Informational Copy of Operating License & Appendices. Techncial Specification Pages 3.3-29 Through 3.3-32 for Amendment 176
ML040570705
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/18/2004
From:
Progress Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
Download: ML040570705 (4)


Text

PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-l shall be OPERABLE.

APPLICABILITY: MODES1, 2, and 3.

ACTIONS

--NOTES------------------------------------

1. LCO 3.0.4 is not applicable.
2. Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETIONTIME A. ---------NOTE--------- A.1 Restore required 30 days Not applicable to channel to OPERABLE Functions 3, 4, 19, status.

22, 23, and 24.

One or more Functions with one required channel inoperable.

B. Required Action and B.l Initiate action in Immediately associated Completion accordance with Time of Condition A Specification 5.6.6 not met.

(continued)

HBRSEP Unit No. 2 3.3-29 Amendment No. 176

PAM Instrumentation 3.3.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETIONTIME C. ---------NOTE--------- c.1 Restore one channel 7 days Not applicable to to OPERABLE status.

hydrogen monitor channels.

One or more Functions with two required channels inoperable.

D.-NOTE--------- D.1 Restore required 7 days Only applicable to channel to OPERABLE Functions 3, 4, 19, status.

22, 23, and 24.

One or more Functions with one required channel inoperable.

E. Two hydrogen monitor E.l Restore one hydrogen 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> channels inoperable. monitor channel to OPERABLE status.

F. Required Action and F.1 Enter the Condition Immediately associated Completion referenced in Time of Condition C, Table 3.3.3-l for the D, or E not met. channel.

G. As required by G.l Be in MODE3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Required Action F.l and referenced in AND Table 3.3.3-l.

G.2 Be in MODE4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

HBRSEP Unit No. 2 3.3-30 Amendment No. 176

PAM Instrumentation 3.3.3 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETIONTIME I

H. As required by H.l Initiate action in Immediately Required Action F.l accordance with and referenced in Specification 5.6.6.

Table 3.3.3-l.

SURVEILLANCE REQUIREMENTS

-NOTE------------

SR 3.3.3.1 and SR 3.3.3.2 apply to each PAM instrumentation Function in Table 3.3.3-l; except Functions 9, 22, 23, and 24. SR 3.3.3.3 applies only to Functions 9, 22, 23, and 24.

SURVEILLANCE FREQUENCY SR 3.3.3.1 Perform CHANNEL CHECK for each required 31 days instrumentation channel that is normally energized.

SR 3.3.3.2 ---NOTE--------------------

Neutron detectors are excluded from CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION. 18 months SR 3.3.3.3 ---NOTE--------------------

Verification of setpoint not required.

Perform TADOT. 18 months HBRSEP Unit No. 2 3.3-31 Amendment No. 176

PAM Instrumentation 3.3.3 Table 3.3.3-l (page 1 of 1)

Post Accident Monitoring Instrumentation CONDITION REFERENCEDFROM FUNCTION REQUIRED CHANNELS REQUIRED ACTION F.l

1. Power Range Neutron Flux 2
2. Source Range Neutron Flux 2
3. Reactor Coolant System (RCS) Hot Leg Temperature 1 per loop
4. RCS Cold Leg Temperature 1 per loop
5. RCS Pressure (Wide Range) 2
6. Refueling Water Storage Tank Level 2
7. Containment Sump Water Level (Wide Range) 2
8. Containment Pressure (Wide Range) 2
9. Containment Isolation Valve Position 2 per penetration flow pat-,(a)(b)
10. Containment Area Radiation (High Range) 2
11. Hydrogen Monitors 2
12. Pressurizer Level 2
13. Steam Generator Water Level (Narrow Range) 2 per SG
14. Condensate Storage Tank Level 2
15. Core Exit Temperature-Quadrant 1 2(c)
16. Core Exit Temperature-Quadrant 2 2(c)
17. Core Exit Temperature-Quadrant 3 $1
18. Core Exit Temperature-Quadrant 4 $1
19. Auxiliary Feedwater Flow SD AFW Pump 1 per SG MD AFW Pump 1 per SG
20. Steam Generator Pressure 2 per SG
21. Containment Spray Additive Tank Level 2
22. PORV Position (Primary) 1
23. PORVBlock Valve Position (Primary) 1
24. Safety Valve Position (Primary) 1 (a) Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.

(b) Only one position indication channel is required for penetration flow paths with only one installed automatic containment isolation valve.

(c) A channel consists of one core exit thermocouple (CET).

HBRSEP Unit No. 2 3.3-32 Amendment No. 176