Year 2000 Computer Systems Readiness Audits
ML031040450
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Crane  Entergy icon.png
Issue date: 04/28/1999
From: Marsh L
Division of Regulatory Improvement Programs
To:
References
IN-99-012, NUDOCS 9904230323
Download: ML031040450 (8)


v>

UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D.C. 20555-0001

April 28, 1999

NRC INFORMATION NOTICE 99-12: YEAR 2000 COMPUTER SYSTEMS READINESS

AUDITS

Addresses

All holders of operating licenses or construction permits for nuclear power plants.

PurDose

The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice (IN) to inform

addressees of observations made by NRC staff during audits conducted on the Year 2000

(Y2K) readiness programs of twelve plants. It is expected that recipients will review the

information for applicability to their facilities and consider actions, as appropriate. However, suggestions contained in this information notice are not NRC requirements: therefore, no

specific action or written response is required.

Background

The Y2K issue involves potential date-related errors with computer systems, microprocessor- based (embedded software) devices, and software applications. An example of a date-related

problem is a software application or digital device that misinterprets the numbers 00" to

represent the year 1900 rather than the year 2000. Date-related errors can result in

malfunctions of computer systems by providing erroneous data output or failing to operate at

all.

On December 24, 1996, the NRC issued Information Notice (IN) 96-70, wYear 2000 Effect on

Computer System Software,' to alert nuclear power plant licensees of the Y2K issue.

Subsequently, on May 11, 1998 and January 14, 1999, the NRC issued Generic Letter

(GL) 98-01, 'Year 2000 Readiness of Computer Systems at Nuclear Power Plants," and

Supplement 1 to Generic Letter 98-01, respectively, requesting information regarding each

licensee's program to address the Y2K computer systems issue. In GL 98-01, the staff

determined that the Nuclear Energy Institute/Nuclear Utilities Software Management Group

(NEIINUSMG) framework document, NEI/NUSMG 97-07, *Nuclear Utility Year 2000

Readiness,' is an acceptable approach to addressing the Y2K issue, provided licensees

address the additional areas of risk management, business continuity and contingency

planning, and remediation of embedded systems. Subsequently, NEI/NUSMG issued

NEI/NUSMG 98-07, aNuclear Utility Year 2000 Readiness Contingency Planning,* in August

1998, to address the additional areas cited by the NRC in GL 98-01.

PD

T-4E

91O0Q

A'11°Oa q-q

0)e

IN 99-12 April 28, 1999

Description of Circumstances

From September 1998 thru January 1999, NRC audit teams conducted twelve representative

Y2K readiness audits at nuclear plant sites throughout the United States. The NRC staff

determined that this approach was an appropriate means of oversight of licensee Y2K

readiness efforts because all licensees had committed to the nuclear power industry Y2K

readiness guidance, NEI/NUSMG 97-07, in their first response to NRC GL 98-01 and because

the NRC staff had not identified any Y2K problems in safety-related actuation systems. The

NRC staff selected a variety of types of plants of different ages and locations in order to obtain

the necessary assurance that nuclear power industry Y2K readiness programs are being

effectively implemented and that licensees are on schedule to meet the readiness target date of

July 1, 1999, established in GL 9801. The results of the audits were intended to determine the

need for additional regulatory action. The sample of 12 licensees included large utilities such

as Commonwealth Edison and Tennessee Valley Authority (TVA) as well as small single-unit

licensees such as North Atlantic Energy (Seabrook) and Wolf Creek Nuclear Operating

Corporation. Because licensee Y2K programs are corporate-wide, many of the NRC staff

audits include more than a single nuclear power plant site since many utilities own more than

one nuclear power plant. In all, a total of 42 of 103 operating nuclear power plant units were

associated with the Y2K readiness program audits of 12 utilities. The 12 representative Y2K

program audit sites Included Braidwood, Brunswick, Davis-Besse, Hope Creek, Limerick, Monticello, North Anna, Seabrook, Washington Nuclear Project No. 2, Waterford, Watts Bar, and Wolf Creek.

In evaluating the audited Y2K programs, the staff did not identify any issues that would preclude

the nuclear power plants from achieving Y2K readiness before January 1, 2000. The licensee

Y2K programs are generally on schedule to be ready by July 1, 1999, and no Y2K problems

were identified that directly impact the proper functioning of safety systems. However, the

audits did identify some remaining remediation activities of certain software items and

embedded systems which will prevent a number of licensees from meeting full program

implementation by July 1, 1999. In those instances the remaining remediation activities of

software applications and digital devices are scheduled for the Fall 1999. The schedule was

frequently driven by licensee outage planning or equipment availability. The audit reports are

publicly available and may be accessed from the NRC website at

www.nrc.aov/NRC/Y2KNRR.html.

