AC Sources-Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:

a.

The qualified circuit between the offsite transmission network and the onsite emergency AC Electrical Power Distribution System; and

b.

Two diesel generators (DGs) capable of supplying the onsite emergency power distribution subsystem(s)

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION A.

The qualified offsite circuit inoperable.

HBRSEP Unit No. 2 A.1 Declare required feature(s) with no offsite power available inoperable when its redundant required feature(s) is inoperable.

AND COMPLETION TIME A.2 Restore offsite circuit to OPERABLE status.

(continued) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from discovery of no offsite power to one train concurrent with inoperability of redundant required feature(s).

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND 8 days from discovery of failure to meet LCO 3.8-l Amendment No. 176

AC Sources-Operating3.8.1 ACTIONS (continued)

CONDITION B.

One DG inoperable.

B.l REQUIRED ACTION AND B.2 AND B.3.1 OR Perform SR 3.8.1.1 for the offsite circuit.

Declare required feature(s) supported by the inoperable DG inoperable when its required redundant feature(s) is inoperable.

Perform SR 3.8.1.2 for OPERABLE DG B.3.2.1 Determine OPERABLE DG is not inoperable due to common cause failure.

AND B.3.2.2 Perform SR 3.8.1.2 for OPERABLE DG.

AND COMPLETION TIME 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B

concurrent with inoperability of redundant required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 24 hours 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> (continued)

HBRSEP Unit No. 2 3.8-2 Amendment No. 176

AC Sources-Operating3.8.1 ACTIONS (continued)

CONDITION B.

(continued)

C.

Required Action and associated Completion Time of Condition A or B not met.

D.

Two or more AC sources inoperable.

REQUIRED ACTION B.4 Restore DG to OPERABLE status.

c.1 Be in MODE 3.

