Fuel Storage Pool Boron Concentration 3.7.17 3.7 PLANT SYSTEMS 3.7.17 Fuel Storage Pool Boron Concentration LCO 3.7.17 The fuel storage pool boron concentration shall be
$ 2000 ppm.
- APPLICABILITY: Whenever any fuel assembly is stored in the fuel storage
- pool.
- ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Fuel storage pool ------------NOTE-------------
boron concentration LCO 3.0.3 is not applicable.
not within limit. -----------------------------
A.1 Suspend movement of Immediately fuel assemblies in the fuel storage pool.
AND A.2 Initiate action to Immediately
- restore fuel storage pool boron concentration to within limit.
SAN ONOFRE-UNIT 2 3.7-30 Amendment No. 213
Spent Fuel Assembly Storage 3.7.18 3.7 PLANT SYSTEMS 3.7.18 Spent Fuel Assembly Storage LCO 3.7.18 The combination of initial enrichment and burnup of each SONGS 2 and 3 spent fuel assembly stored in Region I shall
- be within the acceptable burnup domain of Figure 3.7.18-1 or Figure 3.7.18-2, or the fuel assembly shall be stored in accordance with Technical Specification 4.3.1.1.
- The combination of initial enrichment and burnup of each
- SONGS 2 and 3 spent fuel assembly stored in Region II shall
- be within the acceptable burnup domain of Figure 3.7.18-3 or
- Figure 3.7.18-4, or the fuel assembly shall be stored in
- accordance with Technical Specification 4.3.1.1.
- Region II shall be stored in accordance with Technical
- Specification 4.3.1.1.
- APPLICABILITY: Whenever any fuel assembly is stored in the fuel storage
- pool.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of the A.1 --------NOTE---------
LCO not met. LCO 3.0.3 is not applicable.
Initiate action to bring Immediately
- the noncomplying fuel
- assembly into compliance.
- SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.18.1 Verify by administrative means the initial Prior to moving a
- enrichment, burnup, and cooling time of the fuel assembly to
- fuel assembly are in accordance with LCO any spent fuel
- 3.7.18, or Design Features 4.3.1.1, or LCS pool storage
- 4.0.100. Rev 2, dated 09/27/07. location.
- SAN ONOFRE--UNIT 2 3.7-32 Amendment No. 213
Spent Fuel Assembly Storage 3.7.18 FIGURE 3.7.18-1 MINIMUM BURNUP AND COOLING TIME VS. INITIAL ENRICHMENT FOR UNRESTRICTED PLACEMENT OF SONGS 2 AND 3 FUEL IN REGION I RACKS 25 Fuel Assembly Burnup (GWD/T) 20 15 Acceptable Region 10 5
Unacceptable Region 0
2.0 2.5 3.0 3.5 4.0 4.5 5.0 Initial U-235 Enrichment (w/o) 0 Years 5 Years 10 Years 15 Years 20 Years SAN ONOFRE--UNIT 2 3.7-33 Amendment No. 213
Spent Fuel Assembly Storage 3.7.18 FIGURE 3.7.18-2 MINIMUM BURNUP AND COOLING TIME VS. INITIAL ENRICHMENT FOR PLACEMENT OF SONGS 2 AND 3 FUEL IN PERIPHERAL POOL LOCATIONS IN REGION I RACKS 15 Fuel Assembly Burnup (GWD/T) 10 Acceptable Region 5
Unacceptable Region 0
3.0 3.5 4.0 4.5 5.0 Initial U-235 Enrichment (w/o) 0 Years 5 Years 10 Years 15 Years 20 Years SAN ONOFRE--UNIT 2 3.7-34 Amendment No. 213
Spent Fuel Assembly Storage 3.7.18 FIGURE 3.7.18-3 MINIMUM BURNUP AND COOLING TIME VS. INITIAL ENRICHMENT FOR UNRESTRICTED PLACEMENT OF SONGS 2 AND 3 FUEL IN REGION II RACKS SAN ONOFRE--UNIT 2 3.7-34a Amendment No. 213
- Spent Fuel Assembly Storage 3.7.18 FIGURE 3.7.18-4 MINIMUM BURNUP AND COOLING TIME VS. INITIAL ENRICHMENT FOR PLACEMENT OF SONGS 2 AND 3 FUEL IN PERIPHERAL POOL LOCATIONS IN REGION II RACKS SAN ONOFRE-UNIT 2 3.7-34b Amendment No. 213
