MONTHYEARML0631701292006-11-0707 November 2006 Proposed Change Number 576, Request to Revise Main Steam Safety Valve Requirements and Actions (Technical Specification 3.7.1) Project stage: Request LIC-06-0146, License Amendment Request, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Purge System Using the Consolidated Line Item Improvement Process.2006-12-20020 December 2006 License Amendment Request, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Purge System Using the Consolidated Line Item Improvement Process. Project stage: Request ML0705201952007-02-26026 February 2007 Facsimile Transmission of Draft Request for Additional Information Project stage: Draft RAI RS-07-050, Additional Information Supporting Risk-Informed Inservice Inspection Relief Request2007-04-0303 April 2007 Additional Information Supporting Risk-Informed Inservice Inspection Relief Request Project stage: Request ML0713000222007-06-0505 June 2007 Technical Specifications, Issuance of Amendment Nos. 212 and 204 to Revise TS 3.7.1, Main Steam Safety Valves Requirements and Actions Project stage: Approval ML0713000182007-06-0505 June 2007 License Amendment, Issuance of Amendment Nos. 212 and 204 to Revise TS 3.7.1, Main Steam Safety Valves Requirements and Actions Project stage: Approval ML0706102732007-06-0606 June 2007 Technical Specification Pages - Amendment No. 250 Adoption of TSTF-447 to Delete Requirements for Hydrogen Purge System - CLIIP Project stage: Other ML0706102692007-06-0606 June 2007 Issuance of Amendment No. 250 Adoption of TSTF-447 to Delete Requirements for Hydrogen Purge System - CLIIP Project stage: Approval ML0721400232007-08-0808 August 2007 Request for Additional Information Related to the Use of Risk-Informed Inservice Inspection Requirements Project stage: RAI RS-07-123, Additional Information Supporting Risk-Informed Inservice Inspection Relief Request2007-09-0707 September 2007 Additional Information Supporting Risk-Informed Inservice Inspection Relief Request Project stage: Request ML0726105102007-09-25025 September 2007 Evaluation of Proposed Risk-Informed Request for an Inservice Inspection Program Project stage: Other 2007-06-05
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML17311A3642018-04-23023 April 2018 Issuance of Amendments to Change the Physical Security Plan to Reflect an ISFSI - Only Configuration ML17300A0422017-11-0909 November 2017 2/3 - Issuance of Amendments 235 and 228 Removal of Cyber Security Plan License Condition (CAC Nos. L53191 and L53192) ML16252A2072017-01-23023 January 2017 Issuance of Amendments 234 and 227 to Revise the Cyber Security Plan Milestone 8 Completion Date in the Facility Operating Licenses (CAC Nos. L53132 and L53133) ML15209A9352015-10-0101 October 2015 LTR-15-0424 - San Onofre Nuclear Generating Station, Units 2 and 3 - Issuance of Amendments to Revise the Cyber Security Plan Milestone 8 Completion Date in the Facility Operating Licenses ML15139A3902015-07-17017 July 2015 Issuance of Amendment for Permanently Shutdown and Defueled Technical Specifications and Certain License Conditions ML15105A3492015-06-0505 June 2015 the Independent Spent Fuel Storage Installation - Issuance of Amendments Changes to the Emergency Action Level Scheme ML15082A0172015-03-18018 March 2015 Supplement 4 to Amendment Applications 266 and 251, Permanently Defueled Technical Specifications ML15058A0332015-02-25025 February 2015 Response to a Request for Additional Information and Supplement 3 Amendment Applications 266 and 251 Permanently Defueled Technical Specifications ML14262A0602014-09-15015 September 2014 Response to Request for Additional Information and Supplement 2 to Amendment Application Numbers 265 and 250, Responsibility, Organization and Qualifications, San Onofre Nuclear Generating Station, Units 2 and 3 ML14085A1412014-03-21021 March 