Redacted - Hope Creek Generating Station Updated Final Safety Analysis Report, Rev. 22, Chapter 6, Engineered Safety Features
ML18044A006
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 05/09/2017
From:
Public Service Enterprise Group
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18053A189 List: ... further results
References
LR-N17-0088
Download: ML18044A006 (696)


Text

SECTION 6 ENGINEERED SAFETY FEATURES TABLE OF CONTENTS Section Title Page 6.0 GENERAL 6.0-1 6.1 ENGINEERED SAFETY FEATURE MATERIALS 6.1-1 6.1.1 Metallic Materials 6.1-1 6.1.1.1 Materials Selection and Fabrication 6.1-2 6.1.1.2 Composition, Compatibility, and 6.1-6 Stability of Containment and Core Spray Coolants 6.1.1.3 SRP Rule Review 6.1-6 6.1.2 Organic Materials 6.1-8 6.1.2.1 NSSS Supplied Components 6.1-8 6.1.2.2 Non-NSSS Supplied Components 6.1-9 6.1.3 Post Accident Chemistry 6.1-10 6.2 CONTAINMENT SYSTEMS 6.2-1 6.2.1 Containment Functional Design 6.2-1 6.2.1.1 Pressure Suppression Containment 6.2-1 6.2.1.2 Containment Subcompartments 6.2-33 6.2.1.3 Mass and Energy Release Analyses for 6.2-33 Postulated LOCA's 6.2.1.4 Mass and Energy Release Analysis for 6.2-35 Postulated Secondary System Pipe Ruptures Inside Containment (PWR) 6.2.1.5 Minimum Containment Pressure Analysis for 6.2-35 Performance Capability Studies on Emergency Core Cooling System (PWR) 6.2.1.6 Testing and Inspection 6.2-36 6-i HCGS-UFSAR Revision 0 April 11, 1988

TABLE OF CONTENTS (Cont)

Section Title Page 6.2.1.7 Instrumentation Requirements 6.2-36 6.2.1.8 SRP Rule Review 6.2-37 6.2.2 Containment Heat Removal 6.2-37 6.2.2.1 Design Basis 6.2-37 6.2.2.2 Containment Cooling System Design 6.2-38 6.2.2.3 Design Evaluation of the Containment 6.2-41 Cooling Function 6.2.2.4 Tests and Inspections 6.2-43 6.2.2.5 Instrumentation Requirements 6.2-43 6.2.3 Reactor Building Functional Design 6.2-44 6.2.3.1 Design Basis 6.2-44 6.2.3.2 System Design 6.2-45 6.2.3.3 Design Evaluation 6.2-53 6.2.3.4 Tests and Inspections 6.2-54 6.2.3.5 Instrumentation Requirements 6.2-55 6.2.3.6 SRP Rule Review 6.2-55 6.2.4 Containment Isolation System 6.2-56 6.2.4.1 Design Bases 6.2-56 6.2.4.2 System Design 6.2-57 6.2.4.3 Design Evaluation 6.2-60 6.2.4.4 Tests and Inspections 6.2-84 6.2.4.5 SRP Rule Review 6.2-91 6.2.5 Combustible Gas Control In Containment 6.2-92 6.2.5.1 Design Bases 6.2-93 6.2.5.2 Containment Atmosphere Control System 6.2-96 Description 6.2.5.3 Deleted 6.2-108 6.2.5.4 Tests and Inspections 6.2-116 6.2.5.5 Instrumentation Requirements 6.2-116 6.2.5.6 Safety Evaluation 6.2-116 6.2.5.7 SRP Rule Review 6.2-118 6-ii HCGS-UFSAR Revision 15 October 27, 2006

TABLE OF CONTENTS (Cont)

Section Title Page 6.2.6 Primary Reactor Containment Leakage 6.2-118 Rate Testing 6.2.6.1 Primary Containment Integrated Leakage 6.2-119 Rate Test 6.2.6.2 Primary Containment Penetration Leakage 6.2-124 Rate Test 6.2.6.3 Primary Containment Isolation Valve 6.2-126 Leakage Rate Tests 6.2.6.4 Scheduling and Reporting of Periodic 6.2-128 Tests 6.2.6.5 Special Testing Requirements 6.2-128 6.2.7 Fracture Prevention of Containment 6.2-129 Pressure Boundary 6.2.7.1 Containment Vessel and Pressure Boundary 6.2-129 Component Materials 6.2.7.2 Piping, Pump, and Valve Materials 6.2-130 6.2.8 References 6.2-131 6.3 EMERGENCY CORE COOLING SYSTEMS 6.3-1 6.3.1 Design Bases and Summary Description 6.3-1 6.3.1.1 Design Bases 6.3-1 6.3.1.2 Summary Descriptions of ECCS 6.3-7 6.3.2 System Design 6.3-8 6.3.2.1 Schematic Piping and Instrumentation 6.3-8 and Process Diagrams 6.3.2.2 Equipment and Component Descriptions 6.3-8 6.3.2.3 Applicable Codes and Classifications 6.3-33 6.3.2.4 Materials Specifications and 6.3-33 Compatibility 6.3.2.5 System Reliability 6.3-34 6.3.2.6 Protection Provisions 6.3-34 6.3.2.7 Provisions for Performance Testing 6.3-35 6-iii HCGS-UFSAR Revision 0 April 11, 1988

TABLE OF CONTENTS (Cont)

Section Title Page 6.3.2.8 Manual Actions 6.3-35 6.3.2.9 TMI Action Plans 6.3-36 6.3.3 Performance Evaluation 6.3-36 6.3.3.1 ECCS Bases for Technical Specifications 6.3-37 6.3.3.2 Acceptance Criteria for ECCS Performance 6.3-37 6.3.3.3 Single Failure Considerations 6.3-38 6.3.3.4 System Performance During the Accident 6.3-39 6.3.3.5 Use of Dual Function Components for ECCS 6.3-40 6.3.3.6 Limits on ECCS System Parameters 6.3-40 6.3.3.7 ECCS Analyses for LOCA 6.3-40 6.3.3.8 LOCA Analysis Conclusions 6.3-45 6.3.4 Tests and Inspections 6.3-45 6.3.4.1 ECCS Performance Tests 6.3-45 6.3.4.2 Reliability Tests and Inspections 6.3-46 6.3.5 Instrumentation Requirements 6.3-49 6.3.6 References 6.3-50 6.4 HABITABILITY SYSTEMS 6.4-1 6.4.1 Design Bases 6.4-1 6.4.2 System Design 6.4-4 6.4.2.1 Definition of Control Room Envelope 6.4-4 6.4.2.2 Ventilation System Design 6.4-5 6.4.2.3 Leaktightness 6.4-6 6.4.2.4 Interaction with Other Zones and 6.4-6 Pressure-Containing Equipment 6.4.2.5 Shielding Design 6.4-7 6.4.3 System Operational Procedures 6.4-7 6.4.3.1 Normal Operation 6.4-7 6.4.3.2 Post-Accident Operation 6.4-8 6.4.4 Design Evaluations 6.4-9 6.4.4.1 Radiological Protection 6.4-9 6-iv HCGS-UFSAR Revision 0 April 11, 1988

TABLE OF CONTENTS (Cont)

Section Title Page 6.4.4.2 Toxic Gas Protection 6.4-11 6.4.4.3 Chlorine Protection 6.4-12 6.4.4.4 Smoke Protection 6.4-12 6.4.4.5 Respiratory Protection 6.4-12 6.4.5 Testing and Inspection 6.4-13 6.4.6 Instrumentation Requirements 6.4-15 6.4.7 Control Room Dose Evaluation Models 6.4-16 6.4.7.1 Control Room Atmospheric Dispersion Model 6.4-16 6.4.7.2 Control Room Dose Model 6.4-17 6.4.8 References 6.4-17 6.5 FISSION PRODUCT REMOVAL AND CONTROL 6.5-1 SYSTEMS 6.5.1 Engineered Safety Feature (ESF) Filter 6.5-1 Systems 6.5.1.1 Control Room Emergency Filter System 6.5-1 6.5.2 The Primary Containment Spray System 6.5-8 6.5.3 Fission Product Control Structures and 6.5-9 Systems 6.5.3.1 Primary Containment 6.5-9 6.5.3.2 Reactor Building Enclosure 6.5-10 6.5.4 Ice Condenser as a Fission Product 6.5-11 Cleanup System 6.6 INSERVICE INSPECTION OF ASME B&PV CODE 6.6-1 CLASS 2 AND 3 COMPONENTS 6.6.1 Components Subject to Examination 6.6-1 6.6.2 Accessibility 6.6-2 6.6.3 Examination Techniques and Procedures 6.6-2 6.6.4 Inspection Intervals 6.6-3 6.6.5 Examination Categories and Requirements 6.6-4 6-v HCGS-UFSAR Revision 19 November 5, 2012

TABLE OF CONTENTS (Cont)

Section Title Page 6.6.6 Evaluation of Examination Results 6.6-4 6.6.7 System Pressure Test 6.6-4 6.6.8 Augmented Inservice Inspection to 6.6-4 Protect Against Postulated Piping Failures 6.7 Not Used 6-vi HCGS-UFSAR Revision 12 May 3, 2002

TABLE OF CONTENTS (Cont)

Section Title Page 6.8 FILTRATION, RECIRCULATION, AND 6.8-1 VENTILATION SYSTEM 6.8.1 FRVS Recirculation System 6.8-1 6.8.1.1 Design Bases 6.8-1 6.8.1.2 System Description 6.8-3 6.8.1.3 Safety Evaluation 6.8-7 6.8.1.4 Tests and Inspections 6.8-8 6.8.1.5 Instrument Requirements 6.8-8 6.8.1.6 Materials 6.8-9 6.8.2 FRVS Ventilation System 6.8-9 6.8.2.1 Design Bases 6.8-9 6.8.2.2 System Description 6.8-11 6.8.2.3 Safety Evaluation 6.8-14 6.8.2.4 Tests and Inspections 6.8-14 6.8.2.5 Instrument Requirements 6.8-15 6.8.2.6 Materials 6.8-16 Appendix 6A Negative Pressure Design Evaluation 6A-1 Appendix 6B Subcompartment Differential Pressure 6B-1 Considerations Appendix 6C Structural Design Criteria for 6C-1 Seismic Category I HVAC Ducts and Duct Supports 6-vii HCGS-UFSAR Revision 0 April 11, 1988

LIST OF TABLES Table Title 6.0-1 Engineered Safety Features Discussed in Other Chapters of the Hope Creek FSAR 6.1-1 NSSS-Supplied Engineered Safety Features Component Materials 6.1-2 Principal Pressure Retaining Materials for Non-NSSS ESF Components 6.1-3 Organic Materials Within the Primary Containment 6.1-4 Coatings Used Inside the Primary Containment 6.2-1 Containment Design Parameters 6.2-2 Engineered Safety Feature Systems Information for Containment Response Analyses 6.2-3 Initial Conditions for Containment Response Analyses 6.2-4 Accident Assumptions and Initial Conditions for Containment Response Analyses 6.2-5 Summary of Short Term Containment Responses to Recirculation Line and Main Steam Line Breaks 6.2-6 Summary of Long Term Containment Responses to Recirculation Line or Main Steam Line Breaks 6-viii HCGS-UFSAR Revision 0 April 11, 1988

LIST OF TABLES (Cont)

Table Title 6.2-7 Energy Balance for Recirculation Line Break Accident 6.2-8 Accident Chronology for Recirculation Line Break Accident 6.2-9 Reactor Blowdown Data for Recirculation Line Break (3359 MWt) 6.2-9a Reactor Blowdown Data for Recirculation Line Break (4031 MWt) 6.2-10 Reactor Blowdown Data for Main Steam Line Break 6.2-11 Core Decay Heat Following LOCA for Containment Analyses (4031 MWt) 6.2-12 Reactor Building Design Data 6.2-13 Post-LOCA Pressure Transient Analysis Data 6.2-13A Sequence of Events for Post-LOCA Pressure Transient 6.2-14 Monitored and Alarmed Openings in Reactor Building Enclosure 6.2-14a Administratively Controlled Openings in Equipment Airlock 6.2-15 Potential Reactor Building Bypass Leakage Paths 6.2-16 Containment Penetrations 6.2-17 CAC System Design and Performance Data 6.2-18 Containment Hydrogen Recombiner Subsystem Failure Modes and Effects Analysis 6-ix HCGS-UFSAR Revision 17 June 23, 2009

LIST OF TABLES (Cont)

Table Title 6.2-19 Combustible Gas Analyzer Subsystem Failure Modes and Effects Analysis 6.2-20 Deleted 6.2-21 Deleted 6.2-21a Deleted 6.2-22 Type A Test Definitions 6.2-23 System Venting and Draining Exceptions for Primary Containment Integrated Leakage Rate Test 6.2-24 Containment Penetrations/Isolation Valve Compliance with 10CFR50, Appendix J 6.2-25 Penetrations Using a Closed System Outside Primary Containment as a Second Isolation Barrier 6.2-26 System Isolation Valves Associated with Primary Containment Isolation 6.2-27 Result Summary of Pool Temperature Responses 6.2-28 Personnel and Equipment Openings into the Reactor Building 6.2-29 Results of Containment Depressurization Transients 6-x HCGS-UFSAR Revision 15 October 27, 2006

LIST OF TABLES (Cont)

Table Title 6.4-6 Radioactive Release Locations Relative to Control Room Intake 6.5-1 Control Room Emergency Filter Systems Design Parameters 6.5-2 CREF Compliance with Recommendations of Regulatory Guide 1.52 6.5-3 Materials Used in the Control Room Emergency Filter System 6.5-4 CREF Compliance with Minimum Instrumentation Requirements 6.7-1 Not Used 6.8-1 Filtration, Recirculation, and Ventilation System 6.8-2 FRVS Compliance with Recommendations of Regulatory Guide 1.52 6.8-3 FRVS Recirculation System Failure Mode and Effect Analysis 6.8-4 Vent System Failure Mode and Effect Analysis 6.8-5 FRVS Compliance with Minimum Instrumentation Requirements 6-xii HCGS-UFSAR Revision 12 May 3, 2002

LIST OF TABLES (Cont)

Table Title 6.8-6 Filtration, Recirculation, and Ventilation System Tests and Inspections 6A-1 Initial and Boundary Conditions for Inadvertent Spray Actuation Following a SBA 6A-2 Maximum Negative Pressure Inside Primary Containment 6A-3 Comparison of Spray Actuation for SBA and Normal Operation 6B-1 Mass and Energy Blowdown Rate - Recirculation Line Break 6B-2 Recirculation Outlet Line Break Blowdown Mass Flux Time History 6B-3 Reactor Primary System Blowdown Flowrates and Fluid Enthalpy -

Feedwater Line Break 6B-4 Feedwater Line Break Blowdown Mass Flux Time History (1) 6B-5 Mass and Energy Release Rate Head Spray Line Break 6B-6 HCGS-Compartment Volumes Used in Reactor Vessel Shield Annulus Subcompartment Analysis 6B-7 HCGS-Flow Area and Coefficients Used in Reactor Vessel Shield Annulus Subcompartment Analysis 6B-8 Geometry Node Locations (1) Head spray line has been removed; however, head spray line break is still the bounding analysis for the drywell head region.