At the time of the audits, most licensees were beginning the contingency planning phase of

their actions to address the Y2K issue. Therefore, in an effort to verify and assess the

effectiveness of licensee contingency planning, NRC staff will conduct audits focused In the

area of Y2K contingency planning at six additional sites, involving licensees other than those

that comprise the original 12. The sites selected are: Diablo Canyon, Duane Arnold, Indian

Point 2, Oconee, Palo Verde and Turkey Point. As stated earlier, licensee Y2K programs are

corporate - wide and many utilities own more than one nuclear power plant. Therefore, a total

of 18 operating nuclear power plant units will be associated with these six licensee audits.

'11 o

IN 99-12 April 28, 1999 Further, NRC regional and resident staff will conduct additional Y2K readiness and contingency

planning site-specific reviews at all commercial nuclear power plants. The six focused audits of

contingency planning and regional site-specific reviews will be completed by July 1999.

Discussion

Based on the 12 representative Y2K audit results, the staff observed several common factors

among effective programs. The staff found that properly following the NEI/NUSMG 97-07 and NEI/NUSMG 98-07 guidance documents resulted in an overall functional and straight

forward Y2K program. Effective Y2K programs have generally received appropriate

management attention and support. The staff believes active management oversight is vital for

program effectiveness. The staff found that central control of Y2K activities, independent peer

reviews, and aggressive quality assurance involvement promotes consistency across program

activities and products. In addition, the staff recognized that sharing information via owners

groups and utility alliances aided licensees in the implementation of effective Y2K programs.

The staff also concluded that corporate and plant programs should interface in order to achieve

consistency in application and system readiness.

Most commercial nuclear power plants have protection systems based on analog technology

rather than digital technology. Since Y2K concerns are associated with digital systems, analog

reactor protection system functions are not affected directly by the Y2K problem. Although

there is limited use of computer systems in nuclear power plant mission critical and safety- related functions, licensee Y2K programs have identified some software and digital devices that

affect a small number of safety functions. None of these safety functions are actuation based.

Digital systems and components requiring remediation of Y2K-related problems perform

functions such as post-accident sampling, fuel handling, core power distribution monitoring, and

reactor vessel level measurement. Licensees have identified incorrect dates in safety-related

printouts, logs, and displays in systems such as radiation monitoring. These'errors, however, have not affected the functions performed by the devices or systems. There are mission critical

non-safety-related functions such as digital feedwater controls, moisture separator reheater

controls, reactor recirculating coolant controls, and motor generator set controls that are

affected by the Y2K concern and have required remediation. These balance-of-plant functions

are critical for power generation.

The audits revealed that licensees are actively addressing loss of off-site communications and

grid instability issues which are addressed as part of their contingency planning. Based on the

available contingency plans and licensees' scheduled evaluations, remediations, and testing, the staff did not identify any communication related Issue that would prevent any audited plant

from being Y2K ready by January 1, 2000. Licensees are continuing to evaluate their

communication systems for susceptibility to the Y2K issue and have developed plans to cope

with system failures. Licensees are interacting with the North American Electric Reliability

Council (NERC) to develop electrical grid stability plans for generation and transmission. The

licensees have Identified grid instability as a factor to be included under external risk as part of

the Y2K contingency planning effort. Nuclear plant licensees and the NRC recognize the

  • .

IN 99-12 April 28, 1999 national importance of having available the broadest range of electrical generating capability in

order to cope with any unforseen Y2K impacts should they occur. However, NERC in their

report to DOE, "Preparing the Electric Power Systems of North America For Transition to the

Year 2000," dated September 17, 1998, states as follows: aNuclear generating facilities are

expected to be available to supply their share of energy needs and all nuclear safety systems

are expected to be fully ready for Y2K." The NRC regulatory focus on electrical grid reliability is

still related primarily to the challenges on plant safety systems.

Based on the regional site-specific reviews, contingency plan focused audits, and licensee

responses to GL 98-01 or Supplement 1 of GL 98-01, the NRC will determine the need for

future actions regarding the Y2K computer system readiness issue. The results of the these

reviews and audits will be made publically available and may be accessed thru the NRC website

at www.nrc.gov/NRC/NEWS/year2000.html.

This information notice requires no specific action or written response. However, recipients are

reminded that they are required to consider industry-wide operating experience (including NRC

information notices), where practical. If you have any questions about the information in this

notice, please contact one of the technical contacts listed below or the appropriate Office of

Nuclear Reactor Regulation (NRR) project manager.

