Informational Copy of Operating License & Appendices. Techncial Specification Pages 3.3-29 Through 3.3-32 for Amendment 176
ML040570705
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/18/2004
From:
Progress Energy Carolinas
To:
Office of Nuclear Reactor Regulation
References
Download: ML040570705 (4)


Text

PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 The PAM instrumentation for each Function in Table 3.3.3-l shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTIONS

--NOTES------------------------------------

1.

LCO 3.0.4 is not applicable.

2.

Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION A.


NOTE---------

Not applicable to Functions 3, 4, 19, 22, 23, and 24.

One or more Functions with one required channel inoperable.

B.

Required Action and associated Completion Time of Condition A

not met.

A.1 Restore required channel to OPERABLE status.

B.l Initiate action in accordance with Specification 5.6.6 HBRSEP Unit No. 2 3.3-29 COMPLETION TIME 30 days Immediately (continued)

Amendment No. 176

PAM Instrumentation 3.3.3 ACTIONS (continued)

CONDITION C.


NOTE---------

Not applicable to hydrogen monitor channels.

One or more Functions with two required channels inoperable.

D.-NOTE---------

Only applicable to Functions 3, 4, 19, 22, 23, and 24.

One or more Functions with one required channel inoperable.

E.

Two hydrogen monitor channels inoperable.

F.

Required Action and associated Completion Time of Condition C,

D, or E not met.

G.

As required by Required Action F.l and referenced in Table 3.3.3-l.

REQUIRED ACTION c.1 Restore one channel to OPERABLE status.

D.1 Restore required channel to OPERABLE status.

E.l Restore one hydrogen monitor channel to OPERABLE status.

F.1 Enter the Condition referenced in Table 3.3.3-l for the channel.

G.l Be in MODE 3.

AND G.2 Be in MODE 4.

COMPLETION TIME 7 days 7 days 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Immediately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours HBRSEP Unit No. 2 3.3-30 (continued)

Amendment No. 176

PAM Instrumentation 3.3.3 ACTIONS (continued)

CONDITION I

REQUIRED ACTION COMPLETION TIME H.

As required by H.l Initiate action in Required Action F.l accordance with Immediately and referenced in Table 3.3.3-l.

Specification 5.6.6.

SURVEILLANCE REQUIREMENTS

-NOTE------------

SR 3.3.3.1 and SR 3.3.3.2 apply to each PAM instrumentation Function in Table 3.3.3-l; except Functions 9, 22, 23, and 24.

SR 3.3.3.3 applies only to Functions 9, 22, 23, and 24.

SURVEILLANCE SR 3.3.3.1 Perform CHANNEL CHECK for each required instrumentation channel that is normally energized.

SR 3.3.3.2

---NOTE--------------------

Neutron detectors are excluded from CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION.

SR 3.3.3.3

---NOTE--------------------

Verification of setpoint not required.

Perform TADOT.

FREQUENCY 31 days 18 months 18 months HBRSEP Unit No. 2 3.3-31 Amendment No. 176

PAM Instrumentation 3.3.3 Table 3.3.3-l (page 1 of 1)

Post Accident Monitoring Instrumentation

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

CONDITION FUNCTION REFERENCED FROM REQUIRED CHANNELS REQUIRED ACTION F.l Power Range Neutron Flux 2

Source Range Neutron Flux 2

Reactor Coolant System (RCS) Hot Leg Temperature 1 per loop RCS Cold Leg Temperature 1 per loop RCS Pressure (Wide Range) 2 Refueling Water Storage Tank Level 2

Containment Sump Water Level (Wide Range) 2 Containment Pressure (Wide Range) 2 Containment Isolation Valve Position 2 per penetration flow pat-,(a)(b)

Containment Area Radiation (High Range) 2 Hydrogen Monitors 2

Pressurizer Level 2

Steam Generator Water Level (Narrow Range) 2 per SG Condensate Storage Tank Level 2

Core Exit Temperature-Quadrant 1

2(c)

Core Exit Temperature-Quadrant 2

2(c)

Core Exit Temperature-Quadrant 3

$1 Core Exit Temperature-Quadrant 4

$1 Auxiliary Feedwater Flow SD AFW Pump 1 per SG MD AFW Pump 1 per SG Steam Generator Pressure 2 per SG Containment Spray Additive Tank Level 2

PORV Position (Primary) 1 PORV Block Valve Position (Primary) 1 Safety Valve Position (Primary) 1 (a)

Not required for isolation valves whose associated penetration is isolated by at least one closed and deactivated automatic

valve, closed manual valve, blind
flange, or check valve with flow through the valve secured.

(b)

Only one position indication channel is required for penetration flow paths with only one installed automatic containment isolation valve.

(c)

A channel consists of one core exit thermocouple (CET).

HBRSEP Unit No. 2 3.3-32 Amendment No. 176