Category:Letter type:RNP
MONTHYEARRNP-RA/21-0035, Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-18018 February 2021 Duke Energy Progress, Inc - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/20-0234, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2020-07-23023 July 2020 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RNP-RA/20-0199, Registration of Use of Spent Fuel Casks2020-06-25025 June 2020 Registration of Use of Spent Fuel Casks RNP-RA/18-0063, Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal2018-11-29029 November 2018 Request for Extension of Due Date for Seismic Probabilistic Risk Assessment Submittal RNP-RA/18-0060, Transmittal of Core Operating Limits Report2018-10-17017 October 2018 Transmittal of Core Operating Limits Report RNP-RA/18-0050, Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change2018-08-0101 August 2018 Response to Supplemental Request for Additional Information Regarding License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Change RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/18-0039, Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis2018-06-27027 June 2018 Transmittal of Emergency Procedure Revisions and 10 CFR 50.54(q) Summary of Analysis RNP-RA/18-0041, Independent Spent Fuel Storage Installation - Register as User for Cask2018-06-13013 June 2018 Independent Spent Fuel Storage Installation - Register as User for Cask RNP-RA/18-0036, Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ...2018-05-16016 May 2018 Response to Request for Additional Information (RAI) Regarding Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use ... RNP-RA/18-0029, Submittal of 2017 Annual Radiological Environmental Operating Report2018-05-0808 May 2018 Submittal of 2017 Annual Radiological Environmental Operating Report RNP-RA/18-0031, (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 352018-04-23023 April 2018 (Hbrsep), Unit 2 - 2017 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Revision 35 RNP-RA/18-0015, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program2018-04-16016 April 2018 Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequently Requirements to a Licensee Controlled Program RNP-RA/18-0024, Report of Changes Pursuant to 10 CFR 50.59(d)(2)2018-04-0202 April 2018 Report of Changes Pursuant to 10 CFR 50.59(d)(2) RNP-RA/18-0020, Notification of Change in Licensed Operator Status2018-02-20020 February 2018 Notification of Change in Licensed Operator Status RNP-RA/18-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-01-23023 January 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report RNP-RA/17-0085, Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2018-01-0808 January 2018 Request for Additional Information Regarding Application to Revise Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0086, Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses2017-12-14014 December 2017 Transmittal of Emergency Procedure Revision and 10 CFR 50.54(q) Summary of Analyses RNP-RA/17-0081, Submittal of Change in Licensed Operators Medical Status2017-12-11011 December 2017 Submittal of Change in Licensed Operators Medical Status RNP-RA/17-0079, Operator License Renewal Application2017-12-0707 December 2017 Operator License Renewal Application RNP-RA/17-0071, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks2017-10-19019 October 2017 Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks RNP-RA/17-0068, Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-09-28028 September 2017 Response to NRC Request for Additional Information Related to License Amendment Request Regarding Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0037, License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers2017-09-27027 September 2017 License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specifications 3.8.1, AC Sources-Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RNP-RA/17-0043, Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-42017-09-22022 September 2017 Relief Request (RR)-12 for Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4 RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0060, Notification of Change in Licensed Operator Status2017-08-10010 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0058, Notification of Change in Licensed Operator Status2017-08-0303 August 2017 Notification of Change in Licensed Operator Status RNP-RA/17-0055, Transmittal of Core Operating Limits Report for Cycle 312017-07-26026 July 2017 Transmittal of Core Operating Limits Report for Cycle 31 RNP-RA/17-0042, Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals2017-06-29029 June 2017 Submittal of the PWROG-14048-P, Revision 1, to Satisfy the Regulatory Commitment Related to the Pressurized Water Reactor Internals Program Plan for Aging Management of Reactor Internals RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0038, (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report2017-05-0909 May 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radiological Environmental Operating Report RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/17-0036, (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 342017-04-25025 April 2017 (Hbrsep), Unit No. 2 - 2016 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual, Current Revision 34 RNP-RA/17-0031, Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 02017-04-20020 April 2017 Provides Additional Information Regarding License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler 522, Revision 0 RNP-RA/17-0033, Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal2017-04-12012 April 2017 Flood Hazard Mitigating Strategies Assessment (MSA) Report Submittal RNP-RA/17-0014, Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Resubmittal of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0028, Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2017-04-0303 April 2017 Submittal of Engineering Calculation in Support of a Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/17-0021, Transmittal of Core Operating Limits Report2017-03-13013 March 2017 Transmittal of Core Operating Limits Report RNP-RA/17-0019, Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 22017-03-0808 March 2017 Supplemental Submittal to Correct Marked Up Technical Specifications (TS) Pages Transmitted with Application for Technical Specification Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RNP-RA/17-0015, Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 Independent Spent Fuel Storage Installations - Letter Regarding Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/17-0016, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2017-02-22022 February 2017 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RNP-RA/17-0015, H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.482017-02-22022 February 2017 H.B. Robinson Steam Electric Plant & ISFSIs - Report of Changes Pursuant to 10 CFR 72.48 RNP-RA/16-0100, Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-2272017-01-24024 January 2017 Response to Apparent Violation in NRC Inspection Report 05000261/2016404, EA-16-227 RNP-RA/16-0097, Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/20154052016-12-15015 December 2016 Transmittal Letter for Response to Inspection Report Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones 1-7, Inspection Report 05000261/2015405 RNP-RA/16-0089, Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles2016-11-10010 November 2016 Request for Withdrawal of License Amendment Request for Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles RNP-RA/16-0090, Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise2016-11-10010 November 2016 Notification of Rescheduled Date for 2017 Emergency Preparedness Graded Exercise RNP-RA/16-0087, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-31031 October 2016 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0078, Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors2016-10-0505 October 2016 Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable High Range Containment Area Radiation Monitors RNP-RA/16-0079, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants.2016-10-0505 October 2016 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Light Water Reactor Electric Generating Plants. 2021-02-18
[Table view] Category:Technical Specification
MONTHYEARRA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .2021-05-27027 May 2021 Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-11-0202 November 2015 Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions2015-10-0808 October 2015 Transmittal of Technical Specifications Bases Revisions RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication2015-09-0101 September 2015 Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication ML14188B0152014-06-20020 June 2014 Request for Technical Specifications (TS) Change Regarding Correction to TS 5.5.9.b.2, Steam Generator (SG) Program Accident-Induced Leakage Performance Criterion RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions2014-04-29029 April 2014 Transmittal of Technical Specifications Bases Revisions RNP-RA/13-0077, License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications2013-09-30030 September 2013 License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2013-04-24024 April 2013 Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions2012-09-17017 September 2012 Transmittal of Technical Specifications Bases Revisions RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-02-10010 February 2012 Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions2011-01-12012 January 2011 Transmittal of Technical Specifications Bases Revisions RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation2010-03-0505 March 2010 Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 RNP-RA/08-0006, Request for Technical Specifications Changes Related to Control Room Habitability - Supplement2008-04-0101 April 2008 Request for Technical Specifications Changes Related to Control Room Habitability - Supplement RNP-RA/08-0016, Supplement to the Request for Administrative Changes to the