MONTHYEARInformation Notice 2006-04, Design Deficiency in Pressurizer Heaters for Pwrs2006-02-13013 February 2006 Design Deficiency in Pressurizer Heaters for Pwrs Information Notice 2006-04, Design Deficiency in Pressurizer Heaters for PWRs2006-02-13013 February 2006 Design Deficiency in Pressurizer Heaters for PWRs Information Notice 1999-28, Recall of Star Brand Fire Protection Sprinkler Heads1999-09-30030 September 1999 Recall of Star Brand Fire Protection Sprinkler Heads Information Notice 1999-27, Malfunction of Source Retraction Mechanism in Cobalt-60 Teletherapy Treatment Units1999-09-0202 September 1999 Malfunction of Source Retraction Mechanism in Cobalt-60 Teletherapy Treatment Units Information Notice 1999-26, Safety and Economic Consequences of Misleading Marketing Information1999-08-24024 August 1999 Safety and Economic Consequences of Misleading Marketing Information Information Notice 1999-25, Year 2000 Contingency Planning Activities1999-08-10010 August 1999 Year 2000 Contingency Planning Activities Information Notice 1999-24, Broad-Scope Licensees' Responsibilities for Reviewing and Approving Unregistered Sealed Sources and Devices1999-07-12012 July 1999 Broad-Scope Licensees' Responsibilities for Reviewing and Approving Unregistered Sealed Sources and Devices Information Notice 1999-23, Safety Concerns Related to Repeated Control Unit Failures of the Nucletron Classic Model High-Dose-Rate Remote Afterloading Brachytherapy Devices1999-07-0606 July 1999 Safety Concerns Related to Repeated Control Unit Failures of the Nucletron Classic Model High-Dose-Rate Remote Afterloading Brachytherapy Devices Information Notice 1999-20, Contingency Planning for the Year 2000 Computer Problem1999-06-25025 June 1999 Contingency Planning for the Year 2000 Computer Problem Information Notice 1999-21, Recent Plant Events Caused by Human Performance Errors1999-06-25025 June 1999 Recent Plant Events Caused by Human Performance Errors Information Notice 1999-22, 10CFR 34.43(a)(1); Effective Date for Radiographer Certification and Plans for Enforcement Discretion1999-06-25025 June 1999 10CFR 34.43(a)(1); Effective Date for Radiographer Certification and Plans for Enforcement Discretion Information Notice 1999-19, Rupture of the Shell Side of a Feedwater Heater at the Point Beach Nuclear Plant1999-06-23023 June 1999 Rupture of the Shell Side of a Feedwater Heater at the Point Beach Nuclear Plant Information Notice 1999-18, Update on Nrc'S Year 2000 Activities for Material Licensees and Fuel Cycle Licensees and Certificate Holders1999-06-14014 June 1999 Update on Nrc'S Year 2000 Activities for Material Licensees and Fuel Cycle Licensees and Certificate Holders Information Notice 1999-17, Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses1999-06-0303 June 1999 Problems Associated with Post-Fire Safe-Shutdown Circuit Analyses Information Notice 1999-16, Federal Bureau of Investigation'S Nuclear Site Security Program1999-05-28028 May 1999 Federal Bureau of Investigation'S Nuclear Site Security Program Information Notice 1999-15, Misapplication for 10CFR Part 71 Transportation Shipping Cask Licensing Basis to 10CFR Part 50 Design Basis1999-05-27027 May 1999 Misapplication for 10CFR Part 71 Transportation Shipping Cask Licensing Basis to 10CFR Part 50 Design Basis Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick1999-05-0505 May 1999 Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick Information Notice 1999-13, Insights from NRC Inspections of Low-and Medium-Voltage Circuit Breaker Maintenance Programs1999-04-29029 April 1999 Insights from NRC Inspections of Low-and Medium-Voltage Circuit Breaker Maintenance Programs Information Notice 1999-12, Year 2000 Computer Systems Readiness Audits1999-04-28028 April 1999 Year 2000 Computer Systems Readiness Audits Information Notice 1999-11, Incidents Involving the Use of Radioactive Iodine-1311999-04-16016 April 1999 Incidents Involving the Use of Radioactive Iodine-131 Information Notice 1999-08, Urine Specimen Adulteration1999-03-26026 March 1999 Urine Specimen Adulteration Information Notice 1999-09, Problems Encountered When Manually Editing Treatment Data on the Nucletron Microselectron-HDR (New) Model 105-9991999-03-24024 March 1999 Problems Encountered When Manually Editing Treatment Data on the Nucletron Microselectron-HDR (New) Model 105-999 Information Notice 1999-07, Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems1999-03-22022 March 1999 Failed Fire