Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss Nrc'S Assessment of the Safety Performance of the Beaver Valley Nuclear Power Station for Calendar Year 2003
ML040690308
Person / Time
Site: Beaver Valley
Issue date: 03/09/2004
From: Eselgroth P
NRC/RGN-I/DRP/PB7
To:
Shared Package
ML040640310 List:
References
MN-04-06
Download: ML040690308 (3)


Text

MN No. 04-06 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 9, 2004 Licensee: FirstEnergy Nuclear Operating Company (FENOC)

Facility: Beaver Valley Nuclear Power Station, Units 1 and 2 Docket Nos.: 50-334, 50-412 Date/Time: March 25, 2004 at 1:00 p.m.

Location: Beaver Valley Power Station Emergency Response Facility Shippingport, PA 15077

Purpose:

The NRC requested an Annual Assessment Meeting with FENOC to discuss NRCs assessment of the safety performance of the Beaver Valley Nuclear Power Station for calendar year 2003. NRCs assessment is documented in a letter dated March 2, 2004.

Attendees:*

NRC: P. Eselgroth, Chief-Projects Branch 7 P. Cataldo, Senior Resident Inspector G. Smith, Resident Inspector T. Colburn, Project Manager, NRR Licensee: W. Pearce, Vice President J. Lash, Plant General Manager T. Cosgrove, Director, Nuclear Engineering/Projects V. Kaminskas, Director, Nuclear Maintenance R. Mende, Director, Work Management Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRCs assessment letter and meeting agenda can be found in the ADAMS Meeting package, Accession Number is ML040640310. ADAMS is accessible for the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs Annual Assessment process and the safety performance of Beaver Valley can be found on the NRC web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

2 Meeting

Contact:

Peter W. Eselgroth, Chief - Projects Branch 7 (610) 337-5234 E-mail: pwe@nrc.gov.

C Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 22, 2004, via telephone to the NRC meeting contact.

Approved by: /RA/

Peter W. Eselgroth, Chief Projects Branch 7 Division of Reactor Projects Distribution:

L. William Pearce, Site Vice President First Energy Nuclear Operating Company R. Janati, Chief, Division of Nuclear Safety, Commonwealth of Pennsylvania C. OClaire, State Liaison to the NRC, State of Ohio D. Hill, Chief Radiological Health Program, State of West Virginia Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (with concurrences)

3 Distribution: (Via E-Mail)

Executive Director for Operations, OEDO, (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO, (RIDSEDOMAILCENTER)

M. Markley, OEDO, (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR, (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, (NRR/ADPR), (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR, (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR, (RIDSNRRDIPM)

Asst General Counsel Materials Litigation and Enforcement, OGC, (RIDSOGCMAILCENTER)

C. Holden, Director, DLPM R. Laufer, NRR T. Colburn, PM, NRR R. Guzman, Backup PM W. Lanning, Director, DRS K. Farrar, Regional Counsel D. Screnci, Sr. Public Affairs Officer, RI N. Sheehan, Public Affairs Officer, RI R. Bores, State Liaison Officer, RI P. Eselgroth, DRP, RI R. Barkley, DRP, RI P. Cataldo, SRI, Beaver Valley PMNS WEBWORK DOCUMENT NAME: C:\ORPCheckout\FileNET\ML040690308.wpd After declaring this document An Official Agency Record it will be released to the Public.