AND c.2 Be in MODE 5.

~~~~~~~~----

NOTE------~

Entry into this Required Action may be delayed for no greater than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> during performance of Required Action B.3.1 and Required Action 8.3.2.2.

-_I-__________-______________

D.l Enter LCO 3.0.3.

COMPLETION TIME 7 days AND 8 days from discovery of failure to meet LCO 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours Immediate1y HBRSEP Unit No. 2 3.8-3 Amendment No. 176

AC Sources-Operating3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.1.1 Verify correct breaker alignment and indicated power availability for the offsite circuit.

SR 3.8.1.2


NOTES-------------------

1.

Performance of SR 3.8.1.7 satisfies this SR.

2.

All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.

3.

A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.

When modified start procedures are not used, the time,

voltage, and frequency tolerances of SR 3.8.1.7 must be met.

Verify each DG starts from standby conditions and achieves steady state voltage

> 467 V and < 493 V, and frequency

> 58.8 Hz and < 61.2 Hz.

HBRSEP Unit No. 2 3.8-4 FREQUENCY 7 days 31 days (continued)

Amendment No. 176

AC Sources-Operating3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.3


NOTES-------------------

1.
2.
3.
4.
5.

DG loadings may include gradual loading as recommended by the manufacturer.

Momentary transients outside the load range do not invalidate this test.

This Surveillance shall be conducted on only one DG at a time.

This SR shall be preceded by and immediately follow without shutdown a

successful performance of SR 3.8.1.2 or SR 3.8.1.7.

During periods when a diesel generator is being operated for testing

purposes, its protective trips need not be bypassed after the diesel generator has properly assumed the load on its bus.

Verify each DG is synchronized and loaded and operates for

> 60 minutes at a load

> 2350 kW and < 2500 kW.

SR 3.8.1.4 Verify each day tank contains

> 140 gallons of fuel oil.

SR 3.8.1.5 Check for and remove accumulated water from each day tank.

31 days 31 days 31 days (continued)

HBRSEP Unit No. 2 3.8-5 Amendment No. 176

AC Sources-Operating3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3.8.1.6 Verify the fuel oil transfer system operates to automatically transfer fuel oil from storage tank to the day tank.

SR 3.8.1.7


NOTES--------------------

All DG starts may be preceded by an engine prelube period.

Verify each DG starts from standby condition and achieves in < 10 seconds, voltage

> 467 V and frequency

> 58.8 Hz, and after steady state conditions are

reached, maintains voltage

> 467 V and

< 493 V and frequency

> 58.8 Hz and

< 61.2 Hz.

SR 3.8.1.8


NOTES-------------------

1.

This Surveillance shall not be performed in MODE 1 or 2.

2.

If performed with the DG synchronized with offsite

power, it shall be performed at a power factor

< 0.9.

_____-___-I_____-___-----------------------

Verify each DG rejects a load greater than or equal to its associated single largest post-accident load and does not trip on overspeed.

HBRSEP Unit No. 2 3.8-6 FREQUENCY 31 days 184 days 18 months (continued)

Amendment No. 176

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.9


NOTES-------------------

1.

All DG starts may be preceded by an engine prelube period.

2.

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

3.

During periods when a diesel generator is being operated for testing

purposes, its protective trips need not be bypassed after the diesel generator has properly assumed the load on its bus.

Verify on an actual or simulated loss of offsite power signal:

a.

De-energization of emergency buses;

b.

Load shedding from emergency buses:

C.

DG auto-starts from standby condition and:

1.

energizes permanently connected loads in < 10 seconds,

2.

energizes auto-connected shutdown loads through automatic load sequencer,

3.

maintains steady state voltage

> 467 V and < 493 V,

4.

maintains steady state frequency

> 58.8 Hz and < 61.2 Hz, and

5.

supplies permanently connected and auto-connected shutdown loads for

> 5 minutes.

18 months HBRSEP Unit No. 2 3.8-7 (continued)

Amendment No. 176

AC Sources-Operating 3.8.i SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3.8.1.10


NOTES-------------------

1.

All DG starts may be preceded by prelube period.

2.

This Surveillance shall not be performed in MODE 1 or 2.

3.

During periods when a diesel generator is being operated for testing

purposes, its protective trips need not be bypassed after the diesel generator has properly assumed the load on its bus.

Verify on an actual or simulated Engineered Safety Feature (ESF) actuation signal each DG auto-starts from standby condition and:

a.

In < 10 seconds after auto-start achieves voltage

> 467 V, and after steady state conditions are reached, maintains voltage

> 467 V and < 493 V:

b.

In < 10 seconds after auto-start achieves frequency

> 58.8 Hz, and after steady state conditions are

reached, maintains frequency

> 58.8 Hz and < 61.2 Hz:

C.

Operates for

> 5 minutes:

d.

Permanently connected loads remain energized from the offsite power system:

and FREQUENCY 18 months

e.

Emergency loads are energized through the automatic load sequencer from the offsite power system.

(continued)

HBRSEP Unit No. 2 3.8-8 Amendment No. 176

AC Sources-Operating3.8.1 SURVEILLANCE REQUIREMENTS (continued>

SURVEILLANCE SR 3.8.1.11 Verify each DG's automatic trips are bypassed except engine overspeed.

SR 3.8.1.12


NOTES-------------------

1.

Momentary transients outside the load and power factor ranges do not invalidate this test.

2.

This Surveillance shall not be performed in MODE 1 or 2.

3.

During periods when a diesel generator is being operated for testing

purposes, its protective trips need not be bypassed after the diesel generator has properly assumed the load on its bus.

Verify each DG operating at a power factor

< 0.9 operates for > 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:

a.

For > 1.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> loaded

> 2650 kW and

< 2750 kW; and FREQUENCY 18 months 18 months

b.

For the remaining hours of the test loaded

> 2400 kW and < 2500 kW.

(continued)

HBRSEP Unit No. 2 3.8-9 Amendment No. 176

AC Sources-Operating3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3.8.1.13


NOTES-------------------

1.

This Surveillance shall be performed within 5 minutes of shutting down the DG after the DG has operated

> 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded

> 2400 kW and < 2500 kW.

Momentary transients outside of load range do not invalidate this test.

2.

All DG starts may be preceded by an engine prelube period.

Verify each DG starts and achieves, in

< 10 seconds, voltage

> 467 V, and frequency

> 58.8 Hz, and after steady state conditions are reached, maintains voltage 467 V and < 493 V and frequency

> 58.8 Hz and < 61.2 Hz.

SR 3.8.1.14


NOTE--------------------

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

Verify actuation of each sequenced load block is within

+ 0.5 seconds of design setpoint for each emergency load sequencer.

HBRSEP Unit No. 2 3.8-10 FREQUENCY 18 months 18 months (continued)

Amendment No. 176

AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3.8.1.15


NOTES-------------------

1.

All DG starts may be preceded by an engine prelube period.

2.

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

3.

During periods when a diesel generator is being operated for testing

purposes, its protective trips need not be bypassed after the diesel generator has properly assumed the load on its bus.

Verify on an actual or simulated loss of offsite power signal in conjunction with an actual or simulated ESF actuation signal:

a.

De-energization of emergency buses;

b.

Load shedding from emergency buses:

and C.

DG auto-starts from standby condition and:

1.

energizes permanently connected loads in <10

seconds,
2.

energizes auto-connected emergency loads through sequencer, 1 oad l tage e quency

3.

achieves steady state vo

> 467 V and < 493 V,

4.

achieves steady state fr

> 58.8 Hz and < 61.2 Hz, and FREQUENCY 18 months (continued)

HBRSEP Unit No. 2 3.8-11 Amendment No. 176

AC Sources-Operating3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.1.15 (continued)

5.

supplies permanently connected and auto connected emergency loads for

> 5 minutes.

SR 3.8.1.16


NOTE--------------------

1.

This Surveillance shall not be perfomed in MODE 1 or 2.

2.

SR 3.8.1.16 is not required to be met if 4.160 kV bus 2 and 480 V Emergency Bus 1 power supply is from the start up transformer.

Verify automatic transfer capability of the 4.160 kV bus 2 and the 480 V Emergency bus 1 loads from the Unit auxiliary transformer to the start up transformer.

SR 3.8.1.17


NOTE--------------------

All DG starts may be preceded by an engine prelube period.

Verify when started simultaneously from standby condition, each DG achieves, in

< 10 seconds, voltage

> 467 V and frequency

> 58.8 Hz, and after steady state conditions are reached, maintains voltage 467 V and < 493 V and frequency

> 58.8 Hz and < 61.2 Hz.

FREQUENCY 18 months 10 years HBRSEP Unit No. 2 3.8-12 Amendment No. 176

AC Sources-Shutdown 3.8.2 3.8 ELECTRICAL POWER SYSTEMS 3.8.2 AC Sources-Shutdown LCO 3.8.2 The following AC electrical power sources shall be OPERABLE:

a.

One qualified circuit between the offsite transmission network and the onsite AC electrical power distribution subsystem(s) required by LCO 3.8.10, "Distribution Systems-Shutdown":

and

b.

One diesel generator (DG) capable of supplying one train of the onsite AC electrical power distribution subsystem(s) required by LCO 3.8.10.

APPLICABILITY:

MODES 5 and 6 and During movement of irradiated fuel assemblies.

ACTIONS CONDITION A.

The required offsite circuit inoperable.

REQUIRED ACTION

