Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24136A1952024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24130A0022024-05-0909 May 2024 Summary of Facility Changes, Tests and Experiments and Commitment Changes IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24101A0422024-04-22022 April 2024 Solutions Inc. – Exemption from Select Requirements of 10 CFR Part 73 ((Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24106A0492024-04-15015 April 2024 2023 Annual Radioactive Effluent Release Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML24079A0162024-03-19019 March 2024 Annual Property Insurance Status Report ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24061A0202024-02-15015 February 2024 (Ksp) ISFSI, Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 6 ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23066A3232023-03-0707 March 2023 Energysolutions, LLC, Notification of Closing of Transaction ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) – Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commission’S Analysis of Dominion Energy Kewaunee‘S Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML24061A0182022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Pla11, Training and Qualification Plan and Safeguards Contingency Plan Revision 5 ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22091A1892022-04-0101 April 2022 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc 2024-09-18
[Table view] Category:Technical Specification
MONTHYEARML16097A4172016-03-29029 March 2016 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML14106A4502014-04-0303 April 2014 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML14009A3932014-01-0707 January 2014 Supplement 2: License Amendment Request 256, Permanently Defueled License and Technical Specifications ML13108A1832013-04-0505 April 2013 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML12109A2302012-04-10010 April 2012 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML11252A6562011-08-30030 August 2011 License Amendment Request 244, Radiological Accident Analysis and Discussion of Associated Technical Specification Changes, Attachment 4 ML11252A6542011-08-30030 August 2011 License Amendment Request 244, Marked-Up Operating Technical Specifications Bases Pages, Attachment 3 ML11252A6532011-08-30030 August 2011 License Amendment Request 244, Marked-Up Operating License and Technical Specifications Pages, Attachment 2 ML1011206552010-04-14014 April 2010 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML1011101232010-04-13013 April 2010 License Amendment Request 246: Revision to Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection Limitations ML0910607252009-04-0707 April 2009 Submittal of Technical Specifications Bases Changes and Technical Requirements Manual Changes ML0902602992009-01-23023 January 2009 License Amendment Request 247: Emergency Diesel Generator Fuel Oil Technical Specification Changes ML0823200832008-08-14014 August 2008 License Amendment Request 229, Change Technical Specifications to Require Testing Containment Purge and Vent Isolation Valves When the Reactor Is Above Cold Shutdown ML0810700722008-04-0808 April 2008 Transmittal of Technical Specifications Bases Changes and Technical Requirements Manual Changes ML0726201442007-09-14014 September 2007 License Amendment Request 210 - Technical Specification Modifications Regarding Control Room Envelope Habitability ML0712101852007-04-26026 April 2007 Supplement to License Amendment Request 230, Emergency Diesel Generator Short-Time Load Testing. ML0701200882007-01-10010 January 2007 License Amendment Request 230 Emergency Diesel Generator Short-Time Load Testing ML0624201332006-08-29029 August 2006 Tech Specs, Correction Amendment 188 ML0615601442006-06-0202 June 2006 Response to NRC Request for Additional Information Re License Amendment Request 218: Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0604504872006-02-0606 February 2006 License Amendment Request - 219, One-Time Extension of Surveillance Requirements ML0602505242006-01-12012 January 2006 License Amendment Request 218 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0517200282005-06-20020 June 2005 (TS) Issuance of Amendment Auxiliary Feedwater System ML0505302282005-02-10010 February 2005 Response to NRC Request for Additional Information License Amendment Request 203 to the Kewaunee Nuclear Power Plant Technical Specifications, Rod Position Indication. ML0435800062004-12-22022 December 2004 Tech Specs - Issuance of Amendment Deletion of Requirements for Submittal of Occupational Radiation Exposure Reports, Reports of Challenges to and Failures of the Pressurizer Power Operated Relief Valves and Safety ML0427300902004-09-24024 September 2004 Technical Specification Pages for Amendment No. 177 Turbine Building Service Water Header Isolation (TS) S110810 ML0423904602004-08-18018 August 2004 Response to Request for Additional Information Related to License Amendment Request 197 to the Kewaunee Nuclear Power Plant Technical Specifications ML0421603022004-07-19019 July 2004 Bases Revision(S) to the Kewaunee Nuclear Power Plant Technical Specifications ML0416205032004-05-25025 May 2004 License Amendment Request 203 Re Technical Specifications on Rod Position Indication ML0413803552004-05-13013 May 2004 Amd No. 174, Tech Spec, Relocation of Requirements for Hydrogen Monitors ML0404204242004-01-30030 January 2004 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process ML0402901202004-01-16016 January 2004 License Amendment Request 201 to the Kewaunee Nuclear Power Plant Technical Specifications, Equipment