ML040160671

From kanterella
Jump to navigation Jump to search
Initial Submittal of the Walkthrough Jpms for the Prairie Island Initial Examination - Sep 2003
ML040160671
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/29/2003
From: Cooper P
Nuclear Management Co
To:
NRC/RGN-III
References
50-282/03-301, 50-306/03-301
Download: ML040160671 (181)


Text

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Prairie Island TASK TITLE: RESPONSE TO CONTAINMENT ISOLATION FAILURE JPM NUMBER: E0-29SF-1 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS: CRO 3010010601 K/A NUMBERS: 013A4.01 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path /

YES Faulted:

TASK APPLICABILITY: SRO, RO Additional signatures may be added as needed.

Developed by: Mark Loosbrock 6/26/03 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 1 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

E0-29SF-1 RESPONSE TO CONTAINMENT ISOLATION FAILURE, Rev. 0 JPM Number: E0-29SF-1 JPM

Title:

RESPONSE TO CONTAINMENT ISOLATION FAILURE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 2 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

E0-29SF-1 RESPONSE TO CONTAINMENT ISOLATION FAILURE, Rev. 0 JPM BRIEFING/TURNOVER This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

Review PITC-90, JPM Briefing Checklist with trainee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 is operating at 100% power with no equipment out of service.
  • Unit 1 has just experienced an SI.
  • Verification of immediate actions of 1E-0 are complete.

INITIATING CUES (IF APPLICABLE):

  • The Unit 1 SS has directed you to perform Attachment L.

Page 3 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

E0-29SF-1 RESPONSE TO CONTAINMENT ISOLATION FAILURE, Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: None General

References:

1E-0 Attachment L Auto Actions Guide Task Standards: Perform Attachment L. Identify and manually actuate/close Containment Isolation valves from the control room.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: SI NOT READY lights - NOT LIT Critical N (SEQ-1)

Standard: Verifies SI NOT READY lights are not lit Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: SI ACTIVE lights - lit for plant conditions Critical N (SEQ-2)

Standard: Verifies SI ACTIVE Lights are LIT Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 4 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

E0-29SF-1 RESPONSE TO CONTAINMENT ISOLATION FAILURE, Rev. 0 Performance Step: Containment Isolation lights - lit for plant conditions.

Critical Y (SEQ-3)

  • If NOT, then manually or locally align components as necessary.

Standard: Identifies a CI train has failed to actuate and:

  • Actuates containment Isolation using either control board switch Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Containment Isolation lights - lit for plant conditions.

Critical Y (SEQ-4)

  • If NOT, then manually or locally align components as necessary.

Standard: Identifies letdown CI valve CV-31326 failed to close and attempts manual closure.

Evaluator Note: Valve may be closed by closing letdown isolation valves.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When the candidate manually initiates CI and attempts to close CV-31326, inform the candidate that, "this JPM is complete."

Stop Time:

Page 5 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

E0-29SF-1, RESPONSE TO CONTAINMENT ISOLATION FAILURE, Rev. 0 SIMULATOR SET UP: (Modify table as necessary)

Simulator Setup Instructions:

  • Setup the simulator to IC-10 per normal checklist.
  • Place the simulator in RUN.
  • Actuate safety injection using either control board switch.
  • WHEN the safeguards buses have completed load rejection/restoration, THEN acknowledge alarms and place the simulator in FREEZE.
  • Provide the examinee with the turnover information.
  • WHEN the examinee is ready to begin, THEN place the simulator in RUN.

Relative Type Code Severity or Event Description Order Value Trigger 0 Malfunction RP05 Train A CI Fails to Actuate 0 OVRD DI 46171 O open ON CV-31326 fails to close Page 6 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

E0-29SF-1, Rev. 0 TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 has just experienced an SI.
  • Verification of immediate actions of 1E-0 are complete.

INITIATING CUES (IF APPLICABLE):

  • The Unit 1 SS has directed you to perform Attachment L.

Page 7 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

EO-30SF-1, Respond to Stuck Open Pressurizer Spray Valve ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

1. Are all items on the signature page filled in correctly?
2. Has the JPM been reviewed and validated by SMEs?
3. Can the required conditions for the JPM be appropriately established in the simulator if required?
4. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
5. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
6. Has the completion time been established based on validation data or incumbent experience?
7. If the task is time critical, is the time critical portion based upon actual task performance requirements?
8. Is the Licensee level appropriate for the task being evaluated if required?
9. Is the K/A appropriate to the task and to the licensee level if required?
10. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

11. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
12. Are all references identified, current, accurate, and available to the trainee?
13. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Page 8 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

EO-30SF-1, Respond to Stuck Open Pressurizer Spray Valve SIMULATOR JPM GUIDE EO-30SF-1 Respond to stuck open pressurizer spray valve 6/04/03 JPM NUMBER/TITLE DATE Approved by:

TRAINING MANAGEMENT Approved by:

PROGRAM OWNER EVALUATION LOCATION: PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD: PERFORM SIMULATE AVG. COMPLETION TIME: 3 AVG. TIME FOR THIS JPM IN MINUTES TIME CRITICAL TASK: YES NO MAX. COMPLETION TIME: MAX. TIME ALLOWED FOR JPM IN MINUTES N/A FOR NON-TIME CRITICAL JPM LICENSEE LEVEL: SRO RO OTHER: list applicable positions as needed TASK NUMBER:

TASK NUMBER TASK TITLE:

TASK TITLE TASK TYPE: INITIAL CONTINUING K/A

REFERENCE:

010 A2.02 K/A REFERENCE PLANT SYSTEM: Pressurizer Pressure Control 010 PLANT SYSTEM NAME/NUMBER CRITICAL STEPS:

CRITICAL (C) STEPS SEQUENCE CRITICAL (S) STEPS TIME (T) CRITICAL STEPS TOOLS & EQUIPMENT: LIST SPECIAL TOOLS REQUIRED TO PERFORM JPM

REFERENCES:

LIST REFERENCES USED TO PERFORM JPM Page 9 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

EO-30SF-1, Respond to Stuck Open Pressurizer Spray Valve Note: The follow Simulator JPM and simulator Setup, Malfunctions, Override, Remote Function sections are only applicable when simulator is used.

SIMUALTOR JPM IF the Operator is present when setting up for the JPM, THEN read the following:

PLEASE STANDBY WHILE WE ESTABLISH CONDITIONS FOR THE NEXT JPM.

Ensure the simulator is clear of all unauthorized individuals and conducive to conducting the examination.

Ensure all procedures and other materials necessary to conduct the JPM examination are in their proper locations Page 10 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

EO-30SF-1, Respond to Stuck Open Pressurizer Spray Valve SIMULATOR SET UP: IC-10 Note: Manually open spray valve CV-31225 to 65% before inserting malf, then return controller to auto.

Output dial to 0 EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRITPTION SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

No. TITLE RC24B Pzr spray mech stuck open SIMULATOR OVERRIDES:

TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION AO- Controller output 100 4304103:

M2 SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNTION TITLE VALUE RAMP FUNCTION No.

GO TO NEXT PAGE Page 11 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

EO-30SF-1 READ THE FOLLOWING INSTRUCTIONS TO THE OPERATOR:

THIS TASK IS NOT TIME CRITICAL THE TASK CONDITIONS ARE:

THE STEPS IN THIS JPM SHOULD BE:

INITIATING CUE: The Reactor has tripped, Perform E-0 step 8 and Respond to Plant Conditions INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK:

DO YOU HAVE ANY QUESTIONS BEFORE WE BEGIN?

Answer any questions the operator may have, then read the following to initiate the JPM:

IF THERE ARE NO FURTHER QUESTIONS THEN LETS BEGIN GO TO NEXT PAGE Page 12 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

INSTRUCTOR ACTIONS:

If required take the simulator out of freeze. (Only applicable if using simulator.)

Use the JPM evaluation form to mark the Operators performance as the task is being performed.

Follow the prescripted format for implementing the JPM evaluation.

Provide cues in accordance with the JPM.

Take notes to support the results of the pass/fail grade.

For unsatisfactory grades, documentation must be noted in the comments section of the JPM evaluation form.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 13 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

LOG START TIME:

NOTE: Critical steps are denoted with a C. Failure to meet the standard for this step constitutes failure.

PERFORMANCE STEP: Check Pressurizer PORVs and Spray Valves CRITICAL: C STANDARD: Checks Pressurizer PORVs and Spray Valves closed

a. Checks pressurizer PORVs closed
b. Checks pressurizer Spray valves closed

- verifies RCS pressure is less than 2260 PSIG

- determines one spray valve is open and attempts to close it.

- determines spray valve will not close and stops both RCPs PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

TEMINATING CUE: After examinee stops both RCPs, inform examinee the JPM is complete.

LOG STOP TIME:

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 14 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

When the operator competes the JPM, then read the following:

THAT COMPLETES THIS PORTION OF THE JPM.

Ask any required follow-up questions and note the questions and answers in the JPM evaluation comments section.

When follow-up questions are complete, then read the following:

THAT COMPLETES THIS JPM.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 15 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

VERIFICATION OF COMPLETION JPM NUMBER: __________________________________

JPM TITLE: ____________________________________________________________

OPERATOR:_______________________EVALUATOR:_________________________

VERIFICATION STATEMENT YES NO N/A Were all critical steps performed correctly?

If the JPM was time critical, Then was the JPM completed in the designated time?

If the JPM was not time critical, Then was acceptable progress made in performing the task?

Was the task standard met?

If any of the above questions were answered NO, then this JPM must be evaluated as unsatisfactory.

LICENSEE:

SRO RO SRO CERTIFICATION OTHER: list applicable positions as needed RESULTS:

SATISFACTORY UNSATISFACTORY COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE: ______________________________________

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 16 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST MUT BE PERFORMED UPON INITIAL VALIDATION AND REVALIDATION PRIOR TO USE.

REVIEW STATEMENTS YES NO

1. All items on page one of this procedure are filled in correctly?
2. The JPM as been reviewed and validated by SMEs?
3. The required conditions for the JPM can be appropriately established in the simulator?
4. The performance steps accurately reflect operator actions in accordance with plant procedures?
5. The standard for each performance item is specific as to what controls, indications and ranges are required to evaluate if the operator properly performed the step?
6. The average completion time has been established based on validation data or incumbent experience?
7. Establishing the task as time critical is based on actual task performance requirements?
8. The maximum time requirement has been established based on actual task performance requirements or if a maximum time requirement does not apply, then it has been based on reasonable progress in completing the task?

9.Licensee level is appropriate for the task being evaluated?

10. The K/A is appropriate to the task and to the licensee level?
11. Critical steps have been identified and typed (C, S, T) appropriately?
12. All special tools and equipment needed to perform the task have been identified and are available to the trainee?
13. All references are identified, current and accurate, and available to the trainee?
14. All required cues (as can be anticipated) have been identified for the evaluator to assist task completion.

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date SIMULATOR JPM GUIDE JPM NUMBER/TITLE DATE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 17 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Approved by:

TRAINING MANAGEMENT Approved by:

PROGRAM OWNER EVALUATION LOCATION: PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD: PERFORM SIMULATE AVG. COMPLETION TIME: AVG. TIME FOR THIS JPM IN MINUTES TIME CRITICAL TASK: YES NO MAX. COMPLETION TIME: MAX. TIME ALLOWED FOR JPM IN MINUTES N/A FOR NON-TIME CRITICAL JPM LICENSEE LEVEL: SRO RO OTHER: list applicable positions as needed TASK NUMBER:

TASK NUMBER TASK TITLE:

TASK TITLE TASK TYPE: INITIAL CONTINUING K/A

REFERENCE:

K/A REFERENCE PLANT SYSTEM:

PLANT SYSTEM NAME/NUMBER CRITICAL STEPS:

CRITICAL (C) STEPS SEQUENCE CRITICAL (S) STEPS TIME (T) CRITICAL STEPS TOOLS & EQUIPMENT: LIST SPECIAL TOOLS REQUIRED TO PERFORM JPM

REFERENCES:

LIST REFERENCES USED TO PERFORM JPM Note: The follow Simulator JPM and simulator Setup, Malfunctions, Override, Remote Function sections are only applicable when simulator is used.

SIMUALTOR JPM IF the Operator is present when setting up for the JPM, THEN read the following:

PLEASE STANDBY WHILE WE ESTABLISH CONDITIONS FOR THE NEXT JPM.

Ensure the simulator is clear of all unauthorized individuals and conducive to conducting the examination.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 18 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Ensure all procedures and other materials necessary to conduct the JPM examination are in their proper locations Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 19 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP:

EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRITPTION SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

No. TITLE SIMULATOR OVERRIDES:

TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNTION TITLE VALUE RAMP FUNCTION No.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 20 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

READ THE FOLLOWING INSTRUCTIONS TO THE OPERATOR:

THIS TASK IS/ IS NOT TIME CRITICAL THE TASK CONDITIONS ARE:

THE STEPS IN THIS JPM SHOULD BE:

INITIATING CUE:

INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK:

DO YOU HAVE ANY QUESTIONS BEFORE WE BEGIN?

Answer any questions the operator may have, then read the following to initiate the JPM:

IF THERE ARE NO FURTHER QUESTIONS THEN LETS BEGIN GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 21 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

INSTRUCTOR ACTIONS:

If required take the simulator out of freeze. (Only applicable if using simulator.)

Use the JPM evaluation form to mark the Operators performance as the task is being performed.

Follow the prescripted format for implementing the JPM evaluation.

Provide cues in accordance with the JPM.

Take notes to support the results of the pass/fail grade.

For unsatisfactory grades, documentation must be noted in the comments section of the JPM evaluation form.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 22 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

LOG START TIME:

NOTE: Critical steps are denoted with a C. Failure to meet the standard for this step constitutes failure.

PERFORMANCE STEP:

CRITICAL: C STANDARD:

PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

PERFORMANCE STEP:

CRITICAL: C STANDARD:

PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

PERFORMANCE STEP:

CRITICAL: C STANDARD:

PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

TEMINATING CUE:

LOG STOP TIME:

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 23 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

When the operator competes the JPM, then read the following:

THAT COMPLETES THIS PORTION OF THE JPM.

Ask any required follow-up questions and note the questions and answers in the JPM evaluation comments section.

When follow-up questions are complete, then read the following:

THAT COMPLETES THIS JPM.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 24 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

VERIFICATION OF COMPLETION JPM NUMBER: __________________________________

JPM TITLE: ____________________________________________________________

OPERATOR:_______________________EVALUATOR:_________________________

VERIFICATION STATEMENT YES NO N/A Were all critical steps performed correctly?

If the JPM was time critical, Then was the JPM completed in the designated time?

If the JPM was not time critical, Then was acceptable progress made in performing the task?

Was the task standard met?

If any of the above questions were answered NO, then this JPM must be evaluated as unsatisfactory.

LICENSEE:

SRO RO SRO CERTIFICATION OTHER: list applicable positions as needed RESULTS:

SATISFACTORY UNSATISFACTORY COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE: ______________________________________

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 25 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST MUT BE PERFORMED UPON INITIAL VALIDATION AND REVALIDATION PRIOR TO USE.

REVIEW STATEMENTS YES NO

1. All items on page one of this procedure are filled in correctly?
2. The JPM as been reviewed and validated by SMEs?
3. The required conditions for the JPM can be appropriately established in the simulator?
4. The performance steps accurately reflect operator actions in accordance with plant procedures?
5. The standard for each performance item is specific as to what controls, indications and ranges are required to evaluate if the operator properly performed the step?
6. The average completion time has been established based on validation data or incumbent experience?
7. Establishing the task as time critical is based on actual task performance requirements?
8. The maximum time requirement has been established based on actual task performance requirements or if a maximum time requirement does not apply, then it has been based on reasonable progress in completing the task?

