Letter Sequence Approval |
---|
|
|
MONTHYEARML0406307362002-05-30030 May 2002 Technical Specification Page Amendment No. 125 Allowed Outage Time.. Project stage: Other ML0215402412002-05-30030 May 2002 Issuance of Amendments Regarding Containment Vacuum Relief Valve Allowed Outage Time Extension Project stage: Approval 2002-05-30
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) ML21342A2092022-01-14014 January 2022 Issuance of Amendment Nos. 252 and 207 to Allow Risk-Informed Completion Times (RICT) for the 120-Volt Alternating Current (AC) Instrument Bus Requirements ML21022A2192021-02-26026 February 2021 Issuance of Amendment No. 206 to Replace the Current Time-Limited Reactor Coolant System Pressure/Temperature Limit Curves and LTOP Setpoints with Curves and Setpoints That Will Remain Effective for 55 Effective Full Power Years ML20259A2982020-11-18018 November 2020 Issuance of Amendment No. 205 Regarding Modification of the Reactor Coolant Pump Flywheel Inspection Program ML20237F2572020-10-30030 October 2020 Issuance of Amendment Nos. 251 and 204 Regarding Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 Development of Emergency Action Levels for Non-Passive Reactors ML19266A0722020-01-27027 January 2020 Issuance of Amendment Nos. 250 and 202 Regarding Technical Specification Changes to Allow the Performance of Selected Emergency Diesel Generator Surveillance Requirements During Power Operation ML19248C2382019-11-20020 November 2019 Issuance of Amendment No. 201 Regarding Technical Specification Changes to Eliminate Requirements of Iodine Removal System ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19203A1662019-07-26026 July 2019 Issuance of Exigent Amendment No. 248 Technical Specification 3/4.8.1 Change to Allow for a One-Time Extension of the Allowed Outage Time for One Emergency Diesel Generator ML19113A0992019-07-0202 July 2019 Issuance of Amendments Regarding Adoption of Risk-Informed Completion Times in Technical Specifications ML19058A4922019-04-23023 April 2019 Issuance of Amendment 198 Regarding Technical Specification Changes to Reduce the Number of Control Element Assemblies ML18274A2242018-11-0202 November 2018 Issuance of Amendment Nos. 246 and 197 Regarding Technical Specifications Site Area Map ML18129A1492018-07-0909 July 2018 Issuance of Amendments Regarding Technical Specification Changes Related to the Auxiliary Feedwater System (CAC Nos. MG0237 and MG0238; EPID L-2017-LLA-0296) ML18046A7122018-03-26026 March 2018 Issuance of Amendments Regarding the Unusual Event Fire Related Emergency Action Level Scheme ML17257A0152017-10-31031 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to the Reactor Protection System and Limiting Condition for Operation 3.0.5 ML17248A3792017-10-23023 October 2017 Issuance of Amendments to Revise the Renewed Facility Operating Licenses Fire Protection License Conditions (CAC Nos. MF9681 and MF9682; EPID L-2017-LLA-0230) ML17235A5652017-10-0505 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to Component Cyclic or Transient Limits ML17195A2912017-08-14014 August 2017 Issuance of Amendments Regarding Relocation of Radiation Monitor Requirements from Technical Specifications to Licensee-Controlled Documents ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17038A2252017-03-29029 March 2017 Issuance of Amendment No. 188 Regarding Emergency Diesel Generator Day Tank Volume ML16251A1282016-12-0505 December 2016 Issuance of Amendments to Update Appendix B to the Renewed Facility Operating License to Incorporate the 2016 Biological Opinion ML16166A4242016-10-0505 October 2016 St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments Regarding the Use of a New Computer Code to Model the Containment Vacuum Analyses ML16183A1382016-09-19019 September 2016 Issuance of Amendments Regarding Technical Specification Change to Eliminate the Moderator Temperature Coefficient Surveillance Test at the End of Cycle ML16210A3742016-08-30030 August 2016 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2 