6-xiii HCGS-UFSAR Revision 14 July 26, 2005

LIST OF TABLES (Cont)

Table Title 6C-1 Load Combinations for HVAC Ducts 6C-2 Load Combinations for HVAC Duct Supports 6-xiv HCGS-UFSAR Revision 0 April 11, 1988

LIST OF FIGURES Figure Title 6.2-1 Diagram of the Recirculation Line Break Location 6.2-2 Effective Blowdown Area for Recirculation Line Break (3359 MWt) 6.2-3 Short-Term Containment Pressure Response Following Recirculation Line Break (4031 MWt) 6.2-4 Short Term-Containment Temperature Response Following Recirculation Line Break (4031 MWt) 6.2-5 Short-Term Drywell-to-Suppression Chamber Differential Pressure Response Following Recirculation Line Break (4031 MWt) 6.2-6 Short-Term Vent System Flow Following Recirculation Line Break (4031 MWt) 6.2-7 Long-Term Containment Pressure Response Following Recirculation Line Break (3359 MWt) 6.2-7a Long-Term Containment Pressure Response Following Recirculation Line Break (3917 MWt) 6.2-8 Long-Term Drywell Temperature Response Following Recirculation Line Break (3359 MWt) 6.2-8a Long-Term Drywell Temperature Response Following Recirculation Line Break (3917 MWt) 6.2-9 Long-Term Suppression Pool Temperature Response Following Recirculation Line Break (3359 MWt) 6.2-9a Long-Term Suppression Pool Temperature Response Following Recirculation Line Break (3917 MWt) 6.2-10 RHR Heat Removal Rate Following Recirculation Line Break (3359 MWt) 6-xv HCGS-UFSAR Revision 17 June 23, 2009

LIST OF FIGURES (Cont)

Figure Title 6.2-10a RHR Heat Removal Rate Following Recirculation Line Break (4031 MWt) 6.2-11 Effective Blowdown Area for Main Steam Line Break (3359 MWt) 6.2-12 Short-Term Containment Pressure Response Following Main Steam Line Break (3359 MWt) 6.2-13 Short-Term Containment Temperature Response Following Main Steam Line Break (3359 MWt) 6.2-14 Short-Term Containment Pressure Response Following An Intermediate Size Break (3359 MWt) 6.2-15 Short-Term Containment Temperature Response Following An Intermediate Size Break (3359 MWt) 6.2-16 Reactor Vessel Blowdown Flowrate Following Recirculation Line Break (4031 MWt) 6.2-17 Reactor Vessel Blowdown Flowrate Following Main Steam Line Break (3359 MWt) 6.2-18 Reactor Vessel Temperature Response Following Recirculation Line Break (3359 MWt) 6.2-18a Reactor Vessel Temperature Response Following Recirculation Line Break (4031 MWt) 6.2-19 Sensible Energy in Reactor Vessel and Internal Structure Metals Following Recirculation Line Break (3359 MWt) 6.2-20 Deleted: Refer to Plant Drawing A-4643-1 6.2-21 Deleted: Refer to Plant Drawing A-4644-1 6-xvi HCGS-UFSAR Revision 20 May 9, 2014

LIST OF FIGURES (Cont)

Figure Title 6.2-22 Deleted: Refer to Plant Drawing A-4645-1 6.2-23 Deleted: Refer to Plant Drawing A-4646-1 6.2-24 Deleted: Refer to Plant Drawing A-4647-1 6.2-25 Deleted: Refer to Plant Drawing A-0402-0 6.2-26 Drawdown Pressure History Reactor Building Limiting Compartment (MCC Compartment - 77ft level) 6.2-26a Deleted 6.2-26b Deleted 6.2-26c Deleted 6.2-27 Containment Penetration Details 6.2-28 Legend 6.2-29 Deleted: Refer to Plant Drawing M-57-1 6.2-30 Deleted: Refer to Plant Drawing M-58-1 6-xvii HCGS-UFSAR Revision 20 May 9, 2014

LIST OF FIGURES (Cont)

Figure Title 6.2-31 Containment Hydrogen Recombiner Skid, Cutaway View 6.2-32 Controlled and Uncontrolled Oxygen Concentrations 6.2-33 Controlled and Uncontrolled Hydrogen Concentrations 6.2-34 Deleted 6.2-35 Deleted 6.2-36 Deleted 6.2-37 Long Term Hydrogen Generation Primary Containment 6.2-38 Deleted 6.2-39 Deleted 6.2-40 Drywell Pressure 6.2-41 Deleted: Refer to Plant Drawing M-60-1 6.2-42 Containment Personnel Lock Door Penetrations 6.2-43 Containment Personnel Lock Door Seals 6.2-44 Containment Personnel Lock Inner Door Test Clamps 6.2-45 RCIC as an Extended Containment Boundary 6-xviii HCGS-UFSAR Revision 20 May 9, 2014

LIST OF FIGURES (Cont)

Figure Title 6.2-46 HPCI as an Extended Containment Boundary 6.2-47 RHR and Core Spray as Extended Containment Boundaries 6.2-48 Extended Containment Boundary - PASS and Containment Hydrogen Recombiner System 6.2-49 Suppression Pool Temperature Monitoring System Sensor Arrangement 6.2-50 Hydrogen Oxygen Analyzer System Sample Locations 6.3-1 Deleted: Refer to Plant Drawing M-55-1 6.3-2 Deleted: Refer to Plant Drawing M-56-1 6.3-3 Deleted: Refer to Vendor Technical Document PN1-E41-1020-0004 6.3-4 Head vs. High Pressure Coolant Injection Flow Used in LOCA Analyses 6.3-5 Head vs Combined High Pressure Coolant Injection Core Spray Flow Used in LOCA Analyses 6.3-6 High Pressure Coolant Injection Pump Characteristics 6.3-7 Deleted: Refer to Plant Drawing M-52-1 6.3-8 Deleted: Refer to Vendor Technical Document PN1-E21-1020-0003 6-xix HCGS-UFSAR Revision 20 May 9, 2014

LIST OF FIGURES (Cont)

Figure Title 6.3-9 Head vs Core Spray Flow Used in LOCA Analyses 6.3-10 Core Spray Pump Characteristics 6.3-11 Head vs Low Pressure Coolant Injection Flow Used in LOCA Analyses 6.3-12 Process Diagram, Residual Heat Removal System 6.3-13 RHR (LPCI) Pump Characteristics 6.3-14 Peak Cladding Temperature and Maximum Local Oxidation vs. Break Area (GE 14 Fuel) 6.3-14a Deleted 6.3-15 Decay Heat Used for ECCS/LOCA Calculations 6.3-16 Deleted 6.3-17 Deleted 6.3-18 Deleted 6.3-19 Deleted 6-xx HCGS-UFSAR Revision 20 May 9, 2014

LIST OF FIGURES (Cont)

Figure Title 6.3-20 Water Level Inside Shroud vs Time After Break (DBA, Recirculation Suction Break, Failure, Channel A DC Source) 6.3-21 Reactor Vessel Pressure vs. Time After Break (DBA, Recirculation Suction Break, Failure of Channel A DC Source) 6.3-22 Fuel Rod Convective Heat Transfer Coefficient vs. Time After Break (Large Break Model) (DBA, Recirculation Suction Break, Failure of Channel A DC Source) 6.3-22a Deleted 6.3-23 Fuel, Peak Cladding Temperature vs. Time After Break (DBA, Recirculation Suction Break, Failure of Channel A DC Source) 6.3-23a Deleted 6.3-24 Deleted 6.3-25 Deleted 6.3-26 Deleted 6.3-27 Deleted 6-xxi HCGS-UFSAR Revision 22 May 9, 2017

LIST OF FIGURES (Cont)

Figure Title 6.3-28 Deleted 6.3-29 Deleted 6.3-30 Water Level Inside Shroud vs. Time After Break (Large Break Model) (60% DBA Recirculation Suction Break, Failure of Channel A DC Source) 6.3-31 Reactor Vessel Pressure vs. Time After Break (Large Break Model)

(60% DBA Recirculation Suction Break, Failure of Channel A DC Source) 6.3-32 GE 14 Fuel Rod Convective Heat Transfer Coefficient vs. Time After Break (Large Break Model) (60% DBA Recirculation Suction Break, Failure of Channel A DC Source) 6.3-32a Deleted 6.3-33 GE 14 Fuel, Peak Cladding Temperature vs. Time After Break (Large Break Model) (60% DBA Recirculation Suction Break, Failure of Channel A DC Source) 6.3-33a Deleted 6.3-34 Deleted 6.3-35 Deleted 6-xxii HCGS-UFSAR Revision 20 May 9, 2014

LIST OF FIGURES (Cont)

Figure Title 6.3-36 Deleted 6.3-37 Deleted 6.3-38 Water Level Inside Shroud vs. Time After Break (Small Break 2

Model) (0.08 ft Recirculation Suction Break, Failure of Channel A DC Source) 6.3-39 Reactor Vessel Pressure vs. Time After Break (Small Break Model) 2 (0.08 ft Recirculation Suction Break, Failure of Channel A DC Source) 6.3-40 Fuel Rod Convective Heat Transfer Coefficient vs. Time After 2

Break (Small Break Model) (0.08 ft Recirculation Suction Break, Failure of Channel A DC Source) 6.3-40a Deleted 6.3-41 Peak Cladding Temperature vs. Time After Break (Small Break 2

Model) (0.08 ft Recirculation Suction Break, Failure of Channel A DC Source) 6.3-41a Deleted 6-xxiii HCGS-UFSAR Revision 22 May 9, 2017

LIST OF FIGURES (Cont)

Figure Title 6.3-42 Deleted 6.3-43 Deleted 6.3-44 Deleted 6.3-45 Deleted 6.3-46 Deleted 6.3-47 Deleted 6-xxiv HCGS-UFSAR Revision 14 July 26, 2005

LIST OF FIGURES (Cont)

Figure Title 6.3-48 Deleted 6.3-49 Deleted 6.3-50 Deleted 6.3-51 Deleted 6.3-52 Deleted 6.3-53 Deleted 6-xxv HCGS-UFSAR Revision 14 July 26, 2005

LIST OF FIGURES (Cont)

Figure Title 6.3-61 Deleted 6.3-62 Deleted 6.4-1 Deleted: Refer to Plant Drawing A-5655-0 6.4-2 Plant Layout with Respect to Control Room Intake 6.7-1 Not Used 6A-1 Model Schematic for Inadvertent Spray Actuation 6A-2 Thermal Heat Removal Efficiency of Containment Atmosphere Spray 6A-3 Containment Pressure Response - Inadvertent Spray Actuation - 2 Spray Loops, and 1 PV Fails 6A-4 Containment Temperature Response - Inadvertent Spray Actuation

- 2 Spray Loops, and 1 PV Fails 6A-5 Differential Pressure Between Drywell and Suppression Chamber -

Inadvertent Spray Actuation - 2 Spray Loops, and 1 VB Fails 6A-6 Containment Temperature Response - Inadvertent Spray Actuation

- 2 Spray Loops, and 1 VB Fails 6-xxvii HCGS-UFSAR Revision 20 May 9, 2014

LIST OF FIGURES (Cont)

Figure Title 6B-1 Recirculation Outlet Nozzle Flow Diverter 6B-2 Reactor Shield Annulus Arrangement 6B-3a Schematic of the RPV Shield Annulus Model 6B-3b Schematic of RPV Shield Annulus Developed Model 6B-4 Pressure Transient in Shield Annulus Following a Recirculation Line Break at the Nozzle Safe End 6B-5 Pressure Transient in Shield Annulus Following a Feedwater Line Break 6B-6 Pressure Transient in Shield Annulus for Structure Analysis Case B

6B-7 Pressure Transient in Shield Annulus for Structure Analysis Case C

6B-8 Force Transient on Reactor Pressure Vessel Following a Recirculation Line Break at the Nozzle Safe End 6B-9 Force Transient on Reactor Shield Wall Following a Recirculation Line Break at the Nozzle Safe End 6B-10 Force Transient on Reactor Pressure Vessel Following a Feedwater Line Break 6B-11 Force Transient on Reactor Shield Wall Following a Feedwater Line Break 6-xxviii HCGS-UFSAR Revision 0 April 11, 1988

LIST OF FIGURES (Cont)

Figure Title 6B-12 Drywell Head Arrangement 6B-13 Deleted 6B-14 Deleted 6-xxix HCGS-UFSAR Revision 13 November 14, 2003

6.2 CONTAINMENT SYSTEMS 6.2.1 Containment Functional Design 6.2.1.1 Pressure Suppression Containment 6.2.1.1.1 Design Basis The Pressure Suppression Containment System is designed to have the following functional capabilities:

1. The containment has the capability to maintain its functional integrity during and following peak transient pressures and temperatures that occur following any postulated loss-of-coolant accident (LOCA). The LOCA includes the worst single failure (which leads to maximum containment pressure and temperature) and is further postulated to occur simultaneously with a loss of offsite power (LOP) and a safe shutdown earthquake (SSE). A discussion of the postulated LOCA events is provided in Section 6.2.1.1.3. A discussion of mass and energy release is presented in Section 6.2.1.3.
2. The containment, in combination with other accident mitigation systems, limits fission product leakage during and following the postulated design basis accident (DBA) to values less than leakage rates that result in offsite doses greater than those set forth in 10CFR50.67.
3. The containment can withstand coincident fluid jet forces associated with the flow from the postulated rupture of any pipe within the containment.
4. The containment design permits removal of fuel assemblies from the reactor core after a postulated LOCA.