[Original signed by]

Ledyard B. Marsh, Chief

Events Assessment, Generic Communications

and Non-Power Reactors Branch

Division of Regulatory Improvement Programs

Office of Nuclear Reactor Regulation

Technical Contacts: A. Bryant, NRR

W. Burton, NRR

301-415-2712

301-415-2853 E-mail: alb30nrc.nov

E-mail: wfb(&inrc.nov

List of Recently Issued NRC Information Notices

  • See previous concurrence DOCUMENT NAME: G:%WFB\\IN_Y2K

To receive a copy of this document, Indicate In the box C=Copy wlo attachmentlenclosure E=Copy with attachment/enclosure N = No copy

OFFICE

REXB

I

EEIB

EEIB

I

C:ElC

l

DD:DE I

DDE

l

NAME

Wburton*

_ Abryant*

MChiramal*

JCalvo*

RWessman*

JStrosnider*

DATE

. 4120/99 I 4120199

4/20199

. 04/21/99

1 04/22/99

04/22199 C:REXB

AL

4/4Marsh9

41X.99

OFFICIAL RECORD COPY

0.

Attachment 1

IN99-12

April 28, 1999 LIST OF RECENTLY ISSUED

NRC INFORMATION NOTICES

Information

Date of

Notice No.

Subject

Issuance

Issued to

99-11 Incidents Involving the Use of

4/23/99

All medical use licensees

Radioactive Iodine-131

97-15, Sup I

Reporting of Errors and

4116/99

All holders of operating licensees

Changes inLarge-Break/Small- for nuclear power reactors, except

Break Loss-of-Coolant Evaluation

those who have permanently

models of Fuel Vendors and

cease operations and have

Compliance with 10 CFR 50.46(a)(3)

certified that fuel has been

permanently removed from the

reactor

99-10

Degradation of Prestressing

4/13/99

All holders of Ols for nuclear

Tendon Systems in Prestressed

power reactors

Concrete Containments

99-09 Problems Encountered When

3/24/99

All medical licensees authorized

Manually Editing Treatment Data

to conduct high-dose-rate (HDR)

on The Nucletron Microselectron-HDR

remote after loading

(New) Model 105.999 brachytherapy treatments

99-08 Urine Specimen Adulteration

4/1/99

All holders of operating licensees

For nuclear power reactors and

licensees authorized to possess

or use formula quantities of

strategic special nuclear material

(SSNM)

99-07 Fire Protection Preaction

3122/99

All NRC licensees

Sprinkler System Deluge Valve

Failures and Potentials Testing

Deficiencies

OL = Operating License

CP = Construction Permit

Il1 IN 99-12 April 28,1999 national importance of having available the broadest range of electrical generating capability in

order to cope with any unforseen Y2K impacts should they occur. However, NERC in their

report to DOE, "Preparing the Electric Power Systems of North America For Transition to the

Year 2000,0 dated September 17, 1998, states as follows: "Nuclear generating facilities are

expected to be available to supply their share of energy needs and all nuclear safety systems

are expected to be fully ready for Y2K.0 The NRC regulatory focus on electrical grid reliability is

still related primarily to the challenges on plant safety systems.

Based on the regional site-specific reviews, contingency plan focused audits, and licensee

responses to GL 98-01 or Supplement 1 of GL 98-1, the NRC will determine the need for

future actions regarding the Y2K computer system readiness issue. The results of the these

reviews and audits will be made publically available and may be accessed thru the NRC website

at www.nrc.gov/NRC/NEWS/year2000.html.

This information notice requires no specific action or written response. However, recipients are

reminded that they are required to consider industry-wide operating experience (including NRC

information notices), where practical. If you have any questions about the information in this

notice, please contact one of the technical contacts listed below or the appropriate Office of

Nuclear Reactor Regulation (NRR) project manager.

[Original signed by]

Ledyard B. Marsh, Chief

Events Assessment, Generic Communications

and Non-Power Reactors Branch

Division of Regulatory Improvement Programs

Office of Nuclear Reactor Regulation

Technical Contacts: A. Bryant, NRR

W. Burton, NRR

301-415-2712

301-415-2853 E-mail: alb3(nrc.aov

E-mail: wfbOfnrc.ov

List of Recently Issued NRC Information Notices

  • See previous concurrence DOCUMENT NAME: G:\\WFB\\IN Y2K

To receive a copv of this document, indicate in the box C=Coov wlo attachmentlenclosure E=CoDv with attachment/enclosure N = No coDy

OFFICE

REXB

lI

EEIB

EEIB

L

EI

DD:DE

lI

l DDE

I

NAME

l Wburton*

_ Abryant*

l MChiramal*

l JCalvo*

RWessman*

l JStrosnider*

l

DATE

14/20/99

1 4120199

1 4/20/99

[ 04/21/99 l04122/99

1 04122/99 j

C:REXB

Alh

LMarsh W

4199,

OFFICIAL RECORD COPY

KG/

IN99-xx

April xx, 1999 are expected to be fully ready for Y2K." The NRC regulatory focus on electrical grid reliability is

still related primarily to the challenges on plant safety systems.