ML16103A3972016-07-28028 July 2016 Issuance of Amendments Regarding Removal of Technical Specification for Cleaning Fuel Oil Storage Tank Sediment and Relocating Procedures to Licensee Controlled Documents L-2016-120, License Amendment Request EDG Day Tank Fuel Volume Change2016-06-21021 June 2016 License Amendment Request EDG Day Tank Fuel Volume Change ML16124A3832016-05-25025 May 2016 St. Lucie Plant, Unit No. 1 - Issuance of Amendment Regarding Changes to the Snubber Surveillance Requirements (CAC No. MF6490) ML16063A1212016-04-19019 April 2016 Redacted - Issuance of Amendment Regarding License Amendment Request for the Transitioning to Areva Fuel ML15344A3462016-03-31031 March 2016 Issuance of Amendments Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c) (CAC Nos. MF1373 & MF1374) ML15356A6112016-03-0707 March 2016 Issuance of Amendments Regarding Request to Standardize the Required Actions for Inoperability of Auxiliary Feedwater Pumps ML16034A0802016-03-0707 March 2016 Issuance of Amendments Regarding Technical Specification Change to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents ML15195A6552015-08-27027 August 2015 Issuance of Amendments Regarding Change to Technical Specification 6.8.4.h., Containment Leakage Rate Testing Program ML15121A1822015-06-0505 June 2015 Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML14350A0082015-06-0101 June 2015 Issuance of Amendment to Revise the Requirement Regarding the Shift Technical Advisor ML14343A9182015-02-27027 February 2015 Issuance of Amendments to Revise Limiting Condition for Operation 3.0.4 and Surveillance Requirement 4.0.4 ML14064A1292014-03-31031 March 2014 Issuance of Amendment Regarding the Use of M5 Alloy Fuel Cladding in Core Reload Applications ML13164A2652013-08-30030 August 2013 Issuance of Amendments Revising Station Battery Connection Resistances Acceptance Criteria in Technical Specifications ML13150A3372013-06-18018 June 2013 Issuance of Amendments Revision Station Battery Connection Resistances Acceptance Criteria in Technical Specifications ML12339A1092012-12-17017 December 2012 Issuance of Amendments Regarding Revision to Cyber Security Plan Milestone 6 ML12235A4632012-09-24024 September 2012 Issuance of Amendment Regarding Extended Power Uprate ML12263A2242012-09-19019 September 2012 Public - Issuance of Amendment Regarding New Fuel Vault and Spent Fuel Pool Nuclear Criticality Analysis ML12156A2082012-07-0909 July 2012 Issuance of Amendment Regarding Extended Power Uprate ML12181A0192012-07-0909 July 2012 Issuance of Amendment Regarding Extended Power Uprate (Redacted) ML12052A2212012-03-30030 March 2012 Issuance of Amendments Regarding TSTF-513 Change, Revision 3, Revise Pressurized Water Reactor Operability Requirements and Actions for Reactor Coolant System Leakage Instrumentation ML11196A0792011-08-31031 August 2011 Issuance of Amendments Regarding Approval of the St. Lucie Cyber Security Plan ML1034404952010-12-28028 December 2010 Issuance of Amendments Regarding Deletion of the Structural Integrity Technical Specification Update of Accident Monitoring Instrumentation Requirements and Various Administrative Changes ML1009902752010-05-31031 May 2010 Issuance of Amendment Regarding Control Element Assembly Drop Time ML0917003142009-06-30030 June 2009 Issuance of Amendments Regarding Technical Specification Requirements Associated with Refueling Water Tank Minimum Contained Volume of Borated Water (TAC Nos. MD9208 and MD9209) ML0909602702009-05-27027 May 2009 License Amendment, Implementation of TSTF-511, Revision 0, Eliminate Working Hour Restriction from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0909701742009-04-14014 April 2009 Issuance of Amendments Regarding Relocation of the Existing Surveillance Requirements Associated with Diesel Fuel Oil Testing Program (Tac MD9261 and MD9262) 2022-02-07
[Table view] Category:Safety Evaluation
