MONTHYEARRA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-01-0606 January 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-21-0057, Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical .2021-05-27027 May 2021 Independent Spent Fuel Storage Installation, Submittal of Updated Final Safety Analysis Report (Revision No. 29), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 27), Technical . RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses RA-17-0045, Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules.2017-10-12012 October 2017 Supplement: Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules. RNP-RA/17-0041, Transmittal of Technical Specifications Bases Revisions2017-05-23023 May 2017 Transmittal of Technical Specifications Bases Revisions RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process RA-16-0007, Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process2016-06-23023 June 2016 Duke Energy Carolinas, LLC, Application to Revise TS to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability Using the Consolidated Line Item Improvement Process ML16116A0332016-04-24024 April 2016 Application for Technical Specification Change to Adopt Technical Specifications Task Force (TSTF)-339, Relocate TS Parameters to the COLR Consistent with WCAP-14483, Revision 2 RA-16-0005, Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 52016-02-0101 February 2016 Supplement to Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5 RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-11-0202 November 2015 Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/15-0086, Transmittal of Technical Specifications Bases Revisions2015-10-0808 October 2015 Transmittal of Technical Specifications Bases Revisions RNP-RA/15-0077, Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication2015-09-0101 September 2015 Submittal of Technical Specifications Section 5.6.6, Post Accident Monitoring Instrumentation Report, 14-Day Report for the Inoperability of Pressurizer Power Operated Relief Valves Position Indication ML14188B0152014-06-20020 June 2014 Request for Technical Specifications (TS) Change Regarding Correction to TS 5.5.9.b.2, Steam Generator (SG) Program Accident-Induced Leakage Performance Criterion RNP-RA/14-0042, Transmittal of Technical Specifications Bases Revisions2014-04-29029 April 2014 Transmittal of Technical Specifications Bases Revisions RNP-RA/13-0077, License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications2013-09-30030 September 2013 License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications RNP-RA/13-0038, Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication2013-04-24024 April 2013 Replacement of Technical Specification Pages to Correct Typographical Errors in Request for TS Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication RNP-RA/12-0066, Transmittal of Technical Specifications Bases Revisions2012-09-17017 September 2012 Transmittal of Technical Specifications Bases Revisions RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process RNP-RA/11-0095, Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process2012-02-10010 February 2012 Request for Technical Specifications Change Regarding Missed Surveillance Using the Consolidated Line Item Improvement Process RNP-RA/11-0002, Transmittal of Technical Specifications Bases Revisions2011-01-12012 January 2011 Transmittal of Technical Specifications Bases Revisions RNP-RA/10-0001, Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation2010-03-0505 March 2010 Request for Technical Specification Changes to Section 3.3.2, Engineered Safety Feature, Actuation System (ESFAS) Instrumentation, and Section 3.3.6, Containment Ventilation Isolation Instrumentation ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 RNP-RA/08-0006, Request for Technical Specifications Changes Related to Control Room Habitability - Supplement2008-04-0101 April 2008 Request for Technical Specifications Changes Related to Control Room Habitability - Supplement RNP-RA/08-0016, Supplement to the Request for Administrative Changes to the Technical Specifications2008-02-0404 February 2008 Supplement to the Request for Administrative Changes to the Technical Specifications RNP-RA/07-0126, Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System2007-11-29029 November 2007 Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System RNP-RA/07-0073, Request for Administrative Changes to the Operating License and Technical Specifications2007-11-19019 November 2007 Request for Administrative Changes to the Operating License and Technical Specifications RNP-RA/07-0124, Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication2007-11-15015 November 2007 Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication RNP-RA/07-0108, Transmittal of Technical Specifications Bases Revisions2007-10-30030 October 2007 Transmittal of Technical Specifications Bases Revisions RNP-RA/07-0056, Request for Technical Specifications Changes Related to Control Room Habitability2007-07-17017 July 2007 Request for Technical Specifications Changes Related to Control Room Habitability RNP-RA/06-0095, Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring2007-02-0202 February 2007 Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring ML0702404832007-01-19019 January 2007 H. B. Robinson, Unit 2 - Resubmission of Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria ML0634104702006-11-29029 November 2006 Technical Specification Pages Re Core Operating Limit Report References, ML0628900812006-10-12012 October 2006 Submittal of H. B. Robinson, Unit 2 - Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/06-0033, Transmittal of Technical Specifications Bases Revisions2006-04-0606 April 2006 Transmittal of Technical Specifications Bases Revisions RNP-RA/05-0107, Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass2005-11-30030 November 2005 Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass 2023-05-25
[Table view] Category:Amendment
