MONTHYEARRA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .2021-05-27027 May 2021 Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-11-0202 November 2015 Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions2015-10-0808 October 2015 Transmittal of Technical Specifications Bases Revisions RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication2015-09-0101 September 2015 Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication ML14188B0152014-06-20020 June 2014 Request for Technical Specifications (TS) Change Regarding Correction to TS 5.5.9.b.2, Steam Generator (SG) Program Accident-Induced Leakage Performance Criterion RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions2014-04-29029 April 2014 Transmittal of Technical Specifications Bases Revisions RNP-RA/13-0077, License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications2013-09-30030 September 2013 License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2013-04-24024 April 2013 Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions2012-09-17017 September 2012 Transmittal of Technical Specifications Bases Revisions RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-02-10010 February 2012 Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions2011-01-12012 January 2011 Transmittal of Technical Specifications Bases Revisions RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation2010-03-0505 March 2010 Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 RNP-RA/08-0006, Request for Technical Specifications Changes Related to Control Room Habitability - Supplement2008-04-0101 April 2008 Request for Technical Specifications Changes Related to Control Room Habitability - Supplement RNP-RA/08-0016, Supplement to the Request for Administrative Changes to the Technical Specifications2008-02-0404 February 2008 Supplement to the Request for Administrative Changes to the Technical Specifications RNP-RA/07-0126, Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System2007-11-29029 November 2007 Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System RNP-RA/07-0073, Request for Administrative Changes to the Operating License and Technical Specifications2007-11-19019 November 2007 Request for Administrative Changes to the Operating License and Technical Specifications RNP-RA/07-0124, Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication2007-11-15015 November 2007 Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions2007-10-30030 October 2007 Transmittal of Technical Specifications Bases Revisions RNP-RA/07-0056, Request for Technical Specifications Changes Related to Control Room Habitability2007-07-17017 July 2007 Request for Technical Specifications Changes Related to Control Room Habitability RNP-RA/06-0095, Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring2007-02-0202 February 2007 Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring ML0702404832007-01-19019 January 2007 H. B. Robinson, Unit 2 - Resubmission of Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria ML0634104702006-11-29029 November 2006 Technical Specification Pages Re Core Operating Limit Report References, ML0628900812006-10-12012 October 2006 Submittal of H. B. Robinson, Unit 2 - Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions2006-04-0606 April 2006 Transmittal of Technical Specifications Bases Revisions RNP-RA/05-0107, Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass2005-11-30030 November 2005 Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass 2023-05-25
[Table view] Category:Amendment
MONTHYEARRA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-11-0202 November 2015 Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/13-0077, License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications2013-09-30030 September 2013 License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 RNP-RA/08-0006, Request for Technical Specifications Changes Related to Control Room Habitability - Supplement2008-04-0101 April 2008 Request for Technical Specifications Changes Related to Control Room Habitability - Supplement RNP-RA/08-0016, Supplement to the Request for Administrative Changes to the Technical Specifications2008-02-0404 February 2008 Supplement to the Request for Administrative Changes to the Technical Specifications RNP-RA/07-0126, Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System2007-11-29029 November 2007 Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System RNP-RA/07-0073, Request for Administrative Changes to the Operating License and Technical Specifications2007-11-19019 November 2007 Request for Administrative Changes to the Operating License and Technical Specifications RNP-RA/07-0124, Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication2007-11-15015 November 2007 Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication RNP-RA/07-0056, Request for Technical Specifications Changes Related to Control Room Habitability2007-07-17017 July 2007 Request for Technical Specifications Changes Related to Control Room Habitability RNP-RA/06-0095, Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring2007-02-0202 February 2007 Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring ML0634104702006-11-29029 November 2006 Technical