9.Licensee level is appropriate for the task being evaluated?

11. The K/A is appropriate to the task and to the licensee level?
11. Critical steps have been identified and typed (C, S, T) appropriately?
12. All special tools and equipment needed to perform the task have been identified and are available to the trainee?
13. All references are identified, current and accurate, and available to the trainee?
14. All required cues (as can be anticipated) have been identified for the evaluator to assist task completion.

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 26 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR JPM GUIDE EO - 29SF-1 Response to Containment Isolation Failure 6/04/03 JPM NUMBER/TITLE DATE Approved by:

TRAINING MANAGEMENT Approved by:

PROGRAM OWNER EVALUATION LOCATION: PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD: PERFORM SIMULATE AVG. COMPLETION TIME: AVG. TIME FOR THIS JPM IN MINUTES TIME CRITICAL TASK: YES NO MAX. COMPLETION TIME: MAX. TIME ALLOWED FOR JPM IN MINUTES X N/A FOR NON-TIME CRITICAL JPM LICENSEE LEVEL: SRO RO OTHER:

TASK NUMBER:

TASK NUMBER TASK TITLE:

TASK TITLE TASK TYPE: INITIAL CONTINUING K/A

REFERENCE:

2.1.31 K/A REFERENCE PLANT SYSTEM: Safeguard Components (Containment Isolation)

PLANT SYSTEM NAME/NUMBER CRITICAL STEPS:

CRITICAL (C) STEPS yes SEQUENCE CRITICAL (S) STEPS TIME (T) CRITICAL STEPS TOOLS & EQUIPMENT: none

REFERENCES:

E -0 Attachment L Note: The follow Simulator JPM and simulator Setup, Malfunctions, Override, Remote Function sections are only applicable when simulator is used.

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 27 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMUALTOR JPM IF the Operator is present when setting up for the JPM, THEN read the following:

PLEASE STANDBY WHILE WE ESTABLISH CONDITIONS FOR THE NEXT JPM.

Ensure the simulator is clear of all unauthorized individuals and conducive to conducting the examination.

Ensure all procedures and other materials necessary to conduct the JPM examination are in their proper locations Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 28 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

SIMULATOR SET UP: IC-10 EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRITPTION SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

No. TITLE 0 Any man or auto SI 0 RP05 CI Train failure 0 RP03J CI partial failure SIMULATOR OVERRIDES:

TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION 0 DI 46171 O CV-31326 open on SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNTION TITLE VALUE RAMP FUNCTION No.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 29 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

READ THE FOLLOWING INSTRUCTIONS TO THE OPERATOR:

THIS TASK IS NOT TIME CRITICAL THE TASK CONDITIONS ARE:

THE STEPS IN THIS JPM SHOULD BE:

INITIATING CUE: An SI has initiated on Unit I and the SS directs you to complete E - 0 Attachment L INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK:

DO YOU HAVE ANY QUESTIONS BEFORE WE BEGIN?

Answer any questions the operator may have, then read the following to initiate the JPM:

IF THERE ARE NO FURTHER QUESTIONS THEN LETS BEGIN GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 30 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

INSTRUCTOR ACTIONS:

If required take the simulator out of freeze. (Only applicable if using simulator.)

Use the JPM evaluation form to mark the Operators performance as the task is being performed.

Follow the pre-scripted format for implementing the JPM evaluation.

Provide cues in accordance with the JPM.

Take notes to support the results of the pass/fail grade.

For unsatisfactory grades, documentation must be noted in the comments section of the JPM evaluation form.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 31 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

LOG START TIME:

NOTE: Critical steps are denoted with a C. Failure to meet the standard for this step constitutes failure.

PERFORMANCE STEP: Verify Safeguard Component Alignment CRITICAL:

STANDARD: Verifies Safeguard component alignment:

a. SI NOT READY lights NOT LIT
b. SI ACTIVE lights LIT FOR PLANT CONDITIONS
c. CONTAINMENT ISOLATION lights lit for plant conditions.

PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

PERFORMANCE STEP: Determines Containment Isolation alignment is not sat.

CRITICAL: C STANDARD: Identifies CI train failed to actuate and manually initiates CI using control board switch.

PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

PERFORMANCE STEP: Identifies LD CI CV-31326 failed to close and attempts manual CRITICAL: C closure.

STANDARD:

PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

TEMINATING CUE: After examinee manually initiates CI, identifies LD CI failed to close and attempt to manually close CV-31326, inform examinee the JPM is complete.

LOG STOP TIME:

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 32 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

When the operator competes the JPM, then read the following:

THAT COMPLETES THIS PORTION OF THE JPM.

Ask any required follow-up questions and note the questions and answers in the JPM evaluation comments section.

When follow-up questions are complete, then read the following:

THAT COMPLETES THIS JPM.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 33 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

VERIFICATION OF COMPLETION JPM NUMBER: __________________________________

JPM TITLE: ____________________________________________________________

OPERATOR:_______________________EVALUATOR:_________________________

VERIFICATION STATEMENT YES NO N/A Were all critical steps performed correctly?

If the JPM was time critical, Then was the JPM completed in the designated time?

If the JPM was not time critical, Then was acceptable progress made in performing the task?

Was the task standard met?

If any of the above questions were answered NO, then this JPM must be evaluated as unsatisfactory.

LICENSEE:

SRO RO SRO CERTIFICATION OTHER: list applicable positions as needed RESULTS:

SATISFACTORY UNSATISFACTORY COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE: ______________________________________

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 34 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST MUT BE PERFORMED UPON INITIAL VALIDATION AND REVALIDATION PRIOR TO USE.

REVIEW STATEMENTS YES NO

1. All items on page one of this procedure are filled in correctly?
2. The JPM as been reviewed and validated by SMEs?
3. The required conditions for the JPM can be appropriately established in the simulator?
4. The performance steps accurately reflect operator actions in accordance with plant procedures?
5. The standard for each performance item is specific as to what controls, indications and ranges are required to evaluate if the operator properly performed the step?
6. The average completion time has been established based on validation data or incumbent experience?
7. Establishing the task as time critical is based on actual task performance requirements?
8. The maximum time requirement has been established based on actual task performance requirements or if a maximum time requirement does not apply, then it has been based on reasonable progress in completing the task?

9.Licensee level is appropriate for the task being evaluated?

12. The K/A is appropriate to the task and to the licensee level?
11. Critical steps have been identified and typed (C, S, T) appropriately?
12. All special tools and equipment needed to perform the task have been identified and are available to the trainee?
13. All references are identified, current and accurate, and available to the trainee?
14. All required cues (as can be anticipated) have been identified for the evaluator to assist task completion.

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 35 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Prairie Island TASK TITLE: RESPONSE TO CONTAINMENT ISOLATION FAILURE JPM NUMBER: E0-29SF-1 REV. 0 RELATED PRA PRA Identified Task INFORMATION:

TASK NUMBERS: CRO 3010010601 K/A NUMBERS: 013A4.01 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical:

Alternate Path /

Faulted:

TASK APPLICABILITY: SRO, RO Additional signatures may be added as needed.

Developed by: Dennis Westphal 7/14/03 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 36 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 JPM Number: E0-29SF-1 JPM

Title:

RESPONSE TO CONTAINMENT ISOLATION FAILURE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required Procedure adequately addresses task elements.

Enter Identifier here:

Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 37 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Both Units are at 100% power.
  • A fire has occurred in the Control Room and thick black smoke is making visibility very difficult.
  • As the Unit 1 SS, you have decided to implement F5 Appendix B, Control Room Evacuation (Fire) procedure.

INITIATING CUES (IF APPLICABLE):

  • Perform Unit 1 SS actions in accordance with F5 Appendix B, Attachment A.

Page 38 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 JPM PERFORMANCE INFORMATION Required Materials: Copy of F5 Appendix B, Attachment A, Attachment I, Attachment J, and Attachment K General

References:

F5 Appendix B Task Standards: F5 Appendix B, Attachment A - Unit 1 Shift Supervisor Actions completed.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Make decision to evacuate Control Room.

Critical Standard: Decision made to evacuate the control room, based on visibility and habitability of the Control Room.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Announce: "Attention all plant personnel. Control Room is being evacuated and Critical F5 Appendix B is being implemented."

Standard: Announcement made.

Evaluator Cue: Acknowledge announcement.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 39 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Ensure all watchstanders are aware of the Control Room evacuation.

Critical Y (S-1)

Standard: All watchstanders made aware that a Control Room evacuation is in progress.

Evaluator Note: Examinee should indicate the methodology used to make all watchstanders aware (plant page, radio, telephone, word of mouth).

Evaluator Cue: Acknowledge as all watchstanders, the Control Room evacuation.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Notify Shift Security Lieutenant (4318) and Shift Manager (SM) and the Fire Critical Y (S-1) Department if not already accomplished.

Standard: Shift Security Lieutenant, Shift Manager, and the Fire Department notified.

Evaluator Note: Examinee should indicate what each party will be notified of (fire, control room evacuation, plant shutdown from outside control room).

Evaluator Cue: Acknowledge as each party, the notification made.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If relay room CARDOX system has actuated or is expected to actuate, then direct Critical operations personnel to Don SCBAs prior to evacuating Standard: Examinee states, CARDOX not actuated nor expected Evaluator Cue: Inform examinee CARDOX not actuated and not expected Performance: SATISFACTORY UNSATISFACTORY Page 40 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Don SCBA if required Critical Standard: Examinee acknowledges SCBA is not required Evaluator Cue: Inform examinee SCBA is not required Performance: SATISFACTORY UNSATISFACTORY Performance Step: Proceed with radio, flashlight, set of keys, and this Attachment (A), to hot Critical shutdown panels in the Auxiliary Feedwater Pump rooms. (Use lighted stairwell, near Records Room.)

Standard: Examinee goes to Auxiliary Feedwater Pump room with radio, flashlight, set of keys, and Attachment A.

Evaluator Note: Examinee should use stairways instead of elevators due to the potential for a loss of offsite power at any time during this event.

Evaluator Cue: As Examinee states that he/she would obtain a radio, flashlight, and set of keys, inform examinee that they have obtained said items.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 41 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Place the following Local/Remote Control Switches on "A" Train HSDP to Critical Y (S-2) "LOCAL".

Unit 1 CS-51001, Unit 1 PZR Heaters Group A CS-51003, 11 TD AFWP to 11 Stm Gen MV32238 CS-51005, 11 TD AFWP to 12 Stm Gen MV32239 CS-51009, LTDN Orifice Isol 40 gpm CV31325 CS-51011, LTDN Orifice Isol 40 gpm CV31326 CS-51013, LTDN Orifice Isol 80 gpm CV31327 CS-51007, 11 Boric Acid Transfer Pump Standard: Listed Local/Remote Control Switches simulated placed to "LOCAL".

Evaluator Cue: Provide cues as need to insure you as the examiner understand clearly what action the examinee has simulated. Example:

Point to switch examinee pointed to, I understand you placed this switch in local.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Place the following Local/Remote Control Switches on "A" Train HSDP to Critical Y (S-2) "LOCAL" (cont'd).

Unit 2 CS-51101, Unit 2 PZR Heaters Group A CS-51103, 21 TD AFWP to 21 Stm Gen MV32383 CS-51105, 21 TD AFWP to 22 Stm Gen MV32384 CS-51109, LTDN Orifice Isol 40 gpm CV31347 CS-51111, LTDN Orifice Isol 40 gpm CV31348 CS-51113, LTDN Orifice Isol 80 gpm CV31349 CS-51107, 21 Boric Acid Transfer Pump Standard: Listed Local/Remote Control Switches simulated placed to "LOCAL".

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 42 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Place the following Pwr Operated Relief Valves to "MANUAL CLOSE":

Critical Y (S-2) HC-28400, 1A Atm Stm Relief (Power Op) CV31084 HC-28408, 2A Atm Stm Relief (Power Op) CV31102 Standard: Power Operated Relief Valves CV31084 and CV31102 simulated placed to "MANUAL CLOSE".

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Place the following AFW Pump Local/Remote Switches to "LOCAL":

Critical Y (S-2) CS-51517, 12 MD AFWP CS-51617, 22 TD AFWP CS-19640, Clg Wtr to 12 MD AFWP Suct CS-19642, Cond to 12 MD AFWP Suct CS-19650, Cond to 22 TD AFWP Suct CS-19648, Clg Wtr to 22 TD AFWP Suct Standard: Listed Local/Remote Control Switches simulated placed to "LOCAL".

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 43 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Place the following Local/Remote Control Switches on "B" Train HSDP to Critical Y (S-2) "LOCAL".

Unit 1 CS-51501, Unit 1 PZR Heaters Group B CS-51503, 12 MD AFWP to 11 Stm Gen MV32381 CS-51505, 12 MD AFWP to 12 Stm Gen MV32382 CS-51515, 11 Chg Pump CS-51513, 13 Chg Pump CS-51507, 12 Boric Acid Transfer Pump Standard: Listed Local/Remote Control Switches simulated placed to "LOCAL".

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Place the following Local/Remote Control Switches on "B" Train HSDP to Critical Y (S-2) "LOCAL" (cont'd).

Unit 2 CS-51601, Unit 2 PZR Heaters Group B CS-51603, 22 TD AFWP to 21 Stm Gen MV32246 CS-51605, 22 TD AFWP to 22 Stm Gen MV32247 CS-51615, 21 Chg Pump CS-51613, 23 Chg Pump CS-51607, 22 Boric Acid Transfer Pump Standard: Listed Local/Remote Control Switches simulated placed to "LOCAL".

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 44 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Place the following Pwr Operated Relief Valves to "MANUAL CLOSE":

Critical Y (S-2) HC-28407, 1B Atm Stm Relief (Power Op) CV31089 HC-28409, 2B Atm Stm Relief (Power Op) CV31107 Standard: Power Operated Relief Valves CV31089 and CV31107 simulated placed to "MANUAL CLOSE".

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Place the following AFW Pump Local/Remote Switches to "LOCAL":

Critical Y (S-2) CS-51017, 11 TD AFWP CV31998 CS-51117, 21 MD AFWP CS-19636, Clg Wtr to 11 TD AFWP Suct CS-19638, Cond to 11 TD AFWP Suct CS-19644, Clg Wtr to 21 MD AFWP Suct CS-19646, Cond to 21 MD AFWP Suct Standard: Listed Local/Remote Control Switches simulated placed to "LOCAL".

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 45 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Place the following MCC breakers in the OFF position Critical Y (S-3) 1A1-Z5 Sump B to 11 RHR pump MV-32077 1A1-A5 Sump B to 12 RHR pump MV-32078 2A1-A2 Sump B to 21 RHR pump MV-32180 2A1-A4 Sump B to 22 RHR pump MV-32181 Standard: Breakers 1A1-Z5, 1A1-A5, 2A1-A2, 2A1-A4 simulated placed in off Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Align Auxiliary Feedwater per Attachment I.

Critical Y (S-3) A. OPEN the following MCC breakers:

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 46 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Align Auxiliary Feedwater per Attachment I (cont'd).

Critical B. Check OPEN the following valves (if not open, then manually open using local handwheel(s)):

  • MV-32333, 11 TD AFW Pmp Suct From CST MV
  • MV-32345, 22 TD AFW Pmp Suct From CST MV Standard: Valves MV-32333 and MV-32345 are checked open.

Evaluator Cue: Valves MV-32333 and MV-32345 are open.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 47 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Align Auxiliary Feedwater per Attachment I (cont'd).