~~~I~~~~~~~~

NOTE---------

Enter applicable Conditions and Required Actions of LCO 3.8.10, with one required train de-energized as a result of Condition A.

_____------------_I----------

A.1 Declare affected required feature(s) with no offsite power available inoperable.

COMPLETION TIME Immediate1 y (continued)

HBRSEP Unit No. 2 3.8-13 Amendment No. 176

AC Sources-Shutdown 3.8.2 s

CONDITION A.

(continued)

B.

The required DG inoperable.

REQUIRED ACTION

\\.2.1 Suspend CORE ALTERATIONS.

i.2.2 Suspend movement of irradiated fuel assemblies.

1.2.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.

i.2.4 Initiate action to restore required offsite power circuit to OPERABLE status.

3.1 Suspend CORE ALTERATIONS.

B.2 Suspend movement of irradiated fuel assemblies.

COMPLETION TIME Immediately Immediately Immed iately Immediately Immediately Immediately (continued)

HBRSEP Unit No. 2 3.8-14 Amendment No. W6.190

AC Sources-Shutdown 3.8.2 NS CONDITION B.

(continued)

REQUIRED ACTION 1 COMPLETION TIME 8.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.

Immediately 8.4 Initiate action to Immediately restore required DG to OPERABLE status.

SURVEILLANCE SR 3.8.2.1


NOTE--------------------

The following SRs are not required to be performed:

SR 3.8.1.3, SR 3.8.1.8, SR 3.8.1.9.