2014 Amendment Applications 266 and 251 Permanently Defueled Technical Specifications ML13296A0132013-10-21021 October 2013 Amendment Application Numbers 265 and 250 Responsibility, Organization, and Qualifications ML11252B1102011-09-0202 September 2011 Amendment Applications 258 and 244, Revision 1, Technical Specifications Applicable to Movement of Fuel Assemblies ML1013201682010-06-30030 June 2010 Issuance of Amendment Nos. 223 and 216, Revise Completion Time in Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System, Based on TSTF-340, Revision 3 ML0832300452008-11-14014 November 2008 Response to Request for Additional Information on Battery and DC Sources Upgrades and Cross-Tie License Amendment Request and Replacement Technical Specification Pages ML0820307332008-08-15015 August 2008 Technical Specifications and License Page for Issuance of Amendment No. 210 Containment Leakage Rate Testing Program (TAC No. MD6835) Ts/License Pgs ML0815504212008-05-28028 May 2008 Operating License & Technical Specification/Licensee Controlled Specifications, Change L08-006, List of Effective Pages ML0806001622008-03-25025 March 2008 Tech Spec Pages for Amendment Nos. 216 and 208, Revise Technical Specification Surveillance Requirements 3.3.7.3.a and 3.8.1 Degraded Voltage Function Values ML0805906032008-03-18018 March 2008 Technical Specifications, Revise TS Surveillance Requirements 3.3.7.3.a and 3.8.1 Degraded Voltage Function Values ML0803705962008-01-28028 January 2008 Operating License & Technical Specification/License Controlled Specification Units 2 & 3 TS & LCS Loep with Ndms Rev. 0 ML0728900152007-10-31031 October 2007 Tech Spec Pages for Amendments 214 and 206 Regarding Adoption of Technical Specifications Task Force (TSTF)-448, Revision 3, Control Room Envelope Habitability, Using the Consolidated Line Item Improvement Process ML0725501832007-09-27027 September 2007 Technical Specifications Pages, Revise Fuel Storage Pool Boron Concentration ML0727402512007-09-26026 September 2007 Response to Request for Additional Information and Submittal of Supplement 2 to Proposed Technical Specification Change Number NPF-10/15-572 License Amendment Request, Proposed Technical Specification Change, Steam Generator.. ML0726810942007-09-24024 September 2007 Amendment Application No. 236 Proposed Change Number (PCN) 582 Technical Specification (TS) 5.5.2.15 Containment Leakage Rate Testing Program ML0725503042007-09-11011 September 2007 Amendment Application Numbers 243, Supplement 2 and 227, Supplement 2, Proposed Change Number (PCN) 556, Revision 2 ML0719403142007-06-28028 June 2007 Technical Specifications ML0717000972007-06-15015 June 2007 Amendment Application Numbers 243, Supplement 1 and 227, Supplement 1, Proposed Change Number (PCN) 556, Revision 1, Request to Revise Fuel Storage Pool Boron Concentration ML0713000222007-06-0505 June 2007 Technical Specifications, Issuance of Amendment Nos. 212 and 204 to Revise TS 3.7.1, Main Steam Safety Valves Requirements and Actions ML0711402092007-04-17017 April 2007 Proposed Change Number 549, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Rev. 3, Using the Consolidated Line Item Improvement Process ML0712303082007-04-17017 April 2007 SONGS Units 2 & 3, Single-Sided, Operating License & Technical Specification/Licensee Controlled Specification ML0703803222007-04-0404 April 2007 Tech Spec Pages for Amendments 211 and 203 Regarding Emergency Diesel Generator Fuel Oil Volume Requirements ML0709305972007-03-30030 March 2007 Proposed Change Number (PCN) - 577 Lovs Relay Replacement ML0709501922007-03-30030 March 2007 Proposed Change Number (PCN)-548, Revision 2, Battery and DC Sources Upgrades and Cross-Tie ML0703901182007-02-0505 February 2007 Submittal of San Onofre, Unit 3 - Core Operating Limits Report ML0701004012007-01-0909 January 2007 SONGS 