Protection Deluge Valves & Potential Testing Deficiencies in Preaction Sprinkler Systems Information Notice 1999-06, 1998 Enforcement Sanctions as a Result of Deliberate Violations of NRC Employee Protection Requirements1999-03-19019 March 1999 1998 Enforcement Sanctions as a Result of Deliberate Violations of NRC Employee Protection Requirements Information Notice 1999-06, 1998 Enforcement Sanctions As a Result of Deliberate Violations of NRC Employee Protection Requirements1999-03-19019 March 1999 1998 Enforcement Sanctions As a Result of Deliberate Violations of NRC Employee Protection Requirements Information Notice 1999-05, Inadvertent Discharge of Carbon Dioxide Fire Protection System and Gas Migration1999-03-0808 March 1999 Inadvertent Discharge of Carbon Dioxide Fire Protection System and Gas Migration Information Notice 1999-04, Unplanned Radiation Exposures to Radiographers, Resulting from Failures to Follow Proper Radiation Safety Procedures1999-03-0101 March 1999 Unplanned Radiation Exposures to Radiographers, Resulting from Failures to Follow Proper Radiation Safety Procedures Information Notice 1999-03, Exothermic Reactors Involving Dried Uranium Oxide Powder (Yellowcake)1999-01-29029 January 1999 Exothermic Reactors Involving Dried Uranium Oxide Powder (Yellowcake) Information Notice 1999-02, Guidance to Users on the Implementation of a New Single-Source Dose-Calculation Formalism and Revised Air-Kerma Strength Standard for Iodine-125 Sealed Sources1999-01-21021 January 1999 Guidance to Users on the Implementation of a New Single-Source Dose-Calculation Formalism and Revised Air-Kerma Strength Standard for Iodine-125 Sealed Sources Information Notice 1999-01, Deterioration of High-Efficiency Particulate Air Filters in a Pressurized Water Reactor Containment Fan Cooler Unit1999-01-20020 January 1999 Deterioration of High-Efficiency Particulate Air Filters in a Pressurized Water Reactor Containment Fan Cooler Unit Information Notice 1998-45, Cavitation Erosion of Letdown Line Orifices Resulting in Fatigue Cracking of Pipe Welds1998-12-15015 December 1998 Cavitation Erosion of Letdown Line Orifices Resulting in Fatigue Cracking of Pipe Welds Information Notice 1998-44, Ten-Year Inservice Inspection (ISI) Program Update for Licensees That Intend to Implement Risk-Informed ISI of Piping1998-12-10010 December 1998 Ten-Year Inservice Inspection (ISI) Program Update for Licensees That Intend to Implement Risk-Informed ISI of Piping Information Notice 1998-43, Leaks in Emergency Diesel Generator Lubricating Oil & Jacket Cooling Water Piping1998-12-0404 December 1998 Leaks in Emergency Diesel Generator Lubricating Oil & Jacket Cooling Water Piping Information Notice 1998-42, Implementation of 10 CFR 55.55a(g) Inservice Inspection Requirements1998-12-0101 December 1998 Implementation of 10 CFR 55.55a(g) Inservice Inspection Requirements Information Notice 1998-41, Spurious Shutdown of Emergency Diesel Generators from Design Oversight1998-11-20020 November 1998 Spurious Shutdown of Emergency Diesel Generators from Design Oversight Information Notice 1998-41, Spurious Shutdown of Emergency Diesel Generators From Design Oversight1998-11-20020 November 1998 Spurious Shutdown of Emergency Diesel Generators From Design Oversight Information Notice 1998-39, Summary of Fitness-for-Duty Program Performance Reports for Calendar Years 1996 and 19971998-10-30030 October 1998 Summary of Fitness-for-Duty Program Performance Reports for Calendar Years 1996 and 1997 Information Notice 1998-40, Design Deficiencies Can Lead to Reduced ECCS Pump Net Positive Suction Head During Design-Basis Accidents1998-10-26026 October 1998 Design Deficiencies Can Lead to Reduced ECCS Pump Net Positive Suction Head During Design-Basis Accidents Information Notice 1990-66, Incomplete Draining and Drying of Shipping Casks1998-10-25025 October 1998 Incomplete Draining and Drying of Shipping Casks Information Notice 1998-38, Metal-Clad Circuit Breaker Maintenance Issues Identified by NRC Inspections1998-10-15015 October 1998 Metal-Clad Circuit Breaker Maintenance Issues Identified by NRC Inspections Information Notice 1998-37, Eligibility of Operator License Applicants1998-10-0101 October 1998 Eligibility of Operator License Applicants Information Notice 1998-36, Inadequate or Poorly Controlled, Non-Safety-Related Maintenance Activities Unnecessarily Challenged Safety Systems1998-09-18018 September 1998 Inadequate or Poorly Controlled, Non-Safety-Related