SR 3.8.1.11 through SR 3.8.1.15.

For AC sources required to be OPERABLE, the In accordance SRs of Specification 3.8.1, "AC Sources-with applicable Operating."

except SR 3.8.1.16, and SRs SR 3.8.1.17, are applicable.

HBRSEP Unit No. 2 3.845 Amendment No. Wj.190

Diesel Fuel Oil, and Starting Air 3.8.3 3.8 ELECTRICAL POWER SYSTEMS 3.8.3 Diesel Fuel Oil and Starting Air LCO 3.8.3 The common stored diesel fuel oil and starting air subsystem for each diesel generator (DG> shall be within limits.

APPLICABILITY:

When associated DG is required to be OPERABLE.

ACTIONS NOTE-------------------------------------

Separate Condition entry is allowed for each DG.

_____11____---_1_-__----------------------------------------------------------

CONDITION A.

One or more DGs with DG fuel oil level

< 19,000 gal and

> 14,145 gal in the Unit 2 DG fuel oil storage tank.

B.

One or more DGs with DG Fuel oil level

< 34,000 gal and

> 29,145 gal in the combination of the Unit 1 IC turbine fuel oil storage tanks and the Unit 2 DG fuel oil storage tank.

REQUIRED ACTION COMPLETION TIME A.1 Restore fuel oil level to within limits.

B.l Restore fuel oil level to within limits.

HBRSEP Unit No. 2 3.8-16 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 48 hours (continued)

Amendment No. 176

Diesel Fuel Oil, and Starting Air 3.8.3 ACTIONS (continued)

CONDITION C.

One or more DGs with new fuel oil properties not within limits.

D.

One or more DGs wi starting air recei pressure

< 210 psi and > 100 psig.

th D.l Restore starting air ver receiver pressure to 9

> 210 psig.

E.

Required Action and associated Completion Time not met.

OR Common stored DGs diesel fuel oil or starting air subsystem for each DG not within limits for reasons other than Condition A, B, C, or D.

REQUIRED ACTION c.1 Restore stored fuel oil properties to within limits.

E.l Declare associated DG(s) inoperable.

COMPLETION TIME 30 days 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Immediate1y HBRSEP Unit No. 2 3.8-17 Amendment No. 176

Diesel Fuel Oil, and Starting Air 3.8.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.3.1 Verify

> 19,000 gallons of diesel fuel oil available to the DGs from the Unit 2 DG fuel oil storage tank AND

> 34,000 gallons available to the DGs from the combination of the Unit 1 IC turbine fuel oil storage tanks and the Unit 2 DG fuel oil storage tank.

SR 3.8.3.2 Verify fuel oil properties of stored fuel oil are tested in accordance

with, and maintained within the limits of, the Diesel Fuel Oil Testing Program.

SR 3.8.3.3 Verify each DG air start receiver pressure is > 210 psig.

SR 3.8.3.4 Check for and remove accumulated water from each fuel oil storage tank.

FREQUENCY 7 days In accordance with the Diesel Fuel Oil Testing Program 31 days 31 days HBRSEP Unit No. 2 3.8-18 Amendment No. 176

DC Sources-Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources-Operating LCO 3.8.4 The Train A and Train B DC electrical power subsystems shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One DC electrical A.1 Restore DC electrical 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power subsystem power subsystem to inoperable.

OPERABLE status.

B.

Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Associated Completion Time not met.

AND B.2 Be in MODE 5.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is

> 125.7 V on float charge.

HBRSEP Unit No. 2 3.8-19 (continued)

Amendment No. 176

DC Sources-Operating3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3.8.4.2 Verify battery

cells, cell
plates, and racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance.

SR 3.8.4.3 Remove visible terminal corrosion, verify battery cell to cell and terminal connections are clean and tight, and are coated with anti-corrosion material.

SR 3.8.4.4 Verify each battery charger supplies

> 300 amps at > 125 V for

> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SR 3.8.4.5


NOTES-------------------

1.

The performance discharge test in SR 3.8.4.6 may be performed in lieu of the service test in SR 3.8.4.5 once per 75 months.

2.

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

Verify battery capacity is adequate to

supply, and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test.