MONTHYEARML23219A0032023-09-0101 September 2023 SLRA SER Rev 1 ML23200A1462023-07-21021 July 2023 Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1 and 2 ML22255A1022022-09-21021 September 2022 Authorization and Safety Evaluation for Alternative Relief Request No. 10 - Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality or Safety ML22038A1872022-02-0909 February 2022 Authorization and Safety Evaluation for Relief Request No. 19 (RR19) - the Use of an Alternative to ASME Code Case N-729-6 for Replacement Reactor Vessel Closure Head Penetration Nozzle 85 ML21342A2092022-01-14014 January 2022 Issuance of Amendment Nos. 252 and 207 to Allow Risk-Informed Completion Times (RICT) for the 120-Volt Alternating Current (AC) Instrument Bus Requirements ML21236A1312021-09-30030 September 2021 Authorization of RR 15 Regarding Extension of ASME Requirements Related to Reactor Pressure Vessel Weld Examinations from 10 to 20 Years ML21022A2192021-02-26026 February 2021 Issuance of Amendment No. 206 to Replace the Current Time-Limited Reactor Coolant System Pressure/Temperature Limit Curves and LTOP Setpoints with Curves and Setpoints That Will Remain Effective for 55 Effective Full Power Years ML21027A2262021-02-17017 February 2021 Approval of Alternative to ASME Code, Section XI to Use an Alternative Inservice Inspection Schedule for the Reaction Vessel Closure Head Bolting ML20329A4022021-02-0303 February 2021 Approval of Alternative to Use ASME Code Case N-513-4 for Alternative Repair of Intake Cooling Water System ML20259A2982020-11-18018 November 2020 Issuance of Amendment No. 205 Regarding Modification of the Reactor Coolant Pump Flywheel Inspection Program ML20237F2572020-10-30030 October 2020 Issuance of Amendment Nos. 251 and 204 Regarding Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 Development of Emergency Action Levels for Non-Passive Reactors ML20099A3482020-06-25025 June 2020 Safety Evaluation for Relief Request for Fifth Ten-Year Inservice Inspection (ISI) Interval - Alternative Risk-Informed Inservice Inspection Program for Class 1 and 2 Piping Welds ML20023B3782020-02-19019 February 2020 Safety Evaluation for Relief Request RR-16, Alternate Repair of 2B Boric Acid Makeup Pump Revision for the Fourth 10-Year Inservice Inspection Interval ML20015A1232020-02-0606 February 2020 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19266A0722020-01-27027 January 2020 Issuance of Amendment Nos. 250 and 202 Regarding Technical Specification Changes to Allow the Performance of Selected Emergency Diesel Generator Surveillance Requirements During Power Operation ML19254B5332019-09-30030 September 2019 Safety Evaluation for Relief Request RR#15, Revision 0, Regarding Limited Piping Examinations ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 ML19203A1662019-07-26026 July 2019 Issuance of Exigent Amendment No. 248 Technical Specification 3/4.8.1 Change to Allow for a One-Time Extension of the Allowed Outage Time for One Emergency Diesel Generator ML19115A2812019-05-31031 May 2019 Safety Evaluation for Relief Request No. 6 for the Fifth 10 Year Inservice Inspection Interval ML19058A4922019-04-23023 April 2019 Issuance of Amendment 198 Regarding Technical Specification Changes to Reduce the Number of Control Element Assemblies ML18274A2242018-11-0202 November 2018 Issuance of Amendment Nos. 246 and 197 Regarding Technical Specifications Site Area Map ML18256A0982018-10-30030 October 2018 Safety Evaluation for Relief Request No.5 for the Fifth 10-Year Inservice Inspection Interval ML18129A1492018-07-0909 July 2018 Issuance of Amendments Regarding Technical Specification Changes Related to the Auxiliary Feedwater System (CAC Nos. MG0237 and MG0238; EPID L-2017-LLA-0296) ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML18046A7122018-03-26026 March 2018 Issuance of Amendments Regarding the Unusual Event Fire Related Emergency Action Level Scheme ML18018A0332018-01-26026 January 2018 Safety Evaluation of Relief Requests for the Fifth 10-Year Inservice Testing Program (EPID L-2017-LLR-0113; L-2017-LLR-0017, L-2017-LLR-0018, L-2017-LLR-0119, L-2017-LLR-0120, L-2017-LLR-0121, and L-2017-LLR-0122) ML17334A9362018-01-0404 