- Design Features 4.0 4.0 DESIGN FEATURES (continued) 4.3 Fuel Storage 4.3.1 Criticality 4.3.1.1 The spent fuel storage racks are designed and shall be maintained with:
- a. Fuel assemblies having a maximum U-235 enrichment of 4.8 weight percent;
- b. Keff < 1.0 if fully flooded with unborated water,
- which includes an allowance for uncertainties as described in Section 9.1 of the UFSAR;
- c. Keff # 0.95 if fully flooded with water borated to
- 1700 ppm, which includes an allowance for
- uncertainties as described in Section 9.1 of the
- UFSAR; *
- d. Three or five Borated stainless steel guide tube
- inserts (GT-Insert) may be used. When three
- Borated stainless steel guide tube inserts are
- used, they will be installed in an assembly's
- center guide tube, the guide tube associated with
- the serial number, and the diagonally opposite
- guide tube. Fuel containing GT-Inserts may be
- placed in either Region I or Region II. However,
- credit for GT-Inserts is only taken for Region II
- storage.
- A five-finger CEA may be installed in an assembly.
- Fuel containing a five-finger CEA may be placed in
- either Region I or Region II. Credit for inserted
- 5-finger CEAs is taken for both Region I and
- Region II. *
- e. A nominal 8.85 inch center to center distance
- between fuel assemblies placed in Region II;
- f. A nominal 10.40 inch center to center distance
- between fuel assemblies placed in Region I; (continued)
SAN ONOFRE--UNIT 2 4.0-4 Amendment No. 213
Design Features 4.0 4.0 DESIGN FEATURES (continued) 4.3.1 Criticality (continued)
- g. Prior to using the storage criteria of LCO 3.7.18
- and LCS 4.0.100, the following uncertainties will
- be applied: *
(1) The calculated discharge burnup of San Onofre
- Units 2 and 3 assemblies will be reduced by
- 6.6%. *
(2) The calculated discharge burnup of San Onofre
- Unit 1 fuel assemblies will be reduced by
- 10.0%. *
- h. Units 2 and 3 fuel assemblies with a burnup in the *
"acceptable range" of Figure 3.7.18-1 are allowed unrestricted storage in Region I; *
- i. Units 2 and 3 fuel assemblies with a burnup in the *
"acceptable range" of Figure 3.7.18-2 are allowed unrestricted storage in the peripheral pool locations with 1 or 2 faces toward the spent fuel pool walls of Region I; *
- j. Units 2 and 3 fuel assemblies with a burnup in the *
"acceptable range" of Figure 3.7.18-3 are allowed
- unrestricted storage in Region II; *
- k. Units 2 and 3 fuel assemblies with a burnup in the *
"acceptable range" of Figure 3.7.18-4 are allowed
- unrestricted storage in the peripheral pool
- locations with 1 or 2 faces toward the spent fuel
- pool walls of Region II; *
- l. Units 2 and 3 fuel assemblies with a burnup in the *
"unacceptable range" of Figure 3.7.18-1, Figure
- 3.7.18-2, Figure 3.7.18-3, and Figure 3.7.18-4 will
- be stored in compliance with Licensee Controlled Specification 4.0.100 Rev. 2, dated 09/27/07; and *
- stored in Region II shall be stored in accordance
- with Licensee Controlled Specification 4.0.100 Rev. 2, dated 09/27/07. *
(continued)
SAN ONOFRE--UNIT 2 4.0-4a Amendment No. 213
- Fuel Storage Pool Boron Concentration 3.7.17 3.7 PLANT SYSTEMS 3.7.17 Fuel Storage Pool Boron Concentration LCO 3.7.17 The fuel storage pool boron concentration shall be
$ 2000 ppm.