Based on the regional site-specific reviews, contingency plan focused audits, and licensee

responses to GL 98-01 or Supplement 1 of GL 98-01, the NRC will determine the need for future

actions regarding the Y2K computer system readiness issue. The results of the these reviews

and audits will be made publically available and may be accessed thru the NRC website at

www.nrc.gov/NRC/NEWS/year2000.html.

This information notice requires no specific action or written response. However, recipients are

reminded that they are required to consider industry-wide operating experience (including NRC

information notices), where practical. If you have any questions about the information in this

notice, please contact one of the technical contacts listed below or the appropriate Office of

Nuclear Reactor Regulation (NRR) project manager.

David B. Matthews, Director

Division of Regulatory Improvement Programs

Office of Nuclear Reactor Regulation

Technical Contacts:

A. Bryant, NRR

301-415-2712 E-mail: alb3@nrc.gov

W. Burton, NRR

301-415-2853 E-mail: wfb@nrc.gov

List of Recently Issued NRC Information Notices

DOCUMENT NAME: G:\\WFB\\INY2K

  • See previous concurrence

- £

AX.i..

gni.#t fin

kh_

f^Y r.=,

win attnr-hmnnt/Pnroura E=CopV with attachmenttenclosure N = No copy

lo receive a uupy o, uuIs uucu,,rntu, clb

.les ...

l

-1.

..

t; WA

--

V#

Bre

-u_.

I

OFFICE

REXI

l

EEIB

lEEIB

l

C:EIC

I F

DD:DE

4 '

DDE l Co

NAME

Wburton*

Abryant*

MChiramal*

JCaIvo r

j RWegI'i

jder

DATE

1 4/20/99

4/20/99 J 4/20/99

4/1I99 A;J4,<y99

-I99

-

-

AV

C:REXB

I

D:DRIP

I

LMarsh

DMatthews

/1 99 I 199

OFFICIAL RECORD COPY

K>-

K>-

IN 99-xx

April xx, 1999 are expected to be fully ready for Y2K. The NRC regulatory focus on electrical grid reliability is

still related primarily to the challenges on plant safety systems.

Based on the regional site-specific reviews, contingency plan focused audits, and licensee

responses to GL 98-01 or Supplement I of GL 98-01, the NRC will determine the need for future

actions regarding the Y2K computer system readiness issue. The results of the these reviews

and audits will be made publically available and may be accessed thru the NRC website at

www.nrc.gov/NRC/NEWS/year2000.html.

This information notice requires no specific action or written response. However, recipients are

reminded that they are required to consider industry-wide operating experience (including NRC

information notices), where practical, when setting goals and performing periodic evaluations

under Section 50.65, "Requirements for Monitoring the Effectiveness of Maintenance at Nuclear

Power Plants," of Part 50 of Title 10 of the Code of Federal Regulations. If you have any

questions about the information in this notice, please contact one of the technical contacts listed

below or the appropriate Office of Nuclear Reactor Regulation (NRR) project manager.

David B. Matthews, Director

Division of Regulatory Improvement Programs

Office of Nuclear Reactor Regulation

Technical Contacts:

A. Bryant, NRR

301-415-2712 E-mail: alb3(nrc.oov

W. Burton, NRR

301-415-2853 E-mail: wfbOinrc.gov

List of Recently Issued NRC Information Notices

O9yV

DOCUMENT NAME: G:\\WFB\\INY2K

  • See previous concurrence

To reeniva a mnv of this documAnt indicate in the box r=Crnnv winn atrachmntPeInetiosrp F==nnr

with attnfhmenm

lonInayrfP Id I= KIt-n n

  • . _ ...

,_-

, -.

__

.....

i___,

-e

liwllw9_b-i

-

--

V .XABUll~lUlV

-i

WZV,

OFFICE

REXBEICB

EICB

l

C:EICB

C:REXB

D:DRIP

I

NAME

WBurtonf)l

ABryant L'..i

MChirmal 4 JCalvo

ILMarsh

DMatthews

DATE

1 /9 Ie1I99 fIA'l9

-

-

199

_ I /99 I /99 OFFICIAL RECORD COPY