Critical Y (S-4) C. Check 11 and 22 AFW Pumps RUNNING, if either pump is not runing then start the non-running TDAFWP(s) as follows:

  • Start 11 TDAFWP as follows:
  • If the auxiliary lube oil pump is not running, then depress pushbutton CS-19333, 11 TD AFW Pmp Aux L-O Pmp Start/Stop PB.
  • Place 1AF-292-1, 11 TD AFW Pmp Mn Stm Sply CV-31998 Root Isol, in the "OPEN" position. 11 TDAFWP should roll up to full speed within 30 seconds.
  • Start 22 TDAFWP as follows:
  • If the auxiliary lube oil pump is not running, then depress pushbutton CS-19335, 22 TD AFW Pmp Aux L-O Pmp Start/Stop PB.
  • Place 2AF-292-1, 22 TD AFW Pmp Mn Stm Sply CV-31999 Root Isol, in the "OPEN" position. 22 TDAFWP should roll up to full speed within 30 seconds.

Standard: 11 and 22 TD AFW Pumps are running.

Evaluator Cue: If examinee asks if 11 and 22 TD AFW Pumps are running, inform examinee that, "11 and 22 TD AFW Pumps are not running."

If examinee asks if 11 and 22 TD AFW Pumps Aux Lube Oil Pumps are running, inform examinee that, "11 and 22 TD AFW Pumps Aux Lube Oil Pumps are not running."

When examinee simulates starting 11 and 22 TD AFW Pumps Aux Lube Oil Pumps, inform examinee that, "11 and 22 TD AFW Pumps Aux Lube Oil Pumps are running."

When examinee simulates starting 11 and 22 TD AFW Pumps, inform examinee that, "11 and 22 TD AFW Pumps are running."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 48 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Align Auxiliary Feedwater per Attachment I (cont'd).

Critical D. Verify 11 and 22 TDAFWP discharge pressures exceed SG pressures.

Standard: 11 and 22 TD AFW Pump discharge pressures verified to exceed SG pressures.

Evaluator Note: SG pressure indication at the HSD panel may be affected by the fire in the control room. Verification of SG pressures may be made by comparison with local indication in the Auxiliary Building.

Evaluator Cue: When examinee indicates where he/she would read 11 and 22 TD AFW Pump discharge pressures and SG pressures, inform examinee that, "11 and 22 TD AFW Pump discharge pressures are 1120 psig and SG pressures are 1000 psig."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Align Auxiliary Feedwater per Attachment I (cont'd).

Critical E. Check AFW flow for each unit using flow indicators FI-18032 and FI-18035.

Standard: AFW flow checked using FI-18032 and FI-18035.

Evaluator Cue: AFW flow is 200 gpm on FI-18032 and FI-18035.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 49 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Align Auxiliary Feedwater per Attachment I (cont'd).

Critical Y (S-5) F. Manually align AFW System motor valves for the units as follows:

  • U nit 1
  • Open the following MCC breakers:
  • Check OPEN or locally OPEN MV-32238, 11 AFW to 11 SG MV.
  • Check Unit 1 AFW flow >200 gpm on FI-18032.
  • Locally CLOSE MV-32239, 11 AFW to 12 SG MV. Verify Unit 1 AFW flow remains >200 gpm.
  • Throttle flow to 11 SG as necessary by manually operating MV-32238, 11 AFW to 11 SG MV.
  • Unit 2
  • Open the following MCC breakers:
  • Check OPEN or locally OPEN MV-32246, 22 AFW to 21 SG MV.
  • Check Unit 2 AFW flow >200 gpm on FI-18035.
  • Locally CLOSE MV-32247, 22 AFW to 22 SG MV. Verify Unit 2 AFW flow remains >200 gpm.
  • Throttle flow to 21 SG as necessary by manually operating MV-32246, 22 AFW to 21 SG MV.

Standard: AFW flow established to 11 and 21 SGs at >200 gpm.

Evaluator Cue: If examinee asks if MV-32238, MV-32239, MV-32246, and MV-32247 are open, inform examinee that, "MV-32238, MV-32239, MV-32246, and MV-32247 are open."

I examinee simulates closing MV-32238 and MV-32247, inform examinee that, "AFW flow is slightly greater than 200 gpm to 11 and 21 SGs respectively."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 50 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Align Auxiliary Feedwater per Attachment I (cont'd).

Critical G. Monitor 11 and 22 TDAFWP parameters locally.

Standard: 11 and 22 TD AFW Pumps parameters being monitored locally.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Align Auxiliary Feedwater per Attachment I (cont'd).

Critical H. If it becomes necessary to switchover the AFWP suction to Clg Wtr, then perform the following:

Standard: Determines that this action is not required at this time.

Evaluator Note: This action is not necessary due to the volume of water in the CST.

Evaluator Cue: If examinee asks for the status of the CST, inform examinee that, "CST was full prior to evacuating the Control Room."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Contact LPEO's to verify Bus 15 and Bus 25 status.

Critical Standard: LPEO's simulated contacted for Bus 15 and Bus 25 status.

Evaluator Cue: As LPEO, inform examinee that, "Bus 15 and Bus 25 are energized."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 51 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: If no RCP's are running, then start monitoring RCS for natural circulation flow and Critical adequate subcooling if needed by using Attachment J.

The following conditions support or indicate natural circulation flow and adequate subcooling:

A. RCS subcooling based on core exit TCs - GREATER THAN 20 °F.

B. S/G pressure - STABLE OR DECREASING.

C. RCS hot leg temperature - STABLE OR DECREASING.

D. Core exit TCs - STABLE OR DECREASING.

E. RCS cold leg temperature - AT SATURATION TEMPERATURE FOR RESPECTIVE S/G PRESSURE.

Standard: Natural circulation flow and adequate subcooling monitored using Attachment J.

Evaluator Cue: If examinee asks if RCP are running, inform candidate that, "RCP's are secured."

As examinee indicates appropriate method for monitoring each parameter, inform examinee that the parameter is as indicated below:

A. RCS subcooling based on core exit TCs - 55 °F.

B. S/G pressure - 1050 psig and decreasing.

C. RCS hot leg temperature - 595 °F and decreasing.

D. Core exit TCs - 598 °F and decreasing.

E. RCS cold leg temperature - 552 °F.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Contact Unit 1 RO to verify cooling water headers are pressurized.

Critical Standard: Unit 1 RO simulated contacted for verification that cooling water headers are pressurized.

Evaluator Cue: As Unit 1 RO, inform examinee that, "cooling water headers are pressurized."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 52 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Align Instrument Air System per Attachment K.

Critical Y (S-6) A. Place CS-7055501, 121 Air Compressor Remote/Local ES, in "LOCAL".

B. Start 121 Air Compressor using CS-7055502, 121 Sta Air Comp Lcl On/Off ES.

C. Place CS-7055701, 123 Air Compressor Remote/Local ES, in "LOCAL".

D. Start 123 Air Compressor using CS-7055702, 123 Sta Air Comp Lcl On/Off ES.

Standard: 121 and 123 Air Compressors simulated started locally.

Evaluator Cue: 121 and 123 Air Compressors are running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Contact the Shift Manager in the Technical Support Center to monitor "VC1" on Critical ERCS for both units to provide verification of charging system parameters.

Standard: SM simulated contacted for monitoring and verification of charging system parameters.

Evaluator Cue: Charging system parameters are satisfactory and are being monitored.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Verify Primary System parameters:

Critical

  • Pressurizer level between 18% - 21% cold cal.
  • RCS pressure 2000 - 2235 psig.

Standard: Pressurizer level verified to be between 18 and 21% cold cal and RCS pressure verified to be between 2000 and 2235 psig.

Evaluator Cue: Pressurizer level is 20% cold cal and RCS pressure is 2200 psig.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 53 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Performance Step: Use charging pumps and heaters, if operable, as needed to maintain above Critical parameters.

Standard: Ability demonstrated to operate charging pumps and heaters as necessary to maintain pressurizer level and RCS pressure.

Evaluator Cue: After examinee demonstrates the ability to operate charging pumps and heaters, inform examinee that, "pressurizer level and RCS pressure are being maintained."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Control RCS temperature at Hot Shutdown using A Train SG PORV's.

Critical Standard: A Train SG PORV's simulated used to control RCS temperature at Hot Shutdown.

Evaluator Cue: After examinee demonstrates the ability to operate A Train SG PORV's, inform examinee that, "RCS temperature is being controlled at Hot Shutdown."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: When the following conditions have been achieved, then proceed to Section 4.0, Critical Subsequent Actions:

  • Hot shutdown conditions achieved and can be maintained.
  • Safeguard AC power has been restored to at least one safeguard bus per unit.
  • Fire is extinguished.

Standard: Conditions achieved for proceeding to Section 4.0.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 54 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 Terminating Cues: When examinee indicates that he/she is waiting for the conditions to be achieved to allow proceeding to Section 4.0, inform examinee that, "this JPM is complete."

Stop Time:

Page 55 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-7, Appendix B, Attachment A - Unit 1 Shift Supervisor Actions, Rev. 44 TURNOVER SHEET INITIAL CONDITIONS:

  • Both Units are at 100% power.
  • A fire has occurred in the Control Room and thick black smoke is making visibility very difficult.
  • As the Unit 1 SS, you have decided to implement F5 Appendix B, Control Room Evacuation (Fire) procedure.

INITIATING CUES (IF APPLICABLE):

  • Perform Unit 1 SS actions in accordance with F5 Appendix B, Attachment A.

Page 56 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 57 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

14. Are all items on the signature page filled in correctly?
15. Has the JPM been reviewed and validated by SMEs?
16. Can the required conditions for the JPM be appropriately established in the simulator if required?
17. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
18. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
19. Has the completion time been established based on validation data or incumbent experience?
20. If the task is time critical, is the time critical portion based upon actual task performance requirements?
21. Is the Licensee level appropriate for the task being evaluated if required?
22. Is the K/A appropriate to the task and to the licensee level if required?
23. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

24. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
25. Are all references identified, current, accurate, and available to the trainee?
26. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Dat Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 58 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Prairie Island TASK TITLE: RESPONSE TO CONTAINMENT ISOLATION FAILURE JPM NUMBER: E0-29SF-1 REV. 0 RELATED PRA PRA Identified Task INFORMATION:

TASK NUMBERS: CRO 3010010601 K/A NUMBERS: 013A4.01 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical:

Alternate Path /

Faulted:

TASK APPLICABILITY: SRO, RO Additional signatures may be added as needed.

Developed by: Dennis Westphal 7/14/03 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 59 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-8, F5 Appendix B, Attachment B - Unit 2 Shift Supervisor Actions, Rev. 33 JPM Number: E0-29SF-1 JPM

Title:

RESPONSE TO CONTAINMENT ISOLATION FAILURE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required Procedure adequately addresses task elements.

Enter Identifier here:

Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 60 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-8, F5 Appendix B, Attachment B - Unit 2 Shift Supervisor Actions, Rev. 33 JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Both Units were at 100% power.
  • A fire occurred in the Control Room and thick black smoke made visibility very difficult.
  • The Unit 1 SS made the decision to evacuate the Control Room and to implement F5 Appendix B, Control Room Evacuation (Fire).

INITIATING CUES (IF APPLICABLE):

  • Perform Unit 2 SS actions in accordance with F5 Appendix B, Attachment B.

Page 61 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-8, F5 Appendix B, Attachment B - Unit 2 Shift Supervisor Actions, Rev. 33 JPM PERFORMANCE INFORMATION Required Materials: Copy of F5 Appendix B, Attachment B General

References:

F5 Appendix B Task Standards: F5 Appendix B, Attachment B - Unit 2 Shift Supervisor Actions completed.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Proceed with radio, flashlight, set of keys, and this Attachment (B) to 11 Battery Critical Room.

Standard: Examinee goes to 11 Battery Room with radio, flashlight, set of keys, and Attachment B. (Use lighted stairwell, near Records Room.) If accessable.

Evaluator Note: Examinee should use stairways instead of elevators due to the potential for a loss of offsite power at any time during this event.

Examinee should acknowledge, donning SCBA if directed by Unit 1 SS due to fire concerns.

Evaluator Cue: As Examinee states that he/she would obtain a radio, flashlight, and set of keys, inform examinee that they have obtained said items.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 62 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-8, F5 Appendix B, Attachment B - Unit 2 Shift Supervisor Actions, Rev. 33 Performance Step: On DC panel 11, Place 11-18, 125VDC Panel 191, in the "OFF" position.

Critical Y (S-1)

Standard: 11-18 simulated placed in the "OFF" position.

Evaluator Cue: Provide cues as needed to insure you as the examiner clearly understand the action the examinee has simulated. Example:

I understand you have placed this breaker in the off position, point to the component the examinee pointed to.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: On DC Panel 11, Place 11-5, 4KV Swgr Bus 15, in the "OFF" position.

Critical Y (S-1)

Standard: 11-5 simulated placed in the "OFF" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: On DC Panel 11, Place 11-8, 125 VDC panel 171 in the "OFF" position.

Critical Y (S-1)

Standard: 11-8 simulated placed in the "OFF" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 63 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-8, F5 Appendix B, Attachment B - Unit 2 Shift Supervisor Actions, Rev. 33 Performance Step: Proceed to 12 Battery Room.

Critical Y (S-2)

Standard: Examinee goes to 12 Battery Room.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: On DC Panel 12, Place 12-18, 125VDC Panel 16, in the "OFF" position.

Critical Y (S-3)

Standard: 12-18 simulated placed in the "OFF" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: On DC Panel 12, Place 12-8, 125VDC Panel 181, in the "OFF" position.

Critical Y (S-3)

Standard: 12-8 simulated placed in the "OFF" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 64 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-8, F5 Appendix B, Attachment B - Unit 2 Shift Supervisor Actions, Rev. 33 Performance Step: Proceed to 22 Battery Room.

Critical Y (S-4)

Standard: Examinee goes to 22 Battery Room.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: On DC Panel 22, Place 22-18, 125VDC Panel 26, in the "OFF" position.

Critical Y (S-5)

Standard: 22-18 simulated placed in the "OFF" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: ON DC Panel 22, Place 22-10, 125VDC PNL 281 in OFF.

Critical Y (S-5)

Standard: 22-10 simulated placed in OFF position Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 65 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-8, F5 Appendix B, Attachment B - Unit 2 Shift Supervisor Actions, Rev. 33 Performance Step: Proceed to 21 Battery Room.

Critical Y (S-6)

Standard: Examinee goes to 21 Battery Room.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: On DC Panel 21,Place 21-16, 125VDC Panel 25, in the "OFF" position.

Critical Y (S-7)

Standard: 21-16 simulated placed in the "OFF" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: On DC Panel 21,Place 21-10, 125VDC Panel 271, in the "OFF" position.

Critical Y (S-7)

Standard: 21-10 simulated placed in the "OFF" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 66 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-8, F5 Appendix B, Attachment B - Unit 2 Shift Supervisor Actions, Rev. 33 Performance Step: Proceed back through Battery Rooms to east entrance of AFW Pump Room, Critical enter and proceed to Hot Shutdown Panels.

Standard: Examinee goes to Hot Shutdown Panels via the Battery Rooms, entering the AFW Pump Room through the east entrance.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Examinee should state that he/she would assist the Unit 1 Shift Supervisor in establishing hot shutdown conditions. At this point, inform Examinee that, "this JPM is complete."

Stop Time:

Page 67 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-8, F5 Appendix B, Attachment B - Unit 2 Shift Supervisor Actions, Rev. 33 TURNOVER SHEET INITIAL CONDITIONS:

  • Both Units were at 100% power.
  • A fire occurred in the Control Room and thick black smoke made visibility very difficult.
  • The Unit 1 SS made the decision to evacuate the Control Room and to implement F5 Appendix B, Control Room Evacuation (Fire).