January 2018 Relief from the Requirements of the ASME Code Regarding Relief Request No. 17, Revision 0, for the Fourth 10-Year Inservice Inspection Interval (CAC No. MF9826; EPID L-2017-LLR-0043) ML17341A4422018-01-0404 January 2018 Relief from the Requirements of the ASME Code Relief Request No. 3 for the Fifth 10-Year Inservice Inspection Interval (CAC No. MF9288; EPID L-2017-LLR-0003) ML17257A0152017-10-31031 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to the Reactor Protection System and Limiting Condition for Operation 3.0.5 ML17263A1202017-10-27027 October 2017 Inservice Inspection Plan Fourth 10-Year Interval Relief Request No. 16 (CAC No. MF9827; EPID L-2017-LLR-0044) ML17248A3792017-10-23023 October 2017 Issuance of Amendments to Revise the Renewed Facility Operating Licenses Fire Protection License Conditions (CAC Nos. MF9681 and MF9682; EPID L-2017-LLA-0230) ML17235A5652017-10-0505 October 2017 Issuance of Amendments Regarding Technical Specification Changes Related to Component Cyclic or Transient Limits ML17219A1742017-08-31031 August 2017 Relief from the Requirements of the ASME Code Regarding Relief Request 12 for the Fourth 10-Year Inservice Inspection Interval ML17195A2912017-08-14014 August 2017 Issuance of Amendments Regarding Relocation of Radiation Monitor Requirements from Technical Specifications to Licensee-Controlled Documents ML17132A1672017-07-10010 July 2017 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 13 ML17110A2702017-05-10010 May 2017 Inservice Inspection Plan Fourth 10-year Interval Relief Request No. 14 Rev 0 - ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17038A2252017-03-29029 March 2017 Issuance of Amendment No. 188 Regarding Emergency Diesel Generator Day Tank Volume ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML16251A1282016-12-0505 December 2016 Issuance of Amendments to Update Appendix B to the Renewed Facility Operating License to Incorporate the 2016 Biological Opinion ML16292A7612016-11-0202 November 2016 Inservice Inspection Plan Fourth 10 Year Interval Relief Request No. 11 ML16166A4242016-10-0505 October 2016 St. Lucie Plant, Unit Nos. 1 and 2 - Issuance of Amendments Regarding the Use of a New Computer Code to Model the Containment Vacuum Analyses ML16183A1382016-09-19019 September 2016 Issuance of Amendments Regarding Technical Specification Change to Eliminate the Moderator Temperature Coefficient Surveillance Test at the End of Cycle ML16210A3742016-08-30030 August 2016 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2 ML16103A3972016-07-28028 July 2016 Issuance of Amendments Regarding Removal of Technical Specification for Cleaning Fuel Oil Storage Tank Sediment and Relocating Procedures to Licensee Controlled Documents ML16167A4732016-07-0505 July 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16139A5882016-05-27027 May 2016 Inservice Inspection Plan Fourth 10-Year Interval Relief Request No. 10, Revision 0 ML16124A3832016-05-25025 May 2016 St. Lucie Plant, Unit No. 1 - Issuance of Amendment Regarding Changes to the Snubber Surveillance Requirements (CAC No. MF6490) ML16063A1212016-04-19019 April 2016 Redacted - Issuance of Amendment Regarding License Amendment Request for the Transitioning to Areva Fuel ML15344A3462016-03-31031 March 2016 Issuance of Amendments Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with Title 10 of the Code of Federal Regulations Section 50.48(c) (CAC Nos. MF1373 & MF1374) 2023-09-01
[Table view] |
Text
May 30, 2002 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
ST. LUCIE UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS REGARDING CONTAINMENT VACUUM RELIEF VALVE ALLOWED OUTAGE TIME EXTENSION (TAC NOS. MB4229 AND MB4230)
Dear Mr. Stall:
The Commission has issued the enclosed Amendment Nos. 182 and 125 to Facility Operating License Nos. DPR-67 and NPF-16 for the St. Lucie Plant, Units 1 and 2. These amendments consist of changes to the Technical Specifications (TS) in response to your application dated February 20, 2002.