Technical Specifications2008-02-0404 February 2008 Supplement to the Request for Administrative Changes to the Technical Specifications RNP-RA/07-0126, Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System2007-11-29029 November 2007 Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System RNP-RA/07-0073, Request for Administrative Changes to the Operating License and Technical Specifications2007-11-19019 November 2007 Request for Administrative Changes to the Operating License and Technical Specifications RNP-RA/07-0124, Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication2007-11-15015 November 2007 Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions2007-10-30030 October 2007 Transmittal of Technical Specifications Bases Revisions RNP-RA/07-0056, Request for Technical Specifications Changes Related to Control Room Habitability2007-07-17017 July 2007 Request for Technical Specifications Changes Related to Control Room Habitability RNP-RA/06-0095, Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring2007-02-0202 February 2007 Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring ML0702404832007-01-19019 January 2007 H. B. Robinson, Unit 2 - Resubmission of Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria ML0634104702006-11-29029 November 2006 Technical Specification Pages Re Core Operating Limit Report References, ML0628900812006-10-12012 October 2006 Submittal of H. B. Robinson, Unit 2 - Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions2006-04-0606 April 2006 Transmittal of Technical Specifications Bases Revisions RNP-RA/05-0107, Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass2005-11-30030 November 2005 Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass 2023-05-25
[Table view] Category:Bases Change
MONTHYEARRA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .2021-05-27027 May 2021 Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions2015-10-0808 October 2015 Transmittal of Technical Specifications Bases Revisions RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication2015-09-0101 September 2015 Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication ML14188B0152014-06-20020 June 2014 Request for Technical Specifications (TS) Change Regarding Correction to TS 5.5.9.b.2, Steam Generator (SG) Program Accident-Induced Leakage Performance Criterion RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions2014-04-29029 April 2014 Transmittal of Technical Specifications Bases Revisions RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2013-04-24024 April 2013 Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions2012-09-17017 September 2012 Transmittal of Technical Specifications Bases Revisions RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-02-10010 February 2012 Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions2011-01-12012 January 2011 Transmittal of Technical Specifications Bases Revisions RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation2010-03-0505 March 2010 Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions2007-10-30030 October 2007 Transmittal of Technical Specifications Bases Revisions ML0702404832007-01-19019 January 2007 H. B. Robinson, Unit 2 - Resubmission of Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions2006-04-0606 April 2006 Transmittal of Technical Specifications Bases Revisions RNP-RA/04-0133, Transmittal of Technical Specifications Bases Revisions2004-10-21021 October 2004 Transmittal of Technical Specifications Bases Revisions RNP-RA/03-0038, Request for Technical Specifications Change Re Credit for Spent Fuel Storage Pool Dissolved Boron2003-05-28028 May 2003 Request for Technical Specifications Change Re Credit for Spent Fuel Storage Pool Dissolved Boron RNP-RA/03-0061, Transmittal of TS Bases Revisions2003-05-0202 May 2003 Transmittal of TS Bases Revisions RNP-RA/02-0118, Response to Request for Additional Information on Technical Specifications Change Re Selective Implementation of Alternative Radiological Source Term2002-08-14014 August 2002 Response to Request for Additional Information on Technical Specifications Change Re Selective Implementation of Alternative Radiological Source Term 2023-05-25
[Table view] |
Text
TS 5.5.14 Progress Energy Serial: RNP-RA/1 1-0002 JAN 1 2 2011 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 TRANSMITTAL OF TECHNICAL SPECIFICATIONS BASES REVISIONS Ladies and Gentlemen:
In accordance with Technical Specifications 5.5.14.d, Carolina Power and Light Company, also known as Progress Energy Carolinas, Inc., is transmitting revisions to the H. B. Robinson Steam Electric Plant (HBRSEP), Unit No. 2, Technical Specifications Bases. The attachment to this letter provides Technical Specifications Bases pages for Revisions Number 40 through 42.
If you have any questions concerning this matter, please contact me at (843) 857-1626.
Sincerely, Curt Castell Supervisor - Licensing/Regulatory Programs RAC/rac Attachment c: L. A. Reyes, NRC, Region II NRC Resident Inspector, HBRSEP B. Mozafari, NRC, NRR Progress Energy Carolinas, Inc.