Hatch and Control Room Post Accident Recirculation System. ML0335704692003-12-12012 December 2003 License Amendment Request 198, ILRT 5-Year Extension, NMC Response to NRC Request for Additional Information. ML0332505592003-11-20020 November 2003 Tech Spec Pages for Amendment No. 171, Revising the Reporting Requirements for the Discovery of Defective or Degraded Steam Generator Tubes ML0321706442003-07-25025 July 2003 Bases Revision(S) to the Kewaunee Nuclear Power Plant Technical Specifications ML0318206132003-06-20020 June 2003 License Amendment Request 198 to Kewaunee TS for One Time Extension of Containment Integrated Leak Rate Test Interval ML0316813912003-06-0909 June 2003 Bases Revisions to the Kewaunee Nuclear Power Plant Technical Specifications 4.4 and 4.12 ML0314205282003-05-15015 May 2003 Bases Revision(S) to the Kewaunee Nuclear Power Plant Technical Specifications ML0233803042002-11-22022 November 2002 License Amendment Request 189 to Kewaunee TS Regarding Modification of Diesel Generator Inspection Requirements ML0231104142002-10-29029 October 2002 Bases Revision to Kewaunee Nuclear Power Plant TS ML0214402322002-05-0707 May 2002 Proposed Amendment 180 Application for Technical Specification Change Re Missed Surveillance & Adoption of Technical Specifications Bases Control Program) Using Consolidated Line Item Improvement Process ML0208805202002-03-19019 March 2002 Bases Revision Technical Specifications 2.2, Safety Limit - Reactor Coolant System Pressure. ML0203103642002-01-0303 January 2002 Bases Revisions to the Kewaunee Power Plant Technical Specifications 2016-03-29
[Table view] Category:Bases Change
MONTHYEARML16097A4172016-03-29029 March 2016 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML14106A4502014-04-0303 April 2014 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML14009A3932014-01-0707 January 2014 Supplement 2: License Amendment Request 256, Permanently Defueled License and Technical Specifications ML13108A1832013-04-0505 April 2013 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML12109A2302012-04-10010 April 2012 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML11252A6542011-08-30030 August 2011 License Amendment Request 244, Marked-Up Operating Technical Specifications Bases Pages, Attachment 3 ML1011206552010-04-14014 April 2010 Technical Specifications Bases Changes and Technical Requirements Manual Changes ML1011101232010-04-13013 April 2010 License Amendment Request 246: Revision to Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection Limitations ML0910607252009-04-0707 April 2009 Submittal of Technical Specifications Bases Changes and Technical Requirements Manual Changes ML0902602992009-01-23023 January 2009 License Amendment Request 247: Emergency Diesel Generator Fuel Oil Technical Specification Changes ML0810700722008-04-0808 April 2008 Transmittal of Technical Specifications Bases Changes and Technical Requirements Manual Changes ML0701200882007-01-10010 January 2007 License Amendment Request 230 Emergency Diesel Generator Short-Time Load Testing ML0615601442006-06-0202 June 2006 Response to NRC Request for Additional Information Re License Amendment Request 218: Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity ML0505302282005-02-10010 February 2005 Response to NRC Request for Additional Information License Amendment Request 203 to the Kewaunee Nuclear Power Plant Technical Specifications, Rod Position Indication. ML0423904602004-08-18018 August 2004 Response to Request for Additional Information Related to License Amendment Request 197 to the Kewaunee Nuclear Power Plant Technical Specifications ML0421603022004-07-19019 July 2004 Bases Revision(S) to the Kewaunee Nuclear Power Plant Technical Specifications ML0416205032004-05-25025 May 2004 License Amendment Request 203 Re Technical Specifications on Rod Position Indication ML0321706442003-07-25025 July 2003 Bases Revision(S) to the Kewaunee Nuclear Power Plant Technical Specifications ML0316813912003-06-0909 June 2003 Bases Revisions to the Kewaunee Nuclear Power Plant Technical Specifications 4.4 and 4.12 ML0314205282003-05-15015 May 2003 Bases Revision(S) to the Kewaunee Nuclear Power Plant Technical Specifications ML0231104142002-10-29029 October 2002 Bases Revision to Kewaunee Nuclear Power Plant TS ML0214402322002-05-0707 May 2002 Proposed Amendment 180 Application for Technical Specification Change Re Missed Surveillance & Adoption of Technical Specifications Bases Control Program) Using Consolidated Line Item Improvement Process ML0208805202002-03-19019 March 2002 Bases Revision Technical Specifications 2.2, Safety Limit - Reactor Coolant System Pressure. ML0203103642002-01-0303 January 2002 Bases Revisions to the Kewaunee Power Plant Technical Specifications 2016-03-29
[Table view] |
Text
Committed to Nuclear Excellence Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-061 10 CFR 50.36 June 9, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 BASES REVISION(S) TO THE KEWAUNEE NUCLEAR POWER PLANT TECHNICAL SPECIFICATIONS Nuclear Management Company (NMC), licensee for the Kewaunee Nuclear Power Plant (KNPP), hereby submits a revision to the Bases for the Technical Specifications (TS) 4.4, "Containment Tests" and TS 4.12, "Spent Fuel Pool Sweep System." The change to the bases was to the values listed for the clean filter pressure drop. These changes are being revised to state a clean filter bank has a delta P of approximately 3" WC for the shield building ventilation system and auxiliary building special ventilation system filters and approximatly 2" WC for the SFP sweep system filters based on clean filter data.