6.2-1 HCGS-UFSAR Revision 12 May 3, 2002

5. The containment is protected from or designed to withstand missiles from internal sources and excessive motion of pipes that could directly or indirectly endanger the integrity of the containment.
6. The containment provides a means to channel the flow from postulated pipe ruptures in the drywell to the suppression pool.
7. The containment is designed to allow for periodic testing at the calculated peak accident pressure, in order to confirm the leaktight integrity of the containment and its penetrations.

6.2.1.1.2 Design Features Section 3.8 describes the design features of the containment and its internal structures. Figure 3.8-1 shows the general arrangement of the containment and its internal structures.

6.2.1.1.2.1 Protection from Dynamic Effects The containment and the Engineered Safety Feature (ESF) System functions are protected from dynamic effects of postulated accidents, as described in Sections 3.5 and 3.6.

6.2.1.1.2.2 Codes, Standards, and Specifications Table 3.8-1 lists the applicable codes, standards, and specifications for the containment. Codes, standards, and specifications applicable to the containment internal structures are given in Table 3.8-7.

Regulatory guides specific to the containment design are discussed in Sections 3.8.2.4 and 3.8.2.5.

6.2-2 HCGS-UFSAR Revision 0 April 11, 1988

6.2.1.1.2.3 Functional Capability Tests The functional capability of the containment is verified by pressurizing the containment to 1.15 times the internal design pressure, as described in Section 3.8.2. A discussion of containment leakage testing is provided in Section 6.2.6.

6.2.1.1.2.4 External Pressure Loading Conditions The containment is designed to withstand an external to internal differential pressure of 3 psi. To ensure that this design limit is not exceeded, vacuum relief valves are provided. The design and functional capability of the containment vacuum relief valves are discussed in Section 6.2.1.1.4.

6.2.1.1.2.5 Trapped Water That Cannot Return to Containment Sump Not applicable to pressure suppression type containments.

6.2.1.1.2.6 Containment and Subcompartment Atmosphere Control Section 3.11 provides the pressure, temperature, and humidity limits within which all Class 1E equipment located inside the containment is qualified to operate. Sections 6.2.1.1.4, 6.2.5, and 9.4.5 describe the functional capability and frequency of operation of the systems and equipment that maintain the containment and subcompartment atmospheres within prescribed limits during normal plant operation.

6.2.1.1.3 Design Evaluation 6.2.1.1.3.1 Introduction The containment functional design evaluation is based on the consideration of several postulated accidents, each of which results in the release of reactor coolant to the containment environs. These postulated accidents include the following:

6.2-3 HCGS-UFSAR Revision 0 April 11, 1988

1. An instantaneous guillotine rupture of a recirculation line
2. An instantaneous guillotine rupture of a main steam line
3. An intermediate size Reactor Coolant System (RCS) break
4. A small size RCS break.

Analysis of this spectrum of accidents indicates that the maximum temperatures and pressures experienced inside the containment do not all result from a single accident. Maximum drywell and suppression chamber pressures occur as a result of the recirculation line break, while the most severe drywell temperature condition (peak temperature and duration) results from the small size steam line break. Consequently, there is no single DBA for the containment.

The most severe drywell temperature condition, peak temperature and duration, occurs for a small RCS rupture above the reactor water level that results in the blowdown of reactor steam to the drywell, a small steam break. To demonstrate that breaks smaller than the rupture of the largest RCS pipe will not exceed the containment design parameters, the containment system responses to an intermediate size liquid break and a small size steam break are evaluated. The results show that the containment design conditions are not exceeded for these smaller break sizes.

The design values and the maximum calculated accident values of key design parameters for the containment are as follows:

Design Calc Accident Parameter Value Value Drywell pressure 62 psig 50.6 psig Drywell temperature 340F 340F Suppression chamber pressure 62 psig 27.7 psig Suppression chamber temperature 310F 212.3F 6.2-4 HCGS-UFSAR Revision 17 June 23, 2009

NOTE: Calculated values above are conservatively based on 102% of an assumed thermal power rating of 3952 MWt compared to the licensed value of 3840 MWt. However, for LOP, peak long term suppression pool temperature is 213.6F based on the licensed thermal power of 3840 MWt. Also, maximum drywell temperature conditions are based on steam line break super heat, which is not dependent on the initial reactor thermal power.

Table 6.2-1 lists the containment design parameters used in the accident response analyses. Table 6.2-2 provides the performance parameters of ESF equipment used for containment cooling purposes during post-blowdown, long term accident operation. Performance parameters given include those applicable to full capacity operation, as well as those applicable to conservatively reduced capacities assumed for accident response analysis purposes. All of the analyses assume that the RCS and the containment are initially at the maximum or minimum normal operating conditions given in Table 6.2-3. Mass and energy release sources and rates used for the containment analyses are as discussed in Section 6.2.1.3.

The containment pressure and temperature responses for each of the postulated accidents are discussed in Sections 6.2.1.1.3.2 through 6.2.1.1.3.5. Analytical models used to evaluate the containment responses are delineated in Section 6.2.1.1.3.6.

6.2.1.1.3.2 Recirculation Line Break Immediately following guillotine rupture of the largest recirculation line, the flow from out of both sides of the break is limited to the maximum allowed by critical flow considerations. Figure 6.2-1 provides a schematic representation of flow paths to the break. In the side adjacent to the suction nozzle, the flow corresponds to critical flow in the pipe cross section.

The proprietary code, LAMB (Reference 6.2-1) was used to calculate the blowdown flow rates, which are then used as inputs to the proprietary code M3CPT (References 6.2-2 through 6.2-4) for the analysis of up-rated power at 4031 MWt. Note the analysis is conservative based on 102% of an assumed rated power of 3952 (4031 MWt) in contrast with 102% of Licensed Thermal Power of 3840 (3917 MWt). This approach differs from the previous analysis for 102% of the original rated thermal power of 3293 (3359 MWt), which used a blowdown model built into M3CPT. Application of the LAMB blowdown model for the analysis at 4031 MWt is identified in Reference 6.2-27. The proprietary code SHEX (Reference 6.2-27) is used for long-term containment response evaluations for the conditions at 4031 MWt as well as at 3359 MWt.

6.2-5 HCGS-UFSAR Revision 17 June 23, 2009

Table 6.2-3 provides the initial conditions for containment response analysis.

Figure 6.2-2 shows the total effective blowdown area for the recirculation line break. This figure is provided for historical information, accordingly it is based on 102% of original rated thermal power of 3293 MWt (3359).

1. Assumptions for reactor blowdown - The response of the RCS during the blowdown period of the accident is analyzed using the following assumptions:
a. The initial conditions for the recirculation line break accident are such that the system energy is maximized and the system mass is minimized. That is:

(1) The reactor is operating at 102 percent of up-rated thermal power or 4031 MWt, which maximizes the post-accident decay heat.

(2) The Safety Auxiliaries Cooling System (SACS) water temperature is at its maximum value.

(3) The suppression pool mass is at the low water level for the long term analysis and at the high water level for the short term analysis.

(4) The suppression pool temperature is at its maximum normal value.

b. The recirculation line is considered to be severed instantly.

This results in the most rapid coolant loss and depressurization of the vessel, with coolant being discharged from both ends of the break.

c. Reactor power generation ceases at the time of accident initiation because of void formation in the core region.

Reactor scram also occurs in less than 1 second from receipt of the high drywell pressure signal. The time difference between accident initiation and reactor scram is negligible.

6.2-6 HCGS-UFSAR Revision 17 June 23, 2009

d. The break flow rate and enthalpy following the DBA-LOCA are calculated using the Homogeneous Equilibrium Model (HEM) critical flow model.
e. The core decay heat and the sensible heat released in cooling the fuel to initial average coolant temperature are included in the RPV depressurization calculation. The rate of energy release is calculated using a conservatively high heat transfer coefficient throughout the depressurization period.

The resulting high energy release rate causes the RPV to maintain nearly rated pressure for approximately 20 seconds.

The high RPV pressure increases the calculated blowdown flow rates, which is again conservative for analysis purposes.

The sensible fuel energy stored at temperatures below the initial average coolant temperature is released to the vessel fluid, along with the stored energy in the vessel and internals, as vessel fluid temperatures decrease during the remainder of the transient calculation.

f. The main steam isolation valves (MSIVs) start closing at 0.5 seconds after the accident. They are fully closed in the shortest possible time of 3 seconds following closure initiation. In actuality, the closure signal for the MSIVs results from low reactor water level, so the valves normally do not receive a signal to close for more than 4 seconds.

Also, the valve closing time may be as long as 5 seconds.

6.2-7 HCGS-UFSAR Revision 17 June 23, 2009

g. The feedwater flow rate coasts down to zero in four seconds.

The four second coastdown assumption maximizes the break flow and is consistent with Reference 6.2-1.

h. A complete LOP occurs simultaneously with the pipe break.

This condition results in the loss of power conversion system equipment and also requires that all ESF systems for long term cooling be supported by onsite power supplies.

2. Assumptions for containment pressurization - The pressure response of the containment during the blowdown period of the accident is analyzed using the following assumptions:
a. Thermodynamic equilibrium exists in the drywell and suppression chamber. Since nearly complete mixing is achieved, the analysis assumes complete mixing.
b. The fluid flowing through the drywell to suppression chamber vents is formed from a homogeneous mixture of the fluid in the drywell. The use of this assumption results in complete carryover of the drywell atmosphere and a higher positive flow rate of liquid droplets, which conservatively maximizes vent system pressure losses.

6.2-8 HCGS-UFSAR Revision 17 June 23, 2009

c. The fluid flow in the drywell to suppression chamber vents is compressible, except for the liquid phase.
d. No heat loss occurs from the gases inside the containment. In reality, some steam condenses on the drywell surfaces.
3. Assumptions for long term cooling - Following the blowdown period of the accident, the Emergency Core Cooling System (ECCS) discussed in Section 6.3 and the Containment Heat Removal System discussed in Section 6.2.2 provide water for core flooding, containment spray, and long term decay heat removal. The containment pressure and temperature responses during this period are analyzed using the following assumptions:
a. The residual heat removal (RHR) pumps, operating in the low pressure coolant injection (LPCI) mode, and the core spray pumps are used to flood the core during the first 600 seconds following the accident. The High Pressure Coolant Injection (HPCI) System is not operating for the DBA-LOCA.
b. After 600 seconds, flow from one RHR pump can be diverted from the RPV to containment spray. This is a manual operation. Actually, containment spray need not be actuated to keep the containment pressure below the containment design pressure. Prior to actuation of containment spray, which is assumed to occur at 600 seconds after the accident, all of the RHR pump flow is used to flood the core.

6.2-9 HCGS-UFSAR Revision 17 June 23, 2009

c. After approximately 600 seconds, the RHR heat exchangers are manually aligned to remove energy from the containment via recirculation cooling of the suppression pool.
d. The effects of decay energy, stored energy, sensible energy, energy added by the ECCS pumps, and metal water reaction energy on the suppression pool temperature are considered.
e. The suppression pool and containment structures are the heat sinks available in the containment.
4. Initial conditions for accident analysis - Table 6.2-4 provides the initial conditions and numerical values assumed for the recirculation line break accident, as well as the sources of energy considered prior to the postulated pipe rupture. The assumed conditions for the reactor blowdown are also provided.
5. Chronology of accident events - A complete description of the containment response to the recirculation line break accident is provided in the following paragraphs. A chronological sequence of events for the accident from time zero is provided in Table 6.2-8.

Analysis results for this accident are shown on Figures 6.2-3 through 6.2-9.

a. Short term accident response - At the beginning of the accident, the suppression chamber is pressurized by the carryover of noncondensable gas from the drywell and by the heatup of the suppression pool. As the vapor formed in the drywell is condensed in the suppression pool, the temperature of the suppression pool peaks and the suppression chamber pressure stabilizes. The drywell pressure stabilizes at a slightly higher pressure, the difference being equal to the downcomer submergence. During the RPV depressurization phase, most of the non-condensable gas initially in the drywell is forced into the suppression chamber.

6.2-10 HCGS-UFSAR Revision 17 June 23, 2009

Table 6.2-5 provides the peak containment pressure and temperature for the recirculation line break, as predicted for the conditions of Tables 6.2-3 and 6.2-4 and as corresponding with the pressure and temperature responses shown on Figures 6.2-3 and 6.2-4. Figure 6.2-5 shows the time dependent response of the pressure differential between the drywell and the suppression chamber.

During the blowdown period of the LOCA, the drywell to suppression chamber vent system conducts the steam water gas mixture in the drywell to the suppression pool for condensation of the steam. The pressure differential between the drywell and the suppression chamber controls this flow.

Figure 6.2-6 provides the mass flow versus time relationship through the vent system for this accident.

b. Long term accident responses - To assess the adequacy of the containment following the initial blowdown transient, an analysis is made of the long term temperature and pressure response. For the long term accident response analysis, following RPV depressurization, the non-condensable gas redistributes between the drywell and the suppression chamber vacuum relief valves, as discussed in Section 6.2.1.1.4.

This redistribution takes place as steam in the drywell is condensed by the relatively cool ECCS water beginning to cascade from the break causing the drywell pressure to decrease.