Specification Pages Re Core Operating Limit Report References, ML0628900812006-10-12012 October 2006 Submittal of H. B. Robinson, Unit 2 - Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/05-0107, Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass2005-11-30030 November 2005 Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass ML0522003672005-08-0202 August 2005 Technical Specification Pages Re Bases Control Program (Tac No. MC3636) ML0511102212005-04-19019 April 2005 Enclosure, Amendment No. 204 on TS Revisions to Eliminate Monthly Operating and Annual Occupational Radiation Exposure Report Requirements (Tac No. MC5129) RNP-RA/05-0005, Request for Technical Specifications Change to Section 3.8.4, DC Sources - Operating2005-02-14014 February 2005 Request for Technical Specifications Change to Section 3.8.4, DC Sources - Operating ML0405707022004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.3-20 Through 3.3-28 for Amendment 176 ML0405706622004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 1.3-1 Through 1.3-13 for Amendment 176 ML0405706652004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 1.1-1 Through 1.2-3 for Amendment 176 ML0405706702004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 1.4-1 Through 1.4-4 for Amendment 176 ML0405706752004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Operating License Effective Pages Through Technical Specifications Effictive Pages ML0405706832004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Table of Contents for Amendment 176 ML0405706872004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 2.0-1 Through 2.0-2 for Amendment 176 ML0405706912004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.0.1 Through 3.0.5 for Amendment 176 ML0405706942004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.1-1 Through 3.1-21 for Amendment 176 ML0405706962004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.2-1 Through 3.2-14 for Amendment 176 ML0405706992004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.3-1 Through 3.3-19 for Amendment 176 ML0407804992004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.6-1 Through 3.6-21 for Amendment 176 ML0407805072004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 5.0-1 Through 5.0-34 for Amendment 176 ML0407805052004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 4.0-1 for Amendment 176 Through 4.0-3 for Amendment 198 ML0407805042004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.9-1 Through 3.0-12 for Amendment 176 ML0407805022004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.8-1 for Amendment 176 Through 3.8-36 for Amendment 190 ML0407805002004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.7-1 Through 3.7-33 for Amendment 176 ML0405707052004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Techncial Specification Pages 3.3-29 Through 3.3-32 for Amendment 176 ML0407804962004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.5-1 Through 3.5-11 for Amendment 176 ML0407804942004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.4-1 Through 3.4-28 for Amendment 176 ML0407804912004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.4-29 Through 3.4-51 for Amendment 176 2023-02-16
[Table view] |
Text
SDM 3.1.1 3.1 REACTIVITY CONTROLSYSTEMS 3.1.1 SHUTDOWNMARGIN (SDM)
LCO 3.1.1 SDM shall be within the limits provided in the COLR.
APPLICABILITY: MODE2 with keff < 1.0, MODES3, 4, and 5.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. SDM not within limit. A.1 Initiate boration to 15 minutes restore SDM to within limit.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify SDM is within the limits provided in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the COLR HBRSEP Unit No. 2 3.1-1 Amendment No. 176
Core Reactivity 3.1.2 3.1 REACTIVITY CONTROLSYSTEMS 3.1.2 Core Reactivity LCO 3.1.2 The measured core reactivity shall be within + 1% Ak/k of predicted values.
APPLICABILITY: MODES1 and 2.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Measured core A.1 Re-evaluate core 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> reactivity not within design and safety limit. analysis, and determine that the reactor core is acceptable for continued operation.
A.2 Establish appropriate 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> operating restrictions and SRs.
B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
HBRSEP Unit No. 2 3.1-2 Amendment No. 176
Core Reactivity 3.1.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.2.1 ________________I_ NOTE--------------------
The predicted reactivity values may be adjusted (normalized) to correspond to the measured core reactivity prior to exceeding a fuel burnup of 60 effective full power days (EFPD) after each fuel loading.
Verify measured core reactivity is within Once prior to
+ 1% Ak/k of predicted values. entering MODE 1 after each refueling AND
-m-w- NOTE------
Only required after 60 EFPD
-~~-----~~---~~
31 EFPD thereafter HBRSEP Unit No. 2 3.1-3 Amendment No. 176
MTC 3.1.3 n
3.1 REACTIVITY CONTROLSYSTEMS 3.1.3 Moderator Temperature Coefficient (MTC)
LCO 3.1.3 The MTC shall be maintained within the limits specified in the COLR. The maximum upper limit shall be = +5.0 pcm/"F at less than 50% RTP or 0.0 pcm/"F at 50% RTP and above.
