Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area5 October 2023License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation AreaHigh Radiation Area
Fuel cladding
ML23145A16025 May 2023Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality
RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements16 February 2023Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Stress corrosion cracking
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies1 February 2023License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement FrequenciesEnforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Operational leakage
RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.21 September 2022License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.Surveillance Frequency Control Program
Fuel cladding
RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)28 April 2022Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)Safe Shutdown
Qualified Offsite Circuit
Emergency Lighting
Fuel cladding
Offsite Circuit
RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position18 January 2022Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionUltimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Operability Determination
Recently irradiated fuel
Power Uprate
RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections6 January 2022Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube InspectionsStress corrosion cracking
Eddy Current Testing
RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .27 May 2021Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .
RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.329 July 2019License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3Unanalyzed Condition
Earthquake
RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description8 July 2019License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program DescriptionCoatings
RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform11 July 2018Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup TransformersQualified Offsite Circuit
Offsite Circuit
RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications10 May 2018Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical SpecificationsUltimate heat sink
Post Accident Monitoring
Hydrostatic
Surveillance Frequency Control Program
Recently irradiated fuel
ML18130A80710 May 2018Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical SpecificationsPost Accident Monitoring
Surveillance Frequency Control Program
Stress corrosion cracking
Recently irradiated fuel
RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications10 May 2018Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical SpecificationsPost Accident Monitoring
Surveillance Frequency Control Program
Stress corrosion cracking
Recently irradiated fuel
RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing7 November 2017Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing
RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses19 October 2017Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety AnalysesBoric Acid
Shutdown Margin
Anticipated operational occurrence
Post Accident Monitoring
Surveillance Frequency Control Program
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.12 October 2017Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.
RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions23 May 2017Transmittal of Technical Specifications Bases RevisionsOffsite Circuit
RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2 May 2017Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)Battery sizing
RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces27 September 2016Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement ProcessPost Accident Monitoring
Surveillance Frequency Control Program
Stress corrosion cracking
Recently irradiated fuel
RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process23 June 2016Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement ProcessTime of Discovery
Fire Barrier
Tornado Missile
Internal Flooding
Incorporated by reference
Turbine Missile
ML16116A03324 April 2016Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2Anticipated operational occurrence
RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 51 February 2016Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5
RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2 November 2015Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature LimitsHydrostatic
Power Uprate
RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions8 October 2015Transmittal of Technical Specifications Bases Revisions
RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication1 September 2015Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position IndicationPost Accident Monitoring
ML14188B01520 June 2014Request for Technical Specifications (TS) Change Regarding Correction to TS 5.5.9.b.2, Steam Generator (SG) Program Accident-Induced Leakage Performance CriterionOperational leakage
RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions29 April 2014Transmittal of Technical Specifications Bases RevisionsShutdown Margin
Nondestructive Examination
Missed surveillance
Operational leakage
RNP-RA/13-0077, License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications30 September 2013License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical SpecificationsIncorporated by reference
RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication24 April 2013Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication
RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions17 September 2012Transmittal of Technical Specifications Bases RevisionsSafe Shutdown
Boric Acid
Stroke time
RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process6 August 2012Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement ProcessIncorporated by reference
RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process10 February 2012Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement ProcessTime of Discovery
Incorporated by reference
Missed surveillance
RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions12 January 2011Transmittal of Technical Specifications Bases RevisionsQualified Offsite Circuit
RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation5 March 2010Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation InstrumentationOffsite Dose Calculation Manual
Recently irradiated fuel
ML0828301376 October 2008License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26Safe Shutdown
Fitness for Duty
RNP-RA/08-0006, Request for Technical Specifications Changes Related to Control Room Habitability - Supplement1 April 2008Request for Technical Specifications Changes Related to Control Room Habitability - SupplementIncorporated by reference
RNP-RA/08-0016, Supplement to the Request for Administrative Changes to the Technical Specifications4 February 2008Supplement to the Request for Administrative Changes to the Technical SpecificationsPost Accident Monitoring
RNP-RA/07-0126, Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System29 November 2007Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System
RNP-RA/07-0073, Request for Administrative Changes to the Operating License and Technical Specifications19 November 2007Request for Administrative Changes to the Operating License and Technical SpecificationsShutdown Margin
RNP-RA/07-0124, Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication15 November 2007Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication
RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions30 October 2007Transmittal of Technical Specifications Bases RevisionsSafe Shutdown
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Nondestructive Examination
Stress corrosion cracking
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Unidentified leakage
Operational leakage
RNP-RA/07-0056, Request for Technical Specifications Changes Related to Control Room Habitability17 July 2007Request for Technical Specifications Changes Related to Control Room HabitabilityIncorporated by reference
RNP-RA/06-0095, Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring2 February 2007Request for Technical Specifications Change to Section 3.3.3, Post Accident MonitoringGrab sample
Post Accident Monitoring
Incorporated by reference
ML07024048319 January 2007H. B. Robinson, Unit 2 - Resubmission of Request for Technical Specifications Change Regarding Steam Generator Alternate Repair CriteriaPost Accident Monitoring
Nondestructive Examination
Affidavit
Operational leakage
ML06341047029 November 2006Technical Specification Pages Re Core Operating Limit Report References,
ML06289008112 October 2006Submittal of H. B. Robinson, Unit 2 - Request for Technical Specifications Change Regarding Steam Generator Alternate Repair CriteriaPost Accident Monitoring
Nondestructive Examination
Affidavit
Operational leakage
RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions6 April 2006Transmittal of Technical Specifications Bases RevisionsGrab sample
Anticipated operational occurrence
Hydrostatic
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Unidentified leakage
Operational leakage
RNP-RA/05-0107, Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass30 November 2005Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips BypassOverspeed trip