6.2-11 HCGS-UFSAR Revision 17 June 23, 2009

The ECCS supplies core cooling water to control core heat-up and to limit the core-wide metal-water reaction to less than one percent. After the RPV is flooded to the height of the jet pump nozzles, the excess flow discharges through the recirculation line break into the drywell. This flow of water (steam flow is negligible) transports the core decay heat out of the RPV and through the broken recirculation line in the form of hot water, which flows into the suppression chamber via the drywell to suppression chamber vent system.

This flow also provides a heat sink for the drywell atmosphere and thereby causes the drywell to depressurize.

The analysis assumptions are those discussed below for the three cases of interest. The initial pressure response of the containment, the first 600 seconds after the break, is the same for each of the following cases:

(1) Case A - All ECCS equipment operating, with containment spray - This case assumes that offsite power is available to operate the core cooling systems. During the first 600 seconds following the pipe break, the HPCI, the core spray, and all RHR (LPCI mode) pumps are assumed to be available. All flow is injected directly into the reactor vessel.

After 600 seconds, both RHR heat exchangers are manually aligned to remove energy from the containment.

During this mode of operation, the flow from two RHR pumps is routed through their associated RHR heat exchangers, where it is cooled before being discharged into the drywell and suppression chamber spray headers.

6.2-12 HCGS-UFSAR Revision 17 June 23, 2009

The containment pressure response to this set of conditions is shown as curve A on Figure 6.2-7. The corresponding drywell and suppression pool temperature responses are shown as curve A on Figures 6.2-8 and 6.2-9. After the initial blowdown and subsequent depressurization due to core spray and LPCI core flooding, energy addition due to core decay heat results in a gradual pressure and temperature rise in the containment. When the energy removal rate of the RHR system equals the energy addition rate from the decay heat, the containment pressure and temperature each reach a second peak value, and then gradually decrease to their pre-accident values. Table 6.2-6 summarizes the ECCS equipment operation, the peak long term containment pressure following the initial blowdown peak, and the peak suppression pool temperature for this analysis case.

(2) Case B - LOP, with containment spray - This case assumes that no offsite power is available following the accident and that only minimum onsite standby power is available, i.e., single standby diesel generator (SDG) failure. The RHR system, including the drywell and suppression chamber sprays, is in operation after 600 seconds. During this mode of operation, RHR system flow passes through only one RHR heat exchanger and is directed to the containment spray headers.

This is a non-limiting event. Accordingly, the related results are presented for historical purposes only and are based on 3359 MWt rather than the licensed thermal power of 3840 MWt.

The containment pressure response to this set of conditions is shown as curve B on Figure 6.2-7. The corresponding drywell and suppression pool temperature responses are shown as curve B on 6.2-13 HCGS-UFSAR Revision 17 June 23, 2009

Figures 6.2-8 and 6.2-9. A summary of this analysis case is given in Table 6.2-6.

(3) Case C - LOP, without containment spray - This case assumes that no offsite power is available following the accident and that only minimum onsite standby power is available. After 600 seconds, the sprays may be manually actuated to further reduce containment pressure if desired. However, this analysis assumes that the drywell and suppression chamber sprays are not actuated. After 600 seconds, one RHR heat exchanger is manually aligned to remove energy from the containment.

The flow from one RHR pump, in the LPCI mode, is cooled by the RHR heat exchanger before being discharged into the reactor vessel.

The containment pressure response to this set of conditions is shown as curve C on Figure 6.2-7 for 3359 MWt to provide a historical basis for comparison between cases and Figure 6.2-7a for 102% of 3840 MWt (3917). The corresponding drywell and suppression pool temperature responses are shown as curve C on Figures 6.2-8 and 6.2-9 for 3359 MWt. Figures 6.2-8a and 6.2-9a are provided for 3917 MWt. A summary of the analysis case is given in Table 6.2-6. Note that the summary data for the extended power up-rate case is conservatively based on the assumed rated thermal power of 102% of 3952 rather than 3840 MWt.

When comparing case B (spray) with case C (no spray), the same RHR heat exchanger duty is obtained since the suppression pool temperature response is approximately the same, as shown on Figure 6.2-9. Thus, the same amount of energy is removed from the suppression pool whether the exit flow from the RHR heat exchanger is injected into the reactor vessel or is injected into the drywell as spray. However, the peak containment pressure is higher for the no-spray case but is still less than the containment design pressure. This comparison is based on analysis at 3359 MWt.

6.2-14 HCGS-UFSAR Revision 17 June 23, 2009

Figures 6.2-10 and 6.2-10a show the rate at which the RHR system removes heat from the suppression pool following a LOCA at 3359 and 4031 MWt, respectively.

6. Energy balance during accident - To establish an energy distribution in the containment as a function of time, short term or long term, for this accident, the following energy sources and sinks are required:
a. Blowdown energy release rates
b. Decay heat rate and fuel relaxation sensible energy
c. Sensible heat rate (vessel and internals)
d. Pump heat rate
e. Heat removal rate from suppression pool (Figure 6.2-10)
f. Metal water reaction heat rate.

Items a., b., c., d., and f. are discussed in Section 6.2.1.3. A complete energy balance for the recirculation line break accident at 3359 MWt is given in Table 6.2-7 for the reactor system, the containment, and the containment cooling systems at time zero, at the time of peak drywell pressure, at the end of reactor blowdown, and at the time of the long term peak pressure in the containment.

6.2-15 HCGS-UFSAR Revision 17 June 23, 2009

6.2.1.1.3.3 Main Steam Line Break NOTE - For the purposes of the Hope Creek Extended Power Up-rate (EPU), the General Electric Company determined the MSLB to be non-limiting. As such, the supporting analysis discussed below and presented in Tables and Figures of Section 6.2 were not reanalyzed for the licensed thermal power rating of 3840 MWt. Accordingly, the associated Tables and Figures are based on 102% of the original rated thermal power 3293 MWt (3353). While provided for historical purposes, the MSLB analysis determines the event to be temperature and not pressure limiting. Furthermore, maximum temperature for MSLB is based on limiting superheated steam conditions, which are not dependant on initial reactor power.

The assumed sudden rupture of a main steam line between the reactor vessel and the main steam flow restrictor results in the maximum flow rate of RCS fluid and energy to the drywell. The sequence of events immediately following the rupture of a main steam line between the reactor vessel and the flow restrictor is as follows. The flow on both sides of the break accelerates to the maximum allowed by critical flow considerations. On the side adjacent to the reactor vessel, the flow corresponds to critical flow in the steam line cross section.

Blowdown through the other side of the break occurs because the steam lines are all interconnected at a point upstream of the main turbine by the main steam bypass header. This interconnection allows RCS fluid to flow from the three unbroken steam lines through the header and into the drywell via the broken line. Flow is limited by critical flow in the steam line flow restrictor of the broken line. Figure 6.2-11 shows the total effective blowdown area. The MSIVs are assumed to start closing at 0.5 seconds after the accident and are fully closed 5 seconds following closure initiation. By assuming slow closure of these valves, a large effective blowdown area is maintained for a longer period of time. The peak drywell pressure occurs before the reduction in effective blowdown area and is therefore insensitive to any additional delay in closure of the MSIVs.

Immediately following the break, the total steam flow rate leaving the vessel exceeds the steam generation rate in the core, causing an initial depressurization of the RPV. Void formation in the reactor vessel water causes a rapid rise in the water level. It is conservatively assumed that the water level reaches the vessel steam nozzles 1 second after the break occurs. This assumed water level rise time of 1 second is the fastest that can occur under any reactor operating condition. From this time on, a two phase mixture 6.2-16 HCGS-UFSAR Revision 17 June 23, 2009

is discharged from the break. During the first second of the blowdown, the blowdown flow consists of saturated steam. This steam enters the containment in a superheated condition at approximately 330F.

Figures 6.2-12 and 6.2-13 show the containment pressure and temperature responses during the RCS blowdown phase of the main steam line break accident.

Figure 6.2-13 shows that the drywell atmosphere temperature approaches a peak after approximately 1 second of RCS steam blowdown. At that time, the water level in the vessel reaches the steam line nozzle elevation, and the blowdown flow changes to a two phase mixture. This increased flow causes a more rapid drywell pressure rise. The peak differential pressure between the drywell and the suppression chamber occurs shortly after the vent clearing transient. As the blowdown proceeds, the RCS pressure and fluid inventory decrease, which results in reduced blowdown rates. As a consequence, the flow rate in the vent system and the differential pressure between the drywell and the suppression chamber begin to decrease.

Table 6.2-5 presents the peak containment pressures and temperatures for this accident, as compared to those for the recirculation line break accident.

After the RCS pressure has dropped to the drywell pressure, the blowdown is over. At this time, the drywell contains saturated steam, and the drywell and suppression chamber pressures stabilize. The pressure difference between the drywell and the suppression chamber corresponds to the hydrostatic pressure of downcomer submergence.

The drywell and the suppression chamber remain in this equilibrium condition until the reactor vessel refloods. During this period, the ECCS pumps inject cooling water from the suppression chamber into the reactor. This injection of water eventually floods the 6.2-17 HCGS-UFSAR Revision 0 April 11, 1988

reactor vessel to the level of the steam line nozzles and the ECCS flow spills into the drywell. The water spillage condenses the steam in the drywell and thus reduces the drywell pressure. As soon as the drywell pressure drops below the suppression chamber pressure, the drywell to suppression chamber vacuum relief valves open and noncondensable gas forced into the suppression chamber during the blowdown phase of the accident flows back into the drywell until the pressures in the two regions equalize.

6.2.1.1.3.4 Intermediate-Size Break NOTE - This event was determined by the General Electric Company to be non-limiting for EPU purposes. As such, the results discussed below and presented in associated Tables and Figures are for 102% of the original rated thermal power (RTP) of 3293 MWt (3359 MWt) rather than 102% if licensed thermal power of 3840 MWt (3917 MWt). The information is provided for comparison and historical purposes.

An intermediate size break is analyzed as part of the containment functional design evaluation to demonstrate that the consequences are no more severe than those from a rupture of the largest RCS pipe. This classification covers those breaks for which the blowdown results in reactor depressurization and operation of the ECCS. This section describes the consequences to the containment of a 0.5-square-foot break below the RPV water level. This break area is chosen as being representative of the intermediate size break area range. These breaks can involve either reactor steam or liquid blowdown.

Following the 0.5-square-foot break, the drywell pressure increases at approximately 1 psi per second. This drywell pressure transient is sufficiently slow so that the dynamic effect of the water in the downcomers is negligible, and the downcomers clear when the drywell to suppression chamber differential pressure is equal to the hydrostatic pressure corresponding to the downcomer submergence.

Figures 6.2-14 and 6.2-15 show the short term containment pressure and temperature responses for this accident. The ECCS response is discussed in Section 6.3. Approximately 5 seconds after the 0.5-square-foot break occurs, noncondensable gas, steam, and water start to flow from the drywell to the suppression chamber; the steam is condensed in the suppression pool; and the noncondensable gas enters the suppression chamber free space. The continual purging of the drywell atmosphere to the suppression chamber results in a 6.2-18 HCGS-UFSAR Revision 17 June 23, 2009

gradual pressurization of both the suppression chamber and the drywell. The containment continues to gradually increase in pressure due to the long term suppression pool heatup.

The ECCS is initiated as the result of the 0.5-square-foot break and provides emergency cooling of the core. The operation of this system is such that the reactor is depressurized in approximately 600 seconds. This terminates the blowdown phase of the transient.

The suppression pool end of blowdown temperature is the same as that for the recirculation line break accident because essentially the same amount of RCS energy is released during the blowdown. After reactor depressurization and reflood, water from the ECCS begins to flow out the break. This flow condenses the drywell steam and eventually causes the drywell and suppression chamber pressures to equalize in the same manner as following a recirculation line break. The subsequent long term suppression pool and containment heatup transient is essentially the same as for the recirculation line break accident.

From this description, it is concluded that the consequences of an intermediate size break are less severe than those of a recirculation line break.

6.2.1.1.3.5 Small Size Break This section discusses the containment transient associated with small RCS blowdowns. The sizes of RCS ruptures in this category are those that do not result in reactor depressurization due to either loss of reactor coolant or automatic operation of the ECCS equipment. Following the occurrence of a break of this size, it is assumed that the reactor operator initiates an orderly plant shutdown and depressurization of the reactor system. The thermodynamic process associated with the blowdown of RCS fluid is one of constant enthalpy.

If the RCS break is below the water level, the blowdown flow consists of reactor water. Blowdown from reactor pressure to drywell pressure flashes approximately one-third 6.2-19 HCGS-UFSAR Revision 0 April 11, 1988

of this water to steam, while two-thirds of the blowdown flow remains as liquid. Both phases are at saturation conditions corresponding to the drywell pressure.

If the RCS rupture is located so that the blowdown flow consists of reactor steam only, the resultant steam temperature in the containment is significantly higher than the temperature associated with liquid blowdown. This is because the constant enthalpy with depressurization of high pressure, saturated steam results in superheated conditions.

A small reactor steam leak, resulting in superheated steam, imposes the most severe temperature conditions on the drywell structures and on the safety equipment in the drywell. For larger steam line breaks, the superheat temperature is nearly the same as for small breaks, but the duration of the high temperature condition is less for the larger break. This is because larger breaks depressurize the reactor more rapidly than the orderly reactor shutdown that is assumed to terminate the small break.

1. Containment response - For drywell design considerations, the following sequence of events is assumed. With the reactor and containment operating at the maximum normal conditions, a small break occurs that allows blowdown of reactor steam to the drywell.