APPLICABILITY: MODE 1 and MODE2 with keff = 1.0 for the upper MTC limit, MODES1, 2, and 3 for the lower MTC limit.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. MTC not within upper A.1 Establish 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> administrative withdrawal limits for control banks to maintain MTC within limit.
B. Required Action and B.l Be in MODE2 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion k eff < 1.0.
Time of Condition A not met.
C. MTC not within lower C.1 Be in MODE4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> limit.
HBRSEP Unit No. 2 3.1-4 Amendment No. 176
MTC 3.1.3 n
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.3.1 Verify MTC is within upper limit. Once prior to entering MODE 1 after each refueling SR 3.1.3.2 -- ~~~~~~~~~~~~~~ NOTES-------------------
- 1. Not required to be performed until 7 effective full power days (EFPD) after reaching the equivalent of an equilibrium RTP all rods out (AR0) boron concentration of 300 ppm.
- 2. If the MTC is more negative than the 300 ppm Surveillance limit (not LCO limit) specified in the COLR, SR 3.1.3.2 shall be repeated once per 14 EFPD during the remainder of the fuel cycle.
- 3. SR 3.1.3.2 need not be repeated if the MTC measured at the equivalent of equilibrium RTP-AR0 boron concentration of = 60 ppm is less negative than the 60 ppm Surveillance limit specified in the COLR.
Verify MTC is within lower limit. Once each cycle HBRSEP Unit No. 2 3.1-5 Amendment No. 176
Rod Group Alignment Limits 3.1.4 3.1 REACTIVITY CONTROLSYSTEMS 3.1.4 Rod Group Alignment Limits LCO 3.1.4 All shutdown and control rods shall be OPERABLE.
AND Individual indicated rod positions shall be as follows:
- a. For bank demand positions > 200 steps, each rod shall be within 15 inches of its bank demand position, and
- b. For bank demand positions < 200 steps, each rod shall be within 7.5 inches of the average of the individual rod positions in the bank.
APPLICABILITY: MODES1 and 2.
ACTIONS
- CONDITION REQUIRED ACTION COMPLETIONTIME A. One or more rod(s) A.l.l Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable. the limits provided in the COLR.
OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.1.2 Initiate boration to restore SDM to within limit.
AND A.2 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> (continued)
HBRSEP Unit No. 2 3.1-6 Amendment No. 176
Rod Group Alignment Limits 3.1.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETIONTIME B. One rod not within B.l Restore rod to within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> alignment limits. alignment limits.
or B.2.1.1 Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the limits provided in the COLR.
OR B.2.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.
AND B.2.2 Reduce THERMAL POWER 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to < 70% RTP.
AND B.2.3 Verify SDM is within Once per the limits provided 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in the COLR.
AND B.2.4 Perform SR 3.2.1.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND B.2.5 Perform SR 3.2.2.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> AND B.2.6 Re-evaluate safety 5 days analyses and confirm results remain valid for duration of operation under these conditions.
(continued)
HBRSEP Unit No. 2 3.1-7 Amendment No. 176
Rod Group Alignment Limits 3.1.4 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETIONTIME C. Required Action and c.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B not met.
D. More than one rod not D.l.l Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> within alignment the limits provided limit. in the COLR.
Or 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> D.1.2 Initiate boration to restore required SDM to within limit.
AND 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> D.2 Be in MODE3.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 Verify individual rod positions within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> alignment limit.
AND Once within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> thereafter when the rod position deviation monitor is inoperable (continued)
HBRSEP Unit No. 2 3.1-8 Amendment No. 176
Rod Group Alignment Limits 3.1.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY I
SR 3.1.4.2 Verify rod freedom of movement 92 days (trippability) by moving each rod not fully inserted in the core > 10 steps in either direction.
SR 3.1.4.3 Verify rod drop time of each rod, from the Prior to fully withdrawn position, is < 1.8 seconds reactor from the beginning of decay of stationary criticality gripper coil voltage to dashpot entry, after each with: removal of the reactor head
> 540°F; and
- b. All reactor coolant pumps operating.