These amendments revise TS 3/4.6.5, Vacuum Relief Valves, to make the Limiting Condition for Operation applicable to vacuum relief lines and extend the allowed outage time for the containment vacuum relief lines from 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Also, some specific requirements for surveillance testing and valve actuation setpoints are relocated to the TS Bases documents.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Brendan T. Moroney, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-335 and 50-389
Enclosures:
- 1. Amendment No. 182 to DPR-67
- 2. Amendment No. 125 to NPF-16
- 3. Safety Evaluation cc w/enclosures: See next page
ML021540241 OFFICE PDII-2/PM PDII-2/LA SPLB/SC RORP/SC OGC PDII-2/SC NAME BMoroney BClayton SWeerakkody RDennig SUttal (NLO) TKoshy DATE 05/16/02 05/16/02 05/23/02 05/29/02 05/28/02 05/29/02 FLORIDA POWER & LIGHT COMPANY DOCKET NO. 50-335 ST. LUCIE PLANT UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 182 License No. DPR-67
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Florida Power & Light Company (the licensee), dated February 20, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, Facility Operating License No. DPR-67 is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and by amending paragraph 2.C.(2) to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 182, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Thomas Koshy, Acting Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: May 30, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 182 TO FACILITY OPERATING LICENSE NO. DPR-67 DOCKET NO. 50-335 Replace the following page of the Appendix A Technical Specifications with the attached page.
The revised page is identified by amendment number and contains marginal lines indicating the area of change.
Remove Page Insert Page 3/4 6-26 3/4 6-26
FLORIDA POWER & LIGHT COMPANY ORLANDO UTILITIES COMMISSION OF THE CITY OF ORLANDO, FLORIDA AND FLORIDA MUNICIPAL POWER AGENCY DOCKET NO. 50-389 ST. LUCIE PLANT UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 125 License No. NPF-16
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Florida Power & Light Company, et al. (the licensee), dated February 20, 2002, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, Facility Operating License No. NPF-16 is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and by amending paragraph 2.C.2 to read as follows:
- 2. Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 125, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Thomas Koshy, Acting Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: May 30, 2002
ATTACHMENT TO LICENSE AMENDMENT NO. 125 TO FACILITY OPERATING LICENSE NO. NPF-16 DOCKET NO. 50-389 Replace the following page of the Appendix A Technical Specifications with the attached page.
The revised page is identified by amendment number and contains marginal lines indicating the area of change.
Remove Page Insert Page 3/4 6-26 3/4 6-26
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NOS. 182 AND 125 TO FACILITY OPERATING LICENSES NOS. DPR-67 AND NPF-16 FLORIDA POWER AND LIGHT COMPANY, ET AL.
ST. LUCIE PLANT, UNITS NOS. 1 AND 2 DOCKET NOS. 50-335 AND 50-389
1.0 INTRODUCTION
By letter dated February 20, 2002, Florida Power and Light Company, et al. (the licensee),
requested amendments to Operating Licenses DPR-67 and NPF-16 for St. Lucie Unit 1 and 2, respectively. The proposed amendments would revise Section 3.6.5 of the Unit 1 and 2 Technical Specifications (TS) to modify the applicability of the specification from vacuum relief valves to vacuum relief lines and would extend the allowed outage time (AOT) for the containment vacuum relief lines from 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Valve actuation setpoint and stroke time requirements specified in the TS will be moved to the TS Bases. The primary intent of the proposed TS changes is to facilitate compliance with the Inservice Testing (IST) Program without placing the plant at risk for an unnecessary forced shutdown. The extended AOT will provide sufficient time to perform the required surveillance operability tests and make any required adjustments on the containment vacuum relief valves.