- APPLICABILITY: Whenever any fuel assembly is stored in the fuel storage
- pool.
- ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Fuel storage pool ------------NOTE-------------
boron concentration LCO 3.0.3 is not applicable.
not within limit. -----------------------------
A.1 Suspend movement of Immediately fuel assemblies in the fuel storage pool.
AND A.2 Initiate action to Immediately
- restore fuel storage pool boron concentration to within limit.
SAN ONOFRE--UNIT 3 3.7-30 Amendment No. 205
Spent Fuel Assembly Storage 3.7.18 3.7 PLANT SYSTEMS 3.7.18 Spent Fuel Assembly Storage LCO 3.7.18 The combination of initial enrichment and burnup of each SONGS 2 and 3 spent fuel assembly stored in Region I shall
- be within the acceptable burnup domain of Figure 3.7.18-1 or Figure 3.7.18-2, or the fuel assembly shall be stored in accordance with Technical Specification 4.3.1.1.
- The combination of initial enrichment and burnup of each
- SONGS 2 and 3 spent fuel assembly stored in Region II shall
- be within the acceptable burnup domain of Figure 3.7.18-3 or
- Figure 3.7.18-4, or the fuel assembly shall be stored in
- accordance with Technical Specification 4.3.1.1.
- Region II shall be stored in accordance with Technical
- Specification 4.3.1.1.
- APPLICABILITY: Whenever any fuel assembly is stored in the fuel storage
- pool.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of the A.1 --------NOTE---------
LCO not met. LCO 3.0.3 is not applicable.
Initiate action to bring Immediately
- the noncomplying fuel
- assembly into compliance.
- SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.18.1 Verify by administrative means the initial Prior to moving a
- enrichment, burnup, and cooling time of the fuel assembly to **
fuel assembly are in accordance with LCO
- 3.7.18, or Design Features 4.3.1.1, or LCS any spent fuel **
4.3.100. Rev 2, dated 09/27/07. pool storage **
location.
- SAN ONOFRE--UNIT 3 3.7-32 Amendment No. 205
Spent Fuel Assembly Storage 3.7.18 FIGURE 3.7.18-1 MINIMUM BURNUP AND COOLING TIME VS. INITIAL ENRICHMENT FOR UNRESTRICTED PLACEMENT OF SONGS 2 AND 3 FUEL IN REGION I RACKS 25 Fuel Assembly Burnup (GWD/T) 20 15 Acceptable Region 10 5
Unacceptable Region 0
2.0 2.5 3.0 3.5 4.0 4.5 5.0 Initial U-235 Enrichment (w/o) 0 Years 5 Years 10 Years 15 Years 20 Years SAN ONOFRE--UNIT 3 3.7-33 Amendment No. 205
Spent Fuel Assembly Storage 3.7.18 FIGURE 3.7.18-2 MINIMUM BURNUP AND COOLING TIME VS. INITIAL ENRICHMENT FOR PLACEMENT OF SONGS 2 AND 3 FUEL IN PERIPHERAL POOL LOCATIONS IN REGION I RACKS 15 Fuel Assembly Burnup (GWD/T) 10 Acceptable Region 5
Unacceptable Region 0
3.0 3.5 4.0 4.5 5.0 Initial U-235 Enrichment (w/o) 0 Years 5 Years 10 Years 15 Years 20 Years SAN ONOFRE--UNIT 3 3.7-34 Amendment No. 205
Spent Fuel Assembly Storage 3.7.18 FIGURE 3.7.18-3 MINIMUM BURNUP AND COOLING TIME VS. INITIAL ENRICHMENT FOR UNRESTRICTED PLACEMENT OF SONGS 2 AND 3 FUEL IN REGION II RACKS SAN ONOFRE--UNIT 3 3.7-34a Amendment No. 205
- Spent Fuel Assembly Storage 3.7.18 FIGURE 3.7.18-4 MINIMUM BURNUP AND COOLING TIME VS. INITIAL ENRICHMENT FOR PLACEMENT OF SONGS 2 AND 3 FUEL IN PERIPHERAL POOL LOCATIONS IN REGION II RACKS SAN ONOFRE--UNIT 3 3.7-34b Amendment No. 205