MONTHYEARRA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core.2022-09-21021 September 2022 License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer)2022-04-28028 April 2022 Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) RA-19-0183, License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.32019-07-29029 July 2019 License Amendment Request to Add New Feedwater Bypass Valves to Technical Specification 3.7.3 RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RNP-RA/18-0044, Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transform2018-07-11011 July 2018 Supplement to License Amendment Request Proposing to Add a Qualified Offsite Circuit to Technical Specification 3.8.1, AC Sources - Operating and the Use of Load Tap Changers in the Automatic Mode of Operation on the Startup Transformers RA-18-0001, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RA-17-0022, Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses2017-10-19019 October 2017 Technical Specification Changes to Support Self-Performance of Core Reload Design and Safety Analyses RNP-RA/17-0034, Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544)2017-05-0202 May 2017 Modification of Request for Technical Specification Change to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles (MF9544) RNP-RA/15-0083, Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits2015-11-0202 November 2015 Submits Request for Technical Specification Change to Reactor Coolant System Pressure and Temperature Limits RNP-RA/13-0077, License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications2013-09-30030 September 2013 License Amendment Request for Technical Specification(Ts) Change to Use NRC-Approved TSTF-491, Revision 2, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications RNP-RA/12-0033, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process2012-08-0606 August 2012 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process ML0828301372008-10-0606 October 2008 License Amendment Request to Eliminate Work Hour Controls to Support Compliance with Revised 10 CFR 26 RNP-RA/08-0006, Request for Technical Specifications Changes Related to Control Room Habitability - Supplement2008-04-0101 April 2008 Request for Technical Specifications Changes Related to Control Room Habitability - Supplement RNP-RA/08-0016, Supplement to the Request for Administrative Changes to the Technical Specifications2008-02-0404 February 2008 Supplement to the Request for Administrative Changes to the Technical Specifications RNP-RA/07-0126, Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System2007-11-29029 November 2007 Request for Technical Specifications Change to Section 3.6.8 Isolation Valve Seal Water System RNP-RA/07-0073, Request for Administrative Changes to the Operating License and Technical Specifications2007-11-19019 November 2007 Request for Administrative Changes to the Operating License and Technical Specifications RNP-RA/07-0124, Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication2007-11-15015 November 2007 Request for Technical Specifications Change to Section 3.1.7 Rod Position Indication RNP-RA/07-0056, Request for Technical Specifications Changes Related to Control Room Habitability2007-07-17017 July 2007 Request for Technical Specifications Changes Related to Control Room Habitability RNP-RA/06-0095, Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring2007-02-0202 February 2007 Request for Technical Specifications Change to Section 3.3.3, Post Accident Monitoring ML0634104702006-11-29029 November 2006 Technical Specification Pages Re Core Operating Limit Report References, ML0628900812006-10-12012 October 2006 Submittal of H. B. Robinson, Unit 2 - Request for Technical Specifications Change Regarding Steam Generator Alternate Repair Criteria RNP-RA/05-0107, Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass2005-11-30030 November 2005 Request for Technical Specifications Change to Section 3.8.1 for the Diesel Generator Automatic Trips Bypass ML0522003672005-08-0202 August 2005 Technical Specification Pages Re Bases Control Program (Tac No. MC3636) ML0511102212005-04-19019 April 2005 Enclosure, Amendment No. 204 on TS Revisions to Eliminate Monthly Operating and Annual Occupational Radiation Exposure Report Requirements (Tac No. MC5129) RNP-RA/05-0005, Request for Technical Specifications Change to Section 3.8.4, DC Sources - Operating2005-02-14014 February 2005 Request for Technical Specifications Change to Section 3.8.4, DC Sources - Operating ML0405707022004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.3-20 Through 3.3-28 for Amendment 176 ML0405706622004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 1.3-1 Through 1.3-13 for Amendment 176 ML0405706652004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 1.1-1 Through 1.2-3 for Amendment 176 ML0405706702004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 1.4-1 Through 1.4-4 for Amendment 176 ML0405706752004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Operating License Effective Pages Through Technical Specifications Effictive Pages ML0405706832004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Table of Contents for Amendment 176 ML0405706872004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 2.0-1 Through 2.0-2 for Amendment 176 ML0405706912004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.0.1 Through 3.0.5 for Amendment 176 ML0405706942004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.1-1 Through 3.1-21 for Amendment 176 ML0405706962004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.2-1 Through 3.2-14 for Amendment 176 ML0405706992004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.3-1 Through 3.3-19 for Amendment 176 ML0407804992004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.6-1 Through 3.6-21 for Amendment 176 ML0407805072004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 5.0-1 Through 5.0-34 for Amendment 176 ML0407805052004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 4.0-1 for Amendment 176 Through 4.0-3 for Amendment 198 ML0407805042004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.9-1 Through 3.0-12 for Amendment 176 ML0407805022004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.8-1 for Amendment 176 Through 3.8-36 for Amendment 190 ML0407805002004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.7-1 Through 3.7-33 for Amendment 176 ML0405707052004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Techncial Specification Pages 3.3-29 Through 3.3-32 for Amendment 176 ML0407804962004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.5-1 Through 3.5-11 for Amendment 176 ML0407804942004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.4-1 Through 3.4-28 for Amendment 176 ML0407804912004-02-18018 February 2004 Informational Copy of Operating License & Appendices. Technical Specification Pages 3.4-29 Through 3.4-51 for Amendment 176 2023-02-16
[Table view] |
Text
Boron Concentration 3.9.1 3.9 REFUELING OPERATIONS 3.9.1 Boron Concentration LCO 3.9.1 Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained within the limit specified in the COLR.