INITIATING CUES (IF APPLICABLE):

  • Perform Unit 2 SS actions in accordance with F5 Appendix B, Attachment B.

Page 68 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 69 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

27. Are all items on the signature page filled in correctly?
28. Has the JPM been reviewed and validated by SMEs?
29. Can the required conditions for the JPM be appropriately established in the simulator if required?
30. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
31. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
32. Has the completion time been established based on validation data or incumbent experience?
33. If the task is time critical, is the time critical portion based upon actual task performance requirements?
34. Is the Licensee level appropriate for the task being evaluated if required?
35. Is the K/A appropriate to the task and to the licensee level if required?
36. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

37. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
38. Are all references identified, current, accurate, and available to the trainee?
39. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 70 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Prairie Island TASK TITLE: RESPONSE TO CONTAINMENT ISOLATION FAILURE JPM NUMBER: E0-29SF-1 REV. 0 RELATED PRA INFORMATION:

TASK NUMBERS: CRO 3010010601 K/A NUMBERS: 013A4.01 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical:

Alternate Path /

Faulted:

TASK APPLICABILITY: SRO, RO Additional signatures may be added as needed.

Developed by: Dennis Westphal 7/14/03 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 71 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

RC, 15S, Initial Response to RCS High Activity, Rev. 8 JPM Number: E0-29SF-1 JPM

Title:

RESPONSE TO CONTAINMENT ISOLATION FAILURE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required Procedure adequately addresses task elements.

Enter Identifier here:

Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 72 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

RC, 15S, Initial Response to RCS High Activity, Rev. 8 JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 at 100% reactor power.
  • Rad monitor R-4 is OOS (charging pump area monitor).

INITIATING CUES (IF APPLICABLE):

Page 73 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

RC, 15S, Initial Response to RCS High Activity, Rev. 8 JPM PERFORMANCE INFORMATION Required Materials: None General

References:

C47048, C12.1 Task Standards: Isolate normal letdown Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Determine the initiating alarm(s) at the RD panel.

Critical X Standard: Determine 1R-9 in alarm.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Refer to C47048 for 1R-9.

Critical Standard: Determine alarm response for 1R-9.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 74 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

RC, 15S, Initial Response to RCS High Activity, Rev. 8 Performance Step: Verify rad levels high.

Critical (S- )

Standard: Verify rad levels high on R-9 and requests RP to verify with portable monitor at letdown monitor location.

Evaluator Cue: Examiner tells examinee that 1R9 reading 10.5 R/hr. locally.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Remove normal and excess letdown from service per C12.1.

Critical X (S-1)

Standard: - All orifice isolation valves verified closed CV-31325, CV-31326, and CV-31327.

- Isolate normal letdown, Both CV-31226 and CV-31255, Loop B to letdown line closed.

- Place charging pumps in manual, stop one pump.

- Reduce charging to minimum and adjust seal injection flow to 8 gpm

- Place LD press control in manual and set at approx 50% open.

- Excess letdown verified not in service.

Evaluator Cue: Alternate letdown is not required.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Initiate Unit shutdown to cold SD.

Critical Standard: I Inform SS to initiate reactor shutdown to CSD.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Terminating Cues: When plant shutdown has been initiated, inform examinee the JPM is complete..

Stop Time:

Page 75 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

RC, 15S, Initial Response to RCS High Activity, Rev. 8 SIMULATOR SETUP INSTRUCTOR GUIDE:

  • Initialize the simulator to IC-10
  • Pull fuses on R-4
  • Place WO sticker on 1R-4. A CARD ON THE PANEL FOR R-4 WILL GIVE BETTER INDICATION THAT R-4 IS O.O.S.
  • Insert I/Os.

I/O

SUMMARY

REL.

ORDER LINE ENTRY CODE ENTRY DESCRIPTION 1 47022:0108W CW Train B RD Alarm 2 R09-LRH ON High Alarm R-9 3 R09-M1 100 R-9 Meter Page 76 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

RC, 15S, Rev. 8 TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 at 100% reactor power.
  • R-4 OOS (charging pump area monitor).

INITIATING CUES (IF APPLICABLE):

Page 77 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

40. Are all items on the signature page filled in correctly?
41. Has the JPM been reviewed and validated by SMEs?
42. Can the required conditions for the JPM be appropriately established in the simulator if required?
43. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
44. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
45. Has the completion time been established based on validation data or incumbent experience?
46. If the task is time critical, is the time critical portion based upon actual task performance requirements?
47. Is the Licensee level appropriate for the task being evaluated if required?
48. Is the K/A appropriate to the task and to the licensee level if required?
49. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

50. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
51. Are all references identified, current, accurate, and available to the trainee?
52. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of plant insurance policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 78 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

ARS-1, Response to Condenser High Pressure SIMULATOR JPM GUIDE ARS - 1 Response to Condenser high pressure 7/2/03 JPM NUMBER/TITLE DATE Approved by:

TRAINING MANAGEMENT Approved by:

PROGRAM OWNER EVALUATION LOCATION: PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD: PERFORM SIMULATE AVG. COMPLETION TIME: 15 AVG. TIME FOR THIS JPM IN MINUTES TIME CRITICAL TASK: YES NO MAX. COMPLETION TIME: MAX. TIME ALLOWED FOR JPM IN MINUTES N/A FOR NON-TIME CRITICAL JPM LICENSEE LEVEL: SRO RO OTHER: list applicable positions as needed TASK NUMBER:

TASK NUMBER TASK TITLE: Respond to Condenser high pressure TASK TITLE TASK TYPE: INITIAL CONTINUING K/A

REFERENCE:

AA1.08 AA2.02K/A REFERENCE PLANT SYSTEM: Air Removal PLANT SYSTEM NAME/NUMBER CRITICAL STEPS:

CRITICAL (C) STEPS SEQUENCE CRITICAL (S) STEPS TIME (T) CRITICAL STEPS TOOLS & EQUIPMENT: LIST SPECIAL TOOLS REQUIRED TO PERFORM JPM

REFERENCES:

C - 47008 and C - 26 Note: The follow Simulator JPM and simulator Setup, Malfunctions, Override, Remote Function sections are only applicable when simulator is used.

SIMUALTOR JPM Page 79 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

ARS-1, Response to Condenser High Pressure IF the Operator is present when setting up for the JPM, THEN read the following:

PLEASE STANDBY WHILE WE ESTABLISH CONDITIONS FOR THE NEXT JPM.

Ensure the simulator is clear of all unauthorized individuals and conducive to conducting the examination.

Ensure all procedures and other materials necessary to conduct the JPM examination are in their proper locations NOTE:

Insert FW03B (air leak on B condenser) at a severity rate adequate to cause the condenser high pressure alarm on ERCS and allow the examinee time to place the standby air ejector in service.

Immediately after the air ejector is placed in service, increase the severity to cause the 1A/1B condenser vacuum DP to exceed 2.5 Hg, requiring a manual reactor and turbine trip.

Note to evaluator:

Plant design is such that Condenser high pressure on B condenser will not result in any CB annunciators or auto trip. B condenser high pressure will result in an ERCS alarm.

Design assumes the highest pressure will be A Condenser because the Circ water passes through B then A. Alarms and trips are on A condenser.

The examinee may trip the turbine for any of the following reasons:

- Condenser high pressure 20 to 23 Hg

- Condenser backpressure outside allowable limit.

- Condenser DP > 2.5 Hg Page 80 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

ARS-1, Response to Condenser High Pressure SIMULATOR SET UP: IC-10 EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRITPTION 1

SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

No. TITLE 0 FW 03 B condenser high 60%

pressure SIMULATOR OVERRIDES:

TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNTION TITLE VALUE RAMP FUNCTION No.

GO TO NEXT PAGE Page 81 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

ARS-1 READ THE FOLLOWING INSTRUCTIONS TO THE OPERATOR:

THIS TASK IS NOT TIME CRITICAL THE TASK CONDITIONS ARE: Respond to condenser high pressure.

THE STEPS IN THIS JPM SHOULD BE:

INITIATING CUE: The SS directs you to respond to the ERCS alarm for Condenser high pressure using Annunciator Response C-47008-0208 INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK:

DO YOU HAVE ANY QUESTIONS BEFORE WE BEGIN?

Answer any questions the operator may have, then read the following to initiate the JPM:

IF THERE ARE NO FURTHER QUESTIONS THEN LETS BEGIN GO TO NEXT PAGE Page 82 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

INSTRUCTOR ACTIONS:

If required take the simulator out of freeze. (Only applicable if using simulator.)

Use the JPM evaluation form to mark the Operators performance as the task is being performed.

Follow the prescripted format for implementing the JPM evaluation.

Provide cues in accordance with the JPM.

Take notes to support the results of the pass/fail grade.

For unsatisfactory grades, documentation must be noted in the comments section of the JPM evaluation form.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 83 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

LOG START TIME:

NOTE: Critical steps are denoted with a C. Failure to meet the standard for this step constitutes failure.

PERFORMANCE STEP: Verify low vacuum using control board indications.

CRITICAL:

STANDARD: verifies low vacuum using available indication PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

PERFORMANCE STEP: Refers to figure C1-20 to verify condenser backpressure is in the CRITICAL: acceptable region of figure C1-20 STANDARD: verify the most limiting condenser vacuum is within allowable region of Figure C1-20 PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

PERFORMANCE STEP: Verifies proper operation of equipment.

CRITICAL:

STANDARD: Verify proper operation of the following:

a. gland steam supply pressure greater than 3 psig PI-412902
b. condenser vacuum breakers closed MV-32052
c. condenser air ejectors functioning MV-32349
d. verify circ water flow, both circ pumps on
e. verify condenser crossover valve MV-32005 is open PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

PERFORMANCE STEP: Transition to C - 26 and place standby Air Ejector in service.

CRITICAL:

STANDARD: Place standby Air Ejector in service as follows:

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 84 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

a. open MV-32328 standby air ejector steam supply Aligned to B Condenser open MV-32358 standby secondary air ejector suction
b. open MV-32347 standby primary air ejector suction from B condenser
c. open SV-33341 air ejector loop seal drain
d. notify the Duty Chemist that the lop seal drain is open PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

PERFORMANCE STEP: Manually trip the reactor and turbine due to high condenser CRITICAL: C pressure STANDARD: Identify any condenser high pressure limit exceeded and initiate a manual reactor and turbine trip.

Limits:

- Condenser high pressure 20 Hg

- Condenser differential pressure >2.5 Hg

- Condenser backpressure not within allowable limit 8 backpressure PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

TEMINATING CUE: After the candidate manually trips the reactor and turbine, inform the candidate that the JPM is complete.

LOG STOP TIME:

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 85 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

When the operator competes the JPM, then read the following:

THAT COMPLETES THIS PORTION OF THE JPM.

Ask any required follow-up questions and note the questions and answers in the JPM evaluation comments section.

When follow-up questions are complete, then read the following:

THAT COMPLETES THIS JPM.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 86 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

VERIFICATION OF COMPLETION JPM NUMBER: __________________________________

JPM TITLE: ____________________________________________________________

OPERATOR:_______________________EVALUATOR:_________________________

VERIFICATION STATEMENT YES NO N/A Were all critical steps performed correctly?

If the JPM was time critical, Then was the JPM completed in the designated time?

If the JPM was not time critical, Then was acceptable progress made in performing the task?

Was the task standard met?

If any of the above questions were answered NO, then this JPM must be evaluated as unsatisfactory.

LICENSEE:

SRO RO SRO CERTIFICATION OTHER: list applicable positions as needed RESULTS:

SATISFACTORY UNSATISFACTORY COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE: ______________________________________

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 87 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST MUT BE PERFORMED UPON INITIAL VALIDATION AND REVALIDATION PRIOR TO USE.

REVIEW STATEMENTS YES NO

1. All items on page one of this procedure are filled in correctly?
2. The JPM as been reviewed and validated by SMEs?
3. The required conditions for the JPM can be appropriately established in the simulator?
4. The performance steps accurately reflect operator actions in accordance with plant procedures?
5. The standard for each performance item is specific as to what controls, indications and ranges are required to evaluate if the operator properly performed the step?
6. The average completion time has been established based on validation data or incumbent experience?
7. Establishing the task as time critical is based on actual task performance requirements?
8. The maximum time requirement has been established based on actual task performance requirements or if a maximum time requirement does not apply, then it has been based on reasonable progress in completing the task?

9.Licensee level is appropriate for the task being evaluated?

13. The K/A is appropriate to the task and to the licensee level?
11. Critical steps have been identified and typed (C, S, T) appropriately?
12. All special tools and equipment needed to perform the task have been identified and are available to the trainee?
13. All references are identified, current and accurate, and available to the trainee?
14. All required cues (as can be anticipated) have been identified for the evaluator to assist task completion.

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 88 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Prairie Island TASK TITLE: RESPONSE TO CONTAINMENT ISOLATION FAILURE JPM NUMBER: E0-29SF-1 REV. 0 RELATED PRA INFORMATION:

TASK NUMBERS: CRO 3010010601 K/A NUMBERS: EA 1.02013A4.01 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical:

Alternate Path /

Faulted:

TASK APPLICABILITY: SRO, RO Additional signatures may be added as needed.

Developed by: Dennis Westphal 6/6/03 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 89 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EG-11F, Perform Local Emergency Start of a Diesel Generator, Rev. 0 JPM Number: E0-29SF-1 JPM

Title:

RESPONSE TO CONTAINMENT ISOLATION FAILURE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required Procedure adequately addresses task elements.

Enter Identifier here:

Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 90 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EG-11F, Perform Local Emergency Start of a Diesel Generator, Rev. 0 JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

A Loss of All AC Power has occurred and the crew is at step 18 of ECA 0.0.

All efforts to restore power have been unsuccessful so far.

INITIATING CUES (IF APPLICABLE):

The Unit I SS has directed you to proceed with a flashlight and copy of C - 20.7 to D - 1 Diesel Generator Room to perform a local Emergency Start of D - 1.

Page 91 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EG-11F, Perform Local Emergency Start of a Diesel Generator, Rev. 0 JPM PERFORMANCE INFORMATION Required Materials:

Flashlight and copy of C - 20.7 General

References:

C 20.7 Task Standards:

Perform local emergency start of a Diesel Generator Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step:

Critical Obtain a flashlight and a copy of C 20.7 and proceed to D -1 Diesel Generator Room.

Standard: Proceeds with a flashlight and copy of C - 20.7 to D -1 Diesel Generator Room.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Locate section 5.3.7 of C - 20.7 at local DG 1 engine control panel.

Critical Standard: Proceeds with step 5.3.7 Step A (page 39)

At D1 engine control panel simulates placing CS-55309 engine control switch in local.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 92 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EG-11F, Perform Local Emergency Start of a Diesel Generator, Rev. 0 Performance Step: Verify Control at Engine light lit.

Critical Standard: Verifies on the Diesel Generator Gage panel that the Control at Engine light is lit.

Evaluator Cue: When the examinee looks at the Control at Engine Light, tell examinee the light is lit.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Attempts local start of D 1 Diesel Generator.

Critical Standard: Examinee simulates placing CS-55308 D 1 Engine Control switch in the start position.

Evaluator Cue: When the examinee simulates placing the control switch in the start position, tell the examinee nothing happened.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Manually open D 1 air start valve Critical Y Standard: Examinee simulates manually opening D 1air start control valve CV-31954.