The resulting pressure increase in the drywell leads to a high drywell pressure signal, which scrams the reactor and actuates the containment isolation system. The drywell pressure continues to increase at a rate dependent upon the size of the steam leak. The pressure increase lowers the water level in the downcomers until the level reaches the bottom of the downcomers. At this time, noncondensable gas and steam start to enter the suppression chamber. The steam is condensed in the suppression pool and the noncondensable gas is carried over to the suppression chamber free space. The carryover of noncondensable gas from the drywell results in a gradual pressurization of 6.2-20 HCGS-UFSAR Revision 17 June 23, 2009

the suppression chamber at a rate dependent upon the size of the steam leak. Once all of the noncondensable gas in the drywell is carried over to the suppression chamber, short-term pressurization of the suppression chamber ceases, and the system reaches equilibrium. The drywell contains only superheated steam, and continued blowdown of reactor steam condenses in the suppression pool. The suppression pool temperature continues to increase until the RHR heat exchanger heat removal rate is equal to the decay heat release rate.

2. Recovery operations - The reactor operator is alerted to the incident by the high drywell pressure signal and by the reactor scram. For the purpose of evaluating the duration of the superheat condition in the drywell, it is assumed that the operator's response is to shut down the reactor in an orderly manner using the main condenser, while limiting the reactor cooldown rate to 100F per hour. This results in the RCS being depressurized within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. At this time, the blowdown flow to the drywell ceases, and the superheat condition is terminated. If the plant operator elects to cool down and depressurize the RCS more rapidly than 100F per hour, the duration of the drywell superheat condition is shorter.
3. Drywell design temperature considerations - For drywell design purposes, it is assumed that there is a blowdown of reactor steam for the 6-hour cooldown period. The corresponding design temperature is determined by finding the combination of RCS pressure and drywell pressure that produces the maximum superheat temperature. The maximum drywell steam temperature occurs when the RCS is at approximately 450 psia. Thus, for design purposes, it is assumed that the drywell is at 50 psia, with a resultant temperature of 340F.

6.2-21 HCGS-UFSAR Revision 0 April 11, 1988

6.2.1.1.3.6 Accident Analysis Models

1. Short term pressurization model - The analytical models, assumptions, and methods used to evaluate the containment response during the reactor blowdown phase of a LOCA are described in References 6.2-2 through 6.2-4.
2. Long term response model - The analytical model used in evaluating the long term response to a LOCA is based on the mass and energy balance of the reactor vessel, drywell, suppression pool, and suppression chamber atmosphere. Auxiliary systems that are connected to the primary systems are also modeled. The two major auxiliary systems that have the greatest impact on the long term response are the emergency core cooling and pool cooling functions of the RHR system.

The governing equations are integrated numerically, enabling the evaluation of the thermodynamic histories of both the primary and containment systems.

3. Analytical assumptions - The key assumptions employed in the model are as follows:
a. The drywell free space is composed of a uniform mixture of steam, air, and liquid droplets.
b. Flow through the vents is adiabatic.
c. For short term analyses, the temperature of the suppression chamber atmosphere is equal to the temperature of the suppression pool.
d. For short term analyses, no credit is taken for heat losses to the drywell wall, suppression chamber walls, and internal structures.

6.2-22 HCGS-UFSAR Revision 17 June 23, 2009

The HCGS Plant Unique Analysis Report (PUAR) has been submitted (letter from R. L. Mittl to A. Schwencer, February 10, 1984) to identify the analyses conducted to establish design basis loads. The PUAR identifies and justifies exceptions to NRC acceptance criteria (e.g., NUREG-0661, "Mark I Containment Long Term Program").

A post-implementation pool dynamic load audit of the Hope Creek PUAR has been completed to verify compliance with the generic acceptance criteria of NUREG-O661. This audit, performed by the NRC staff and Brookhaven National Laboratory, identified four exceptions to the generic acceptance criteria:

1) Use of alternative acceleration drag volumes to determine drag on sharp cornered structures.
2) Phasing of load harmonics used to analyze structures affected by condensation oscillation and post-chug loads.
3) Fluid Structure Interaction methodology used for condensation oscillation and chugging submerged structure loads.
4) Use of calibration factors developed from Monticello in-plant tests for use in defining SRV submerged structure drag loads.

All of these issues have been resolved. The review of the HCGS PUAR has been completed with no issues or concerns outstanding.

6.2-23 HCGS-UFSAR Revision 0 April 11, 1988

6.2.1.1.4 Negative Pressure Design Evaluation 6.2.1.1.4.1 Containment Vacuum Relief Valves The containment is designed to withstand an external to internal differential pressure of 3 psi.

Vacuum in the drywell is relieved by eight 24-inch vacuum relief valves located on the vent header of the drywell to suppression chamber vent system. These valves are self-actuating, check type, that can also be remote manually operated from the main control room for testing purposes. The vacuum relief valves between the drywell and the suppression chamber are sized to provide a total flow area of no less than approximately one-sixteenth of the net vent system cross-sectional area.

Vacuum in the suppression chamber is relieved by a 24-inch vacuum breaker assembly located in each of two lines between the reactor building and the suppression chamber free space. Each assembly consists of a check type vacuum relief valve and a pneumatically operated butterfly valve mounted in series, with the butterfly valve located between the containment and the check type valve. The check type valves are self-actuating and can be remote manually operated from the main control room for testing purposes. The butterfly valves, which are normally closed for containment isolation purposes, are actuated by differential pressure between the reactor building and the suppression chamber free space. The butterfly valves can also be remote manually operated from the main control room for testing purposes. The controls and instrumentation for each butterfly valve are powered from different Class 1E electrical channels to ensure that failure of a single electrical channel does not disable more than one vacuum breaker assembly. The normal air supply for these valve actuator is from the instrument air system.

To assure these butterfly valves can operate post-accident, they are provided with an accumulator which is designed to ASME Code, Section III, Class 3 requirements. The accumulators are provided with a makeup source from the 6.2-24 HCGS-UFSAR Revision 0 April 11, 1988

safety-related Primary Containment Instrument Gas Supply System (See Plant Drawing M-57-1). Each vacuum breaker assembly is sized on the basis of the flow of air from the Reactor Building required to limit the containment collapse pressure to within 3.0 psi. The maximum containment depressurization rate is a function of the containment spray flow rate and temperature and the assumed initial conditions of the containment atmosphere. Low spray temperatures and containment atmospheric conditions that yield the minimum numbers of contained noncondensable moles of gas are assumed for conservatism.

The containment vacuum relief valves are qualified to Seismic Category I criteria and are designed and manufactured in accordance with the requirements of the ASME B&PV Code,Section III, Class 2. The valves and appurtenances are designed to operate at a maximum pressure and temperature of 62 psig and 340F, respectively, concurrent with a maximum relative humidity of 100 percent.

During such environmental conditions, the valves open fully within 1 second, with a 0.25 psi differential pressure existing across the valve. Each valve is equipped with redundant valve-position limit switches, which are suitably sensitive to provide main control room indication of valve closure to a tolerance of 0.01 inch.

GE Letter #MFN-094-82 dated July 2, 1982 is applicable to HCGS's suppression pool to drywell vacuum breaker design. These vacuum breakers have been modified in accordance with the recommendations from the Mark I BWR owners group. The Hope Creek Plant Unique Analysis Report (PUAR) was submitted for NRC review by a PSE&G letter dated February 10, 1984. A discussion of the torus to drywell vacuum breakers is included in the PUAR. Details of the plant unique calculation and the vacuum breaker modifications have been included in the response to the staff's request for additional information on the Hope Creek PUAR (letter from A. Schwencer (USNRC) to R. L. Mittl (PSE&G) dated November 16, 1984). This response was submitted to the staff by letter from R.

L. Mittl (PSE&G) to A. Schwencer (USNRC), dated January 8, 1985 and revised by letter from R. L. Mittl, PSE&G, to W. Butler, NRC, dated June 12, 1985.

6.2-25 HCGS-UFSAR Revision 20 May 9, 2014

6.2.1.1.4.2 Containment Depressurization Evaluation Negative pressure differentials (negative corresponding to an inward loading) across the drywell walls are caused by the rapid depressurization of the drywell. Events that cause depressurization in the drywell are:

1. Cooling cycles
2. Inadvertent containment spray actuation during normal operation
3. Steam condensation following RCS pipe ruptures with inadvertent containment spray actuation.

Cooling cycles result in minor pressure transients in the drywell, which occur slowly and are controlled by heating and ventilating equipment. Inadvertent spray actuation during normal operation results in a more significant pressure transient and becomes important in sizing the suppression chamber to Reactor Building vacuum breaker assemblies. Steam condensation following RCS pipe ruptures with inadvertent containment spray actuation within the drywell results in the most severe pressure transients. Following an RCS rupture, the drywell atmosphere is purged to the suppression chamber free space, leaving the drywell full of steam. Subsequent condensation of the steam in the drywell can be caused either by ECCS spillage from the rupture or by inadvertent containment spray actuation following a LOCA.

Pressure transients within the drywell and the suppression chamber free space, due to inadvertent containment spray actuation for post-LOCA steam condensation, were evaluated. The results of containment depressurization transients are provided in Table 6.2-29. Details of the limiting transient, including the analytical models, assumptions, and methods used, are provided in Appendix 6A. The results of this evaluation demonstrate the adequacy of the containment vacuum relief valves, since the calculated negative 6.2-26 HCGS-UFSAR Revision 0 April 11, 1988

pressure loadings on the containment do not, under any circumstances, exceed the design limit.

6.2.1.1.5 Steam Bypass of the Suppression Pool The pressure boundaries between the drywell and the suppression chamber, including the vent pipes, vent header, and downcomers, are fabricated, erected, and inspected by nondestructive examination methods in accordance with the acceptance standards of the ASME B&PV Code,Section III, Subsection NE. This special construction, inspection, and quality control ensures the integrity of this boundary. The design pressure and temperature for this boundary are defined in Table 6.2-1. Actual accident peak pressure and temperature for this boundary are provided in Table 6.2-5.

There are no flow paths that have been identified, other than an open vacuum relief valve between the suppression chamber and the drywell, that could permit bypassing of steam from the drywell directly to the suppression chamber free space. All penetrations of this boundary, except the drywell to suppression chamber vacuum relief valve seats, are welded. All penetrations are available for periodic visual inspection. Surveillance testing of the vacuum relief valves is as required by the plant technical specifications in Section 16.

The "light bulb torus" design of the containment makes it essentially impossible for an accident flow path to exist between the drywell and the suppression chamber free space. The vacuum relief valves between the drywell and the suppression chamber are simple and reliable devices. Redundant position switches on each vacuum relief valve and frequent testing of valve operability ensure that the possibility of an open relief valve coincident with an accident situation need not be considered.

6.2-27 HCGS-UFSAR Revision 0 April 11, 1988

6.2.1.1.6 Suppression Pool Dynamic Loads The capability of the containment to withstand hydrodynamic loads due to main steam safety/relief valve (SRV) discharge and a LOCA is discussed in Section 3.8.2.

6.2.1.1.7 Asymmetric Loading Conditions Asymmetric loads considered for the design of the containment include horizontal seismic loads and localized pipe rupture loads. Refer to Section 3.7 for a description of the seismic analysis methods. Refer to Sections 3.6 and 3.8 for descriptions of the analytical methods used for pipe rupture.

6.2.1.1.8 Containment Environment Control The functional capability of the Containment Ventilation System to maintain the temperature, pressure, and humidity of the containment and subcompartments is discussed in Section 9.4.5.

6.2.1.1.9 Post-Accident Monitoring A description of the post-accident monitoring systems is provided in Section 7.5.

6.2.1.1.10 Suppression Pool Temperature Analysis The Hope Creek Generating Station takes advantage of the large thermal capacitance of the suppression pool during plant transients requiring SRV actuation. Steam is discharged from the main steam lines through the SRVs and their accompanying discharge lines into the suppression pool where it is condensed, resulting in an increase in the temperature of the suppression pool water. Although stable steam condensation is expected at all pool temperatures, the Nuclear Regulatory Commission (NRC) has imposed the following local temperature limits in the vicinity of T-type quencher discharge devices (Reference 6.2-24):

6.2-28 HCGS-UFSAR Revision 0 April 11, 1988

1. For all plant transients involving SRV operations during which the 2

steam flux through the quencher perforations exceeds 94 lbm/ft -

sec, the suppression pool local temperature shall not exceed 200F.

2. For all plant transients involving SRV operations during which the steam flux through the quencher perforations is less than 42 lbm/ft 2

-sec, the suppression pool local temperature shall be at least 20F subcooled.

3. For all plant transients involving SRV operations during which the 2

steam flux through the quencher perforations exceeds 42 lbm/ft -

2 sec, but is less than 94 lbm/ft -sec, the suppression pool local temperature is obtained by linearly interpolating the local temperatures established under aforementioned Items 1 and 2.

HCGS T-quenchers have a submergence of 9.0 feet of water corresponding to 18.6 psia. The saturation temperature at 18.6 psia is 224.1F. Thus, for limit 2 above, a 20F subcooling translates into a suppression pool local temperature limit of 204.1F.

Since the steam mass flux through the quencher perforations is directly 2

dependent on reactor vessel pressure, mass fluxes of 42 lbm/ft -sec and 2

94 lbm/ft -sec correspond to reactor vessel pressures of 274 psia and 617 psia, respectively.

This section describes the plant unique transient analyses for suppression pool temperature to demonstrate satisfaction of the above limits. This section also describes the pool temperature monitoring system design as it pertains to the NRC requirements.

6.2.1.1.10.1 Design Transients, Initial Conditions and Assumptions To demonstrate that the above limits are satisfied, the NRC has required that the following events be analyzed for local pool temperature response (Reference 6.2-24):

6.2-29 HCGS-UFSAR Revision 17 June 23, 2009

1. Stuck open SRV (SORV) during power operation with only one residual heat removal (RHR) train operable.
2. Stuck open SRV during power operation with the initiation of the main steam isolation valve (MSIV) closure signal at the beginning of the event.
3. SRV discharge following isolation and scram and assuming only one RHR train operable.
4. SRV discharge following a small-break loss-of-coolant accident (LOCA) and assuming only one RHR train operable.
5. SRV discharge following a small-break LOCA and assuming the loss of the shutdown cooling mode of the RHR system.