HBRSEP Unit No. 2 3.1-9 Amendment No. 176
Shutdown Bank Insertion Limits 3.1.5 3.1 REACTIVITY CONTROLSYSTEMS 3.1.5 Shutdown Bank Insertion Limits LCO 3.1.5 Each shutdown bank shall be within insertion limits specified in the COLR.
APPLICABILITY: MODE 1, MODE2 with any control bank not fully inserted.
NOTE----------------------------
This LCO is not applicable while performing SR 3.1.4.2.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. One or both shutdown A.l.l Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> banks not within the limits provided limits. in the COLR.
OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A.1.2 Initiate boration to restore SDM to within limit.
AND 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> A.2 Restore shutdown banks to within limits.
B. Required Action and B.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
HBRSEP Unit No. 2 3.140 Amendment No. 176
Shutdown Bank Insertion Limits 3.1.5 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.5.1 Verify each shutdown bank is within the 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> limits specified in the COLR.
HBRSEP Unit No. 2 3.141 Amendment No. 176
Control Bank Insertion Limits 3.1.6 3.1 REACTIVITY CONTROLSYSTEMS 3.1.6 Control Bank Insertion Limits LCO 3.1.6 Control banks shall be within the insertion, sequence, and overlap limits specified in the COLR.
APPLICABILITY: MODE 1, MODE2 with keff > 1.0.
mm-s---------- NOTE----------------------------
This LCO is not applicable while performing SR 3.1.4.2.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Control bank insertion A.l.l Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> limits not met. the limits provided in the COLR.
OR A.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.
AND A.2 Restore control 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> bank(s) to within limits.
(continued)
HBRSEP Unit No. 2 3.1-12 Amendment No. 176
Control Bank Insertion Limits 3.1.6 ACTIONS (continued>
CONDITION REQUIRED ACTION COMPLETIONTIME B. Control bank sequence B.l.l Verify SDM is within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or overlap limits not the limits provided met. in the COLR.
OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B.1.2 Initiate boration to restore SDM to within limit.
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> B.2 Restore control bank sequence and overlap to within limits.
C. Required Action and c.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify estimated critical control bank Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> position is within the limits specified in prior to the COLR. achieving criticality (continued)
HBRSEP Unit No. 2 3.1-13 Amendment No. 176
Control Bank Insertion Limits 3.1.6 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.1.6.2 Verify each control bank insertion is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> within the limits specified in the COLR.
AND Once within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> thereafter when the rod insertion limit monitor is inoperable SR 3.1.6.3 Verify sequence and overlap limits 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> specified in the COLR are met for control banks not fully withdrawn from the core.
HBRSEP Unit No. 2 3.1-14 Amendment No. 176
Rod Position Indication 3.1.7 3.1 REACTIVITY CONTROLSYSTEMS 3.1.7 Rod Position Indication LCO 3.1.7 The Analog Rod Position Indication (ARPI) System and the Demand Position Indication System shall be OPERABLE.
APPLICABILITY: MODES1 and 2.
ACTIONS
_-_________________________________ --NOTE-------------------------------------
Separate Condition entry is allowed for each inoperable rod position indicator per group and each demand position indicator per bank. '
CONDITION REQUIRED ACTION COMPLETIONTIME A. One ARPI per group inoperable for one or A.1 Verify the position Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> more groups. of the rods with inoperable position indicators by using movable incore detectors*.
OR A.2 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to < 50% RTP.
B. One or more rods with B.l Verify the position 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable position of the rods with indicators have been inoperable position moved in excess of indicators by using 24 steps in one movable incore direction since the detectors.
last determination of the rod's position. OR (continued)
- During Cycle 22, the position of Control Rod H-10, Shutdown Bank B. can be determined by verifying gripper coil parameters of the Control Rod Drive Mechanism have not changed state, until the repair of the indication system for this rod is completed.
HBRSEP Unit No. 2 3.1-15 Amendment No. 197
Rod Position Indication 3.1.7 ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME B. (continued) B.2 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to < 50% RTP.