Robinson Nuclear Plant 3581 West Entrance Road FcoI Hartsville, SC 29550
United States Nuclear Regulatory Commission Attachment to Serial: RNP-RA/1 1-0002 9 Pages (including cover page)
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 TECHNICAL SPECIFICATIONS BASES PAGES FOR REVISIONS NUMBER 40 THROUGH 42
CVCS B 3.4.17 BASES APPLICABILITY In MODES 5 and 6, plant conditions are such that the (continued) risk significance of loss of seal injection to the RCPs is significantly reduced. Therefore, CVCS OPERABILITY requirements in these MODES are not maintained in Technical Specifications.
ACTIONS A.1 With one required charging pump inoperable, the inoperable pump must be returned to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is reasonable, based upon the original licensing basis.
B.1 With one Makeup Water Pathway inoperable, the inoperable components must be returned to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is consistent with the time permitted to restore an inoperable charging pump to OPERABLE status. Because there are two means of establishing Makeup Water Pathways, the remaining OPERABLE pathway will provide the required source of makeup water.
A footnote allows for a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> completion time for the remainder of Cycle 26 based on License Amendment No. 223.
C.1 and C.2 If the inoperable components identified in Required Actions A.1 and B.1 cannot be returned to OPERABLE status within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
D.1, D.2, and D.3 If seal injection to any RCP is not within limit and both required charging pumps are inoperable, adequate makeup to the RCP seals is not assured. In addition, adequate makeup to the RCS is not assured and the RCS inventory will begin to reduce. Backup cooling is provided to the RCP seals by the Component Cooling Water System. Since adequate means of
(
(continued)
HBRSEP Unit No. 2 B 3.4-107 Revision No. 40
RPS Instrumentation B 3.3.1 BASES APPLICABLE 14. Steam Generator Water Level-Low, Coincident With Steam SAFETY ANALYSES, Flow/Feedwater Flow Mismatch (continued)
LCO, and APPLICABILITY maintain SG level. In MODE 3, 4, 5, or 6, the SG Water Level-Low coincident with Steam Flow/Feedwater Flow Mismatch Function does not have to be OPERABLE because the reactor is not operating or even critical.
Decay heat removal is accomplished by the AFW and MFW Systems in MODE 3 and by the RHR System in MODE 4, 5, or 6. The MFW System is in operation only in MODE 1 or 2 and, therefore, this trip Function need only be OPERABLE in these MODES.
- 15. Turbine Trip
- a. Turbine Trip-Low Auto-Stop Oil Pressure The Turbine Trip-Low Auto-Stop Oil Pressure trip Function anticipates the loss of heat removal capabilities of the secondary system following a turbine trip. This trip Function acts to minimize the pressure/temperature transient on the reactor.
Any turbine trip from a power level below the P-8 setpoint, approximately 40% power, will not actuate a reactor trip. Three pressure switches I
monitor the auto-stop oil pressure in the Turbine Trip System. A low pressure condition sensed by two-out-of-three pressure switches will actuate a reactor trip. These pressure switches do not provide any input to the control system. The unit is designed to withstand a complete loss of load and not sustain core damage or challenge the RCS pressure limitations. Core protection is provided by the Pressurizer Pressure-High trip Function and RCS integrity is ensured by the pressurizer safety valves.
The LCO requires three channels of Turbine Trip-Low Auto-Stop Oil Pressure to be OPERABLE in MODE 1 above P-8.
Below the P-8 setpoint, a turbine trip does not actuate a reactor trip. In MODE 3, 4, 5, or 6, there is no potential for a turbine trip, and the Turbine Trip-Low Auto-Stop Oil Pressure trip Function does not need to be OPERABLE.