Evaluator Cue: When examinee simulates opening CV-31954, tell examinee that the engine started.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 93 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EG-11F, Perform Local Emergency Start of a Diesel Generator, Rev. 0 Performance Step: Manually close D 1 air start valve Critical Standard: Examinee simulates closing CV-31954 Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Manually Flash D 1 Diesel Generator field.

Critical Standard: Examinee simulates depressing CS-55301 to initiate manual Field Flash of D 1 Diesel Generator.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Adjust frequency and voltage of D 1 Diesel Generator.

Critical Standard: Examinee simulates adjusting D 1 Frequency and voltage as needed to attain 60 Hz and approximately 4160 volts as indicated on the local gage panel.

Examiner Cue: When examinee observes frequency and voltage on the local gage panel, tell examinee the frequency is 60 Hz and voltage is 4160.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 94 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EG-11F, Perform Local Emergency Start of a Diesel Generator, Rev. 0 Performance Step: Perform a visual check of the Diesel Generator gage panel for normal operation.

Critical Standard: Examinee looks at the engine and gauges on the gage panel to observe any abnormalities Evaluator Cue:

When the examinee looks at the gauges, tell examinee that all parameters read in the normal range and no abnormalities are observed.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Verify room supply and exhaust fans on and dampers open.

Critical Standard: Examinee performs a visual inspection of the ventilation equipment, but if the control room has not energized the safeguard bus yet, then the fans will not be on.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Contact the Control Room Critical Standard: Examinee may contact the control room to verify they know the Diesel Generator is available. (Main Control board indications will provide this info)

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: The JPM may be terminated after the examinee performs a visual inspection of the engine and gauges.

Stop Time:

Page 95 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EG-11F, Rev. 0 TURNOVER SHEET INITIAL CONDITIONS:

A Loss of All AC Power has occurred and the crew is at step 18 of ECA 0.0.

All efforts to restore power have been unsuccessful so far.

INITIATING CUES (IF APPLICABLE):

The Unit I SS has directed you to proceed with a flashlight and copy of C - 20.7 to D - 1 Diesel Generator Room to perform a local Emergency Start of D - 1.

Page 96 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

53. Are all items on the signature page filled in correctly?
54. Has the JPM been reviewed and validated by SMEs?
55. Can the required conditions for the JPM be appropriately established in the simulator if required?
56. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
57. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
58. Has the completion time been established based on validation data or incumbent experience?
59. If the task is time critical, is the time critical portion based upon actual task performance requirements?
60. Is the Licensee level appropriate for the task being evaluated if required?
61. Is the K/A appropriate to the task and to the licensee level if required?
62. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

63. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
64. Are all references identified, current, accurate, and available to the trainee?
65. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 97 of 14

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Prairie Island TASK TITLE: RESPONSE TO CONTAINMENT ISOLATION FAILURE JPM NUMBER: E0-29SF-1 REV. 0 RELATED PRA DOMINANT EVENT SEQUENCE leading to loss of secondary heat sink INFORMATION: contributes 22% to CDF. This task is part of the mitigating strategies for loss of secondary heat sink.PRA Identified Task TASK NUMBERS: CRO 3010010601 K/A NUMBERS: 013A4.01 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path/Faulted: NO TASK APPLICABILITY: SRO, RO Additional signatures may be added as needed.

Developed by: Dennis Westphal 7/14/03 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 98 of 14

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EO-21SF-1, RCS Bleed & Feed During Response to a Loss of Secondary Heat Sink with a PORV Failing to Open, Rev. 6 JPM Number: E0-29SF-1 JPM

Title:

RESPONSE TO CONTAINMENT ISOLATION FAILURE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required Procedure adequately addresses task elements.

Enter Identifier here:

Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 99 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EO-21SF-1, RCS Bleed & Feed During Response to a Loss of Secondary Heat Sink with a PORV Failing to Open, Rev. 6 JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • The AFW pumps tripped.
  • The crew identified a red path on heat sink.
  • ERCS data is unreliable. Do not use ERCS.
  • Outplant operators are attempting to establish AFW flow per C28.1.

INITIATING CUES (IF APPLICABLE):

  • You have been directed by the SS to respond to the heat sink red path per FR-H.1 Loss of Secondary Heat Sink, step 1.

Page 100 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EO-21SF-1, RCS Bleed & Feed During Response to a Loss of Secondary Heat Sink with a PORV Failing to Open, Rev. 6 JPM PERFORMANCE INFORMATION Required Materials: None General

References:

1FR-H.1 Task Standards: Bleed and feed established to RCS Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Check RCS pressure greater than any intact S/G pressure.

Critical N Standard: RCS pressure checked on RCS pressure indicators - 1PI-709, 1PI-710 or recorder 1PR-420; OR PRZR pressure indicators - 1PI-429, 430,431, 449A, or recorder 1PR-429; and compared to S/G pressure on

  • #11 S/G pressure recorder - 42068 or verified using 1PI-468, 469, 482A for
  1. 11 S/G.
  • #12 S/G pressure recorder - 42069 or verified using 1PI-478, 479, 483A for
  1. 12 S/G.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 101 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EO-21SF-1, RCS Bleed & Feed During Response to a Loss of Secondary Heat Sink with a PORV Failing to Open, Rev. 6 Performance Step: Check RCS hot leg temperature greater than 350°F.

Critical N Standard: RCS hot leg temperature verified > 350°F on 1TR-450 and 1TR-451.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Check wide range level greater than 9% in either S/G.

Critical N Standard: S/G levels checked, less than 9% on 1LR-460 and 1LR-470.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Stop #11 and #12 reactor coolant pumps.

Critical Y (SEQ-1)

Standard: CS-46255 and CS-46256 to stop; green indicating lights on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Actuate SI.

Critical Y (SEQ-2)

Standard: SI actuated with CS-46408 or CS-46180. Annunciator 47014-0604 energized.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 102 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EO-21SF-1, RCS Bleed & Feed During Response to a Loss of Secondary Heat Sink with a PORV Failing to Open, Rev. 6 Performance Step: Check #11 or #12 SI pumps running.

Critical N Standard: CS-46178 or CS-46179 red indicating light on; discharge pressure on 1PI-922 or 1PI-923.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Check SI valve alignment for operating pumps - proper emergency alignment.

Critical N Standard: Suction Valves:

  • MV-32162 open; CS-46193 red indicating light on
  • MV-32163 open ; CS-46194 red indicating light on BAST to SI Pumps:
  • MV-32081 open; CS-46198 indicating light on
  • MV-32082 open; CS-46199 red indicating light on; AND SI Not Ready Light not lit for:
  • MV-32083-E1 (light out)

SI Supply to Cold Legs. SI Not Ready Lights not lit for:

  • MV-32070-C3 (lights out)
  • MV-32068-D3 (lights out)
  • MV-32073-A3 (lights out)

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Reset containment isolation.

Critical N Standard: Containment isolation reset with CS-46083 and CS-46084. Annunciator 47018-0505 de-energized.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 103 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EO-21SF-1, RCS Bleed & Feed During Response to a Loss of Secondary Heat Sink with a PORV Failing to Open, Rev. 6 Performance Step: Establish instrument air to containment.

Critical N Standard: CV-31740 and CV-31741 verified open. Red indication light on CS-46154 and CS-46155.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Verify power to pressurizer PORV block valves available.

Critical N Standard: Red indicating light on CS-46263 energized.

Green indicating light on CS-46264 energized.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Verify PRZR PORV block valves - both open Critical N Standard: MV-32196 closed, CS-46264 green light on.

MV-32195 open, CS-46263 red light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Open MV-32196 (CV-31232 block valve).

Critical Y (SEQ-3)

Standard: CS-46264 taken to the open position. Red indicating light on; green indicating light off.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 104 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EO-21SF-1, RCS Bleed & Feed During Response to a Loss of Secondary Heat Sink with a PORV Failing to Open, Rev. 6 Performance Step: Open CV-31231 pressurizer PORV.

Critical N Standard: CS-46260 placed in the open position.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Open CV-31232 pressurizer PORV.

Critical Y (SEQ-3)

Standard: CS-46259 placed in the open position .

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Verify adequate RCS vent path, both PORVs open.

Critical N Standard: CV-31231 closed, CS-46260 green light on.

CV-31232 open, CS-46259 red light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Open RCS vents.

Critical Y (SEQ-3)

Standard: SV-37035 opened, CS-46282 taken to open, CS-46282 red light on.

SV-37036 opened, CS-46285 taken to open, CS-46285 red light on.

SV-37037 opened, CS-46283 taken to open, CS-46283 red light on.

SV-37038 opened, CS-46286 taken to open, CS-46286 red light on and either of the following:

SV-37039 opened, CS-46284 taken to open, CS-46284 red light on OR SV-37040 opened, CS-46287 taken to open, CS-46287 red light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 105 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EO-21SF-1, RCS Bleed & Feed During Response to a Loss of Secondary Heat Sink with a PORV Failing to Open, Rev. 6 Terminating Cues: SI pumps running with flow, one PZR PORV open, RCS vents open Stop Time:

Page 106 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EO-21SF-1, RCS Bleed & Feed During Response to a Loss of Secondary Heat Sink with a PORV Failing to Open, Rev. 6 SIMULATOR SETUP Instructor Guide:

  • Initialize the simulator to IC-10.
  • Close MV-32196 (PCV-430 Block Valve).
  • Insert malfunction for Pzr PORV 431C failure (relative order 0)
  • Insert malfunctions FW13A and FW13B (feedwater pump trip) on remote #1 (relative order 1).
  • Insert malfunctions FW32, FW33 (AFW pump trip) on remote #2 (relative order 2).
  • I/O #11 SG WR level recorder, #12 SG WR level recorder (relative order 3):

42064-R 42078-G 42064-G42078-R 46064-B 42078-B

  • Freeze; give initial conditions.
  • Silence alarms when ready to begin JPM. Take simulator to run.

REL.

ORDER PAGE ENTRY CODE ENTRY DESCRIPTION 0 MFS 1, RC16B PZR PORV PCV-431C failed closed.

1 MFS 2, FW13A,,,,,1 #11 feedwater pump trip 1 MFS 3, FW13B,,,,,1 #12 feedwater pump trip 2 MFS 4, FW32,,,,,2 #11 AFW pump trip 2 MFS 5, FW33,,,,,2 #12 AFW pump trip 3 IOS 1, 42064-R,,,5 11 S/G wide range recorder red 3 IOS 2, 42064-G,,,5 11 S/G wide range recorder green 3 IOS 3, 42078-R,,,5 12 S/G wide range recorder red 3 IOS 4, 42078-G,,,5 12 S/G wide range recorder green 3 IOS 5, 42064-B,,,5 11 S/G wide range recorder blue 3 IOS 6, 42078-B,,,5 12 S/G wide range recorder blue Page 107 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

EO-21SF-1, Rev. 6 TURNOVER SHEET INITIAL CONDITIONS:

  • The AFW pumps tripped.
  • The crew identified a red path on heat sink.
  • ERCS data is unreliable. Do not use ERCS.
  • Outplant operators are attempting to establish AFW flow per C28.1.

INITIATING CUES (IF APPLICABLE):

  • You have been directed by the SS to respond to the heat sink red path per FR-H.1 Loss of Secondary Heat Sink, step 1.

Page 108 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

66. Are all items on the signature page filled in correctly?
67. Has the JPM been reviewed and validated by SMEs?
68. Can the required conditions for the JPM be appropriately established in the simulator if required?
69. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
70. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
71. Has the completion time been established based on validation data or incumbent experience?
72. If the task is time critical, is the time critical portion based upon actual task performance requirements?
73. Is the Licensee level appropriate for the task being evaluated if required?
74. Is the K/A appropriate to the task and to the licensee level if required?
75. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

76. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
77. Are all references identified, current, accurate, and available to the trainee?
78. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 109 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Prairie Island TASK TITLE: RESPONSE TO CONTAINMENT ISOLATION FAILURE JPM NUMBER: E0-29SF-1 REV. 0 RELATED PRA PRA Identified Task INFORMATION:

TASK NUMBERS: CRO 3010010601 K/A NUMBERS: 013A4.01 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 25 Minutes Time Critical:

Alternate Path /

Faulted:

TASK APPLICABILITY: SRO, RO Additional signatures may be added as needed.

Developed by: Dennis Westphal 7/14/03 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 110 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 JPM Number: E0-29SF-1 JPM

Title:

RESPONSE TO CONTAINMENT ISOLATION FAILURE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required Procedure adequately addresses task elements.

Enter Identifier here:

Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 111 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Both Units were at 100% power.
  • A fire occurred in the Control Room and thick black smoke made visibility very difficult.
  • The Unit 1 SS made the decision to evacuate the Control Room and to implement F5 Appendix B, Control Room Evacuation (Fire).
  • You are the Unit 2 RO and have completed steps A through D of F5 Appendix B, Attachment D, such that the:
  • reactor is tripped,
  • turbine is tripped,
  • pressurizer PORV block valves are closed.

INITIATING CUES (IF APPLICABLE):

  • You are to complete the Unit 2 RO actions for Control Room Evacuation in accordance with F5 Appendix B, Attachment D, starting at Step E.

Page 112 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 JPM PERFORMANCE INFORMATION Required Materials: Copy of F5 Appendix B, Attachment D General

References:

F5 Appendix B Task Standards: F5 Appendix B, Attachment D - Unit 2 Reactor Operator Actions completed.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Proceed with radio, flashlight, set of keys, and this Attachment (D) to 695' level, Critical Aux Bldg, CC Pump area. (Use lighted stairwell, near Records Room to Access Control, through Normal Exit door into Aux Bldg, down stairwell and east of Boric Acid aisle to 695' level.)

Standard: Candidate goes to the Auxiliary Building with radio, flashlight, set of keys, and Attachment D.

Evaluator Cue: As candidate states that he/she would obtain a radio, flashlight, and set of keys, inform candidate that they have obtained said items.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 113 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 Performance Step: Place 11 and 21 Component Cooling Pump LOCAL/REMOTE switches to Critical Y (S-1) "LOCAL".

Standard: CS-19606, 11 CC Pmp Lcl/Rem Sel Sw and CS-19608, 21 CC Pmp Lcl/Rem Sel SW simulated placed in "LOCAL".

Evaluator Cue: Use cues as needed to insure you as the examiner understand clearly the action the examinee has simulated.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Secure the RHR Sump Suction path:

Critical Y (S-1) 3. Place MCC Bkr 2KA2-D1, Sump B to 22 RHR Pump MV-32179, in the "OFF" position.

Standard: MCC Bkr 2KA2-D1 simulated placed in the "OFF" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Place MCC Bkr 2K2-A4, 22 SG MS Sply to 22 TD AFW Pmp MV-32020 in the Critical Y (S-1) "OFF" position.

Standard: MCC Bkr 2K2-A4 simulated placed in the "OFF" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 114 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 Performance Step: Secure 23 charging pump Critical Y (S-1) 2. Place MCC Bkr 2K2-B4, 23 Charging Pump bkr in the "OFF" position.

Standard: MCC Bkr 2K2-B4 simulated placed in the "OFF" position.

Evaluator Note:

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Secure 21 Charging Pump Critical Y (S-1) 4. Place MCC Bkr 2K2-C4, 21 Charging Pump bkr in the "OFF" position.

Standard: MCC Bkr 2K2-C4 simulated placed in the "OFF" position.

Evaluator Note:

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 115 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 Performance Step: Place MCC Bkr 2K1-G3, 21 SG MS Sply to 22 TD AFW Pmp MV-32019 in the Critical Y (S-1) "OFF" position.

Standard: MCC Bkr 2K1-G3 simulated placed in the "OFF" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Secure the RHR Sump Suction path:

Critical Y (S-1) 1. Place MCC Bkr 2K1-D1, Sump B to 21 RHR Pump MV-32178, in the "OFF" position.