HBRSEP Unit No. 2 3.8-20 FREQUENCY 18 months 18 months 18 months 18 months (continued)

Amendment No. 176

DC Sources-Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.4.6


NOTE-------------------

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

Verify battery capacity is > 80% for the "A" Battery and 91% for the "B" battery of the manufacturer's rating when subjected to a performance discharge test.

60 months 18 months when battery shows degradation or has reached 85%

for battery "A"

and 95% for battery "B" of expected life.

HBRSEP Unit No. 2 3.8-21 Amendment No. 176

DC Sources-Shutdown 3.8.5 3.8 ELECTRICAL POWER SYSTEMS 3.8.5 DC Sources-Shutdown LCO 3.8.5 DC electrical power subsystem shall be OPERABLE to support the DC electrical power distribution subsystem(s) required by LCO 3.8.10, "Distribution Systems-Shutdown."

APPLICABILITY:

MODES 5 and 6, and During movement of irradiated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION A.

One or more required A.1.1 Declare affected DC electrical power subsystems inoperable.

required feature(s) inoperable.

HBRSEP Unit No. 2 OR A.2.1 Suspend CORE ALTERATIONS.

A.2.2 Suspend movement of irradiated fuel assemblies.

AND COMPLETION TIME Immediate1y Immediate1y Immediate1y (continued) 3.8-22 Amendment No. 176

DC Sources-Shutdown 3.8.5 COMPLETION TIME ACTIONS (continued1 CONDITION A.

(continued)

REQUIRED ACTION A.2.3 A.2.4 Suspend operations involving positive reactivity additions that could result in

x;o;nrequired SDM concentration.

AND Initiate action to restore required DC electrical power subsystems to OPERABLE status.

Immediately Immediately SR 3.8.5s

-v--NOTE ______________

The following SRs are not required to be performed:

SR 3.8.4.4.

SR 3.8.4.5.

and SR 3.8.4.6.

SR 3.8.4.1 SR 3.8.4.3 SR 3.8.4.5 SR 3.8.4.2 SR 3.8.4.4 SR 3.8.4.6 HBRSEP Unit No. 2 3.8-23 Amendment No. 3%.190

Battery Cell Parameters 3.8.6 3.8 ELECTRICAL POWER SYSTEMS 3.8.6 Battery Cell Parameters LCO 3.8.6 Battery cell parameters for Train A and Train B batteries shall be within the limits of Table 3.8.6-l and average electrolyte temperature of representative cells shall be within limit.

APPLICABILITY:

When associated DC electrical power subsystems are required to be OPERABLE.

ACTIONS

___-_-____-___-----I----------------

-NOTE-------------------------------------

Separate Condition entry is allowed for each battery.

___-_-_1___-______1________________I____------------

CONDITION A.

One or more batteries with one or more battery cell parameters not within Category A or B limits.

REQUIRED ACTION COMPLETION TIME A.1 Verify pilot cell electrolyte level and float voltage meet Table 3.8.6-l Category C limits.

AND A.2 Verify battery cell parameters meet Table 3.8.6-l Category C limits.

AND A.3 Restore battery cell parameters to Category A and B limits of Table 3.8.6-l.

HBRSEP Unit No. 2 3.8-24 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 24 hours AND Once per 7 days thereafter 31 days (continued)

Amendment No. 176

Battery Cell Parameters 3.8.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

Required Action and associated Completion Time of Condition A

not met.

OR One or more batteries with average electrolyte temperature of the representative cells

< 67°F.

OR One or more batteries with one or more battery cell parameters not within Category C values.

B.l Declare associated battery inoperable.

Immediate1y SURVEILLANCE REQUIREMENTS SURVEILLANCE I

FREQUENCY SR 3.8.6.1 Verify battery cell parameters meet Table 3.8.6-l Category A limits.

7 days HBRSEP Unit No. 2 3.8-25 (continued)

Amendment No. 176

Battery Cell Parameters 3.8.6 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.6.2 Verify battery cell parameters meet Table 3.8.6-l Category B limits.

92 days AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a battery discharge

< 110 v Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a battery overcharge

> 150 v SR 3.8.6.3 Verify average electrolyte temperature of representative cells is

> 67OF.