(continued)
HBRSEP Unit No. 2 B 3.3-25 Revision No. 41
RPS Instrumentation B 3.3.1 BASES APPLICABLE b. Turbine Trip-Turbine Stop Valve Closure SAFETY ANALYSES, LCO, and The Turbine Trip-Turbine Stop Valve Closure trip APPLICABILITY Function anticipates the loss of heat removal (continued) capabilities of the secondary system following a turbine trip from a power level above the P-8 setpoint, approximately 40% power. This action will actuate a reactor trip. The trip Function anticipates the loss of secondary heat removal capability that occurs when the stop valves close. Tripping the reactor in anticipation of loss of secondary heat removal acts to minimize the pressure and temperature transient on the reactor. This trip Function will not and is not required to operate in the presence of a single channel failure. The unit is designed to withstand a complete loss of load and not sustain core damage or challenge the RCS pressure limitations. Core protection is provided by the Pressurizer Pressure-High trip Function, and RCS integrity is ensured by the pressurizer safety valves. This trip Function is diverse to the Turbine Trip-Low Auto-Stop Oil Pressure trip Function. Each turbine stop valve is equipped with one limit switch that inputs to the RPS. If both limit switches indicate that the stop valves are closed, a reactor trip is initiated.
The limit switches are set to assure channel trip occurs when the associated stop valve is closed.
The LCO requires two Turbine Trip-Turbine Stop Valve Closure channels, one per valve, to be OPERABLE in MODE 1 above P-8. Both channels must trip to cause reactor trip.
I Below the P-8 setpoint, a load rejection can be accommodated by the Steam Dump System. In MODE 3, 4, 5, or 6, there is no potential for a load rejection, and the Turbine Trip-Stop Valve Closure trip Function does not need to be OPERABLE.
(continued)
HBRSEP Unit No. 2 B 3.3-26 Revision No. 41
RPS Instrumentation B 3.3.1 BASES APPLICABLE b. Low Power Reactor Trips Block, P-7 (continued)
SAFETY ANALYSES, LCO, and (1) on increasing power, the P-7 interlock APPLICABILITY automatically enables reactor trips on the following Functions:
" Pressurizer Pressure-Low;
" Pressurizer Water Level-High;
" Reactor Coolant Flow-Low (Two Loops);
" RCPs Breaker Open (Two Loops); and
- Undervoltage RCPs These reactor trips are only required when operating above the P-7 setpoint (approximately 10% power). The reactor trips provide protection against violating the DNBR limit.
Below the P-7 setpoint, the RCS is capable of providing sufficient natural circulation without any RCP running.
(2) on decreasing power, the P-7 interlock automatically blocks reactor trips on the following Functions:
" Pressurizer Pressure-Low;
" Pressurizer Water Level-High;
" Reactor Coolant Flow-Low (Two Loops);
" RCP Breaker Position (Two Loops); and
" Undervoltage RCPs Trip Setpoint and Allowable Value are not applicable to the P-7 interlock because it is a logic Function and thus has no parameter with which to associate an LSSS.
(continued)
HBRSEP Unit No. 2 B 3.3-29 Revision No. 41
RPS Instrumentation B 3.3.1 BASES APPLICABLE b. Low Power Reactor Trips Block, P-7 (continued)
SAFETY ANALYSES, LCO, and The P-7 interlock is a logic Function with train APPLICABILITY and not channel identity. Therefore, the LCO requires one channel per train of Low Power Reactor Trips Block, P-7 interlock to be OPERABLE in MODE 1.
The low power trips are blocked below the P-7 setpoint and unblocked above the P-7 setpoint.
In MODE 2, 3, 4, 5, or 6, this Function does not have to be OPERABLE because the interlock performs its Function when power level drops below 10% power, which is in MODE 1.
- c. Power Range Neutron Flux, P-8 The Power Range Neutron Flux, P-8 interlock is actuated at approximately 40% power as determined by two-out-of-four NIS power range detectors.
The P-8 interlock automatically enables the Turbine Trip, and the Reactor Coolant Flow-Low (Single Loop) and RCP Breaker Position (Single Loop) reactor trips on low flow in one or more RCS loops on increasing power. The LCO requirement for this trip Function ensures that protection is provided against a loss of flow in any RCS loop that could result in DNB conditions in the core when greater than approximately 40%
power. On decreasing power, the reactor trip on turbine trip and low flow in any loop is automatically blocked.