Standard: MCC Bkr 2K1-D1 placed in the "OFF" position.

Evaluator Note:

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Proceed to 735' level above CV-31116, 21 SG MS Isol CV.

Critical Standard: Candidate goes to the 735' level above CV-31116.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 116 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 Performance Step: CLOSE 2SA-59-60, Conn 4 AJB-45, in Air Junction Box 45.

Critical Y (S-2)

Standard: 2SA-59-60 simulates CLOSED.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Remove CV-31116, Accumulator vent line plug.

Critical Y (S-3)

Standard: CV-31116 Accumulator vent line plug simulated removed.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: OPEN 2MS-27-1, 21 SG MS Isol CV-31116 Accum Vent.

Critical Y (S-4)

Standard: 2MS-27-1 simulated OPENED.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 117 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 Performance Step: Check OPEN MV-32019, 21 SG MS Sply to 22 TD AFW Pmp MV. If not OPEN, Critical then manually OPEN MV-32019.

Standard: MV-32019 checked OPENED.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Proceed to CV-31117, 22 SG MS Isol CV.

Critical Standard: Candidate goes to CV-31117.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Remove Red Air Supply Tag and CLOSE Accumulator Local Air Supply Isolation Critical Y (S-5) Valve to CV-31117.

Standard: Red Air Supply Tag simulated removed and Accumulator Local Air Supply Isolation Valve to CV-31117 CLOSED.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 118 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 Performance Step: Remove CV-31117, Accumulator vent line plug.

Critical Y (S-6)

Standard: CV-31117 Accumulator vent line plug simulated removed.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: OPEN 2MS-27-2, 22 SG MS Isol CV-41117 Accum Vent.

Critical Y (S-7)

Standard: 2MS-27-2 simulated OPENED.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Check OPEN MV-32020, 22 SG MS Sply to 22 TD AFW Pmp MV. If not OPEN, Critical then manually OPEN MV-32020.

Standard: MV-32020 checked OPENED.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 119 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 Performance Step: Proceed to 22 Charging Pump Room.

Critical Standard: Candidate goes to 22 Charging Pump Room.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: OPEN 2VC-1-1, MV32062 Bypass.

Critical Y (S-8)

Standard: 2VC-1-1 simulated OPENED.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Place CS-7082001, 22 Charging Pump Loc/Rem Sel Sw, in the "LOCAL" Critical Y (S-9) position.

Standard: CS-7082001 placed in the "LOCAL" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 120 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 Performance Step: Shift Charging Pump speed control to local by placing 2VC-33-1, 22 Chg Pmp Lcl Critical Y (S-10) Spd Cont 3-Way Vlv, in the "LOCAL" position.

Standard: 2VC-33-1 placed in the "LOCAL" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If 22 Charging Pump is not running, then check if power is available.

Critical Standard: 22 Charging Pump Stop Indicator Light Green, 7082005 verified LIT.

Evaluator Cue: If candidate asks if 22 Charging Pump is running, inform candidate that, "22 Charging Pump is not running."

When candidate asks if green indicator light 7082005 is lit, inform candidate that, "green light is LIT."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: When 480V power is available, then start 22 Charging Pump by momentarily Critical Y (S-11) depressing CS-7082002, 22 Charging Pump Start.

Standard: CS-7082002 momentarily simulated depressed to start 22 Charging Pump.

Evaluator Cue: 22 Charging Pump is running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 121 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 Performance Step: Using 2HSC-428E, 22 Chg Pump Speed Manual Loader, adjust 22 Charging Critical Y (S-12) Pump speed as necessary to maintain pressurizer level.

Standard: 2HSC-428E simulated used to adjust 22 Charging Pump speed as necessary to maintain pressurizer level.

Evaluator Cue: Pressurizer level is being maintained.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: CLOSE 2VC-3-8, 21 VCT Outlet.

Critical Y (S-13)

Standard: 2VC-3-8 simulated CLOSED.

Evaluator Note:

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Candidate contacts the SS on the radio to determine if RCP seals are to be Critical Y (S-14) isolated.

Standard: Candidate simulates contacting the SS on the radio.

Evaluator Note:

Evaluator Cue: As, SS direct candidate not to isolate RCP seals.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 122 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 Terminating Cues: After SS directs candidate not to isolate RCP seals, inform candidate that JPM is complete.

Stop Time:

Page 123 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-10, Appendix B, Attachment D - Unit 2 Reactor Operator Actions, Rev. 2 TURNOVER SHEET INITIAL CONDITIONS:

  • Both Units were at 100% power.
  • A fire occurred in the Control Room and thick black smoke made visibility very difficult.
  • The Unit 1 SS made the decision to evacuate the Control Room and to implement F5 Appendix B, Control Room Evacuation (Fire).
  • You are the Unit 2 RO and have completed steps A through D of F5 Appendix B, Attachment D, such that the:
  • reactor is tripped,
  • turbine is tripped,
  • pressurizer PORV block valves are closed.

INITIATING CUES (IF APPLICABLE):

  • You are to complete the Unit 2 RO actions for Control Room Evacuation in accordance with F5 Appendix B, Attachment D, starting at Step E.

Page 124 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

79. Are all items on the signature page filled in correctly?
80. Has the JPM been reviewed and validated by SMEs?
81. Can the required conditions for the JPM be appropriately established in the simulator if required?
82. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
83. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
84. Has the completion time been established based on validation data or incumbent experience?
85. If the task is time critical, is the time critical portion based upon actual task performance requirements?
86. Is the Licensee level appropriate for the task being evaluated if required?
87. Is the K/A appropriate to the task and to the licensee level if required?
88. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

89. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?
90. Are all references identified, current, accurate, and available to the trainee?
91. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 125 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Prairie Island TASK TITLE: RESPONSE TO CONTAINMENT ISOLATION FAILURE JPM NUMBER: E0-29SF-1 REV. 0 RELATED PRA PRA Identified Task INFORMATION:

TASK NUMBERS: CRO 3010010601 K/A NUMBERS: 013A4.01 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: Control Room:

Simulator: Other: X Lab:

Time for Completion: 10 Minutes Time Critical:

Alternate Path /

Faulted:

TASK APPLICABILITY: SRO, RO Additional signatures may be added as needed.

Developed by: Dennis Westphal 7/14/03 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 126 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 JPM Number: E0-29SF-1 JPM

Title:

RESPONSE TO CONTAINMENT ISOLATION FAILURE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required Procedure adequately addresses task elements.

Enter Identifier here:

Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 127 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Both Units were at 100% power.
  • A fire occurred in the Control Room and thick black smoke made visibility very difficult.
  • The Unit 1 SS made the decision to evacuate the Control Room and to implement F5 Appendix B, Control Room Evacuation (Fire).
  • You are the Unit 1 RO and have completed steps A through D of F5 Appendix B, Attachment C, such that the:
  • reactor is tripped,
  • turbine is tripped,
  • pressurizer PORV block valves are closed.

INITIATING CUES (IF APPLICABLE):

  • You are to complete the Unit 1 RO actions for Control Room Evacuation in accordance with F5 Appendix B, Attachment C, starting at Step E.

Page 128 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 JPM PERFORMANCE INFORMATION Required Materials: Copy of F5 Appendix B, Attachment C General

References:

F5 Appendix B Task Standards: F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions completed.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Proceed with radio, flashlight, set of keys, and this Attachment (C) to both turbine Critical front standards and verify turbines are tripped.

Standard: Examinee goes to both turbine front standards with radio, flashlight, set of keys, and Attachment C and verifies both Units turbines are tripped.

Evaluator Note: Examinee should indicate how he/she would determine if the turbines are tripped and then how he/she would trip the turbines if they were running.

Evaluator Cue: As examinee states that he/she would obtain a radio, flashlight, and set of keys, inform examinee that they have obtained said items.

After examinee demonstrates appropriate methods of determining the status of turbine operation and how to trip the turbines locally, inform examinee that, "both turbines are tripped."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 129 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 Performance Step: Proceed to the Screenhouse, 675' level, and check PI-11021, 11 MD CLWP Critical DSCH PI 75 psig or greater. (Use lighted stairwell, near Records Room, across under turbine pedestal, out through Old Admin Bldg door to Screenhouse east door, then use stairwell on east end of Screenhouse to reach 675' level.)

Standard: Examinee goes to Screenhouse 675' level and checks PI-11021 75 psig or greater.

Evaluator Cue: PI-11021 indicates 0 psig.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If PI-11021 is reading less than 75 psig, then proceed to 12 DDCLP room and Critical Y (S-1) start 12 DDCLP as follows:

1. OPEN knife switch SW 7030038, 12 DD CLWP Cont Pnl Pwr Isol Knife Switch.

Standard: Examinee goes to 12 DDCLP room and simulate OPENING knife switch SW 7030038.

Evaluator Cue: Provide cues as needed to insure you as the examiner clearly understand the action the examinee has simulated.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 130 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 Performance Step: If PI-11021 is reading less than 75 psig, then proceed to 12 DDCLP room and Critical Y (S-2) start 12 DDCLP as follows: (cont'd)

2. Manually override one of the starting air solenoid valves, by turning the small knob at the base of the solenoid, to admit air to the starting motor. Return the knob to the "SHUTOFF" position when the engine gets up to full speed.

Standard: One of the starting air solenoid valves is simulated manually overridden and returned to the "SHUTOFF" position when the engine is up to full speed.

Evaluator Cue: When examinee indicates that he/she would turn the override knob to admit air to the starting motor, inform examinee that, "the engine is running."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If PI-11021 is reading less than 75 psig, then proceed to 12 DDCLP room and Critical start 12 DDCLP as follows: (cont'd)

3. Verify OPEN CV-31423, 12 DD Clg Wtr Jckt Clr Outl CV.

Standard: CV-31423 verified OPEN.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If PI-11021 is reading less than 75 psig, then proceed to 12 DDCLP room and Critical start 12 DDCLP as follows: (cont'd)

4. Verify cooling water header is pressurized using PI-11022, 12 DD CLWP Dsch PI.

Standard: PI-11022 used to verify cooling water header pressurized.

Evaluator Cue: PI-11022 indicates 85 psig.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 131 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 Performance Step: If PI-11021 is reading less than 75 psig, then proceed to 12 DDCLP room and Critical Y (S-3) start 12 DDCLP as follows: (cont'd)

5. Proceed to 121 MD Cooling Water Pump Room and place CS-19058, 11 Sfgds Scrnhse Roof Exht Fan, in the "ON" position.

Standard: CS-19058 simulated placed in the "ON" position.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If it was necessary to start 12 DDCLP, then proceed to 22 DDCLP Room and Critical check 22 DDCLP running. If not, then start 22 DDCLP as follows:

Standard: Examinee goes to 22 DDCLP Room and determines that 22 DDCLP is not running.

Evaluator Cue: 22 DDCLP is not running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If it was necessary to start 12 DDCLP, then proceed to 22 DDCLP Room and Critical Y (S-4) check 22 DDCLP running. If not, then start 22 DDCLP as follows:

1. OPEN knife switch SW 7035038, 22 DD CLWP Cont Pnl Pwr Isol Knife Switch.

Standard: SW 7035038 is simulated OPENED.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 132 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 Performance Step: If it was necessary to start 12 DDCLP, then proceed to 22 DDCLP Room and Critical Y (S-5) check 22 DDCLP running. If not, then start 22 DDCLP as follows: (cont'd)

2. Manually override one of the starting air solenoid valves, by turning the small knob at the base of the solenoid, to admit air to the starting motor. Return the knob to the "SHUTOFF" position when the engine gets up to full speed.

Standard: One of the starting air solenoid valves is simulated manually overridden and returned to the "SHUTOFF" position when the engine is up to full speed.

Evaluator Cue: When Examinee indicates that he/she would turn the override knob to admit air to the starting motor, inform examinee that, "the engine is running."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If it was necessary to start 12 DDCLP, then proceed to 22 DDCLP Room and Critical check 22 DDCLP running. If not, then start 22 DDCLP as follows: (cont'd)

3. Verify OPEN CV-31457, 22 DD Clg Wtr Jckt Clr Outl CV.

Standard: CV-31457 verified OPEN.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 133 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 Performance Step: If it was necessary to start 12 DDCLP, then proceed to 22 DDCLP Room and Critical check 22 DDCLP running. If not, then start 22 DDCLP as follows: (cont'd)

4. Verify cooling water header is pressurized using PI-11024, 22 DD CLWP Dsch PI.

Standard: PI-11024 used to verify cooling water header pressurized.

Evaluator Cue: PI-11024 indicates 85 psig.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: Proceed to Screenhouse 695' level, southeast corner, and check PI-11082, Critical Scrnhse FP Hdr PI, 90 psig or greater.

Standard: Examinee goes to Screenhouse 695' level and checks PI-11082 90 psig or greater.

Evaluator Cue: PI-11082 indicates 70 psig.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical then start 122 Diesel Fire Pump per Attachment L.

Standard: Examinee determines that 122 Diesel Fire Pump is not running.

Evaluator Cue: 122 Diesel Fire Pump is not running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 134 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical then start 122 Diesel Fire Pump per Attachment L.

1. At panel 136-2, place Dsl Fire Pmp 121 Oil Stg Tk Pump local AUTO/REMOTE/LOCAL control switch CS-19081 in "AUTO".

Standard: CS-19081 is checked in "AUTO".

Evaluator Cue: CS-19081 is in "AUTO".

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical then start 122 Diesel Fire Pump per Attachment L.

2. Ensure the Battery Charger Control switch is in "ON".

Standard: Battery Charger Control Switch verified in the "ON" position.

Evaluator Cue: Battery Charger Control Switch is "ON".

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical then start 122 Diesel Fire Pump per Attachment L.

3. Depress and release the Reset pushbutton CS-70394-04 located inside of the diesel control cabinet.

Standard: CS-70394-04 simulates depressed and released.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 135 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical then start 122 Diesel Fire Pump per Attachment L.

4. Turn local 5 - position selector switch CS-70394-01 to "MAN-A" or "MAN-B".

Standard: CS-70394-01 selected to "MAN-A" or "MAN-B".

Evaluator Cue: CS-70394-01 is in "MAN-A" ("MAN-B").

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical then start 122 Diesel Fire Pump per Attachment L.

5. Depress Start pushbutton CS-70394-02 to crank engine. Release the pushbutton when the diesel starts.

Standard: CS-70394-02 simulated depressed and released within 30 seconds.

Evaluator Note: The diesel is not to be cranked on one set of batteries continuously for longer than 30 seconds.

Evaluator Cue: CS-70394-02 the engine does not crank.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 136 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical then start 122 Diesel Fire Pump per Attachment L.

6. If the engine fails to start within 20 seconds, or if the engine fails to crank, then turn the local 5 - position switch to the opposite Manual position of the position selected in Step 4 above and repeat Step 5.

Standard: CS-70394-01 simulated selected to "MAN-B" or "MAN-A" (opposite of last position) and CS-70394-02 depressed and released within 30 seconds.

Evaluator Note: The diesel is not to be cranked on one set of batteries continuously for longer than 30 seconds.

Evaluator Cue: Examinee indicates that he/she would position CS-70394-01 to the opposite position from previously selected position.

When examinee indicates that he/she would depress CS-70394-02, inform examinee that, the engine does not crank."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical then start 122 Diesel Fire Pump per Attachment L.

7. If engine fails to start in either "MAN-A" or "MAN-B" position and it is required for an emergency situation, then continue with Step 8.

Standard: Examinee determines that 122 Diesel Fire Pump is required for an emergency situation and continues on with Step 8.