HCGS's current licensing basis for transient analysis is to assume no single failure other than the single equipment malfunction or operator error which initiated the event. Therefore, the failure of one RHR loop, as requested by previously mentioned NRC Events a, 3, and 4, is beyond the currently accepted licensing basis for anticipated operational transients. Even though these events exceed the currently accepted licensing bases, seven transient events have been identified. These seven transient events are summarized in Table 6.2-27. One of these events is expected to result in the maximum long term suppression pool temperature.

These HCGS specific transient event analyses were performed by the General Electric Company using proprietary methods and models which have been generically reviewed and accepted by the NRC. This acceptance was confirmed at a meeting between the NRC staff and the BWR Mark I Containment Owners Group on August 25, 1983. The HCGS analyses, including initial conditions and assumptions, are consistent with the generically approved methods (Reference 6.2-25).

6.2-30 HCGS-UFSAR Revision 0 April 11, 1988

6.2.1.1.10.2 Temperature Evaluation Results A summary of the transients analyzed and the corresponding pool temperature results is presented in Table 6.2-27.

The analysis of Case 2C (a demonstration case; i.e., normal depressurization at isolated hot shutdown), see Table 6.2-27, shows a maximum local pool temperature of 194F at 3359 MWt. This demonstrates that with no system failures and in the event of a non-mechanistic scram, depressurizing the reactor pressure vessel (RPV) with SRVs at 100F/hr results in local pool temperatures that are below the condensation stability limit set by the NRC.

Case 2A (reactor rapid depressurization after isolation with one RHR loop available); see Table 6.2-27, resulted in a maximum local pool temperature of 199F at 3359 MWt and 202F at 4031 MWt, which is below the NRC limit of 204.1F. High local temperatures are present in this case because of reduced mixing when the available RHR pool cooling system is being manually switched to the shutdown cooling mode.

The maximum local pool temperatures of all other cases also remained below the NRC limit throughout the transient. In general, local to bulk temperature differences at the time of maximum temperatures are about 24F for cases where two RHR loops are assumed available and about 34F for cases where one RHR loop is assumed available. Thus, bulk pool circulation induced by RHR pumps leads to good thermal mixing; and effectively lowers the local pool temperatures in the vicinity of quencher devices.

Several limiting transients involving SRV discharges have been analyzed, and the results show that in all cases the maximum local pool temperatures in the vicinity of the T-Quenchers are below the NRC limits.

6.2-31 HCGS-UFSAR Revision 17 June 23, 2009

6.2.1.1.10.3 Suppression Pool Temperature Monitoring System The Suppression Pool Temperature Monitoring System (SPTMS) monitors bulk suppression pool temperature and is designed to meet the requirements of Regulatory Guide 1.97, Rev. 2, for Type A variables. The requirements of NUREG-0783 (Reference 6.2-24) are met as follows:

1. The HCGS SPTMS consists of one sensor for each suppression pool bay (total of 16), located on the outboard side of the suppression pool (relative to the RPV pedestal). These 16 sensors are divided into two redundant channels as shown on Figure 6.2-49. Each channel consists of eight sensors located symmetrically around the suppression pool in order to provide a reasonable measure of bulk temperature.
2. The sensors are located 3'-0 1/2" below the normal minimum water level. This will ensure that the sensors remain submerged and thus properly monitor pool temperature.
3. The eight individual sensor inputs per channel are continuously averaged by a seismically and environmentally qualified microprocessor system. Average (bulk) temperature is both indicated and recorded in the main control room for each channel of the SPTMS.
4. Each channel of the SPTMS has four alarm setpoints which will be consistent with the Technical Specification limits on pool temperature.
5. All SPTMS sensors are Seismic Category I, Quality Group B and are capable of being energized from onsite emergency power supplies.

6.2-32 HCGS-UFSAR Revision 0 April 11, 1988

6.2.1.2 Containment Subcompartments The containment subcompartments considered for HCGS are the RPV shield annulus and the drywell head region. The modeling procedures and considerations are presented in Appendix 6B.

6.2.1.3 Mass and Energy Release Analyses for Postulated Loss-of-Coolant Accidents This section presents information concerning the transient energy release rates from the RCS to the containment following a LOCA. Where the ECCS enters into the determination of energy released to the containment, the single failure criterion is applied in order to maximize the energy release to the containment following a LOCA.

6.2.1.3.1 Mass and Energy Release Data Note the following description applies to rated thermal power of 3359 MWt and are provided for historical purposes.

Table 6.2-9 provides the mass and enthalpy release data for the recirculation line break. Blowdown steam and liquid flow rates approach zero in approximately 48 seconds and do not change significantly during the remainder of the 24-hour period following the accident. Figure 6.2-16 shows the blowdown flow rates for the recirculation line break graphically. These data are employed in the containment pressure temperature response analyses discussed in Section 6.2.1.1.

Table 6.2-10 provides the mass and enthalpy release data for the main steam line break. Blowdown steam and liquid flow rates approach zero in approximately 80 seconds and do not change significantly during the remainder of the 24-hour period following the accident. Figure 6.2-17 shows the vessel blowdown flow rates for the main steam line break as a function of time after the postulated rupture. For 102% of the assumed power up-rate value of 3952 MWt (4031 MWt), Table 6.2-9a provides the mass and enthalpy release data associated with a recirculation line break. Figure 6.2-16 shows the blowdown flow rates for the recirculation line break graphically. These data are employed in the containment pressure/temperature response analyses discussed in Section 6.2.1.1.

6.2-33 HCGS-UFSAR Revision 17 June 23, 2009

6.2.1.3.2 Energy Sources The RCS conditions prior to the line break are presented in Tables 6.2-3 and 6.2-4. Reactor blowdown calculations for containment response analyses are based on these conditions during a LOCA.

The energy released to the containment during a LOCA is comprised of the following:

1. Stored energy in the reactor system
2. Energy generated by fission product decay
3. Energy from fuel relaxation
4. Sensible energy stored in the reactor structures
5. Energy being added by the ECCS pumps
6. Metal water reaction energy.

Following each postulated accident, the stored energy in the reactor system and the energy generated by fission product decay is released. The rate of release of core decay heat for the evaluation of the containment response to a LOCA is provided in Table 6.2-11 as a function of time after accident initiation.

Following a LOCA, the sensible energy stored in the RCS metal is transferred to the recirculating ECCS water and thus contributes to the suppression pool and containment heatup.

Figure 6.2-18 shows the temperature transients of the various RCS structures that contribute to this sensible energy transfer at 4031 MWt. Figure 6.2-19 shows the variation of the sensible heat content of the reactor vessel and internal structures during a recirculation line break accident based on the temperature transient responses at 3359 MWt. Figure 6.2-19 is included for historical purposes.

6.2-34 HCGS-UFSAR Revision 17 June 23, 2009

6.2.1.3.3 Reactor Blowdown Model Description The RCS blowdown flow rates are evaluated using the model described in References 6.2-2 through 6.2-4.

6.2.1.3.4 Effects of Metal Water Reaction The containment is designed to accommodate the effects of metal water reactions and other chemical reactions that may occur following a LOCA. The amount of metal water reaction that can be accommodated is consistent with the performance objectives of the ECCS. In evaluating the containment response, 14,938 Btu/s of heat from metal water reactions is included for the first 120 seconds. The containment response is insensitive to the reaction time, even for the conservative case where all of the energy is included prior to the occurrence of peak drywell pressure.

6.2.1.3.5 Thermal Hydraulic Data for Reactor Analysis Sufficient thermal hydraulic data to perform thermodynamic evaluations of the containment are provided in Section 6.2.1.1.3 and associated tables.

6.2.1.4 Mass and Energy Release Analysis for Postulated Secondary System Pipe Ruptures Inside Containment (PWR)

Not applicable to boiling water reactors (BWRs).

6.2.1.5 Minimum Containment Pressure Analysis for Performance Capability Studies on Emergency Core Cooling System (PWR)

Not applicable to BWRs.

6.2-35 HCGS-UFSAR Revision 17 June 23, 2009

6.2.1.6 Testing and Inspection Preoperational containment testing and inspection programs are described in Section 3.8 and Section 14. Operational containment leakage rate testing and inspection programs are described in Section 6.2.6. The requirements and bases for acceptability are described in Section 16.

6.2.1.7 Instrumentation Requirements Containment pressure and temperature sensing and the associated actuating input to the ESF systems are discussed in Section 7.3. Refer to Section 7.5 for a discussion of the display instrumentation.

Containment airborne radioactivity monitoring is described in Section 12.3.4.

Containment hydrogen monitoring is described in Section 6.2.5. Conformance to the requirements of GDC 13 and 64 of 10CFR50, Appendix A, is discussed in Section 3.1.

6.2.1.8 SRP Rule Review Acceptance Criteria II.B.1 establish the acceptable initial atmospheric conditions within a subcompartment to calculate the maximum resultant differential pressure across the wall of the subcompartment. The initial conditions are to assume air at the maximum allowable temperature, minimum absolute pressure, and 0 percent relative humidity.

At HCGS, subcompartment analyses for the RPV shield annulus and the drywell head were performed at the following initial condition:

Temperature = 135F Relative humidity = 30 percent Absolute pressure = 15.45 psia 6.2-36 HCGS-UFSAR Revision 0 April 11, 1988

An initial relative humidity of 30 percent was assumed because of computer code/analytical tool limitations. The 30 percent value is a realistic maximum value. The initial temperature of 135F (normal condition) versus a temperature of 150F is used in order to satisfy the intent of the SRP requirement to minimize the heat capacity of the air (0 percent relative humidity). The minimum pressure is not used since a 0.2 percent increase in the heat capacity is anticipated; hence a calculated and not a minimum pressure is used.

6.2.2 Containment Heat Removal 6.2.2.1 Design Basis Containment heat removal is accomplished during and after an accident by the containment cooling modes of the Residual Heat Removal (RHR) System: the suppression pool cooling and the containment spray modes. The containment spray mode includes the capability to divert 5 percent of the flow to the suppression chamber spargers. The purpose of these two RHR modes is to prevent excessive containment temperatures and pressures, thus maintaining containment integrity following a loss-of-coolant accident (LOCA). To fulfill this purpose, the following safety design bases are met:

1. The long term bulk temperature of the suppression pool is limited to 170F without spray operation when considering the energy additions to the containment following a LOCA. These energy additions, as a function of time, are provided in Section 6.2.1.
2. The single failure criterion applies to the RHR system.
3. The RHR system is safety-related and Seismic Category I.
4. The RHR system maintains operation during those environmental conditions imposed by the LOCA. Loss of offsite power (LOP),

adverse natural phenomena, e.g., tornadoes, hurricanes, earthquakes, floods, etc, and 6.2-37 HCGS-UFSAR Revision 0 April 11, 1988

site related events, e.g., high and moderate energy pipe breaks, externally generated missiles, and transportation accidents, will not impair the system's post-LOCA function.

5. Each active component of the RHR system is testable during normal operation of the plant.

6.2.2.2 Containment Cooling System Design 6.2.2.2.1 System Design The containment cooling modes are integral operational modes of the RHR system.

Water is drawn from the suppression pool, pumped through one or both RHR heat exchanger loops, and delivered to the suppression pool, to the drywell spray header, or to the suppression chamber spray header. Water from the Safety Auxiliaries Cooling System (SACS) is pumped through the RHR heat exchanger tube side to remove heat from the process flow from the suppression pool. Two cooling loops are provided, each mechanically and electrically separate from the other to achieve redundancy. A piping and instrumentation diagram is provided in Section 5.4.7. The process diagram, including the process data, is provided in Section 6.3 for all RHR design operating modes and conditions.

Minimum available net positive suction head (NPSH) for RHR pump suppression pool suction is discussed in Section 6.3.

All portions of the RHR system used for containment cooling are designed to withstand operating loads and loads resulting from natural phenomena. All operating components can be tested during normal plant operation so that reliability can be ensured. Construction codes and standards are covered in Sections 5.4.7 and 3.2.

The containment cooling modes of the RHR are started manually from the main control room. There are no signals that automatically initiate the containment cooling function. Rather, the low pressure 6.2-38 HCGS-UFSAR Revision 0 April 11, 1988

coolant injection (LPCI) mode is automatically initiated from Emergency Core Cooling System (ECCS) signals, and the RHR system is realigned for containment cooling by the plant operator after the reactor vessel water level has been recovered. Refer to containment functional design in Section 6.2.1 for further details. Containment cooling is initiated by initiating SACS flow to the RHR heat exchanger, starting the RHR pump, opening the suppression pool return valve, and closing the heat exchanger bypass valve. Since RHR has initiated in the LPCI mode, the RHR and SACS pumps will already be running; the LPCI injection valve and suppression pool return valve must be overridden. In the event that a single failure has occurred, and the action that the plant operator is taking does not result in system initiation, the operator places the other totally redundant system into operation by following the same initiation procedure. If the operator chooses to use the containment spray, (s)he must close the LPCI injection valve and open the spray valves. The containment spray water establishes a closed loop to the suppression pool via the downcomers.

Preoperational tests are performed to verify individual component operation, individual logic element operation, and system operation up to the drywell spray spargers. A sample of the sparger nozzles are bench tested for flow rate versus pressure drop to evaluate the original hydraulic calculations. Finally, the spargers are tested by air and visually inspected to verify that all nozzles are clear. Refer to Section 5.4.7 for further discussion of preoperational testing.

6.2.2.2.2 Effects of Insulation on System Performance 6.2-39 HCGS-UFSAR Revision 12 May 3, 2002

Fiberglass blanket sections covered with 22-gauge, 304 stainless steel jacketing insulate structures, equipment and piping within the primary containment. This form of insulation was analyzed with respect to creating a debris clogging problem for containment cooling operation after a LOCA as set forth in USNRC Bulletin 96-03 and NUREG/CR-6224. The BWR Owner's Group ECCS Suction Strainer Committee has studied the performance of the materials during a simulated design basis accident (DBA). The results of the study have been submitted to the NRC as Utility Resolution Guidance for ECCS Suction Strainer Blockage Report, NRC Project 691. As indicated in the study:

1. The quantity of Drywell Insulation and other debris sources during a LOCA has been determined. These and other segments of insulation that are subjected to the violent forces of a component rupture, jet impingement, or pipe whip could be expected to become potential clogging debris.
2. The methodology for debris transport and settling has been established.