The proposed changes are modeled after NUREG-1432, Revision 2, Standard Technical Specifications (STS) Combustion Engineering Plants, Section 3.6.12, Vacuum Relief Valves (Dual). They are also consistent with those approved by the U.S. Nuclear Regulatory Commission (NRC) in TS Amendment No. 171 for the Waterford Steam Electric Station, Unit 3, on June 18, 2001. The Waterford Station is a Combustion Engineering plant with a containment design similar to St. Lucie.
2.0 REGULATORY EVALUATION
Section 182a of the Atomic Energy Act requires applicants for nuclear power plant operating licenses to include technical specifications as part of the license. The Commissions regulatory requirements that are related to the content of the TS are contained in Title 10, Code of Federal Regulations (10 CFR), Section 50.36. The TS requirements in 10 CFR 50.36 include the following categories: (1) safety limits, limiting safety systems settings and control settings, (2) limiting conditions for operation (LCO), (3) surveillance requirements, (4) design features, and (5) administrative controls.
Enclosure
As stated in 10 CFR 50.59(c)(1)(i), a licensee is required to submit a license amendment pursuant to 10 CFR 50.90 if a change to the TS is required. Furthermore, the requirements of 10 CFR 50.59 necessitate that NRC approve the TS changes before the TS changes are implemented.
The staff reviewed the proposed changes for compliance with 10 CFR 50.36 and agreement with the precedent as established in NUREG-1432. The licensee cannot justify technical specification changes solely on the basis of adopting the model STS. In each case the staff makes a determination that the change maintains adequate safety.
3.0 TECHNICAL EVALUATION
The containment vacuum relief system is discussed in Section 6.2.1 of each units Updated Final Safety Analysis Report (UFSAR). The St. Lucie containment vessels are designed for an external pressure differential of 0.7 pounds per square inch (psi) at 120 oF. During normal plant operation, the containment vessel is vented and cooled, as required, to eliminate pressure fluctuations caused by air temperature changes. The vacuum relief system protects the containment vessel against an excessive negative pressure condition inside containment (i.e.,
lower pressure inside than outside), which can occur if there is an inadvertent actuation of the containment spray system during normal operation.
The containment pressure relief system consists of two 100 percent vacuum relief lines, installed in parallel. The vacuum relief lines are 24-inch penetrations that connect the shield building annulus to the containment. The penetrations provide a flow path between the annulus and the containment. Each of the redundant lines making up the containment vacuum relief system is functionally independent. Each penetration has its own set of dual-function, in-series isolation valves that include one 24-inch pneumatically operated butterfly valve and one 24-inch check valve. The pneumatically operated butterfly valves are installed on the shield building annulus side of the containment penetration, and serve as automatic vacuum relief valves as well as containment isolation valves. These valves are normally closed during normal power operation. Each butterfly valve is actuated by a separate pressure controller that senses the differential pressure between the containment and the annulus.
The check valves are installed on the containment side of the penetration to protect the containment against excessive external pressure, prevent backflow of containment air to the annulus, and serve as containment isolation valves. The check valves have magnetic latches that hold the valve swing plate firmly in the closed position until required to open.
The check valves are designed to open at a differential pressure of 1.1 inches water gauge (w.g.). If the pressure differential between the annulus and the containment atmosphere continues to increase (containment pressure being lower than the annulus pressure), both butterfly valves are automatically opened by separate differential pressure transmitters to allow the air pressure in the annulus to relieve into the containment.