These changes have been screened for evaluation pursuant to the requirements of 10 CFR 50.59 in accordance with approved KNPP procedures and were determined to be acceptable.
Attached is a copy of the revised Technical Specification Bases page(s) for your controlled TS.
Thomas Coutu Site Vice-President, Kewaunee Plant GOR cc US NRC, Region III US NRC, Senior Resident Inspector Electric Division, PSCW Attachment Aoo N490 Highway 42
- Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560
ATTACHMENT 1 NUCLEAR MANAGEMENT COMPANY, LLC KEWAUNEE NUCLEAR PLANT DOCKET 50-305 June 9, 2003 Letter from Thomas Coutu (NMC)
To Document Control Desk (NRC)
TS Bases Paaes TS B4.4-2 TS B4.4-3 TS B4.12-1
-6 Maintaining CONTAINMENT SYSTEM INTEGRITY in an OPERABLE state requires, among other conditions, that all the requirements of TS 4.4.a and b, leakage rate testing (Containment Leakage Rate Testing Program), are satisfied. The testing process will include: (1)an overall containment leak rate evaluation (Type A); (2) a determination of the leakage through pressure containing or leakage limiting boundaries (Type B); and (3) an evaluation of the leak rate through containment isolation valves (Type C).(4) These tests are intended to check all possible paths for containment atmosphere to reach the outside atmosphere.
Shield Building Ventilation System (TS 4.4.c)
Pressure drop across the combined HEPA filters and charcoal adsorbers of < 10 inches of water and an individual HEPA bank pressure drop of < 4 inches of water at the system design flow rate
(+/-10%) will indicate that the filters and adsorbers are not clogged by excessive amounts of foreign matter. Atestfrequencyof once peroperating cycle establishes system performance capability. This pressure drop is approximately 3 inches of water when the filters are clean.
The frequency of tests and sample analysis are necessary to show that the HEPA filters and charcoal adsorbers can perform as evaluated. Replacement adsorbent should be qualified according to the guidelines of Regulatory Guide 1.52 (Rev. 1) dated July 1976, except that ASTM D3803-89 standard will be used to fulfill the guidelines of Table 2, item 5, "Radioiodine removal efficiency." The charcoal adsorber efficiency test procedures should allow for the removal of one adsorber tray, emptying of one bed from the tray, mixing the adsorbent thoroughly, and obtaining at least two samples. Each sample should be at least two inches in diameter and a length equal to the thickness of the bed. The use of multi-sample assemblies for test samples is an acceptable altemate to mixing one bed for a sample. If the iodine removal efficiency test results are unacceptable, all adsorbent in the system should be replaced. Any HEPA filters found defective should be replaced with filters qualified pursuant to Regulatory Position C.3.d of Regulatory Guide 1.52 (Rev. 1) dated July 1976.
If painting, fire, or chemical release occurs, the charcoal adsorber will be laboratory tested to determine whether it was contaminated from the fumes, chemicals, or foreign materials.
Replacement of the charcoal adsorber can then be evaluated.
Operation of the systems every month will demonstrate operability of the filters and adsorber system. 0 peration of the S hield B uilding Ventilation System will result in a discharge to the environment. This discharge is made after at least three samples of the building atmosphere have been analyzed to determine the concentration of activity in the atmosphere.