2 & 3, Corrected Technical Specifications, Transfer of Licenses Permitting Transfer of Undivided Ownership Interest Held by City of Anaheim to Scec, Excluding Interest in Spent Fuel & Independent Spent Fuel Storage Installation ML0633900602006-12-0404 December 2006 Tech Spec Pages for Amendments 208 and 200 Regarding Deletion of the Requirements for Fuel Handling Isolation Signals & Fuel Handling Building Post-Accident Cleanup Filter System ML0633201862006-11-17017 November 2006 Operating License & Technical Specifications/Licensee Controlled Specifications ML0631905532006-11-15015 November 2006 Tech Spec Pages for Amendment Nos. 207 and 199 Regarding Revision of Administrative Controls ML0633201852006-11-13013 November 2006 Filing Instructions for SONGS Units 2 & 3 Single-Sided Operating License & Technical Specification/Licensee Controlled Specification L06-008/010 ML0631304962006-11-0909 November 2006 Tech Spec Pages for Amendments 206 and 198 Change, Define Extent of the Required Tube Inspections, and Repair Criteria within the Tubesheet Region of the Steam Generators ML0631701292006-11-0707 November 2006 Proposed Change Number 576, Request to Revise Main Steam Safety Valve Requirements and Actions (Technical Specification 3.7.1) ML0628300302006-10-0505 October 2006 Submittal of Supplement 3 to Proposed Change Number NPF-10/15-565 License Amendment Request, Proposed Technical Specification Change, Define the Extent of the Required Tube Inspections and Repair Criteria within the Tubesheet. ML0627700102006-10-0303 October 2006 Technical Specification Pages for Amendments #205 and #197 Regarding Elimination of License Condition 2.G Requiring Reporting of Violations of Section 2.C of Operating Licenses ML0700902762006-09-27027 September 2006 SONGS, Units 2 & 3, Technical Specifications, Order Approving Transfer of Licenses Permitting Transfer of Undivided Ownership Interest Held by City of Anaheim to Scec Excluding Its Interest in Spent Fuel & Independent Spent Fuel Storage Ins ML0619900712006-07-14014 July 2006 Response to Request for Additional Information and Submittal of Proposed Technical Specifications Change Number (Pcn) 572 Steam Generator Tube Surveillance Program, Tube Repair ML0619900142006-07-14014 July 2006 Proposed Change Number (PCN) 563 Request to Revise Administrative Controls ML0623505242006-07-13013 July 2006 Technical Specification Pages for San Onofre, Units 2 and 3, Issuance of Amendment Reactor Coolant System Pressure and Temperature Limits Report ML0615903192006-06-0202 June 2006 Proposed Change Number (PCN) 567 Emergency Diesel Generator Fuel Oil Volume Requirements ML0613102952006-05-0606 May 2006 SONGS, Unit 3, Technical Specifications, Request to Shutdown Cooling Line Vent Line ML0612207012006-04-28028 April 2006 Amendment Application Numbers 243 and 227, Proposed Change Number (PCN) 556 Request to Revise Fuel Storage Pool Boron Concentration ML0611001392006-04-17017 April 2006 Proposed Change No. NPF-10/15-568, Application to Eliminate License Condition 2.G, Requiring Reporting of Violations of Section 2.C of Operating Licenses 2018-04-23
[Table view] |
Text
MSSVs 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Main Steam Safety Valves (MSSVs)
LCO 3.7.1 The MSSVs shall be OPERABLE as specified in Table 3.7.1-1 and Table 3.7.1-2.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS
NOTE-------------------------------------
Separate Condition entry is allowed for each MSSV.
CONDITION REQUIRED ACTION COMPLETION TIME A. Two to seven required A.1 Reduce power to less 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> l MSSVs per SG than or equal to the l inoperable. applicable % RTP listed in Table 3.7.1-1.
AND A.2 Reduce the Linear 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> l Power Level High trip setpoint in accordance with Table 3.7.1-1.