The UFSAR analysis shows that, in the event of an inadvertent initiation of the containment spray system, the peak differential pressure is kept below the design limit as long as one of the redundant relief lines is operable. For each unit, TS 3/4.6.5, Vacuum Relief Valves, contains a Limiting Condition For Operation (LCO) and Surveillance Requirements (SR) to ensure that
the vacuum relief system remains operable. The LCO requires the primary containment to annulus vacuum relief valves to be operable with an actuation setpoint of 2.25+/-0.25 inches w.g.
differential (for Unit 1) and 9.85+/-0.35 inches w.g. differential (for Unit 2). With one primary containment to annulus vacuum relief valve inoperable, the valve must be returned to operable status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or the plant must be placed in hot standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. The SR requires surveillance of the valves in accordance with the IST Program for both units. The Unit 1 SR has an additional requirement to verify, at least once per 3 years, that the vacuum relief valves open fully within 8 seconds.
St. Lucie 1 and 2 operate under a combined IST program, which currently is committed to comply with the 1989 Edition of ASME Section Xl, as mandated by 10 CFR 50.55(a). The 1989 Edition of ASME Section XI references ASME/ANSI OM-1987, Part 1, which requires that primary containment vacuum relief valves be tested at 6-month intervals and provides specific testing requirements.
The first proposed change would modify the applicability of the LCO from vacuum relief valves to vacuum relief lines and would require two vacuum relief lines to be operable. The proposed changes to the TS 3/4.6.5 LCO at St. Lucie are modeled after NUREG-1432, Revision 2, which requires operability of vacuum relief lines. The LCO establishes the minimum equipment required to accomplish the vacuum relief function following the inadvertent actuation of the containment spray system, assuming a single active failure. Two vacuum relief lines are required to be operable to ensure that at least one is available, assuming one or both valves in the other line fail to open. The proposed change is based on the original design-basis accident analysis involving an inadvertent containment spray system actuation during normal plant operation that can reduce the atmospheric temperature (and hence pressure) inside containment. The analysis is contained in Section 6.2.1 of the Unit 1 and Unit 2 UFSARs.
Conservative assumptions are used for pertinent parameters in the analysis. The inadvertent actuation of the containment spray system was analyzed to determine the resulting reduction in containment pressure. The analysis shows that, with one of the two redundant vacuum relief lines failing to open, the resultant peak containment calculated external pressure load is 0.66 psid for Unit 1 and 0.615 psid for Unit 2, which is less than the design external pressure load equivalent of 0.7 psid. Per 10 CFR 50.36, LCOs are the lowest functional capability or performance levels of equipment required for safe operation. Since failure of a line can result from failure of any component in the line, not just the valve, the proposed change clarifies the applicability of the requirement, is more restrictive than the existing LCO, and is acceptable.
The next proposed change would increase the time allowed to restore an inoperable vacuum relief line to operable status. When one of the required vacuum relief lines is inoperable, the present TS require the inoperable line to be restored to operable status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The licensee proposes to increase the AOT to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The proposed AOT extension facilitates compliance with the IST Program testing without placing the plant at risk for a forced shutdown by providing sufficient time to perform the required surveillance operability tests and any required adjustments on the primary containment to annulus vacuum relief valves. Currently, the IST program requires the vacuum relief valves to be actuated quarterly to verify stroke time and at 6-month intervals to verify their actuation setpoints. This testing can be performed remotely within the 4-hour AOT of TS 3.6.5 from outside the containment. However, if there are any test delays or required adjustments, the 4-hour AOT could be exceeded, requiring the initiation of an unnecessary forced shutdown. In addition, the extended AOT will allow flexibility in the performance of potential on-line maintenance and repair during plant operation in Modes 1, 2, 3, and 4. The staff considers the proposed change to the AOT acceptable based on a
qualitative judgment of the low probability that the system will be called upon to perform its design basis function with one train inoperable. This time period is also consistent with other LCOs for the loss of one train of a system required to mitigate the consequences of a loss of coolant accident or other design basis accident, and the proposed TS change is in conformance with NUREG-1432.
Currently, TS 3/4.6.5 requires the primary containment to annulus vacuum relief valves to be tested in accordance with the IST Program. The current TS 3/4.6.5 SR for each unit states, No additional Surveillance Requirements other than those required by the Inservice Inspection Testing Program. The proposed change would replace this with, Verify each vacuum relief line OPERABLE in accordance with the Inservice Testing Program. The staff finds these to be equivalent statements, and the proposed wording is consistent with the wording in NUREG-1432.