APPLICABILITY: MODE6.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. Boron concentration A.1 Suspend CORE Immediate1y not within limit. ALTERATIONS.
A.2 Suspend positive Immediate1 y reactivity additions.
AND A.3 Initiate action to Immediately restore boron concentration to within limit.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.1.1 Verify boron concentration is within the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit specified in COLR.
HBRSEP Unit No. 2 3.9-l Amendment No. 176
Nuclear Instrumentation 3.9.2 3.9 REFUELINGOPERATIONS 3.9.2 Nuclear Instrumentation LCO 3.9.2 Two source range neutron flux monitors shall be OPERABLE.
APPLICABILITY: MODE6.
CONDITION REQUIRED ACTION COMPLETION TIME A. One required source A.1 Verify one Post 15 minutes range neutron flux Accident Monitor monitor inoperable (PAM) source range neutron flux monitor provides indication in the Control Room.
A.2 Log indicated PAM 30 minutes source range neutron monitor count rate.
Once per 30 minutes thereafter (continued)
HBRSEPUnit No. 2 3.9-2 AmendmentNo. W6.3BO.190 I
Nuclear Instrument;t,i90r2i CONDITION REQUIRED ACTION COMPLETION TIME B. Required Actions and 3.1 Suspend CORE immediately Completion Times of ALTERATIONS.
Condition A not met.
3.2 Suspend operations [mmediately that would cause introduction into the RCS, coolant with boron concentration less than required to meet boron concentration of LCO 3.9.1.
C. Two required source :.1 Initiate action to Immediately range neutron flux restore one source monitors inoperable. range neutron flux monitor to OPERABLE status.
Y!D C.2 Suspend CORE Immediately ALTERATIONS.
lun c.3 Suspend positive Immediately reactivity additions.
c.4 Perform SR 3.9.1.1. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter HBRSEPUnit No. 2 3.9-3 AmendmentNo. 5'%,?80,190
Nuclear 1nstrument;t;o; SURVEILLANCE FREQUENCY SR 3.9.2.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.9.2.2 _____________------NOTE--------------------
Neutron detectors are excluded from CHANNEL CALIBRATION.
Perform CHANNEL CALIBRATION. 18 months HBRSEPUnit No. 2 3.9-3a AmendmentNo. 35%,%30,190 1
Containment Penetrations 3.9.3 3.9 REFUELING OPERATIONS 3.9.3 Containment Penetrations LCO 3.9.3 The containment penetrations shall be in the following status:
- a. The equipment hatch closed and held in place by four bolts;
- b. One door in the air lock closed; and C. Each penetration providing direct access from the containment atmosphere to the outside atmosphere either:
- 1. closed by a manual or automatic isolation valve, blind flange, or equivalent, or
- 2. capable of being closed by an OPERABLE Containment Ventilation Isolation System.
APPLICABILITY: During movement of recently irradiated fuel assemblies within containment.
ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME A. One or more containment A.1 Suspend movement of Immediately penetrations not in recently irradiated required status. fuel assemblies within containment.
HBRSEP Unit No. 2 3.9-4 Amendment No. 4% 195
Containment Penetrations 3.9.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY I
SR 3.9.3.1 Verify each required containment 7 days penetration is in the required status.
SR 3.9.3.2 Verify each required containment 18 months ventilation valve actuates to the isolation position on an actual or simulated actuation signal.
HBRSEP Unit No. 2 3.9-5 Amendment No. 176
RHR and Coolant Circulation-High Water Level 3.9.4 3.9 REFUELINGOPERATIONS 3.9.4 Residual Heat Removal (RHR) and Coolant Circulation-High Water Level LCO 3.9.4 One RHRtrain shall be OPERABLE and in operation.
