Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23318A47214 November 2023Supplement to License Amendment Request to Adopt TSTF-59-AInternal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML23151A34721 August 2023Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each PenetrationReactor Vessel Water Level
Post Accident Monitoring
ML23164A17013 June 2023License Amendment Request to Adopt TSTF-59-A, Incorporate (Combustion Engineering) NPSD-994 Recommendations Into the (Safety Injection Tanks) Specification, Revision 1Surveillance Frequency Control Program
Large early release frequency
ML23153A0982 June 2023Emergency License Amendment Request - One-Time Extension of the Control Room Emergency Ventilation System (CREVS) Technical SpecificationAnticipated operational occurrence
Probabilistic Risk Assessment
FLEX
Surveillance Frequency Control Program
Large early release frequency
Offsite Circuit
RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.22 May 2023Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Cyber Security
Pressure and Temperature Limits Report
Fire Protection Program
ML23052A06321 February 2023License Amendment Request to Modify the Long-Term Coupon Surveillance ProgramAging Management
ML22298A01125 October 2022License Amendment Request to Adopt Technical Specification Task Force TSTF-295-A, Modify Note 2 to Actions of (Post-Accident Monitoring) PAM Table To.Reactor Vessel Water Level
Post Accident Monitoring
RS-22-086, R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.10 August 2022R. E. Ginna Nuclear Power Plant - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam.Safe Shutdown
Non-Destructive Examination
Post Accident Monitoring
Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Cyber Security
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Fire Protection Program
RS-22-017, License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions for Calvert Cliffs20 April 2022License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions for Calvert Cliffs
ML22067A07731 March 2022Correction of License Amendment Nos. 337 and 315 to Revise Response Time Testing Definition
RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements4 January 2022Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage RequirementsProcess Control Program
Pressure Boundary Leakage
ML21277A19316 November 2021Enclosure 2, Draft Conforming License AmendmentsSafe Shutdown
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Cyber Security
Aging Management
Annual Radioactive Effluent Release Report
Safeguards Contingency Plan
Preemption Authority
License Renewal
Subsequent License Renewal
Fuel cladding
Liquid penetrant
Fire Protection Program
Scaffolding
Unidentified leakage
Power Uprate
JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position27 September 2021Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated PositionSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Stroke time
Water Inventory Control
Surveillance Frequency Control Program
Operability Determination
Control of Heavy Loads
Fuel cladding
Recently irradiated fuel
Scaffolding
RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments25 March 2021Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License AmendmentsSafe Shutdown
Safety Limit Minimum Critical Power Ratio
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Cyber Security
Aging Management
Safeguards Contingency Plan
Preemption Authority
License Renewal
Subsequent License Renewal
Fuel cladding
Liquid penetrant
Fire Protection Program
Coast down
Unidentified leakage
Power Uprate
ML21057A27325 February 2021Application for Order Approving License Transfers and Proposed Conforming License AmendmentsDecommissioning Funding Plan
ML20329A33424 November 2020Application to Revise Technical Specifications to Adopt TSTF-567 Rev 1, Add Containment Sump TS to Address GSI-191 IssuesFire Barrier
Coatings
Surveillance Frequency Control Program
ML19347A77912 December 2019License Amendment Request to Utilize Accident Tolerant Fuel Lead Test AssembliesShutdown Margin
Anticipated operational occurrence
Fuel cladding
ML19346E53611 December 2019License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage TolerancesSafe Shutdown
Stroke time
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
RS-19-092, Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing Definitions9 December 2019Application to Revise Technical Specifications to Adopt TSTF-569, Revise Response Time Testing DefinitionsShutdown Margin
Surveillance Frequency Control Program
Recently irradiated fuel
ML19325C12821 November 2019License Amendment Request - Revision to Technical Specification 5.5.7, Reactor Coolant Pump Flywheel Inspection ProgramProbabilistic Risk Assessment
Large early release frequency
Liquid penetrant
Coast down
RS-19-040, Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program25 June 2019Application to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control ProgramShutdown Margin
Surveillance Frequency Control Program
Pressure Boundary Leakage
ML19127A0766 May 2019Application to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech SpecSurveillance Frequency Control Program
Power change
ML18333A02228 November 2018Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors.Hot Short
Safe Shutdown
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
Flooding Focused Evaluation
Turbine Missile