The proposed change moves some specific requirements contained in the current TS to the TS Bases documents. The current TS 3/4.6.5 lists the specific actuation setpoints for the vacuum relief valves in the LCO. For Unit 1 only, there is an additional requirement to verify, at least once per 3 years, that the vacuum relief valves open fully within 8 seconds. The licensee has provided proposed new Bases, which incorporate the identified requirements. By the proposed change, the vacuum relief valve setpoints will be added to the Unit 1 and Unit 2 TS Bases, and the 8-second stroke time will be added to the Unit 1 TS Bases. The vacuum relief valves will be tested in accordance with the IST Program and at an interval that is consistent with the IST Program. Currently, this requires stroke times to be verified quarterly and actuation setpoints to be verified every 6 months, which ensures that the Unit 1 requirement for a test at least every 3 years is met. The proposed TS changes are consistent with NUREG-1432, which requires surveillance to be conducted in accordance with the IST program and does not specify setpoints or frequency of testing. The proposed Bases changes are also consistent with NUREG-1432.
Per 10 CFR 50.36, surveillance requirements are included in TS to assure that the necessary quality of systems and components is maintained and that LCOs will be met. The staff finds that the requirements of 10 CFR 50.36 are satisfied by specifying surveillance of the containment vacuum relief valves in accordance with the IST program. Setpoints are design values that may appropriately be contained in other licensee controlled documents. Therefore, relocation of the valve actuation setpoints to the TS Bases is also acceptable.
Based on the above discussion, the staff finds the proposed changes to the TS to be acceptable.
3.0 STATE CONSULTATION
Based upon a letter dated March 8, 1991, from Mary E. Clark of the State of Florida, Department of Health and Rehabilitative Services, to Deborah A. Miller, Licensing Assistant, U.S. Nuclear Regulatory Commission, the State of Florida does not desire notification of issuance of license amendments.
4.0 ENVIRONMENTAL CONSIDERATION
These amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes surveillance requirements. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration and there has been no public comment on such finding (67 FR 12602, dated March 19, 2002). Accordingly, these amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of these amendments.
5.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Brendan Moroney, NRR Date: May 30, 2002
Mr. J. A. Stall ST. LUCIE PLANT Florida Power and Light Company cc:
Senior Resident Inspector Plant General Manager St. Lucie Plant St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission 6501 South Ocean Drive P.O. Box 6090 Jensen Beach, Florida 34957 Jensen Beach, Florida 34957 Mr. T. L. Patterson Craig Fugate, Director Licensing Manager Division of Emergency Preparedness St. Lucie Nuclear Plant Department of Community Affairs 6501 South Ocean Drive 2740 Centerview Drive Jensen Beach, Florida 34957 Tallahassee, Florida 32399-2100 Mr. Don Mothena M. S. Ross, Attorney Manager, Nuclear Plant Support Services Florida Power & Light Company Florida Power & Light Company P.O. Box 14000 P.O. Box 14000 Juno Beach, FL 33408-0420 Juno Beach, FL 33408-0420 Mr. Douglas Anderson Mr. Rajiv S. Kundalkar County Administrator Vice President - Nuclear Engineering St. Lucie County Florida Power & Light Company 2300 Virginia Avenue P.O. Box 14000 Fort Pierce, Florida 34982 Juno Beach, FL 33408-0420 Mr. William A. Passetti, Chief Mr. J. Kammel Department of Health Radiological Emergency Bureau of Radiation Control Planning Administrator 2020 Capital Circle, SE, Bin #C21 Department of Public Safety Tallahassee, Florida 32399-1741 6000 SE. Tower Drive Stuart, Florida 34997 Mr. Donald E. Jernigan, Site Vice President St. Lucie Nuclear Plant 6501 South Ocean Drive Jensen Beach, Florida 34957