________________________ ----NOTE----------------------------
The required RHRtrain may be removed from operation for
< 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in any 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would cause introduction into the Reactor Coolant System, coolant with boron concentration less than that required to meet the minimum required boron concentration of LCO 3.9.1.
APPLICABILITY: MODE6 with the water level 2 23 ft above the top of reactor vessel flange.
CONDITION REQUIRED ACTION COMPLETION TIME A. RHRtrain requirements 1.1 Suspend operations [mmediately not met. that would cause introduction into the RCS, coolant with boron concentration less than required to meet boron concentration of LCO 3.9.1.
AND A.2 Suspend loading Immediately irradiated fuel assemblies in the core.
(continued)
HBRSEPUnit No. 2 3.9-6 AmendmentNo. %.190
RHRand Coolant Circulation-High Water Level 3.9.4 NS (-4)
CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.3 Initiate action to Immediately satisfy RHRtrain requirements.
AND A.4 Close all containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetrations providing direct access from containment atmosphere to outside atmosphere.
SR 3.9.4.1 Verify one RHRtrain is in operation 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> HBRSEPUnit No. 2 3.9-7 AmendmentNo. ?%190 I
RHR and Coolant Circulation-Low Water Level 3.9.5 3.9 REFUELING OPERATIONS 3.9.5 Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level LCO 3.9.5 Two RHRtrains shall be OPERABLE,and one RHRtrain shall be in operation.
APPLICABILITY: MODE6 with the water level < 23 ft above the top of reactor vessel flange.
CONDITION REQUIRED ACTION COMPLETION TIME A. Less than the required \.l Initiate action to :mmediately number of RHRtrains restore required RHR OPERABLE. trains to OPERABLE status.
4.2 Initiate action to Immediately establish 2 23 ft of water above the top of reactor vessel flange.
B. No RHRtra in in 8.1 Suspend operations Immediately operat ion. that would cause introduction into the RCS, coolant with boron concentration less than required to meet boron
- rp;r;tion of EM (continued)
HBRSEPUnit No. 2 3.9-8 AmendmentNo. I?%.190
RHR and Coolant Circulation-Low Water Level 3.9.5 ACTIONS CONDITION REQUIRED ACTION COMPLETIONTIME I
B. (continued) B.2 Initiate action to Immediate1y restore one RHR train to operation.
B.3 Close all containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetrations providing direct access from containment atmosphere to outside atmosphere.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.5.1 Verify one RHR train is in operation. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.9.5.2 Verify correct breaker alignment and 7 days indicated power available to the required RHR pump that is not in operation.
HBRSEP Unit No. 2 3.9-9 Amendment No. 176
Refueling Cavity Water Level 3.9.6 3.9 REFUELING OPERATIONS 3.9.6 Refueling Cavity Water Level LCO 3.9.6 Refueling cavity water level shall be maintained 2 23 ft above the top of reactor vessel flange.
APPLICABILITY: During movement of irradiated fuel assemblies within containment.
ACTIONS CONDITION IREQUIRED AcTIoN COMPLETIONTIME A. Refueling cavity water A.1 Suspend movement of Immedi ate1 y level not within irradiated fuel limit. assemblies within containment.
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.6.1 Verify refueling cavity water level is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 2 23 ft above the top of reactor vessel flange.
HBRSEP Unit No. 2 3.9-10 Amendment No. J76 195
Containment Purge Filter System 3.9.7 3.9 REFUELING OPERATIONS 3.9.7 Containment Purge Filter System LCO 3.9.7 The Containment Purge Filter System shall be OPERABLE and operating.
APPLICABILITY: During movement of recently irradiated fuel assemblies in containment.
ACTIONS CONDITION RE:QUIREDACTION COMPLETIONTIME A. Containment Purge A.1 Close each Immedi ate1 y Filter System penetration providing inoperable. direct access from the containment OR aitmosphere to the outside atmosphere by Containment Purge 21 manual or automatic Filter System not in valve, blind flange, operation. or equivalent method.
OR A.2 Suspend movement of Immedi ate1 y recently irradiated f'uel assemblies within containment.
HBRSEP Unit No. 2 3.941 Amendment No. 4% 195
Containment Purge Filter System 3.9.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.7.1 Verify relative humidity of containment 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> atmosphere to be processed by the Containment Purge Filter System is < 70%.
SR 3.9.7.2 Verify the Containment Purge Filter System 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> is in operation and maintaining containment pressure negative relative to the adjacent auxiliary building areas.
SR 3.9.7.3 Perform required Containment Purge Filter In accordance System filter testing in accordance with with the VFTP the Ventilation Filter Testing Program (VFTP).
HBRSEP Unit No. 2 3.9-12 Amendment No. 176