C. One demand position C.l.l Verify by Once per indicator per bank administrative means 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable for one or all ARPIs for the more banks. affected banks are OPERABLE.
AND C.1.2 --------NOTE---------
Only required to be met for bank positions < 200 steps.
Verify the position Once per of each rod in the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> affected bank(s) is within 7.5 inches of the average of the individual rod positions in the affected bank(s).
(continued)
HBRSEP Unit No. 2 3.146 Amendment No. 176
Rod Position Indication 3.1.7 ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME C. (continued) c.1.3 ~~ NOTE----
Only required to be met for bank positions > 200 steps.
Verify the position Once per of each rod in the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> affected bank(s) is within 15 inches of the bank demand position.
OR c.2 Reduce THERMAL POWER 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to < 50% RTP.
D. Required Action and D.1 Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.
HBRSEP Unit No. 2 3.147 Amendment No. 176
Rod Position Indication 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.1 -------------------NOTE-------------------
Only required to be met for bank positions
> 200 steps.
Perform CHANNEL CHECK by comparing analog 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> rod position indication and bank demand position indication.
Once within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> following
> 6 inches of rod motion when rod position deviation monitor is inoperable SR 3.1.7.2 ----~~--~~~--~I~~-- NOTE-------------------
Only required to be met for bank positions
< 200 steps.
Verify each ARPI is within 7.5 inches of 31 days the average of the individual ARPIs in the associated bank after moving each full length RCCA bank > 19 steps and returning the banks to their original positions.
SR 3.1.7.3 -------------------NOTE-------------------
Only required to be met for bank positions
> 200 steps.
Verify each ARPI is within 15 inches of the 31 days associated bank demand position after moving each full length RCCA bank
> 19 steps and returning the banks to their original positions.
(continued)
HBRSEP Unit No. 2 3.1-18 Amendment No. 176
Rod Position Indication 3.1.7 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.1.7.4 Perform CHANNEL CALIBRATION of the ARPI 18 months System.
HBRSEP Unit No. 2 3.149 Amendment No. 176
PHYSICS TESTS Exceptions-MODE 2 3.1.8 3.1 REACTIVITY CONTROLSYSTEMS 3.1.8 PHYSICS TESTS Exceptions-MODE 2 LCO 3.1.8 During the performance of PHYSICS TESTS, the requirements of LCO 3.1.3, "Moderator Temperature Coefficient (MTC)":
LCO 3.1.4, "Rod Group Alignment Limits":
LCO 3.1.5, "Shutdown Bank Insertion Limits";
LCO 3.1.6, "Control Bank Insertion Limits": and LCO 3.4.2, "RCS Minimum Temperature for Criticality" may be suspended, provided:
- a. RCS lowest loop average temperature is > 530°F;
- b. SDM is within the limits provided in the COLR: and, C. THERMAL POWERis < 5% RTP APPLICABILITY: MODE2 during PHYSICS TESTS.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. SDM not within limit. A.1 Initiate boration to 15 minutes restore SDM to within limit.
AND A.2 Suspend PHYSICS TESTS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> exceptions.
B. THERMAL POWERnot B.l Open reactor trip Immediate1y within limit. breakers.
(continued)
HBRSEP Unit No. 2 3.1-20 Amendment No. 176
PHYSICS TESTS Exceptions-MODE 2 3.1.8 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETIONTIME I
C. RCS lowest loop c.1 Restore RCS lowest 15 minutes average temperature loop average not within limit. temperature to within limit.
D. Required Action and D.l Be in MODE3. 15 minutes associated Completion Time of Condition C not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.8.1 Perform a CHANNEL OPERATIONAL TEST on power Within 7 days range and intermediate range channels per prior to SR 3.3.1.7, SR 3.3.1.8, and Table 3.3.1-1. initiation of PHYSICS TESTS SR 3.1.8.2 Verify the RCS lowest loop average 30 minutes temperature is > 53OOF.
SR 3.1.8.3 Verify THERMAL POWERis < 5% RTP. 30 minutes SR 3.1.8.4 Verify SDM is within the limits provided in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the COLR.
HBRSEP Unit No. 2 3.1-21 Amendment No. 176