Maintenance Activities Unnecessarily Challenged Safety Systems Information Notice 1998-34, Configuration Control Errors1998-08-28028 August 1998 Configuration Control Errors Information Notice 1998-33, NRC Regulations Prohibit Agreements That Restrict or Discourage an Employee from Participating in Protected Activities1998-08-28028 August 1998 NRC Regulations Prohibit Agreements That Restrict or Discourage an Employee from Participating in Protected Activities Information Notice 1998-31, Fire Protection System Design Deficiencies and Common-Mode Flooding of Emergency Core Cooling System Rooms at Washington Nuclear Project Unit 21998-08-18018 August 1998 Fire Protection System Design Deficiencies and Common-Mode Flooding of Emergency Core Cooling System Rooms at Washington Nuclear Project Unit 2 Information Notice 1998-30, Effect of Year 2000 Computer Problem on NRC Licensees and Certificate Holders1998-08-12012 August 1998 Effect of Year 2000 Computer Problem on NRC Licensees and Certificate Holders Information Notice 1998-29, Predicted Increase in Fuel Rod Cladding Oxidation1998-08-0303 August 1998 Predicted Increase in Fuel Rod Cladding Oxidation Information Notice 1998-28, Development of Systematic Sample Plan for Operator Licensing Examinations1998-07-31031 July 1998 Development of Systematic Sample Plan for Operator Licensing Examinations Information Notice 1998-26, Settlement Monitoring and Inspection of Plant Structures Affected by Degradation of Porous Concrete Subfoundations1998-07-24024 July 1998 Settlement Monitoring and Inspection of Plant Structures Affected by Degradation of Porous Concrete Subfoundations Information Notice 1998-27, Steam Generator Tube End Cracking1998-07-24024 July 1998 Steam Generator Tube End Cracking 2006-02-13
[Table view] |
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
WASHINGTON, D.C. 20555 March 21, 1979 IE Information Notice No. 79-05 USE OF IMPROPER MATERIALS IN SAFETY-RELATED COMPONENTS
Two instances of the addition of Improper materials to safety-related
components during maintenance have recently been identified by NRC
inspections.
Materials on Valve Seating Surfaces
An NRC inspector found that maintenance personnel at the Surry nuclear
power plant had added wax or grease to certain valve seating surfaces.
These valves included the containment spray and recirculation spray
isolation valves. This material could have affected the measured leak
rate through these containment penetrations. VEPCO personnel said that
the material was believed to have been added to prevent damage to the
valve seating surfaces during dry valve testing. It had not been removed
following completion of the maintenance procedure. VEPCO personnel also
reported that a lack of any definitive administrative guidance as to
what lubricants, if any, could be used during valve maintenance, contributed to this problem. The corrective action included modifica- tion of the procedures to include more precise Inspection by quality
control personnel following valve maintenance.
Grease in Snubbers
An NRC inspector found that maintenance personnel at the Browns Ferry
nuclear power plant had added grease to the hydraulic fluid reservoirs
of eight Bergen-Paterson snubbers. The grease had mistakenly been
added, during a scheduled lubrication procedure, through the alemite
type fittings used for normal fluid addition. A similar error involving
thirteen snubbers had previously been made at this facility. At that
time the decision had been made to Install a different type of fitting
on the snubbers. However, the replacement parts had not arrived in tine
for installation prior to the more recent lubrication. At the time of
the earlier occurrence, TVA personnel had removed the affected snubbers
and tested them for lock-up and bleed rate. The results had been within
specification. Nevertheless, the units had been disassembled and cleaned
prior to reinstallation. NRC inspectors witnessed the disassembly of one
of the later set of greased snubbers (a four-inch unit). Approximately
one cubic inch of grease was found in the reservoir. Although the grease 29038001 80
IE Information Notice No. 79-05 March 21, 1979 Grease in Snubbers (continued)
had been in the reservoir for only four days, and stroking
cf the
removal, snubbers was limited to that which occurred during its
grease was found in the control valve assembly and the snubber by
cylinder. All of the recently greased snubbers were replaced
spare units.
