Summary of Annual Assessment Meeting with First Energy Nuclear Operating Company (FENOC)
ML040930330
Person / Time
Site: Beaver Valley
Issue date: 04/02/2004
From: Eselgroth P
NRC/RGN-I/DRP/PB7
To:
Shared Package
ML040640310 List:
References
Download: ML040930330 (2)


Text

April 2, 2004 MEETING

SUMMARY

LICENSEE: FIRST ENERGY NUCLEAR OPERATING COMPANY (FENOC)

FACILITY: BEAVER VALLEY, UNITS 1 & 2

SUBJECT:

SUMMARY

OF MARCH 25, 2004, ANNUAL ASSESSMENT MEETING WITH FENOC On March 25, 2004, at 1:00 p.m., an Annual Assessment Meeting was conducted at the Beaver Valley Emergency Response Facility, Shippingport, PA, between the Nuclear Regulatory Commission (NRC) and First Energy Nuclear Operating Company (FENOC). The NRC requested the meeting with FENOC management to discuss NRCs assessment of the safety performance of the Beaver Valley Nuclear Power Station for calendar year 2003.

The NRC presented and discussed its assessment of the safety performance of Beaver Valley Units 1 & 2 for the period between January 1 through December 31, 2003, as documented in our letter dated March 2, 2004. The NRC presentation included background on both plants, performance assessment results, an overview of calendar year 2004 planned inspections and oversight, and a discussion of general NRC issues. As part of this regulatory performance meeting, FENOC presented an overview of their performance at both facilities.

Local officials and the press observed this public meeting and were offered the opportunity to communicate with the NRC regarding FENOCs performance and the role of the agency in ensuring safe plant operations at the end of the meeting.

Sincerely,

/RA by Richard S. Barkley, Acting For/

Peter Eselgroth, Chief Projects Branch 7 Division of Reactor Projects

2 DOCUMENT NAME: G:\BRANCH 7\+++Beaver Valley\ROP-4 EOC\ROP4 Beaver Valley Annual Assessment Meeting Summary.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy 2)),&( 5,'53 5,'53 5,'53 5,'53

1$0( 5%DUNOH\56% 3HVHOJURWK5 6%)25

'$7( 2   

2)),&,$/5(&25'&23<