The path for insulation to enter the suppression pool is through the vent pipes and the downcomer ring header. The jet deflectors prevent debris from entering the vent pipes directly. Floor grating, structural steel, and components in the drywell will retain insulation debris and restrict it from reaching the floor or the vent pipes. A portion of the insulation debris generated will be transported to the suppression pool.

The openings at the jet deflectors will prevent all but smaller fragments from entering the vent pipes.

Some of the insulation debris that is transported to the suppression pool is fast settling, the remainder settles more slowly. After the initial blowdown, the insulation debris that reaches the suppression pool begins to settle to the bottom. The flow velocity created by the ECCS pump operation for the bulk of the suppression pool is very low, therefore only a portion of the insulation debris in the suppression pool will collect on the ECCS strainers. The strainers are located above the bottom of the suppression pool and the velocities generated at the bottom of the suppression pool are not sufficient to reentrain insulation that has settled except very near the strainers. An evaluation of the transport and accumulation of postulated debris was performed in accordance with the guidelines of NRC Bulletin 96-03 NUREG/CR-6224. The flow restriction caused by the insulation accumulation on the strainers in this analysis does not adversely effect operation of the ECCS pumps.

6.2-40 HCGS-UFSAR Revision 11 November 24, 2000

3. If some fibers do pass through the 0.1225-inch strainer mesh, the study has shown that pump function and spray nozzle performance are not affected. Particles of this size or smaller will not impair the safe function of the suppression pool cooling or drywell spray modes of the RHR system.

Details of suction strainer attachment to the strainer nozzles are provided in Section 5.4.7.

The NRC staff has completed its review of this issue (NRC Project 691, ECCS Suction Strainer Blockage"), which is contained in Safety Evaluation by the Office of Nuclear Reactor Regulation Related to NRC Bulletin 96-03, BWR Owners Group Topical Report NF00-32686, Utility Resolution Guidance for ECCS Suction Strainer Blockage. Based on the findings of this review, this issue is considered closed for HCGS.

6.2.2.3 Design Evaluation of the Containment Cooling Function In the event of the postulated LOCA, the short term energy release from the reactor primary system is dumped to the suppression pool. Subsequent to the accident, fission product decay heat results in a continuing energy input to the pool. The containment cooling modes remove this energy, which is input to the Primary Containment System, thus resulting in acceptable suppression pool temperatures and containment pressures.

6.2-41 HCGS-UFSAR Revision 11 November 24, 2000

To evaluate the adequacy of the RHR system, the following sequence of events is assumed:

1. With the reactor initially operating at 102 percent of up-rated thermal power (3840 MWt) a LOCA occurs.
2. An LOP occurs and one standby diesel generator (SDG) fails to start and remains out of service during the entire transient. This is the worst single failure.
3. Only three RHR pumps are activated and operated as a result of there being no offsite power and minimum onsite power. Section 6.3 describes the ECCS equipment.
4. After 10 minutes, it is assumed that the plant operators activate one RHR heat exchanger in order to start containment heat removal.

Once containment cooling has been established, no further operator actions are required.

6.2.2.3.1 Summary of Containment Cooling Analysis When calculating the long term, post-LOCA suppression pool temperature transient, it is assumed that the initial suppression pool temperature and the RHR heat exchanger SACS water temperature are at their maximum values. This assumption maximizes the heat sink temperature to which the containment heat is rejected and thus maximizes the containment temperature. In addition, the RHR heat exchanger is assumed to be in the maximum design fouled condition at the time the accident occurs. Section 5.4.7 discusses sizing of the heat exchangers to account for fouling. This conservatively minimizes the heat exchanger heat removal capacity. The resultant suppression pool temperature transient is described in Section 6.2.1.1.3.2 and is shown on Figure 6.2-9a for 4031 MWt. Note that Figure 6.2-9 is based on rated power of 3359 MWt and is provided for historical purposes.

6.2-42 HCGS-UFSAR Revision 17 June 23, 2009

It should be noted that, when evaluating this long-term suppression pool transient, all heat sources in the containment are considered with heat losses through structural heat sinks as well as the RHR heat exchangers. These heat sources are discussed in Section 6.2.1.4. Figure 6.2-10a shows the actual heat removal rate of the RHR heat exchanger at 4031 MWt.

It can be concluded that the conservative evaluation procedure described above clearly demonstrates that the RHR system in the suppression pool cooling mode limits the post-LOCA containment temperature transient.

6.2.2.4 Tests and Inspections The preoperational test program of the containment cooling system is described in Section 6.2.2.2. Preoperational testing is discussed in greater detail in Section 14.

Functional tests of the Suppression Pool Cooling and Suppression Pool Spray modes are performed during normal plant operation with the appropriate RHR pumps taking suction from the suppression pool and discharging back to the suppression pool. All discharge valves to the reactor pressure vessel (RPV) remain closed during the test, and reactor operation remains undisturbed.

Control system design provides automatic return from the full flow test line valve alignment to the low pressure coolant injection (LPCI) valve alignment if LPCI is required during testing. The surveillance frequency for testing and inspection is discussed in Section 16.

The containment (i.e., drywell) spray discharge valves E-11-HV-F016 and E HV-F021 are included in the Inservice Testing Program.

6.2.2.5 Instrumentation Requirements The containment spray and suppression pool cooling modes of the RHR system are manually initiated from the main control room. Once initiated, containment cooling performance is monitored by 6.2-43 HCGS-UFSAR Revision 17 June 23, 2009

suppression pool temperature, containment cooling flow, and containment pressure instrumentation. Details of the instrumentation are provided in Section 7.3.1.

6.2.3 Reactor Building Functional Design The Reactor Building houses the reactor and its Pressure Suppression Containment System. Also housed in the Reactor Building are the refueling and reactor servicing equipment; the new and spent fuel storage facilities; the Filtration, Recirculation, and Ventilation System (FRVS); and various reactor auxiliary or service equipment, including the Reactor Core Isolation Cooling (RCIC) System, the Reactor Water Cleanup (RWCU) System, the Standby Liquid Control (SLC) System, the Control Rod Drive (CRD) Hydraulic System, the Residual Heat Removal (RHR) System, and the Emergency Core Cooling System (ECCS). The building also serves as the containment barrier for drywell components when the drywell is open during refueling or maintenance operations.

6.2.3.1 Design Basis The Reactor Building, in conjunction with operation of the FRVS, is designed to limit radiation doses during a design basis accident (DBA) to within 10CFR50.67 guidelines.

The following items are considered in the reactor building design:

1. Conditions that could exist following a loss-of-coolant accident (LOCA) that require control of possible leakage paths from the primary containment into the Reactor Building
2. Functional capability of the ventilation system to maintain negative pressure in the Reactor Building with respect to the outdoors, as discussed in Sections 6.8 and 9.4.2 6.2-44 HCGS-UFSAR Revision 12 May 3, 2002
3. Seismic design, leaktightness, and design pressure of the Reactor Building, as discussed in Section 6.2.3.2 and Section 3
4. Capability for periodic inspection and functional testing of the Reactor Building, as discussed in Section 16 6.2.3.2 System Design 6.2.3.2.1 Reactor Building Design The Reactor Building is designed and constructed in accordance with the design criteria presented in Section 3. It is a Seismic Category I reinforced concrete structure. The foundation is a 14-foot thick reinforced concrete mat.

Above the base mat, the building is approximately 250 feet high, consisting of a cylinder with a torispherical dome, surrounded by a rectangular structure that reaches elevation 132 feet.

The Reactor Building and its penetrations are designed to limit the leakage rate into the building to 100 percent of the building's free volume per day maintaining a differential pressure of at least 0.25 inches water gauge.

During normal plant operation, the Reactor Building pressure is maintained at a negative pressure by the Reactor Building Ventilation System (RBVS), which also maintains airflow from areas of lesser contamination to areas of greater potential contamination. Following a LOCA, the RBVS is automatically shut down, and the FRVS is actuated. The FRVS is designed to maintain a negative building differential pressure of at least 0.25 inches water gauge at all elevations in all climatic conditions. Design data for the Reactor Building, the RBVS, and the FRVS are presented in Table 6.2-12.

The openings providing access to the Reactor Building are listed in Table 6.2-14 and are shown on Plant Drawings A-4643-1 through A-4647-1 and A-0402-0. No plan views below Elevation 102 feet are shown as they are below grade and have no access openings.

6.2-45 HCGS-UFSAR Revision 20 May 9, 2014

Personnel access is through double door, vestibule systems, and therefore building ingress and egress do not jeopardize the integrity of the Reactor Building. In addition, all of the openings to the Reactor Building listed in Table 6.2-14 are monitored and alarmed in the main control room.

Access to the equipment airlock on Elevation 102 feet for refueling operations and maintenance is through the receiving bay door. The status of this door is continuously monitored and alarmed. When opened, an alarm is received in the control room and the equipment airlock thus becomes the secondary containment boundary. In order to ensure that the secondary containment is maintained, administrative procedures require that the access opening listed in Table 6.2-14a be closed when the receiving bay door is opened. Further, the motorized equipment hatch and ventilation supply and exhaust duct shutoff dampers are electrically interlocked with the receiving bay door such that the hatch and dampers must be closed before the door can be opened.

6.2.3.2.2 Reactor Building Isolation System The Reactor Building Isolation System is described in Section 9.4.2.

6.2.3.2.3 Containment Bypass Leakage Upon receipt of a LOCA or other high radioactivity signal, the FRVS is actuated automatically and simultaneously with Reactor Building isolation and shutdown of the normal RBVS. Radioactivity that exfiltrates the primary containment is collected and passed through the FRVS as described in Section 6.8.

Penetrations that pass through both primary and Reactor Building barriers and that have isolation valves, seals, gaskets, or welded joints are considered potential bypass leakage paths. Potential leakage paths that could bypass the areas serviced by the FRVS have been evaluated. Table 6.2-15 identifies those lines penetrating the Primary containment that do not terminate inside the Reactor 6.2-46 HCGS-UFSAR Revision 0 April 11, 1988

Building or in a closed system outside primary containment within the Reactor Building. Section 6.2.4.3.5 provides an evaluation of closed systems outside primary containment. Closed systems outside primary containment are considered effective bypass leakage barriers because they are dependable (i.e., Seismic Category I and Quality Group B) systems that are water filled by the use of the system jockey pumps. The systems are maintained leaktight by periodic visual inspection and the leak detection provisions identified in Section 5.2.5.2.2.

The types of bypass leakage barriers employed by lines listed in Table 6.2-15 are:

1. Redundant primary containment isolation valves
2. Closed Seismic Category I piping system inside or outside primary containment
3. A water seal maintained for at least 30 days following a LOCA
4. The line terminates outside the Reactor Building in a filtered area
5. Positive in-line air seal
6. A temporary spool piece in the line that is removed during normal operation and replaced by blind flanges so that any leakage through the flange is into the Reactor Building.
7. The line contains a spectacle flange that is inserted during normal operation so the line is blocked off and any leakage by the flange is into the reactor building enclosure.

Type 1. leakage barriers are considered to limit but not eliminate bypass leakage. Types 2. through 7. are considered to effectively eliminate any bypass leakage.

The design criterion for bypass leakage is to minimize allowable leakage because of the effect any allowed activity release would have on the accident dose analysis. No bypass leakage paths have 6.2-47 HCGS-UFSAR Revision 9 June 13, 1998

been identified. Therefore, no bypass leakage is postulated to reach the environment. The quality group and seismic qualification of the closed systems that are relied upon to eliminate bypass leakage are identified in Table 3.2-1.

The containment leakage is monitored during periodic tests as discussed in Section 6.2.6. Those penetrations for which credit is taken for water seals as a means of eliminating bypass leakage, as outlined in Table 6.2-15, are preoperationally leak tested with air or water. For these water seals, either a loop seal is present, or the water for the seal is replenished from a large reservoir. For those valves maintaining a water seal, calculations have been done to verify that there is a sufficient water inventory for 30 days assuming leakage rates of 10 ml/hr of nominal valve diameter unless indicated otherwise below. Except for HPCI valve FD-V018 and RCIC valve FC-V016 all valves required to maintain a water seal are 10CFR50 Appendix J, Type C tested. Those valves that are not Type C tested will be identified in administrative procedures as requiring periodic leakage testing in order to ensure the existence of the water seal. These seals are in:

1. Feedwater line - The feedwater line fill network is normally used to maintain a water seal in the feedwater lines between the inboard and outboard containment isolation valves following a LOCA. The fill network consists of the HPCI and the RCIC jockey pump loops, as shown on Plant Drawings M-55-1, M-56-1, M-49-1 and M-50-1, and utilizes the HPCI and RCIC injection lines to the feedwater piping to provide makeup water to the piping between the isolation valves.

In order to permit the fill network to perform its intended safety function following a single active failure, a piping crosstie is provided between the feedwater lines immediately upstream of the outboard containment isolation valves as illustrated in Plant Drawing M-41-1. This crosstie includes a normally closed key locked motor operated valve.

6.2-48 HCGS-UFSAR Revision 20 May 9, 2014

This valve, and its respective controls, is provided with Class 1E channelized power such that no single active failure could disable both the crosstie valve and either of the HPCI or RCIC injection valves or associated jockey pumps. The crosstie piping and valve is safety-related and designed to Seismic Category I criteria.

Following a LOCA, the feedwater line fill network is manually aligned from the main control room by opening the HPCI and RCIC injection valves to provide sealing water to the feedwater lines.

