E.l ,:co-i:,:;Ntll~-,;; ----

inoperable in MODE 1,

2. or 3. other LCO Required Actions requiring OR MODE changes are suspended until Three AFW pumps one AFW pump and flow inoperable in MODE 1, path are restored to 2, or 3. OPERABLE status.

Initiate action to Immediately restore one AFW pump and flow path to OPERABLE status.

F. Required AFW pump and F.l Initiate action to Immediately flow path inoperable restore AFW pump and in MODE4. flow path to OPERABLE status.

HBRSEP Unit No. 2 3.7-11 Amendment No. 176

AFW System 3.7.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.4.1 Verify each AFW manual, power operated, and 31 days automatic valve in each water flow path, and in the steam supply flow path to the steam driven AFW pump, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.7.4.2 ___________________ NOrE _____.____.________

Not required to be performed for the steam driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after 2 1000 psig in the steam generator.

Verify the developed head of each AFW pump 31 days on a at the flow test point is greater than or STAGGEREDTEST equal to the required developed head. BASIS SR 3.7.4.3 -------------------NOTE---------.---------.-

Not applicable in MODE4 when steam generator is being used for heat removal.

Verify each AFW automatic valve that is 18 months not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

(continued)

HBRSEP Unit No. 2 3-7-12 Amendment No. 176

AFW System 3.7.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.7.4.4 ---.---------------NOTES----.---------------

1. Not required to be performed for the steam driven AFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after = 1000 psig in the steam generator.
2. Not applicable in MODE4 when steam generator is being used for heat removal.

Verify each AFW pump starts automatically 18 months on an actual or simulated actuation signal.

SR 3.7.4.5 -----.-----------NOTE-------------------

Not required to be performed for the

\ steam driven AFW pump until prior to entering MODE 1.

Verify proper alignment of the required Prior to AFW flow paths by verifying flow from the entering condensate storage tank to each steam MODE2.

generator. whenever unit has been in MODE 5 or 6 for > 30 days SR 3.7.4.6 Verify the AFW automatic bus transfer 18 months switch associated with discharge valve V2-16A operates automatically on an actual or simulated actuation signal.

HBRSEP Unit No. 2 3.7-13 Amendment No. 176

CST 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Condensate Storage Tank (CST)

LCO 3.7.5 The CST level shall be = 35.000 gal and the backup Service Water System (SWS) supply to the AFW system shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

MODE4 when a steam generator is being used for heat removal.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME I

A. CST level not within A.1 Verify by 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> lim it. administrative means

'OPERABILITY of backup AND Iwater supply.

Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter A.2 IRestore CST level to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> within limit.

B. Required Action and B.l I3e in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. j4NJl B.2 I3e in MODE4, without 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> reliance on steam generator for heat removal.

(continued)

HBRSEP Unit No. 2 3.7-14 Amendment No. 176

CST 3.7.5 ACTIONS (Continued)

CONDITION REQUIRED ACTION COMPLETIONTIME C. SWS supply to AFW c-1 IBe in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> system inoperable.

AND c.2 IBe in MODE4, without 18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> reliance on steam generator for heat removal.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.5.1 Verify the CST level is = 35,000 gal. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.7.5.2 Verify by administrative means OPERABILITY 31 days of backup SWS supply to the AFW System.

HBRSEP Unit No. 2 3.7-15 Amendment No. 176

CCW System 3.7.6 3.7 PLANT SYSTEMS 3.7.6 Component Cooling Water (CCW) System LCO 3.7.6 Two CCWtrains powered from emergency power supplies shall be OPERABLE.

APPLICABILITY: MODES1. 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required CCWtrain A.1 --------NOTE---------

inoperable. Enter applicable Conditions and Required Actions of LCO 3.4.6, "RCS Loops-MODE 4." for residual heat removal

- loops made inoperable by CCW.

Restore required CCW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> train to OPERABLE status.

B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A AND not met.

8.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HBRSEP Unit No. 2 3.7-16 Amendment No. 176

CCWSystem 3.7.6 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.6.1 -----------.--.----NOTE--------------------

Isolation of CCWflow to individual components does not render the CCWSystem inoperable.

Verify each required CCWmanual, power 31 days operated, and automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.7.6.2 Verify each required CCWpump starts 18 months automatically on an actual or simulated LOP DG Start undervoltage signal.

HBRSEP Unit No. 2 3.7-17 Amendment No. 186 I

SWS 3.7.7 3.7 PLANT SYSTEMS 3.7.7 Service Water System (SWS)

LCO 317.7 Two SWS trains and the Turbine Building loop isolation valves shall be OPERABLE.

APPLICABILITY: MODES1, 2, 3. and 4..

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. One SWS train A.1 ---.----NOTES-------

inoperable. iEnter applicable Conditions and IRequired Actions Iof LCO 3.8.1, "AC Sources-Operating,"

for emergency diesel generator made inoperable by SWS.

Restore SWS train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

B. One Turbine Building B.l Close and deactivate 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> loop isolation valve inoperable Turbine inoperable. 13uilding loop

,isolation valve.

B.2 Verify the inoperable 31 days Turbine Building loop isolation valve is closed and deactivated.