Evaluator Cue: If examinee asks if 122 Diesel Fire Pump is required for an emergency situation, inform examinee that, "fire water pressure is low due to fire fighting efforts and 122 Diesel Fire Pump is required."

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 137 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical Y (S-6) then start 122 Diesel Fire Pump per Attachment L.

8. Turn the Manual Override Knob fully clockwise to bypass the electric solenoid control and permit fuel flow.

Standard: Examinee simulates Manual Override Knob turned fully clockwise.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical Y (S-7) then start 122 Diesel Fire Pump per Attachment L.

9. OPEN cooling line bypass valve to the heat exchanger FP-121-3.

Standard: Cooling line bypass valve simulated OPENED.

Evaluator Cue:

Performance: SATISFACTORY UNSATISFACTORY Comments:

Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical then start 122 Diesel Fire Pump per Attachment L.

10.Lift Contactor A Start Lever to the Emergency Start.

Standard: Contactor A Start Lever simulated lifted to the Emergency Start position.

Evaluator Note: The diesel is not to be cranked on one set of batteries continuously for longer than 30 seconds.

Evaluator Cue: The engine does not crank.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Page 138 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, F5 Appendix B, Attachment C - Unit 1 Reactor Operator Actions, Rev. 3 Performance Step: If PI-11082 is less than 90 psig, then check 122 Diesel Fire Pump running. If not, Critical Y (S-8) then start 122 Diesel Fire Pump per Attachment L.

11.If engine fails to start within 20 seconds, then lift Contactor B Start.

Standard: Contactor B Start Lever simulated lifted to the Emergency Start position.

Evaluator Note: The diesel is not to be cranked on one set of batteries continuously for longer than 30 seconds.

Evaluator Cue: The engine is running.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When 122 Diesel Fire Pump is started, inform examinee that, "this JPM is complete."

Stop Time:

Page 139 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

F5-9, Rev. 3 TURNOVER SHEET INITIAL CONDITIONS:

  • Both Units were at 100% power.
  • A fire occurred in the Control Room and thick black smoke made visibility very difficult.
  • The Unit 1 SS made the decision to evacuate the Control Room and to implement F5 Appendix B, Control Room Evacuation (Fire).
  • You are the Unit 1 RO and have completed steps A through D of F5 Appendix B, Attachment C, such that the:
  • reactor is tripped,
  • turbine is tripped,
  • pressurizer PORV block valves are closed.

INITIATING CUES (IF APPLICABLE):

  • You are to complete the Unit 1 RO actions for Control Room Evacuation in accordance with F5 Appendix B, Attachment C, starting at Step E.

Page 140 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A

92. Are all items on the signature page filled in correctly?
93. Has the JPM been reviewed and validated by SMEs?
94. Can the required conditions for the JPM be appropriately established in the simulator if required?
95. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?
96. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?
97. Has the completion time been established based on validation data or incumbent experience?
98. If the task is time critical, is the time critical portion based upon actual task performance requirements?
99. Is the Licensee level appropriate for the task being evaluated if required?

100. Is the K/A appropriate to the task and to the licensee level if required?

101. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

102. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

103. Are all references identified, current, accurate, and available to the trainee?

104. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 141 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Prairie Island TASK TITLE: RESPONSE TO CONTAINMENT ISOLATION FAILURE JPM NUMBER: E0-29SF-1 REV. 0 RELATED PRA None INFORMATION:

TASK NUMBERS: CRO 3010010601 K/A NUMBERS: 013A4.01 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: X Perform:

EVALUATION LOCATION: In-Plant: X Control Room:

Simulator: Other:

Lab:

Time for Completion: 10 Minutes Time Critical: NO Alternate Path /

NO Faulted:

TASK APPLICABILITY: SRO, RO Additional signatures may be added as needed.

Developed by: Dennis Westphal 6/6/03 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 142 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

MS-4, LOCALLY OPEN 12S/G PORV, Rev. # 5 JPM Number: E0-29SF-1 JPM

Title:

RESPONSE TO CONTAINMENT ISOLATION FAILURE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 143 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

MS-4, LOCALLY OPEN 12S/G PORV, Rev. # 5 JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • Unit 1 has experienced a loss of all AC power.
  • Attempts to restore power IAW 1ECA-0.0 have thus far been unsuccessful.
  • The Control Room Operators have made the decision to depressurize the RCS by depressurizing the S/G's.
  • Instrument Air header pressure is 0 psig.

INITIATING CUES (IF APPLICABLE):

  • The Control Room Operator has directed you to locally dump steam from 12 S/G by locally-manually opening S/G PORV fully IAW 1ECA-0.0 Step 28.b. RNO.

Page 144 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

MS-4, LOCALLY OPEN 12S/G PORV, Rev. # 5 JPM PERFORMANCE INFORMATION Required Materials: None General

References:

1ECA-0.0 Task Standards: 12 S/G PORV (CV-31089 handwheel used to simulate opening the valve fully.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Locally dump steam from 12 SG using PORV (CV-31089).

Critical Y (SEQ-1)

Standard: 12 SG PORV handwheel used to open CV-31089 fully.

Evaluator Note: Handwheel must be turned clockwise to open valve.

Evaluator Cue: When examinee simulates turning the handwheel clockwise, inform him/her that steam flow can be heard through valve. After the examinee continues to turn the handwheel, tell him/her the valve is full open.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: When examinee indicates that PORV is fully open.

Stop Time:

Page 145 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

MS-4, Rev. # 5 TURNOVER SHEET INITIAL CONDITIONS:

  • Unit 1 has experienced a loss of all AC power.
  • Attempts to restore power IAW 1ECA-0.0 have thus far been unsuccessful.
  • The Control Room Operators have made the decision to depressurize the RCS by depressurizing the S/G's.
  • Instrument Air header pressure is 0 psig.

INITIATING CUES (IF APPLICABLE):

  • The Control Room Operator has directed you to locally dump steam from 12 S/G by locally-manually opening S/G PORV fully IAW 1ECA-0.0 Step 28.b. RNO.

Page 146 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A 105. Are all items on the signature page filled in correctly?

106. Has the JPM been reviewed and validated by SMEs?

107. Can the required conditions for the JPM be appropriately established in the simulator if required?

108. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

109. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

110. Has the completion time been established based on validation data or incumbent experience?

111. If the task is time critical, is the time critical portion based upon actual task performance requirements?

112. Is the Licensee level appropriate for the task being evaluated if required?

113. Is the K/A appropriate to the task and to the licensee level if required?

114. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

115. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

116. Are all references identified, current, accurate, and available to the trainee?

117. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of plant insurance policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 147 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

PS-6S, Respond to Pressurizer Level Channel Failed High SIMULATOR JPM GUIDE PS-6S rev. 0 Respond to Pressurizer Level Channel Failed High 7/2/03 JPM NUMBER/TITLE DATE Approved by:

TRAINING MANAGEMENT Approved by:

PROGRAM OWNER EVALUATION LOCATION: PLANT SIMULATOR CONTROL ROOM EVALUATION METHOD: PERFORM SIMULATE AVG. COMPLETION TIME: 12 AVG. TIME FOR THIS JPM IN MINUTES TIME CRITICAL TASK: YES NO MAX. COMPLETION TIME: MAX. TIME ALLOWED FOR JPM IN MINUTES N/A FOR NON-TIME CRITICAL JPM LICENSEE LEVEL: SRO RO OTHER: list applicable positions as needed TASK NUMBER: CRO 011.ATI.01 TASK NUMBER TASK TITLE: Respond to pressurizer level failed high TASK TITLE TASK TYPE: INITIAL CONTINUING K/A

REFERENCE:

2.1.23 K/A REFERENCE PLANT SYSTEM: Pressurizer Level PLANT SYSTEM NAME/NUMBER CRITICAL STEPS: Yes CRITICAL (C) STEPS SEQUENCE CRITICAL (S) STEPS TIME (T) CRITICAL STEPS TOOLS & EQUIPMENT: Simulator

REFERENCES:

C-51 Instrument Failure Guide, C47012 Note: The follow Simulator JPM and simulator Setup, Malfunctions, Override, Remote Function sections are only applicable when simulator is used.

Page 148 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

PS-6S, Respond to Pressurizer Level Channel Failed High SIMUALTOR JPM IF the Operator is present when setting up for the JPM, THEN read the following:

PLEASE STANDBY WHILE WE ESTABLISH CONDITIONS FOR THE NEXT JPM.

Ensure the simulator is clear of all unauthorized individuals and conducive to conducting the examination.

- Initialize to IC-10

- Place the simulator in run

- Place CS-46291, PZR level control selector switch is in 2-3 pos. (White-Blue)

- Place the simulator in freeze

- Read the Cue to the examinee: Respond to plant conditions

- Place the simulator to run

- Enter the over ride to cause the pressurizer LT to fail high Ensure all procedures and other materials necessary to conduct the JPM examination are in their proper locations Page 149 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

PS-6S, Respond to Pressurizer Level Channel Failed High SIMULATOR SET UP:

EVENT NUMBER EVENT FILE NAME EVENT LOGIC EVENT WORD STATEMENT DESCRITPTION SIMULATOR MALFUNCTIONS:

TIME MALFUNCTION MALFUNCTION ET DELAY F. SEV. RAMP I. SEV.

No. TITLE SIMULATOR OVERRIDES:

TIME OVERRIDE OVERRIDE ET DELAY VALUE RAMP ID. DESCRIPTION 0 RX206 Pzr level LT 428 100 SIMULATOR REMOTE FUNCTIONS:

TIME REMOTE REMOTE FUNTION TITLE VALUE RAMP FUNCTION No.

GO TO NEXT PAGE Page 150 of 178

QF-1030-13 Rev. 0 (FP-T-SAT-30)

PS-6S READ THE FOLLOWING INSTRUCTIONS TO THE OPERATOR:

THIS TASK IS NOT TIME CRITICAL THE TASK CONDITIONS ARE:

THE STEPS IN THIS JPM SHOULD BE:

INITIATING CUE: You are the Unit I RO, Respond to plant conditions INFORM THE EVALUATOR WHEN YOU HAVE COMPLETED THE TASK:

DO YOU HAVE ANY QUESTIONS BEFORE WE BEGIN?

Answer any questions the operator may have, then read the following to initiate the JPM:

IF THERE ARE NO FURTHER QUESTIONS THEN LETS BEGIN GO TO NEXT PAGE Page 151 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

INSTRUCTOR ACTIONS:

If required take the simulator out of freeze. (Only applicable if using simulator.)

Use the JPM evaluation form to mark the Operators performance as the task is being performed.

Follow the prescripted format for implementing the JPM evaluation.

Provide cues in accordance with the JPM.

Take notes to support the results of the pass/fail grade.

For unsatisfactory grades, documentation must be noted in the comments section of the JPM evaluation form.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 152 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

LOG START TIME:

NOTE: Critical steps are denoted with a C. Failure to meet the standard for this step constitutes failure.

PERFORMANCE STEP: Respond to Pressurizer level deviation alarm:

CRITICAL: - Verify level deviation

- Verify level controller LC-428 controlling in Auto

- Place charging in manual STANDARD: Charging placed in manual PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS: Examinee may respond to the alarm response or go directly to C-51 Instrument Failure Guide PERFORMANCE STEP: Determine LT 428 failed high and Implement C-51 Instrument CRITICAL: Failure Guide STANDARD: Implement C-51:

- Verify level indicator failed high

- Blue status light on for PZR high level RX trip 0313

- High level channel alert annunciator

- If Blue channel selected to level control

a. Charging to min. speed
b. Charging pump high/lo speed alarm
c. BU heaters on
d. PZR level deviation alarm PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 153 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

PERFORMANCE STEP: Control pressurizer heaters manually CRITICAL: N STANDARD: Pressurizer heater control switches are placed in any position except AUTO.

PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

PERFORMANCE STEP: Place charging in manual and adjust level to setpoint.

CRITICAL: C STANDARD: Charging pump speed control is placed in MANUAL.

If pressurizer level is above setpoint, charging flow is reduced until total flow is less than letdown + RCP seal leakoff.

If pressurizer level is below setpoint, charging flow is reduced until total flow is less than letdown + RCP seal leakoff.

PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

PERFORMANCE STEP: Select 2-1 (White-Red) on PZR level control selector switch CRITICAL: C STANDARD: PZR level control selector switch is placed in 2-1 (White-Red) position.

PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 154 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

PERFORMANCE STEP: Complete corrective actions of C-51 CRITICAL: N STANDARD: Complete corrective actions of C-51

- Return pressurizer heaters to auto

- Return one charging pump speed control to auto

- Ensure pressurizer level recorder not in Blue channel

- Recommend SS refer to TS LCO 3.3.1 PEFORMANCE SATISFACTORY RESULTS: UNSATISFACTORY COMMENTS:

TEMINATING CUE: JPM may be terminated when SS is referred to TS LOG STOP TIME:

When the operator competes the JPM, then read the following:

THAT COMPLETES THIS PORTION OF THE JPM.

Ask any required follow-up questions and note the questions and answers in the JPM evaluation comments section.

When follow-up questions are complete, then read the following:

THAT COMPLETES THIS JPM.

GO TO NEXT PAGE Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 155 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

VERIFICATION OF COMPLETION JPM NUMBER: __________________________________

JPM TITLE: ____________________________________________________________

OPERATOR:_______________________EVALUATOR:_________________________

VERIFICATION STATEMENT YES NO N/A Were all critical steps performed correctly?

If the JPM was time critical, Then was the JPM completed in the designated time?

If the JPM was not time critical, Then was acceptable progress made in performing the task?

Was the task standard met?

If any of the above questions were answered NO, then this JPM must be evaluated as unsatisfactory.

LICENSEE:

SRO RO SRO CERTIFICATION OTHER: list applicable positions as needed RESULTS:

SATISFACTORY UNSATISFACTORY COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE: ______________________________________

Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 156 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST MUT BE PERFORMED UPON INITIAL VALIDATION AND REVALIDATION PRIOR TO USE.

REVIEW STATEMENTS YES NO

1. All items on page one of this procedure are filled in correctly?
2. The JPM as been reviewed and validated by SMEs?
3. The required conditions for the JPM can be appropriately established in the simulator?
4. The performance steps accurately reflect operator actions in accordance with plant procedures?
5. The standard for each performance item is specific as to what controls, indications and ranges are required to evaluate if the operator properly performed the step?
6. The average completion time has been established based on validation data or incumbent experience?
7. Establishing the task as time critical is based on actual task performance requirements?
8. The maximum time requirement has been established based on actual task performance requirements or if a maximum time requirement does not apply, then it has been based on reasonable progress in completing the task?

9.Licensee level is appropriate for the task being evaluated?

14. The K/A is appropriate to the task and to the licensee level?
11. Critical steps have been identified and typed (C, S, T) appropriately?
12. All special tools and equipment needed to perform the task have been identified and are available to the trainee?
13. All references are identified, current and accurate, and available to the trainee?
14. All required cues (as can be anticipated) have been identified for the evaluator to assist task completion.

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 157 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Prairie Island TASK TITLE: RESPONSE TO CONTAINMENT ISOLATION FAILURE JPM NUMBER: E0-29SF-1 REV. 0 RELATED PRA Important Operator Action. This provides 10.3% CDF Reduction if performed INFORMATION: correctly.

TASK NUMBERS: CRO 3010010601 K/A NUMBERS: 013A4.01 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical:

Alternate Path /

Faulted:

TASK APPLICABILITY: SRO, RO Additional signatures may be added as needed.