SAN ONOFRE--UNIT 2 3.7-1 Amendment No. 212
MSSVs 3.7.1 CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND OR B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Eight or more required l MSSVs per SG l inoperable. l SAN ONOFRE--UNIT 2 3.7-2 Amendment No. 212
MSSVs 3.7.1 Table 3.7.1-1 (page 1 of 1)
Maximum Allowable Power Level l versus Inoperable MSSVs l MAXIMUM ALLOWABLE MAXIMUM l NUMBER OF INOPERABLE LINEAR POWER l ALLOWABLE POWER l MSSVs PER STEAM GENERATOR LEVEL HIGH TRIP l
(% RTP) l
(% RTP) 2 95 95 l l
3 56 56 l l
4 46 46 l l
5 to 7 MODE 3 Not applicable l SAN ONOFRE--UNIT 2 3.7-3 Amendment No. 212
MSSVs 3.7.1 Table 3.7.1-2 (page 1 of 1)
Main Steam Safety Valves (Lift Settings)
VALVE NUMBER LIFT SETTING*
Steam Generator Steam Generator (psig)
- 1 #2 2PSV-8401 2PSV-8410 1085 2PSV-8402 2PSV-8411 1092 2PSV-8403 2PSV-8412 1099 2PSV-8404 2PSV-8413 1106 2PSV-8405 2PSV-8414 1113 2PSV-8406 2PSV-8415 1120 2PSV-8407 2PSV-8416 1127 2PSV-8408 2PSV-8417 1134 2PSV-8409 2PSV-8418 1140
- The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure. Each MSSV has an as-found tolerance of +2%/-3%. Following testing according to Technical l Specification 5.5.2.10, MSSVs will be set within +/-1% of the specified l lift setpoint.
SAN ONOFRE--UNIT 2 3.7-4 Amendment No. 212
MSSVs 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Main Steam Safety Valves (MSSVs)
LCO 3.7.1 The MSSVs shall be OPERABLE as specified in Table 3.7.1-1 and Table 3.7.1-2.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS
NOTE-------------------------------------
Separate Condition entry is allowed for each MSSV.
CONDITION REQUIRED ACTION COMPLETION TIME A. Two to seven required A.1 Reduce power to less 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> l MSSVs per SG than or equal to the l inoperable. applicable % RTP listed in Table 3.7.1-1.
AND A.2 Reduce the Linear 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> l Power Level High trip setpoint in accordance with Table 3.7.1-1.
SAN ONOFRE--UNIT 3 3.7-1 Amendment No. 204
MSSVs 3.7.1 CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met. AND OR B.2 Be in MODE 4. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Eight or more required l MSSVs per SG l inoperable. l SAN ONOFRE--UNIT 3 3.7-2 Amendment No. 204
MSSVs 3.7.1 Table 3.7.1-1 (page 1 of 1)
Maximum Allowable Power Level l versus Inoperable MSSVs l MAXIMUM ALLOWABLE MAXIMUM l NUMBER OF INOPERABLE LINEAR POWER l ALLOWABLE POWER l MSSVs PER STEAM GENERATOR LEVEL HIGH TRIP l
(% RTP) l
(% RTP) 2 95 95 l l
3 56 56 l l
4 46 46 l l
5 to 7 MODE 3 Not applicable l SAN ONOFRE--UNIT 3 3.7-3 Amendment No. 204
MSSVs 3.7.1 Table 3.7.1-2 (page 1 of 1)
Main Steam Safety Valves (Lift Settings)
VALVE NUMBER LIFT SETTING*
Steam Generator Steam Generator (psig)
- 1 #2 3PSV-8401 3PSV-8410 1085 3PSV-8402 3PSV-8411 1092 3PSV-8403 3PSV-8412 1099 3PSV-8404 3PSV-8413 1106 3PSV-8405 3PSV-8414 1113 3PSV-8406 3PSV-8415 1120 3PSV-8407 3PSV-8416 1127 3PSV-8408 3PSV-8417 1134 3PSV-8409 3PSV-8418 1140
- The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure. Each MSSV has an as-found tolerance of +2%/-3%. Following testing according to Technical l Specification 5.5.2.10, MSSVs will be set within +/-1% of the specified l lift setpoint.
SAN ONOFRE--UNIT 3 3.7-4 Amendment No. 204