- Design Features 4.0 4.0 DESIGN FEATURES (continued) 4.3 Fuel Storage 4.3.1 Criticality 4.3.1.1 The spent fuel storage racks are designed and shall be maintained with:
- a. Fuel assemblies having a maximum U-235 enrichment of 4.8 weight percent;
- b. Keff < 1.0 if fully flooded with unborated water,
- which includes an allowance for uncertainties as described in Section 9.1 of the UFSAR;
- c. Keff # 0.95 if fully flooded with water borated to
- 1700 ppm, which includes an allowance for
- uncertainties as described in Section 9.1 of the
- UFSAR; *
- d. Three or five Borated stainless steel guide tube
- inserts (GT-Inserts) may be used. When three
- Borated stainless steel guide tube inserts are
- used, they will be installed in an assembly's
- center guide tube, the guide tube associated with
- the serial number, and the diagonally opposite
- guide tube. Fuel containing GT-Inserts may be
- placed in either Region I or Region II. However,
- credit for GT-Inserts is only taken for Region II
- storage.
- A five-finger CEA may be installed in an assembly.
- Fuel containing a five-finger CEA may be placed in
- either Region I or Region II. Credit for inserted
- 5-finger CEAs is taken for both Region I and
- Region II. *
- e. A nominal 8.85 inch center to center distance
- between fuel assemblies placed in Region II;
- f. A nominal 10.40 inch center to center distance
- between fuel assemblies placed in Region I; (continued)
SAN ONOFRE-UNIT 3 4.0-4 Amendment No. 205
- Design Features 4.0 4.0 DESIGN FEATURES (continued) 4.3.1 Criticality (continued)
- g. Prior to using the storage criteria of LCO 3.7.18
- and LCS 4.0.100, the following uncertainties will
- be applied: *
(1) The calculated discharge burnup of San Onofre
- Units 2 and 3 assemblies will be reduced by
- 6.6%. *
(2) The calculated discharge burnup of San Onofre
- Unit 1 fuel assemblies will be reduced by
- 10.0%. *
- h. Units 2 and 3 fuel assemblies with a burnup in the *
"acceptable range" of Figure 3.7.18-1 are allowed unrestricted storage in Region I; *
- i. Units 2 and 3 fuel assemblies with a burnup in the *
"acceptable range" of Figure 3.7.18-2 are allowed unrestricted storage in the peripheral pool locations with 1 or 2 faces toward the spent fuel pool walls of Region I; *
- j. Units 2 and 3 fuel assemblies with a burnup in the *
"acceptable range" of Figure 3.7.18-3 are allowed
- unrestricted storage in Region II; *
- k. Units 2 and 3 fuel assemblies with a burnup in the *
"acceptable range" of Figure 3.7.18-4 are allowed
- unrestricted storage in the peripheral pool
- locations with 1 or 2 faces toward the spent fuel
- pool walls of Region II; *
- l. Units 2 and 3 fuel assemblies with a burnup in the *
"unacceptable range" of Figure 3.7.18-1, Figure
- 3.7.18-2, Figure 3.7.18-3, and Figure 3.7.18-4 will
- be stored in compliance with Licensee Controlled Specification 4.0.100 Rev. 2, dated 09/27/07; and *
- stored in Region II shall be stored in accordance
- with Licensee Controlled Specification 4.0.100 Rev. 2, dated 09/27/07. *
(continued)
SAN ONOFRE-UNIT 3 4.0-4a Amendment No. 205 *