Fire Protection Program
ML18235A19923 August 2018License Amendment Request: 10 CFR 50.90 Proposed Changes to Technical Specification (TS) 3.8.1 Actions A.3 and D.3 to Extend the Offsite Circuit Inoperable Completion Times from 72 Hours to ...Safe Shutdown
Boric Acid
Ultimate heat sink
Anticipated operational occurrence
Probabilistic Risk Assessment
Reserve Station Service Transformer
Qualified Offsite Circuit
FLEX
Offsite Circuit
ML18113A09020 April 2018Administrative Change to Technical Specification 5.2.2, Unit Staff
RS-17-161, Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)1 March 2018Fleet License Amendment Request to Relocate Technical Specification Unit/Facility/Plant Staff Qualification ANSI N18.1-1971 and ANSl/ANS-3.1-1978 Requirements to the Exelon Quality Assurance Topical Report (QATR)Coatings
Fire Protection Program
ML17164A14331 May 2017Enclosure 2C - EAL Basis Document for Calvert Cliffs Nuclear Power Plant, Units 1 and 2
ML17164A14131 May 2017Enclosure 2A - EAL Comparison Matrix Document for Calvert Cliffs Nuclear Power Plant, Units 1 and 2
ML17164A14231 May 2017Enclosure 2B - EAL Red-Line Basis Document for Calvert Cliffs Nuclear Power Plant, Units 1 and 2
ML17164A14531 May 2017Enclosure 2E - Procedure Matrix for Calvert Cliffs Nuclear Power Plant, Units 1 and 2
ML17087A37428 March 2017License Amendment Request, Refueling Water TankStroke time
Surveillance Frequency Control Program
RS-17-049, Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement Process28 March 2017Application to Revise Technical Specifications to Adopt TSTF-529 Clarify Use and Application Rules, Revision 4, Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Time of Discovery
Missed surveillance
ML16280A4026 October 2016License Amendment Request - Supplement Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing.Shutdown Margin
Reactor Vessel Water Level
Packing leak
High Radiation Area
Stroke time
Hydrostatic
Squib
Surveillance Frequency Control Program
Excess Flow Check Valve
Power Operated Valves
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Unidentified leakage
ML16266A08622 September 2016License Amendment Request - Control Room Emergency Ventilation SystemSurveillance Frequency Control Program
ML16209A21826 July 2016Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing.Shutdown Margin
Reactor Vessel Water Level
Packing leak
High Radiation Area
Stroke time
Hydrostatic
Squib
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Excess Flow Check Valve
Power Operated Valves
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Unidentified leakage
ML16060A22325 February 2016License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.Hot Short
Safe Shutdown
High winds
High Radiation Area
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Tornado Generated Missile
Surveillance Frequency Control Program
Large early release frequency
Exemption Request
Earthquake
Turbine Missile
Offsite Circuit
Fire Protection Program
Power change
ML16035A2274 February 2016License Amendment Request - Change to Surveillance Requirement 3.5.3.1
ML15310A0645 November 2015License Amendment Request to Relocate Surveillance Frequency RequirementsSurveillance Frequency Control Program
ML15212A90230 July 2015Supplemental Information Regarding TSTF-425 License Amendment Request
ML15210A31429 July 2015License Amendment Request to Revise the Emergency Plan Requalification Training Frequency for Emergency Response Organization PersonnelGrace period
RA-14-057, License Amendment Request Regarding the Cyber Security Plan Implementation Schedule for Milestone 829 August 2014License Amendment Request Regarding the Cyber Security Plan Implementation Schedule for Milestone 8Safe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
ML14050A37413 February 2014License Amendment Request Re Pressurizer Safety Valve Technical Specification RevisionAbnormal operational transient
ML14050A37513 February 2014Summary of Analysis Supporting Pressurizer Safety Valve Technical ChangeStroke time
Anticipated operational occurrence
Fuel cladding
ML14015A13813 January 2014License Amendment Request: Add Technical Specification for Atmospheric Dump ValvesAnticipated operational occurrence
Time Critical Operator Action
ML13308A38731 October 2013Application for Technical Specification Improvement to Adopt TSTF-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection.Nondestructive Examination
ML13228A26514 August 2013Independent Spent Fuel Storage Installations Application for Preemption Authority Pursuant to Section 161A of the Atomic Energy Act & License Amendment RequestSafe Shutdown
Cyber Security
Preemption Authority
Fuel cladding
Fire Protection Program
ML13232A1566 August 2013ISFSI, Nine Mile Point, Units 1, 2 and ISFSI and R.E. Ginna, and ISFSI, Application for Order Approving Transfer of Operating Authority and Conforming License Amendments. Part 1 of 2Safe Shutdown
Cyber Security
Decommissioning Funding Plan
Fire Protection Program
ML13030A13328 January 2013License Amendment Request Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCOSafe Shutdown
Offsite Circuit
Power change
ML13029A45622 January 2013Emergency License Amendment Request: Revise Description of Operable Containment Air Cooling TrainUltimate heat sink
Scaffolding
ML11222A0208 August 2011License Amendment Request: Diesel Generator Surveillance Requirement 3.8.1.11 RevisionSafe Shutdown
Offsite Circuit