These two occurrences illustrate the necessity of controlling
care- construction and maintenance practices through the use of as the
fully developed procedures designed to prevent errors, such
introduction of foreign materials into safety-related components.
significant
This information is provided as a notification of a possibly for
recipients will review the information
matter. It is expected that response
action or
possible applicability to their facilities. No specificso indicate, an IE
is requested at this time. If further NRC evaluations
soecific li- Circular or Bulletin will be issued to recommend or request please
censee actions. If you have questions regarding this matter, contact the Director of the appropriate NRC Regional Office.
Enclosure:
Listing of IE Information
Notices Issued in 1979 IE Information Notice No. 79-05 March 21, 1979 LISTING OF IE INFORMATION NOTICES
ISSUED IN 1979 Information Subject Date Issued To .
Notice No. Issued
79-01 Bergen-Paterson Hydraulic 2/2/79 All power reactor
Shock and Sway Arrestor facilities with an
OL or a CP
79-02 Attempted Extortion - 2/2/79 All Fuel Facilities
Low Enriched Uranium
79-03 Limitorque Valve Geared 2/9/79 All power reactor
Limit Switch Lubricant facilities with an
OL or a CP
79-04 Degradation of 2/16/79 All power reactor
Engineered facilities with an
Safety Features OL or a CP
79-05 Use of Improper Materials 3/21/79 All power reactor
in Safety-Related facilities with an
Components OL or CP
|
---|
|
list | - Information Notice 1979-01, Bergen-Paterson Hydraulic Shock & Sway Arrestors (Hssa) (2 February 1979, Topic: Water hammer)
- Information Notice 1979-01, Bergen-Paterson Hydraulic Shock & Sway Arrestors (HSSA) (2 February 1979, Topic: Water hammer)
- Information Notice 1979-03, Limitorque Valve Geared Limit Switch Lubricant (9 February 1979)
- Information Notice 1979-04, Degradation of Engineered Safety Features (16 February 1979)
- Information Notice 1979-05, Use of Improper Materials in Safety-Related Components (21 March 1979)
- Information Notice 1979-06, Stress Analysis of Safety-Related Piping (23 March 1979, Topic: Earthquake)
- Information Notice 1979-07, Rupture of Radwaste Tanks (26 March 1979)
- Information Notice 1979-08, Interconnection of Contaminated Systems with Service Air Systems Used as Source of Breathing Air (28 March 1979)
- Information Notice 1979-08, Interconnection of Contaminated Systems With Service Air Systems Used As Source of Breathing Air (28 March 1979)
- Information Notice 1979-09, Spill of Radioactively Contaminated Resin (30 March 1979, Topic: Hydrostatic)
- Information Notice 1979-19, Pipe Cracks in Stagnant Borated Water Systems at PWR Plants (17 July 1979, Topic: Boric Acid, Hydrostatic, Liquid penetrant)
- Information Notice 1979-20, NRC Enforcement Policy - NRC Licensed Individuals (7 September 1979, Topic: Overexposure)
- Information Notice 1979-21, Transportation & Commercial Burial of Radioactive Material (7 September 1979)
- Information Notice 1979-22, Qualification of Control Systems (14 September 1979)
- Information Notice 1979-24, Overpressurization of Containment of a PWR Plant After a Main Steam Line Break (1 October 1979)
- Information Notice 1979-25, Reactor Trips at Turkey Point Units 3 & 4 (1 October 1979)
- Information Notice 1979-26, Breach of Containment Integrity (5 November 1979)
- Information Notice 1979-28, Overloading of Structural Elements Due to Pipe Support Loads (16 November 1979)
- Information Notice 1979-29, Loss of Nonsafety-Related Reactor Coolant System Instrumentation During Operation (16 November 1979)
- Information Notice 1979-30, Reporting of Defects & Noncompliances, 10 CFR Part 21 (6 December 1979)
- Information Notice 1979-31, Use of Incorrect Amplified Response Spectra (13 December 1979)
- Information Notice 1979-32, Separation of Electrical Cables for HPCI and ADS (21 December 1979, Topic: Fire Watch)
- Information Notice 1979-33, Improper Closure of Primary Containment Equipment Access Matches (21 December 1979, Topic: Local Leak Rate Testing)
- Information Notice 1979-34, Inadequate Design of Safety-Related Heat Exchangers (27 December 1979)
- Information Notice 1979-35, Control of Maintenance & Essential Equipment (31 December 1979)
- Information Notice 1979-36, Computer Code Defect in Stress Analysis of Piping Elbow (31 December 1979)
- Information Notice 1979-37, Cracking in Low Pressure Turbine Discs (28 December 1979, Topic: Stress corrosion cracking, Turbine Missile)
|
---|