ML020790007

From kanterella
Jump to navigation Jump to search

Technical Specification Page for Amendment No. 184, Technical Bases Control Program
ML020790007
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 03/19/2002
From:
NRC/NRR/DLPM
To:
References
Download: ML020790007 (1)


Text

TS Bases Control 5.4 5.0 ADMINISTRATIVE CONTROLS 5.4 Technical Specifications (TS) Bases Control 5.4.1 Changes to the Bases of the TS shall be made under appropriate administrative controls.

5.4.2 Changes to the Bases may be made without prior NRC approval provided the changes do not require either of the following:

a. A change in the TS incorporated in the license; or
b. A change to the updated FSAR )r Bases that requires NRC approval pursuant to 10 CFR ,0.59.

5.4.3 The Bases Control Program shall contain provisions to ensure that the Bases are maintained consist .nt with the UFSAR.

5.4.4 Proposed changes that meet the criteria of (a) or (b) above shall be reviewed and approved by the NRC prior to implementation. Changes to the Bases implemented without prior NRC approval shall be provided to the NRC within 6 months following every Unit 3 refueling, not to exceed 24 months. This schedule is consistent with SCE's submittal of UFSAR updates as allowed by the NRC approved exemption from 10 CFR 50.71(e) dated April 27, 1999.

SAN ONOFRE--UNIT 2 5.0-6 Amendment No. 127, 168 , 184