Developed by: Dennis Westphal 7/14/03 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 158 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

[SI-11S], [Transfer SI to Recirculation Mode], [Rev. 12]

JPM Number: E0-29SF-1 JPM

Title:

RESPONSE TO CONTAINMENT ISOLATION FAILURE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required Procedure adequately addresses task elements.

Enter Identifier here:

Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 159 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

[SI-11S], [Transfer SI to Recirculation Mode], [Rev. 12]

JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • A large break LOCA has occurred on Unit 1.
  • All actions in 1E-0 performed to TRANSITION to 1E1.
  • All actions in 1FR-Z.1 were performed before TRANSITION to 1E1 was made.
  • All actions in 1E-1 were completed through and including Step 6.
  • RWST level has decreased to 32%.
  • SS has directed TRANSITION to 1ES-1.2 to transfer ECCS to recirculation.

INITIATING CUES (IF APPLICABLE):

  • The Unit 1 SS directs you to continue with 1ES-1.2 starting at step 2, and place Train A ECCS in the recirculation mode.

Page 160 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

[SI-11S], [Transfer SI to Recirculation Mode], [Rev. 12]

JPM PERFORMANCE INFORMATION Required Materials: None General

References:

1ES-1.2 Task Standards: Train A safeguard equipment in recirculation mode.

Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Reset SI Critical N Standard: Annunciator 47014-0504 on; Annunciator 47014-0604 off.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Reset containment spray.

Critical N Standard: CS-46001 and CS-46065 depressed, annunciator 47019-0103 off.

Evaluator Note: IF only CS-46001 is depressed, annunciator 47019-0103 off.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 161 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

[SI-11S], [Transfer SI to Recirculation Mode], [Rev. 12]

Performance Step: Check both trains of safeguards pumps available for recirculation Critical N Standard: Verifies both trains of safeguards pumps are running.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Stop 11 RHR pump.

Critical Y Standard: CS-46184 to stop position; green indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Stop 11 SI pump.

Critical Y Standard: CS-46178 to stop position; green indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Stop 11 containment spray pump.

Critical N Standard: CS-46008 to stop; green indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 162 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

[SI-11S], [Transfer SI to Recirculation Mode], [Rev. 12]

Performance Step: Close RWST to 11 RHR pump suction MV-32084.

Critical Y Standard: CS-46202 to close; green indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Close SI test line to RWST valves MV-32202 and MV-32203.

Critical Y Standard: CS-46204 and CS-46205 to close position; green indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Verify RHR to reactor vessel nozzle valves MV-32064 and MV-32065 open.

Critical N Standard: CS-46223 and CS-46224 red indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Align CC to RHR Heat Exchanger for Idle RHR Train, Opens MV-32093 Critical N Standard: CS-46023 red indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 163 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

[SI-11S], [Transfer SI to Recirculation Mode], [Rev. 12]

Performance Step: Check Sump B level adequate to support RHR Pump Operation Critical N Sump B level - 100% OR Containment level greater than 1.75 feet Standard: Checks Sump B levels on indicators 1LI725 and 1LI726 OR Containment levels on indicators 1LI727 and 1LI728.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Verify RWST to RHR isolation valves for 11 RHR pump are CLOSED, MV-Critical Y 32084.

Standard: Examinee checks red light off, green light on for CS-46202.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Check Sump B to RHR MV bonnets vented per Attachment K.

Critical N Standard: Examinee asks Aux Building Operator if bonnets vented.

Evaluator Cue: Aux Building Operator reports that bonnets vented per Attachment K.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Open Sump B to RHR isolation valves for 11 RHR pump MV-32075 AND MV-Critical Y 32077.

Standard: Positions CS-44210 and CS-46208 to OPEN; red light on for both switches.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 164 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

[SI-11S], [Transfer SI to Recirculation Mode], [Rev. 12]

Performance Step: Check if 12 containment spray pump can be stopped.

Critical N Check 12 Containment Spray Pump running Verify containment Pressure <20psig Stop 12 CS Pump Standard: CS-46009 to stop; green indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Verify Sump B to RHR isolation valves for 11 RHR pump are FULL OPEN, MV-Critical Y 32075 AND MV-32077.

Standard: Red light on and green light off for CS-44210 and CS-46208.

Evaluator Note: Examinee SHALL not proceed until both valves are full open.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Start 11 RHR pump.

Critical Y Standard: CS-46184 to start; red indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Check RCS pressure less than 125 psig.

Critical N Standard: Pressure check on 1PI-709, 1PI-710, ERCS, or 1PR-420 pressure greater than 125 psig. Transitions to step 14.

Evaluator Note: If indicated RCS pressure is less than 125 psig, tell examinee, RCS pressure is greater than 125 psig.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 165 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

[SI-11S], [Transfer SI to Recirculation Mode], [Rev. 12]

Performance Step: Close 11 SI pump suction isolation valve MV-32162.

Critical Y Standard: CS-46193 to close; green indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Check RHR pressure less than 210 psig.

Critical N Standard: Examinee checks RHR pressure less than 210 psig on 1PI-629.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Open 11 RHR pump supply to 11 SI pump suction MV-32206.

Critical Y Standard: CS-46206 to open; red indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Start 11 SI pump.

Critical Y Standard: CS-46178 to start; red indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 166 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

[SI-11S], [Transfer SI to Recirculation Mode], [Rev. 12]

Performance Step: Verify SI flow.

Critical N Standard: SI flow indicated on 1FI-925.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Close 11 RHR pump supply to reactor vessel nozzle MV-32064.

Critical N Standard: CS-46223 to close; green indicating light on.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Terminating Cues: 11 SI pump being supplied from 11 RHR pump via sump B, RHR supply to reactor vessel valve MV-32064 closed.

Stop Time:

Page 167 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

[SI-11S], [Transfer SI to Recirculation Mode], [Rev. 12]

SIMULATOR SETUP Instructor Guide:

  • Initialize the simulator to IC-10.
  • Insert code lines to prepare for transfer to recirc (Attachment K) (Relative Order 0).
  • Insert malfunction RC07A at 15% severity, cold leg LOCA (Relative Order 1).
  • Perform steps of E-0, E-1 through step 6.
  • Place all FCUs in slow and stop SFP Make-up and Exhaust Fans.
  • Freeze simulator after RCS pressure is less than 500 psig.
  • Give initial conditions.
  • Do not come out of freeze until just before the first control board manipulation.

REL.

ORDER CODE SEVERITY ENTRY DESCRIPTION 0 WD104 ANN SUMP WL-87-1 aligned to ASMP 0 WD105 ANN SUMP WL-87-2 aligned to ASMP 0 CH127 OFF Rad Waste Bldg Vent Stopped 0 CC111 Removed 11 CC Travel Stops Removed 0 CC112 Removed 12 CC Travel Stops Removed 0 SI107 NRML SI suction from RHR BKR ON 0 SI108 NRML SI suction from RHR BKR ON 0 SI115 33 Puts RWST to 33%

0 AO-1LI725 100 Sump B Level 0 AO-1LI726 100 Sump B Level 0 AO-1LI727 40 CTMNT Level 0 AO-1LI728 40 CTMNT Level 1 RC07A 15 Cold leg LOCA Page 168 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

[SI-11S], [Rev. 12]

TURNOVER SHEET INITIAL CONDITIONS:

  • A large break LOCA has occurred on Unit 1.
  • All actions in 1E-0 performed to TRANSITION to 1E1.
  • All actions in 1FR-Z.1 were performed before TRANSITION to 1E1 was made.
  • All actions in 1E-1 were completed through and including Step 6.
  • RWST level has decreased to 32%.
  • SS has directed TRANSITION to 1ES-1.2 to transfer ECCS to recirculation.

INITIATING CUES (IF APPLICABLE)

The Unit 1 SS directs you to continue with 1ES-1.2 starting at step 2, and place Train A ECCS in the recirculation mode.

Page 169 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A 118. Are all items on the signature page filled in correctly?

119. Has the JPM been reviewed and validated by SMEs?

120. Can the required conditions for the JPM be appropriately established in the simulator if required?

121. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

122. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

123. Has the completion time been established based on validation data or incumbent experience?

124. If the task is time critical, is the time critical portion based upon actual task performance requirements?

125. Is the Licensee level appropriate for the task being evaluated if required?

126. Is the K/A appropriate to the task and to the licensee level if required?

127. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

128. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

129. Are all references identified, current, accurate, and available to the trainee?

130. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 170 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

JOB PERFORMANCE MEASURE (JPM)

SITE: Prairie Island TASK TITLE: RESPONSE TO CONTAINMENT ISOLATION FAILURE JPM NUMBER: E0-29SF-1 REV. 0 RELATED PRA INFORMATION:

TASK NUMBERS: CRO 3010010601 K/A NUMBERS: 013A4.01 APPLICABLE METHOD OF TESTING:

Discussion: Simulate/walkthrough: Perform: X EVALUATION LOCATION: In-Plant: Control Room:

Simulator: X Other:

Lab:

Time for Completion: 10 Minutes Time Critical:

Alternate Path /

Faulted:

TASK APPLICABILITY: SRO, RO Additional signatures may be added as needed.

Developed by: Dennis Westphal 7/14/03 Instructor Date Validated by:

Validation Instructor Date (See JPM Validation Checklist, Attachment 1)

Approved by:

Training Supervisor Date Retention: Life of policy + 10yrs. Disposition: Reviewer and Approver Retain in: Training Program File Page 171 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

VC-12SF-1, Emergency Borate the RCS, Rev. 0 JPM Number: E0-29SF-1 JPM

Title:

RESPONSE TO CONTAINMENT ISOLATION FAILURE Examinee: Evaluator:

Job

Title:

Date:

Start Time Finish Time PERFORMANCE RESULTS: SAT: UNSAT:

Delete this table if not required Procedure adequately addresses task elements.

Enter Identifier here:

Other document adequately describes necessary task elements.

Enter Identifier here:

Task elements described as attached.

COMMENTS/FEEDBACK: (Comments shall be made for any steps graded unsatisfactory).

EVALUATORS SIGNATURE:

NOTE: Only this page needs to be retained in examinees record if completed satisfactorily. If unsatisfactory performance is demonstrated, the entire JPM should be retained.

Page 172 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

VC-12SF-1, Emergency Borate the RCS, Rev. 0 JPM BRIEFING/TURNOVER Add required site specific JPM briefing material here:

i.e., This section is read once for the entire package of JPMs. It is not required to review this section for every JPM being performed in the package. The initial conditions and initiating cue(s)/tasks to be performed should be read and then provided to the examinee.

You may use any approved reference materials normally available including logs. Make all written reports, oral reports, and log entries as if the evolution is actually being performed.

EOP Immediate Actions are required to be performed from memory. After completing immediate action steps without using the procedure, you may then use any approved reference materials.

If this JPM is performed on the simulator, the JPM administrator should only give cues that are not indicated on the simulator. If simulator indication is sufficient to indicate the completion of a step, the JPM administrator should not have to give a cue to the trainee to continue the evolution.

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

DURING THE JPM, ENSURE PROPER SAFETY PRECAUTIONS, FME, AND/OR RADIOLOGICAL CONCERNS AS APPLICABLE ARE FOLLOWED.

INITIAL CONDITIONS:

  • FR-S.1 ATWS procedure is in effect.
  • Steps 1, 2 and 3 of FR-S.1 have been completed.

INITIATING CUES (IF APPLICABLE):

  • Perform step 4 of FRS.1.

Page 173 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

VC-12SF-1, Emergency Borate the RCS, Rev. 0 JPM PERFORMANCE INFORMATION Required Materials: None General

References:

FR-S.1 Task Standards: Initiate emergency boration IAW FR-S.1 Start Time:

NOTE: When providing Evaluator Cues to the examinee, care must be exercised to avoid prompting the examinee. Typically cues are only provided when the examinees actions warrant receiving the information (i.e. the examinee looks or asks for the indication).

NOTE: Critical steps are marked with a Y below the performance step number. Failure to meet the standard for any critical step shall result in failure of this JPM.

Performance Step: Attempts normal boration Critical Standard: Examinee attempts normal boration:

- Places make up mode selector switch to borate

- Sets boric acid integrator to desired value

- Sets boric acid flow control to desired value

- Places control switch to start Evaluator Cue: Normal boration will be unsuccessful, start switch fails to initiate.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Page 174 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

VC-12SF-1, Emergency Borate the RCS, Rev. 0 Performance Step: (S-1) Examinee transitions to RNO to FRS.1 and shifts runing BA pump to fast.

Critical Y Standard: Running pump shifted to FAST (CS-46163 or CS-46164) and started (CS-46161 or CS-46162)

Evaluator Cue: CS-46161 or CS-46162 FAST red light ON.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: Open inservice BAST recirc valve to 50%

Critical Standard: Inservice BAST recirc valve (CV-31195 or CV-31197) opened to 50% (1HC-105 or 1HC-104)

Evaluator Cue: Inservice BAST recirc valve at 50% open.

Performance: SATISFACTORY UNSATISFACTORY ____

Comments:

Performance Step: (S-1) Open emergency boration motor valve.

Critical Y Standard: MV-32086 opened (CS-46297).

Evaluator Cue: CS-46297 red light in ON.

Performance: SATISFACTORY UNSATISFACTORY Comments:

Terminating Cues: Emergency boration established., integrator begins to click one gallon about every 10 sec.

Stop Time:

Page 175 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

VC-12SF-1, Emergency Borate the RCS, Rev. 0 SIMULATOR SET UP

- Initialize to IC-10

- Insert any ATWS malf

- Insert IO D1- 46301 C close

- Insert IO D1- 46281 : IN

- Run for 1 min.

- Freeze Provide examinee with initial conditions and cue Remove simulator from freeze Page 176 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

VC-12SF-1, Rev. 0 TURNOVER SHEET INITIAL CONDITIONS:

  • The control rods failed to insert following a Unit 1reactor trip.
  • FR-S.1 ATWS procedure is in effect.
  • Steps 1, 2 and 3 of FR-S.1 have been completed.

INITIATING CUES (IF APPLICABLE):

  • Perform step 4 of FRS.1.

Page 177 of 178

QF-1030-11 Rev. 1 (FP-T-SAT-30)

E0-29SF-1, RESPONSE TO CONTAINMENT ISOLATION FAILURE, Rev. 0 ATTACHMENT 1 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST ALL STEPS IN THIS CHECKLIST ARE TO BE PERFORMED UPON INITIAL VALIDATION AND PRIOR TO USE.

REVIEW STATEMENTS YES NO N/A 131. Are all items on the signature page filled in correctly?

132. Has the JPM been reviewed and validated by SMEs?

133. Can the required conditions for the JPM be appropriately established in the simulator if required?

134. Does the performance steps accurately reflect trainees actions in accordance with plant procedures?

135. Is the standard for each performance item specific as to what controls, indications and ranges are required to evaluate if the trainee properly performed the step?

136. Has the completion time been established based on validation data or incumbent experience?

137. If the task is time critical, is the time critical portion based upon actual task performance requirements?

138. Is the Licensee level appropriate for the task being evaluated if required?

139. Is the K/A appropriate to the task and to the licensee level if required?

140. Have the performance steps been identified and typed (Critical /

Sequence / Time Critical) appropriately?

141. Have all special tools and equipment needed to perform the task been identified and made available to the trainee?

142. Are all references identified, current, accurate, and available to the trainee?

143. Have all required cues (as anticipated) been identified for the evaluator to assist task completion?

All questions/statements must be answered YES or the JPM is not valid for use. If all questions/statements are answered YES then the JPM is considered valid and can be performed as written. The individual(s) performing the validation shall sign and date this form.

Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Validation Personnel /Date Validation Personnel/Date Page 178 of 178