(continued)

HBRSEP Unit No. 2 3.7-18 Amendment No. 176

SWS 3.7.7 ACTIONS (continued1 CONDITION REQUIRED ACTION COMPLETIONTIME C. Two Turbine Building C.l Close and deactivate 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loop isolation valves one inoperable Turbine inoperable. Building loop isolation valve.

D. Required Actions and D.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Times of Conditions A. ANJ B, or C not met.

D.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS -

SURVEILLANCE FREQUENCY SR 3.7.7.1 ------.------------NOlrE------.-------------

Isolation of SWS flow to individual components does not render the SWS inoperable.

Verify each SWS manual, power operated, and 31 days automatic valve in the flow path servicing safety related equipment, that is not locked, sealed, or otherwise secured in position, is in the correct position.

SR 3.7.7.2 Verify each SWS automatic valve in the flow 18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

(continued)

HBRSEP Unit No. 2 3.7-19 Amendment No. 176

SWS 3.7.7 SURVEILLANCE REQUIREMENTS(continued)

SURVEILLANCE FREQUENCY SR 3.7.7.3 Verify each SWS pump and SWS booster pump 18 months starts automatically on an actual or simulated actuation signal.

SR 3.7.7.4 Verify the SWS automatic bus transfer 18 months switch associated with Turbine Building loop isolation valve V6-16C operates automatically on an actual or simulated actuation signal.

HBRSEP Unit No. 2 3.7-20 Amendment No. 176

UHS 3.7.8 3.7 PLANT SYSTEMS 3.7.8 Ultimate Heat Sink (UHS)

LCO 3.7.8 The UHS shall be OPERABLE.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Service water A.1 Verify required cooling 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> temperature not capacity maintained.

within limit. AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND A.2 Verify service water Once per hour temperature is 99°F.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND OR B.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> UHS inoperable for reasons other than Condition A.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.8.1 Verify water level of UHS is $ 218 ft mean 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> sea level.

HBRSEP Unit No. 2 3.7-21 Amendment No. 191

UHS 3.7.8 Surveillance Requirements (continued)

SURVEILLANCE FREQUENCY SR 3.7.8.2 Verify service water temperature is # 97EF. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> HBRSEP Unit No. 2 3.7-21a Amendment No. 191

CREFS 3.7.9 3.7 PLANT SYSTEMS 3.7.9 Control Room Emergency Filtration System (CREFS)

LCO 3.7.9 Two CREFS trains shall be OPERABLE.

APPLICABILITY: MODES1, 2, 3, and 4 During movement of irradiated fuel assemblies.

ACTIONS CONDITION RE:QUIREDACTION COMPLETIONTIME A. One CREFS train A.1 Restore CREFS train 7 days inoperable. to OPERABLE status.

B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A AND not met in MODE1, 2, 3, or 4. B.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C. Required Action and c.1 Place OPERABLECREFS Immedi ate1 y associated Completion train in emergency Time of Condition A plressurization mode.

not met during movement of irradiated OR fuel assemblies.

c.2 Sluspend movement of Immedi ate1 y irradiated fuel xsemblies.

(continued)

HBRSEP Unit 2 3.7-22 Amendment No. 3% 195

CREFS 3.7.9 ACTIONS (continued)

D. Two CREFS trains D.l Suspend movement of Immediately inoperable during irradiated fuel movement of irradiated assemblies.

fuel assemblies.

E. Two CREFS trains E.l Restore at least one 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> inoperable in MODE 1, CREFS train to 2, 3, or 4. OPERABLE status.

F. Required Action and F.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition E AND not met in MODE 1, 2, 3, or 4. F.2 Be in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Operate each CREFS train for 2 15 minutes. 31 days SR 3.7.9.2 Perform required CREFS filter testing in In accordance accordance with the Ventilation Filter with VFTP Testing Program (VFTP).

SR 3.7.9.3 Verify each CREFS train actuates on an 18 months actual or simulated actuation signal.

SR 3.7.9.4 Verify one CREFS train can maintain a 18 months on a positive pressure of 2 0.125 inches water STAGGEREDTEST gauge, relative to the outside atmosphere BASIS and a positive pressure relative to adjacent building areas during the emergency pressurization mode of operation at a makeup flow rate of 5 400 cfm.

HBRSEP Unit 2 3.7-23 Amendment No. JJ6 195

CREFS 3.7.9 Page is intentionally blank HBRSEP Unit 2 3.7-24 Amendment No. JX 195

CREATC 3.7.10 3.7 PLANT SYSTEMS 3.7.10 Control Room Emergency Air Temperature Control (CREATC)

LCO 3.7.10 Two CREATC Water Cooled Condensing Unit (WCCU) trains shall be OPERABLE.

APPLICABILITY: MODES1, 2, 3, and 4 During movement of irradiated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. One CREATC WCCUtrain A.1 Restore CREATC WCCU 30 days inoperable. train to OPERABLE status.

