ML031631159

From kanterella
Jump to navigation Jump to search
PI&R Data Request, Dated 06/12/2003
ML031631159
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/12/2003
From: Eric Duncan
NRC/RGN-III/DRP/RPB6
To: Bakken A
American Electric Power Co
References
Download: ML031631159 (6)


Text

June 12, 2003 Mr. A. C. Bakken III Senior Vice President Nuclear Generation Group American Electric Power Company 500 Circle Drive Buchanan, MI 49107

SUBJECT:

INFORMATION REQUEST TO SUPPORT AUGUST PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION

Dear Mr. Bakken:

This letter contains a list of requested materials needed to support our August 2003 PI&R inspection. By the current inspection schedule, this inspection will be conducted onsite the weeks of August 18 and September 2, 2003. Therefore we request that you provide the information needed for the inspection to our RIII office by August 4. If you have any questions regarding our schedule or the material being requested, please contact me at (630) 829-9628.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Eric Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

Requested Information to Support PI&R Inspection See Attached Distribution

DOCUMENT NAME: C:\ORPCheckout\FileNET\ML031631159.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME LKozak:dtp EDuncan DATE 06/10/03 06/12/03 OFFICIAL RECORD COPY

A. Bakken cc w/encl: J. Pollock, Site Vice President M. Finissi, Plant Manager R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists

A. Bakken cc w/encl: J. Pollock, Site Vice President M. Finissi, Plant Manager R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists ADAMS Distribution:

WDR DFT JFS2 RidsNrrDipmIipb GEG HBC BJK1 DRPIII DRSIII PLB1 JRK1

Requested Information to Support Problem Identification and Resolution (PI&R)

Inspection

1. A copy of any evaluation performed to address the substantive cross-cutting issue in problem identification and resolution that was identified in the NRCs mid-cycle assessment and annual assessment letters of 2002. Include any related corrective actions specified and the status of those corrective actions.
2. A copy of administrative procedure(s) for the corrective action process, trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program.
3. A copy of Quality Assurance audits and/or self-assessments of the corrective action program completed since January 2002.
4. A copy of the QA manual.
5. A copy of the Employee Concerns Program/Ombudsman administrative procedure.
6. A list of Quality Assurance audits completed since January 2002 with brief description of areas where findings were identified.
7. A list of self-assessments completed since January 2002.
8. A list of root cause evaluations completed since January 2002.
9. A list of test failures (IST or Technical Specification surveillances) since January 2002, with a brief description of component/system which failed.
10. A list of all open condition reports sorted by significance level. Include a description of the issue and the significance category.
11. A list of condition reports closed since January 2002 including a description, significance category, date initiated, date closed, and whether there is an associated operability evaluation.
12. A list of condition reports initiated since January 2002 that involve inadequate or ineffective corrective actions. Include a brief description, status, and significance category of the issue.
13. A list of condition reports initiated since January 2002 that identify trends of conditions adverse to quality. Include a brief description, status, and significance category for each item.
14. A copy of any performance indicator reports used to track the corrective action program effectiveness.
15. A list of condition reports issued during the past 3 refueling outages sorted by system and component, including a brief description, status, and significance category for each item.