92 days HBRSEP Unit No. 2 3.8-26 Amendment No. 176

Battery Cell Parameters 3.8.6 PARAMETER Electrolyte Level Float Voltage Specific Gravity(b)(c)

Table 3.8.6-l (page 1 of 1)

Battery Cell Parameters Requirements CATEGORY A:

LIMITS FOR EACH DESIGNATED PILOT CELL

> Minimum level indication

mark, and < 1/4inch above maximum level indication mark(a)

> 2.13 V

> 1.200 CATEGORY B:

LIMITS FOR EACH CONNECTED CELL

> Minimum level indication

mark, and <1/4inch above maximum levelindication mark (a)

> 2.13 V

> 1.195 AND Average of all connected cells

> 1.205 CATEGORY C:

ALLOWABLE LIMITS FOR EACH CONNECTED CELL Above top of

plates, and not overflowing

> 2.07 V Not more than 0.020 below average of all connected cells AND Average of all connected cells

> 1.195 (a)

It is acceptable for the electrolyte level to temporarily increase above the specified maximum during equalizing charges provided it is not overflowing.

(b)

Corrected for electrolyte temperature and level.

Level correction is not required,

however, when battery charging current is < 2 amps while on float charge.

(c)

A battery charging current of < 2 amps when on float charge is acceptable for meeting specific gravity limits following a battery

recharge, for a maximum of 7 days.

When charging current is used to satisfy specific gravity requirements, specific gravity of each connected cell shall be measured prior to expiration of the 7 day allowance.

HBRSEP Unit No. 2 3.8-27 Amendment No. 176

AC Instrument Bus Sources-Operating3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 AC Instrument Bus Sources-Operating LCO 3.8.7 The following AC Instrument Bus Power Sources shall be OPERABLE:

Inverters A and B, and Constant Voltage Transformers (CVT) 1 and 2.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION REQUIRED ACTION A.

One AC Instrument Bus power source inoperable.

B.

Required Action and associated Completion Time not met.

A.1


NOTE--------

Enter applicable Conditions and Required Actions of LCO 3.8.9, "Distribution Systems - Operating" with any instrument bus de-energized.

Restore AC Instrument Bus Power Source to OPERABLE status.

B.l Be in MODE 3.

AND B.2 Be in MODE 5.

COMPLETION TIME 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6 hours 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> HBRSEP Unit No. 2 3.8-28 Amendment No. 176

AC Instrument Bus Sources-Operating 3.8.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE I

FREQUENCY SR 3.8.7.1 Verify correct inverter

voltage, frequency, 7 days and alignment to required AC instrument buses.

SR 3.8.7.2 Verify voltage availability and correct CVT 7 days alignment to required AC instrument buses.

HBRSEP Unit No. 2 3.8-29 Amendment No. 176

AC Instrument Buses-Shutdown 3.8.8 3.8 ELECTRICAL POWER SYSTEMS 3.8.8 AC Instrument Bus Sources-Shutdown LCO 3.8.8 AC instrument bus source shall be OPERABLE to support the onsite AC instrument bus electrical power distribution subsystem(s) required by LCO 3.8.10, "Distribution Systems-Shutdown."

APPLICABILITY:

MODES 5 and 6, and During movement of irradiated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION A.

One or more AC instrument bus sources inoperable.

HBRSEP Unit No. 2 A.1 Declare affected required feature(s) inoperable.

OR A.2.1 Suspend CORE ALTERATIONS.

AND A.2.2 Suspend movement of irradiated fuel assemblies.

AND COMPLETION TIME Immediate1y Immediately Immediate1y (continued) 3.8-30 Amendment No. 176

AC Instrument Buses-Shu;dr; ACTIONS CONDITION A.

(continued)

Initiate action to restore AC instrument bus sources to OPERABLE status.

REQUIRED ACTION 4.2.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.

COMPLETION TIME Immediately Immediately SR 3.8.8.1


NOTE--------------------

Actual voltage and frequency measurement is not required for AC instrument buses supplied from CVTs.

Verify correct inverter

voltage, frequency.

and alignments to required AC instrument buses.

7 days HBRSEP Unit No. 2 3.8-31 Amendment No. 55,190

Distribution Systems-Operating3.8.9 3.8 ELECTRICAL POWER SYSTEMS 3.8.9 Distribution Systems-Operating LCO 3.8.9 Train A and Train B AC, DC, and AC instrument bus electrical power distribution subsystems shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS CONDITION A.