The LCO requires four channels of Power Range Neutron Flux, P-8 interlock to be OPERABLE in MODE 1. In MODE 1, a loss of flow in one RCS loop could result in DNB conditions, so the Power Range Neutron Flux, P-8 interlock must be OPERABLE. In MODE 2, 3, 4, 5, or 6, this Function does not have to be OPERABLE because the core is not producing sufficient power to be concerned about DNB conditions.
- d. Power Range Neutron Flux, P-10 The Power Range Neutron Flux, P-10 interlock is actuated at approximately 10% power, as (continued)
HBRSEP Unit No. 2 B 3.3-30 Revision No. 41
RPS Instrumentation B 3.3.1 BASES ACTIONS N.1 and N.2 (continued) a MODE where the LCO is no longer applicable. This trip Function does not have to be OPERABLE below the P-8 setpoint because other RPS trip Functions provide core protection below the P-8 setpoint. The 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowed to restore the channel to OPERABLE status or place in trip and the 4 additional hours allowed to reduce THERMAL POWER to below the P-8 setpoint are justified in Reference 7.
0.1 and 0.2 Condition 0 applies to the RCP Breaker Position (Single Loop) reactor trip Function. There is one breaker position device per RCP breaker. With one channel inoperable, the inoperable channel must be restored to OPERABLE status within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. If the channel cannot be restored to OPERABLE status within the 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, then THERMAL POWER must be reduced below the P-8 setpoint within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
This places the unit in a MODE where the LCO is no longer applicable. This Function does not have to be OPERABLE below the P-8 setpoint because other RPS Functions provide core protection below the P-8 setpoint. The 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowed to restore the channel to OPERABLE status and the 4 additional hours allowed to reduce THERMAL POWER to below the P-8 setpoint are justified in Reference 7.
P.1 and P.2 Condition P applies to Turbine Trip on Low Auto-Stop Oil Pressure or on Turbine Stop Valve Closure. With one channel inoperable, the inoperable channel must be placed in the trip condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. If placed in the tripped condition, this results in a partial trip condition requiring only one additional channel to initiate a reactor trip. If the channel cannot be restored to OPERABLE status or placed in the trip condition, then power must be reduced below the P-8 setpoint within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowed to place the inoperable channel in the tripped condition and the 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> allowed for reducing power are justified in-Reference 7.
(continued)
HBRSEP Unit No. 2 B 3.3-43 Revision No. 41
DC Sources- Operating B 3.8.4 B 3.8 ELECTRICAL POWER SYSTEMS B 3.8.4 DC Sources - Operating BASES BACKGROUND The station DC electrical power system provides the AC emergency power system with control power. It also provides both motive and control power to selected safety related equipment and preferred AC instrument bus power (via inverters). As required by HBRSEP Design Criteria (Ref.1),
the DC electrical power system is designed to have sufficient independence, redundancy, and testability to perform its safety functions, assuming a single active failure.
The 125 VDC electrical power system consists of two separate and redundant safety related DC electrical power subsystems (Train A and Train B). Each subsystem consists of one station 125 VDC battery, one primary (in service) battery charger for the battery, and all the associated control equipment and interconnecting cabling.
Two 100% capacity battery chargers are installed to support system operation. One charger is designated as the in service unit and the other is designated as the standby unit, which provides backup service in the event that the in service battery charger is out of service. If the standby battery charger is substituted for one of the in service battery chargers, then the requirements of redundancy between subsystems are maintained.
During normal operation, the 125 VDC load is powered from the battery chargers with the batteries floating on the system.
In case of loss of normal AC power to the battery charger, the battery charger trips and the DC load is automatically powered from the station batteries. The in service unit automatically restarts and the standby unit requires a manual restart when power is restored. The manual restart is required due to capacity margin associated with the EDG.