B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A AND not met in MODE 1, 2, 3, or 4. B.2 E;e in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

HBRSEP Unit No. 2 3.7-25 Amendment No. %?6 195

CREATC 3.7.10 ACTIONS (continued)

CONDITION RE:QUIREDACTION COMPLETIONTIME C. Required Action and c.1 Fllace OPERABLECREATC Immediately associated Completion WCCUtrain in Time of Condition A operation.

not met during movement of irradiated OR fuel assemblies.

c.2 Suspend movement of Immedi ate1 y irradiated fuel assemblies.

D. Two CREATC WCCUtrains D.l Suspend movement of Immedi ate1 y inoperable during irradiated fuel movement of irradiated assemblies.

fuel assemblies.

E. Two CREATC WCCUtrains E.l Ftestore at least one 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> inoperable in MODE1, CREATC WCCUtrain to 2, 3, or 4. QPERABLE status.

F. Required Action and F.l Ele in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition E AND not met in MODE 1, 2, 3, or 4. F.2 Ele in MODE5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HBRSEP Unit No. 2 3.7-26 Amendment No. %?6 195

CREATC 3.7.10 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.10.1 Verify each CREATC WKU train has the 18 months capability to remove the assumed heat load.

HBRSEP Unit No. 2 3.7-27 Amendment No. 176

FBACS 3.7.11 3.7 PLANT SYSTEMS 3.7.11 Fuel Building Air Cleanup System (FBACS)

LCO 3.7.11 The FBACS shall be QPERABLE and operating.

APPLICABILITY: During movement of irradiated fuel assemblies in the fuel building.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME I I A. The FBACS inoperable A.1 Suspend movement of Immediately during movement of irradiated fuel irradiated fuel assemblies in the assemblies in the fuel fuel building.

building.

L, SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.11.1 Operate the FBACS for = 10 continuous hours 31 days with the heaters operating automatically.

SR 3.7.11.2 Perform required FBAC!; filter testing in In accordance accordance with the Ventilation Filter with the VFTP Testing Program (VFTP:).

(continued1 HBRSEP Unit No. 2 3.7-28 Amendment No. 176

FBACS 3.7.11 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.7.11.3 ~~~~~~~~~~~~~~~~_-~ NOTE-------------------

Not required to be met when the only movement of irradiated fuel is movement of the spent fuel shipping cask containing irradiated fuel.

Verify the FBACS can maintain a negative 18 months pressure with respect to atmospheric pressure.

HBRSEP Unit No. 2 3.7-29 Amendment No. 176

Fuel Storage Pool Water Level 3.7.12 3.7 PLANT SYSTEMS 3.7.12 Fuel Storage Pool Water Level LCO 3.7.12 The fuel storage pool water level shall be 1 21 ft over the top of irradiated fuel assemblies seated in the storage racks.

APPLICABILITY: During movement of irradiated fuel assemblies in the fuel storage pool.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Fuel storage pool A.1 --------NOTE---------

water level not within LCO 3.0.3 is not limit. applicable.

Suspend movement of Immediately irradiated fuel assemblies in the fuel storage pool.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.12.1 Verify the fuel storage pool water level is 7 days 2 21 ft above the top of the irradiated fuel assemblies seated in the storage racks.

HNRSEP Unit No. 2 3.7-30 Amendment No. 176

Fuel Storage Pool Boron Concentration 3.7.13 3.7 PLANT SYSTEMS 3.7.13 Fuel Storage Pool Boron Concentration LCO 3.7.13 The fuel storage pool boron concentration shall be

$ 1500 ppm.

APPLICABILITY: At all times.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Fuel storage pool ------------NOTE-------------

boron concentration LCO 3.0.3 is not applicable.

not within limit. -----------------------------

A.1 Suspend movement of fuel assemblies in Immediately the fuel storage pool.

AND A.2 Initiate action to restore fuel storage pool boron Immediately concentration to within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.13.1 Verify the fuel storage pool boron concentration is within limit. 7 days HBRSEP Unit No. 2 3.7-31 Amendment No. 198

New and Spent Fuel Assembly S;o;ayf 3.7 PLANT SYSTEMS

,j 3.7.14 New and Spent Fuel Assembly Storage LCO 3.7.14 New and spent fuel shall be stored in approved locations.

APPLICABILITY: Whenever any fuel assembly is stored in the new or spent fuel storage racks.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Requirements of the A.1 --------NOTE-.-------

LCO not met. LCO 3.0.3 is not applicable.

Initiate action to Immediately restore fuel storage to within 9 ( requirements.

9 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I

SR 3.7.14.1 Verify by administrative means that fuel Prior to assemblies are stored in approved storing the locations. fuel assembly HBRSEP Unit No. 2 3.7-32 Amendment No. 176

Secondary Specific Ac;i;iE; 3.7 PLANT SYSTEMS 3.7.15 Secondary Specific Activity LCO 3.7.15 The specific activity of the secondary coolant shall be

= 0.10 pCi/gm DOSE EIQUIVALENT I-131.

APPLICABILITY: MODES1. 2. 3, and 4,.

ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Specific activity not A.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> within limit.

!vJ A.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.7.15.1 Verify the specific activity of the 31 days secondary coolant is :s 0.10 pCi/gm DOSE EQUIVALENT I-131.