One AC electrical power distribution subsystem inoperable.

B.

One AC instrument bus subsystem inoperable.

C.

One DC electrical power distribution subsystem inoperable.

REQUIRED ACTION COMPLETION TIME A.1 Restore AC electrical power distribution subsystem to OPERABLE status.

B.l Restore AC instrument bus subsystem to OPERABLE status.

c.1 Restore DC electrical power distribution subsystem to OPERABLE status.

HBRSEP Unit No. 2 3.8-32 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> AND 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> AND 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> AND 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO (continued)

Amendment No. 176

Distribution Systems-Operating 3.8.9 ACTIONS (continued)

CONDITION D.

Trip elements inoperable for both of the molded case circuit breakers associated with the AFW Header Discharge to S/G "A" valve, V2-16A.

E.

Trip elements inoperable for both of the molded case circuit breakers associated with the Service Water System Turbine Building Supply Valve (emergency supply)

V6-16C.

F.

Required Action and associated Completion Time not met.

HBRSEP Unit No. 2 REQUIRED ACTION D-1


NOTE--------

Enter applicable Conditions and Required Actions for Systems made inoperable by inoperable valves.

___-1_____-1___1_____

Open one of the circuit breaker(s) with the inoperable trip element.

E-1


NOTE--------

Enter applicable Conditions and Required Actions for Systems made inoperable by inoperable valves.

_________________I___

Open one of the circuit breaker(s) with the inoperable trip element.

F.l Be in MODE 3.

AND F.2 Be in MODE 5.

3.8-33 COMPLETION TIME 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 2 hours 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours (continued)

Amendment No. 176

Distribution Systems-Operating3.8.9 ACTIONS (continued)

CONDITION G.

Two trains with inoperable distribution subsystems that result in a loss of safety function.

REQUIRED ACTION COMPLETION TIME G.l Enter LCO 3.0.3.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3.8.9.1


NOTE-------------------

Actual voltage measurement is not required for the AC vital buses supplied from the constant voltage transformers.

1.1___1-_----------------------------------

Verify correct breaker alignments and voltage to AC, DC, and AC instrument bus electrical power distribution subsystems.

SR 3.8.9.2 Verify capability of the two molded case circuit breakers for AFW Header Discharge Valve to S/G "A",

VZ-16A to trip on overcurrent.

SR 3.8.9.3 Verify capability of the two molded case circuit breakers for Service Water System Turbine Building Supply Valve (emergency supply),

V6-16C to trip on overcurrent.

HBRSEP Unit No. 2 3.8-34 FREQUENCY 7 days 18 months 18 months Amendment No. 176

Distribution Systems-Shutdown 3.8.10 3.8 ELECTRICAL POWER SYSTEMS 3.8.10 Distribution Systems-Shutdown LCO 3.8.10 The necessary portion of AC, DC, and AC instrument bus electrical power distribution subsystems shall be OPERABLE to support equipment required to be OPERABLE.

APPLICABILITY:

MODES 5 and 6, and During movement of irradiated fuel assemblies.

ACTIONS CONDITION A.

One or more required AC, DC, or AC instrument bus electrical power distribution subsystems inoperable.

REQUIRED ACTION A.1 Declare associated supported required feature(s) inoperable.

OR A.2.1 Suspend CORE ALTERATIONS.

A.2.2 Suspend movement of irradiated fuel assemblies.

AND COMPLETION TIME Immediate1y Immediate1y Immediate1y (continued)

HBRSEP Unit No. 2 3.8-35 Amendment No. 176

Distribution Systems-Sh;t;oy; ACTIONS CONDITION A.

(continued)

REQUIRED ACTION A.2.3 Suspend operations involving positive reactivity additions that could result in loss of required SDM or boron concentration.

A.2.4 Initiate actions to restore required AC, DC, and AC instrument bus electrical power distribution subsystems to OPERABLE status.

A.2.5 Declare associated required residual heat removal subsystem(s) inoperable and not in operation.

SURVEILLANCE SR 3.8.10.1


.---NOTE--------------------

Actual voltage measurement is not required for the AC vital buses supplied from constant voltage transformers.

Verify correct breaker alignments and voltage to required AC, DC, and AC instrument bus electrical power distribution subsystems.