The Train A and Train B DC electrical power subsystems provide the control power for its associated AC power load group, 4.16 kV switchgear, and 480 V breakers. The DC electrical power subsystems also provide DC electrical power to the inverters, which in turn power four of the eight instrument buses.
(continued)
HBRSEP Unit No. 2 B 3.8-38 Revision No. 41
AC Sources-Operating B 3.8.1 B 3.8 ELECTRICAL POWER SYSTEMS B 3.8.1 AC Sources-Operating BASES BACKGROUND The unit AC Electrical Power Distribution System AC sources consist of the offsite power source (preferred power source),
and the onsite standby power sources (Train A and Train B diesel generators (DGs)). As required by HBRSEP design criteria (Ref. 1), the design of the AC electrical power system provides independence and redundancy to ensure an available source of power to the Engineered Safety Feature (ESF) systems.
The onsite emergency AC Distribution System is divided into redundant load groups (trains) so that the loss of any one group does not prevent the minimum safety functions from being performed. Each train has connections to the preferred offsite power source and a single DG.
Offsite power is supplied to the unit switchyard(s) from the transmission network by multiple transmission lines. The 480 V ESF bus E2 is normally powered from the 115 kV switchyard through the startup transformer, 4.160 kV bus 3 and station service transformer 2G. The 480 V ESF bus El is normally powered from the turbine generator through the unit auxiliary transformer, 4.160 kV buses 1 and 2 and station service transformer 2F.
A main generator lockout causes 4.160 kV buses 1 and 2 to be automatically transferred to the startup transformer which results in 480 V ESF bus El being supplied from the startup transformer.
Should a failure of the startup transformer occur, a spare startup transformer located onsite can be jumpered into service. During the time that the startup transformer is out of service, the unit auxiliary transformer is capable of supplying power to the onsite distribution system while powered from the turbine generator or by back-feeding the main transformer from the 230 kV switchyard.
The unit auxiliary transformer powered from the turbine generator is not a qualified offsite circuit. Prior to back-feeding the main transformer from the 230 kV switchyard, the generator must be disconnected from the main transformer by removing (continued)
HBRSEP Unit No. 2 B 3.8-1 Revision No. 42
10 CFR 55.40 Serial: RNP-RA/10-0098 JAN 13 2011 Mr. Richard S. Baldwin Senior Operations Engineer, Department of Reactor Safety U. S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 REACTOR OPERATOR AND SENIOR REACTOR OPERATORoINITIAL EXAMINATIONS
Dear Mr. Baldwin:
in accordance with the guidelines in Revision 9, Supplement 1, of NUREG- 1021, "Operator Licensing Examination Standards for Power Reactors," Carolina Power and Light Company, now doing business as Progress Energy Carolinas, Inc., is providing the enclosed operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-20 1, "Reference Material Guidelines For Initial Licensing Examinations," for examinations scheduled to begin the week of February 28, 2011.
As required by Attachment 1 of Revision 9, Supplement 1, of NUREG-1021, Section ES-201, "Examination Security and Integrity Considerations," please ensure that these examination materials are withheld from public disclosure until after the examinations are complete.
If you have any questions concerning this matter, please contact Mr. James Edwards at (843) 857-1558.
Sincerely, Chris Kamilaris Manager - Support Services.- Nuclear CSK/cac Enclosure Progress Energy Carolinas, Inc.
Robinson Nuclear Plant 3561 West Entrance Road Hartsville. SC 29550
,United States Nuclear Regulatory Commission Serial: RNP-RA/1O-0098 Page 2 of 2 c: Document Control Desk (w/o Enclosure)
NRC Resident Inspector, HBRSEP (w/o Enclosure)
Mr. L. A. Reyes, NRC, Region II (w/o Enclosure)
Ms. B. Mozafari, NRC, NRR (w/o Enclosure)
Mr. M. T. Widmann, NRC, Region II (w/o Enclosure)