Information Notice 1979-31, Use of Incorrect Amplified Response Spectra

From kanterella
Jump to navigation Jump to search
Use of Incorrect Amplified Response Spectra
ML031180198
Person / Time
Site: 05000000
Issue date: 12/13/1979
From:
NRC/OI
To:
References
IN-79-031, NUDOCS 7910250507
Download: ML031180198 (2)


SSINS: 6870

Accession No.:

UNITED STATES

7910250507

NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

WASHINGTON, D.C.

20555

December 13, 1979

IE Information Notice No. 79-31 USE OF INCORRECT AMPLIFIED RESPONSE SPECTRA (ARS)

Description of Circumstances

Recently, the NRC was informed that, durinq a review of valve weights in

conjunction with the as-built review for IE Bulletin 79-14 at North Anna

Unit 1, it was discovered that incorrect amplified response spectra (ARS) had

been used as input to the analyses of some piping on both units 1 and 2. The

reanalyses are being performed by Stone & Webster (S&W), the Architect Engineer

for the Virqinia Electric & Power Company's facilities.

Similarly, Public

Service Company of New Hampshire informed the NRC that the wrong ARS were used

for the design of some containment supports at their Seabrook units. The

Architect Engineer for these plants is United Engineers & Constructors (UE&C).

The NRC is currently pursuing this issue in detail with S&W and UE&C to

determine the extent of the problem and the generic implications for other

facilities.

This Information Notice is provided as an early notification of a possible

significant matter. It is expected that recipients will review the informa- tion for possible applicability to their facilities.

Specific action has been

requested by IE Bulletin 79-14. This bulletin requires that input to seismic

analyses of piping, which includes the use of the correct ARS, be verified

against the as-built condition of the plant.

No specific actions are requested

in response to this Information Notice. If NRC evaluations so indicate, further licensee actions may be requested or required. If you have any ques- tions regarding this matter, please contact the Director of the appropriate

NRC Regional Office.

No written response to this IE Information Notice is required.

Enclosure:

List of IE Information

Notices Recently Issued

IE Information Notice No. 79-31

December 13, 1979

RECENTLY ISSUED

IE INFORMATION NOTICES

Enclosure

Information

Notice No.

79-30

79-29

79-28

79-27

79-12A

79-26

79-25

79-24

79-23

79-22 Subject

Date

Issued

Renortinq of Defects and

Noncompliances, 10 CFR

Part 21 Loss of NonSafety-Related

Reactor Coolant System

Instrumentation Curing

Operation

Overloadina of Structural

Elements Due to Pipe Support

Loads

Steam Generator Tube

Ruptures At Two PWIR

Facilities

Attempted Damage To flew

Fuel.Assemblies

Breach of Containment

Inteqrity

Reactor Trips At Turkey

Point Units 3 And 4

Overpressurization Of

Containment Of A PWR Plant

After A Main Steam Line

Break

Emergency Diesel Generator

Lube Oil Coolers

Oualification of Control

Systems

Transportation and Commercial

Burial of Radioactive Material

12/6/79 Issued To

All power reactor facilities

holding OLs and CPs and

vendors inspected by LCVIP

11/16/79

All power reactor facilities

holdinc

OLs or CPs

11/16/79

All power reactor facilities

with an OL or CP

11/16/79

All power reactor facilities

holding OLs and CPs

11/9/79 All Fuel Facilities, research reactors, and

power reactors with an

OL or CP

1/5/79

0/1/79

All power reactor facilities

holding OLs and CPs

All power facilities with

an OL or a CP

.0/1/79

All power reactor facilities

with a CP

9/26/79

?/14/79

9/7/79

All power reactor

facilities holding OLs

and CPs

All Power reactor

facilities with

operating licenses

and construction permits.

All power and research

reactors with OLs

79-21