(4) 10 CFR Part 50, Appendix J, Option B TS B4.4-2 06/09/2003
Auxiliary Building Special Ventilation System (TS 4.4.d)
Demonstration of the automatic initiation capability is necessary to assure system performance capability.(5)
Pressure drop across the combined HEPA filters and charcoal adsorbers of < 10 inches of water and an individual HEPA bank pressure drop of < 4 inches of water at the system design flow rate (i10%) will indicate that the filters and adsorbers are not clogged by excessive amounts of foreign matter. A test frequency of once per operating cycle establishes system performance capability. This pressure drop is approximately 3 inches of water when the filters are clean.
The frequency of tests and sample analysis are necessary to show that the HEPA filters and charcoal adsorbers can perform as evaluated. Replacement adsorbent should be qualified according to the guidelines of Regulatory Guide 1.52 (Rev. 1) dated July 1976, except that ASTM D3803-89 standard will be used to fulfill the guidelines of Table 2, item 5, Radioiodine removal efficiency." The charcoal adsorber efficiency test procedures should allow for the removal of one adsorber tray, emptying of one bed from the tray, mixing the adsorbent thoroughly, and obtaining at least two samples. Each sample should be at least two inches in diameter and a length equal to the thickness of the bed. The use of multi-sample assemblies for test samples is an acceptable altemate to mixing one bed for a sample. If the iodine removal efficiency test results are unacceptable, all adsorbent in the system should be replaced. Any HEPA filters found defective should be replaced with filters qualified pursuant to Regulatory Position C.3.d of Regulatory Guide 1.52 (Rev. 1) dated July 1976.
If painting, fire, or chemical release occurs, the charcoal adsorber will be laboratory tested to determine whether it was contaminated from the fumes, chemicals, or foreign materials.
Replacement of the charcoal adsorber can then be evaluated.
Periodic checking of the inlet heaters and associated controls for each train will provide assurance that the system has the capability of reducing inlet air humidity so that charcoal adsorber efficiency is enhanced.
In-place testing procedures will be established utilizing applicable sections of ANSI N510-1975 standard as a procedural guideline.
Vacuum Breaker Valves (TS 4.4.e)
The vacuum breaker valves are 18 inch butterfly valves with air to open, spring to close operators.
The valve discs are center pivot and rotate when closing to an EPT base material seat. When closed, the disc is positioned fully on the seat regardless of flow or pressure direction. Testing these valves in a direction opposite to that which would occur post-LOCA verifies leakage rates of both the vacuum breaker valves and the check valves downstream.
(5) USAR Section 9.6 TS 134.4-3 06/09/2003
BASIS Pressure drop across the combined HEPA filters and charcoal adsorbers of <10 inches of waterand 4 inches across any HEPA filter bank at the system design flow rate (+/-10%) will indicate that the filters and adsorbers are not clogged by excessive amounts of foreign matter. A test frequency of once per operating cycle establishes system performance capability. This pressure drop is approximately 2 inches of water when filters are clean.
The frequency of tests and sample analysis are necessary to show that the HEPA filters and charcoal adsorbers can perform as evaluated. Replacement adsorbent should be qualified according to the guidelines of Regulatory Guide 1.52 (Rev. 1) dated July 1976, except that ASTM D3803-89 standard will be used to fulfill the guidelines of Table 2, item 5, "Radioiodine removal efficiency." The charcoal adsorber efficiency test procedures should allow for the removal of one adsorber tray, emptying of one bed from the tray, mixing the adsorbent thoroughly, and obtaining at least two samples. Each sample should be at least 2 inches in diameter and a length equal to the thickness of the bed. The use of multi-sample assemblies for test samples is an acceptable altemate to mixing one bed for a sample. If the iodine removal efficiency test results are unacceptable, all adsorbent in the system should be replaced. Any HEPA filters found defective should be replaced with filters qualified pursuant to Regulatory Position C.3.d of Regulatory Guide 1.52 (Rev. 1) dated July 1976.
If painting, fire, or chemical release occurs such that the charcoal adsorbers become contaminated from the fumes, chemicals, or foreign materials, the same tests and sample analysis should be performed as required for operabonal use.
Degradation of the HEPA filters due to painting, fire or chemical release in a communicating ventilation zone would be detected by an increased pressure drop across the filters. Should the filters become contaminated, engineering judgment would be used to determine if further leakage and/or efficiency testing was required.
Demonstration of the automatic initiation capability is necessary to assure system performance capability.
In-place testing procedures will be established utilizing applicable sections of ANSI N510 - 1975 standard as a procedural guideline only.
TS B4.12-1 06/09/2003