In the unlikely event that either the HPCI or the RCIC injection line cannot be used as a flow path to the feedwater piping, the motor operated valve in the crosstie would be manually opened from the main control room. Manual operator action to align the fill network is not required sooner than 20 minutes following detection of a LOCA. This is due to the fact that during the time period required to refill the feedwater lines, no radioactive contaminants would be expected to leak through the feedwater isolation valves out to the environment as discussed below. The abnormal operating procedures will include the actions to be taken by the operator to mitigate the unlikely event of the HPCI or RCIC injection line being unavailable as a flow path to the feedwater piping.

An evaluation of the capability of the condensate/feedwater system to provide a water seal in the short term in the system piping following a postulated LOCA prior to initiation of the feedwater line fill system indicates that a water seal will be maintained in the piping and equipment upstream of the No. 3 feedwater heaters where a substantial amount of unflashed water would remain. This is based on the fact that the quality assurance during design and construction, as well as the continuous inspection during normal operation, of the feedwater/condensate piping and equipment are such that 6.2-49 HCGS-UFSAR Revision 0 April 11, 1988

the system would realistically be expected to remain intact. Prior to the postulated LOCA, the feedwater system has been functioning at its operating pressure of 1000 psig. The feedwater system equipment and piping are designed to withstand the high pressures observed during operation; no system leakage is realistically expected at the relatively low post-LOCA containment pressures. For long term control, the feedwater fill system will reestablish a water seal at the feedwater containment isolation check valves to eliminate bypass leakage.

2. High pressure coolant injection (HPCI) turbine steam supply - The drain pot line Valve FD-V018 is contained in a Type 1 system. A water seal is not required for this valve because when the system containment isolation valves are closed, leakage to the FD-V018 valve is limited to the Appendix J acceptance criteria. The leakage is already included in the accident dose analysis.
3. Chilled water from and to drywell coolers - The lines in the Reactor Building are seismically analyzed with a vertical rise from the containment penetration of approximately 8 feet.

There is sufficient water inventory for a 30-day seal for valves GB-V081, V082, V083, and V084.

4. RWCU supply - The lines in the primary containment are Seismic Category I and form a loop whose vertical leg is approximately 49 feet.

6.2-50 HCGS-UFSAR Revision 7 December 29, 1995

There is sufficient water inventory for a 30-day seal for valve BG-V001.

5. RCIC turbine steam supply - The drain pot line Valve FC-V016 is contained in a Type 1 system. A water seal is not required for this valve because when the system containment isolation valves are closed, leakage to the FC-V016 valve is limited to the Appendix J acceptance criteria. The leakage is already included in the accident dose analysis.
6. Main steam line drain - The line to the isolation valve is Seismic Category I. Steam would condense in the line and form a water seal during normal operation. Closure of the inboard and outboard isolation valves upon receipt of a containment isolation signal and the water seal provide a barrier to bypass leakage.

There is sufficient inventory for a 30-day seal for valve AB-V039.

7. Drywell floor drain and drywell equipment drain sump discharges -

The lines to the isolation valves are seismically analyzed, and the sump water acts as an effective water seal. The water barrier is maintained by instrumentation and controls that prevent the sumps from being pumped dry.

8. Reactor Auxiliaries Coolant System (RACS) supply and return - There are seismically analyzed lines in the Auxiliary Building, with containment isolation valves on each line.

6.2-51 HCGS-UFSAR Revision 12 May 3, 2002

The two isolation valves on each line, which include valves ED-V003 and ED-V004, are Type 1 leakage barriers. A water seal is not required for the supply and return lines because when containment isolation valves are closed, leakage is limited to the Appendix J acceptance criteria. This leakage is already included in the accident dose analysis.

9. Torus water cleanup supply and return - The suppression pool water forms an effective water seal for these lines. The suppression pool is a reliable source of water that can provide the required separation between the primary containment atmosphere and the environs. The Suppression Chambers Structural design is discussed in Section 3.8.2.
10. Post Accident Sampling System (PASS) supply and return - The liquid and gas sample lines to the isolation valves are Seismic Category I. The PASS sampling lines terminate in the PASS sample station. The PASS sample station location is described in Section 9.3.2.2.2.4. Any gaseous bypass leakage in the PASS sample station will be vented to the reactor building ventilation system/filtration, recirculation and ventilation system common return duct as described in Section 9.3.2.2.2.7. Any liquid bypass leakage in the PASS sample station will be collected in a sump located in the sample station which can be pressurized with the discharge being directed to the suppression pool.
11. Main steam - The steam lines to the main steam stop valves (MSSVs) are seismic category I. Leakage through the Main Steam Isolation Valves (MSIVs) is limited to Technical Specification acceptance criteria. The leakage is included in the accident dose analysis.
12. Recirculation Pump Seal Purge - There is sufficient inventory for a 30-day seal for valve BF-V098 and V099.

6.2-52 HCGS-UFSAR Revision 12 May 3, 2002

13. HPCI and RCIC Turbine Auxiliary Steam Supply - These lines contain a temporary spool piece that is removed during normal operation and replaced by a blind flange so that any leakage through the flange is into the reactor building enclosure.
14. Instrument Gas Supply to and Suction from Drywell - A positive air seal is maintained through the operation of the primary containment instrument gas system.

6.2.3.2.4 Access Doors Access doors to secondary containment (Reactor Building) are provided with position indication and are monitored in the control room. See Table 6.2-28 for a list of Reactor Building openings.

6.2.3.3 Design Evaluation The design evaluation of the Reactor Building Ventilation System is given in Sections 6.8 and 9.4.2. The high energy lines within the reactor building are identified and pipe ruptures are analyzed in Section 3.6.

The post-LOCA pressure transient for the design basis reactor building inleakage has been analyzed to determine the length of time, following a LOCA, for the building differential pressure to reach at least 0.25 inches water gauge. The results of this analysis for the slowest responding compartment in the reactor building are shown on Figure 6.2-26.

The design basis analysis was based on the initial conditions, design, and thermal characteristics listed in Tables 6.2-12, 6.2-13, and 6.2-13a. Further details of the FRVS design and operation are provided in Section 6.8. Heat transfer to the outside environment is assumed to be zero. The reactor building is considered to be in thermal equilibrium at the beginning of the pressure transient. This includes heat load contributions from the primary containment.

Since the drawdown of the Reactor Building pressure by the FRVS is completed within the first 375 seconds following a LOCA, there is insufficient time for the temperature transient associated with the LOCA to propagate through the 3-foot-thick 6.2-53 HCGS-UFSAR Revision 13 November 14, 2003

doors or hatches are not considered in the depressurization analysis or test.

The program for initial performance testing is described in Section 14. This test includes determination of depressurization time and inleakage rate. The uniformity of negative pressure throughout the Reactor Building is assured by the operation of the FRVS recirculation fans. The program for periodic functional testing of the reactor building structures, isolation system, FRVS, and system components is described in Section 16. Detailed procedures will be available for NRC review prior to plant operation.

6.2.3.5 Instrumentation Requirements The control systems to be employed for the actuation of the Reactor Building Engineered Safety Feature (ESF) Air Handling Systems are described in Section 7.3.

The control and monitoring instrumentation for these control systems is discussed in Sections 6.8 and 9.4.2. Design details and instrumentation logic are discussed in Section 7.3.

6.2.3.6 SRP Rule Review Acceptance Criterion II.3.e requires that the external design pressure of the reactor building be provided with an adequate margin above the maximum expected external pressure.

The Reactor Building is designed with an external pressure of -3 psig resulting from tornado depressurization. This is in agreement with Regulatory Guide 1.76 for the site location. Due to the low probability of occurrence of the tornado at the plant site and the conservative design basis of this structure, the Reactor Building is not provided with an additional margin for the external design pressure.

6.2-55 HCGS-UFSAR Revision 0 April 11, 1988

6.2.4 Containment Isolation System The Containment Isolation System consists of piping, blind flanges, valves, valve operators, and controls arranged to provide isolation barriers for all fluid lines that penetrate the primary containment. The Containment Isolation System, in conjunction with the primary containment, is designed to establish an essentially leaktight barrier that will prevent or limit the release of radioactivity to the environment which may result from postulated accidents while allowing the normal or emergency passage of fluid through the containment boundary.

6.2.4.1 Design Bases 6.2.4.1.1 Safety Design Basis

1. The Containment Isolation System provides the necessary isolation of the containment in the event of accidents or other conditions when the unfiltered release of the containment's contents cannot be permitted.
2. The capability for rapid closure, or isolation of all pipes or ducts that penetrate the containment, is provided by a containment barrier in such pipes or ducts sufficient to maintain leakage within permissible limits.
3. The design of isolation valving for lines penetrating the containment follows the requirements of GDC 54 through 57 except where compliance is based on the "other defined basis" criterion.

6.2.4.1.2 Other Defined Bases

1. An Engineered Safety Feature (ESF) System may have only one containment isolation valve in a line penetrating primary containment, if the system is designed as a closed system outside primary containment. Such a configuration, one using a single containment isolation valve and a closed system outside of containment, can be used to increase ESF System reliability or to eliminate 10CFR50 Appendix J testing of the valve being replaced by the closed system outside of containment to provide the second barrier. Appendix J testing of the closed system boundary valves is not required as long as system integrity is maintained during normal plant operations and system pressure is maintained equal to or above containment design pressure.

6.2-56 HCGS-UFSAR Revision 15 October 27, 2006

The keep fill or alternate condensate transfer keep fill systems maintain the ESF closed systems outside containment sufficiently pressurized to preclude Appendix J testing of the closed system boundary valves. Acceptable means for providing boundary isolation of the closed system to minimize potential intersystem leakage are identified in Section 1.10 of the UFSAR. The Leakage Reduction Program periodically verifies the system integrity of the closed system outside containment up to and including the boundary isolation valves.

A closed system outside containment is protected from missiles, designed to Seismic Category I standards, classified as ASME B&PV Code,Section III, Class 1 or 2, and designed to have a design pressure and temperature rating at least equal to that for the primary containment. This other defined basis provides a second containment isolation barrier that is as reliable as the primary containment itself. The use of the second containment isolation boundary makes it possible for an ESF safety system to accommodate a single active failure with only one isolation valve.

2. Fluid instrument lines that penetrate primary containment conform to the isolation criteria of Regulatory Guide 1.11 (Safety Guide 11) to the greatest extent practicable, except as discussed and justified in Section 1.8.11. The flow limiting orifices in the instrument lines that penetrate the primary containment are 1/4 in.

restriction orifices.

6.2.4.2 System Design The general criteria governing the design of the Containment Isolation System is provided in Section 3.1.2 and 6.2.4.1. Specifically, the containment isolation valves and associated piping are designed as Seismic Category I and meet the requirements of the ASME B&PV Code, Section III, Class 1 or 2, commensurate with their respective importance to safety. The only exception to this design rule is certain portions of the Control Rod Drive (CRD) System, which are designed to special quality standards commensurate with their importance to safety and consistent with their safety function.

See Section 3.2 for further discussion of seismic and quality group classification and Section 3.10 for discussion of seismic qualification of Seismic Category I instrumentation.

6.2-57 HCGS-UFSAR Revision 15 October 27, 2006

The Containment Isolation System is designed to withstand the most severe plant-related event, such as missiles, pipe whip, and jet impingement without impairment of its function. Protection is provided for containment isolation valves, actuators, and controls against damage. Potential hazards are evaluated, and where possible hazards exist, protection is afforded by separation, by missile shields, or by location. For further discussion of protection against missiles, and the dynamic effects associated with a postulated pipe rupture, see Sections 3.5 and 3.6, respectively.

The Containment Isolation System is designed to be operable under the most adverse environmental conditions. The containment isolation valves and their actuators are designed to be operable under maximum differential pressures, steam laden atmospheres, high temperature, high humidity, and radiation. See Section 3.11 for further discussion of environmental qualification and Section 3.9.3 for further discussion of the operability of active components.

Generally, the Containment Isolation System is redundant and physically separated in its electrical and mechanical design, with diversity in parameters sensed for the initiation of containment isolation. Power for the actuation of the two isolation valves in a line is supplied by two redundant, independent power sources without crossties. In general, depending upon the system under consideration, the outboard and inboard containment isolation valves are powered and controlled by different electrical channels, with the supply source being Class 1E ac for both channels. See Section 7 for further discussion of the control and instrumentation of the containment isolation system and Section 8.3 for a further discussion of onsite power systems.

The Containment Isolation System is designed with provisions for administrative control, to ensure that the proper position of all nonpowered or power removed isolation valves is maintained. All power operated primary containment isolation valves which have power available have position indicators in the main control room.

6.2-58 HCGS-UFSAR Revision 0 April 11, 1988

Discussion of instrumentation and controls for the isolation valves is included in Section 7.

The design of the Primary Containment Isolation System gives consideration to the possible adverse dynamic effects, such as water hammer, sudden isolation valve closure under normal operation, and to thermal expansion in those portions of pipe between the containment isolation valves.

The Containment Isolation System is designed so that failure of motive power is in the direction of greater safety. Motor operated isolation valves remain in their last position upon failure of electrical power to the motor operator. Air operated containment isolation valves are spring loaded to close upon loss of air or electrical power to the pilot operated solenoid valve. Solenoid-operated isolation valves fail closed upon a loss of electrical power to the solenoid.

The 1.68 psig containment pressure setpoint that initiates containment isolation for nonessential penetrations is the minimum compatible with an acceptable plant availability for power production.

Table 6.2-16 lists all the process and instrument line penetrations of the primary containment. Also tabulated in Table 6.2-16 is detailed information about each penetration. Figure 6.2-27 shows diagrams for the various isolation valve arrangements.

The closure times of containment isolation valves are selected to ensure rapid isolation of the primary containment following postulated accidents. The isolation valves in lines that provide an open path from the primary containment to the environs have closure times that minimize the release of containment atmosphere to the environs and mitigate the offsite radiological consequences. The isolation valves for lines outside the containment, in which high energy line breaks can occur, have closure times that minimize 6.2-59 HCGS-UFSAR Revision 3 April 11, 1991

the resultant pressure and temperature transients as well as the radiological consequences.

The design provisions for testing of operability of the isolation valves and the leakage rate of the containment isolation barriers are discussed in Section 6.2.6.

For a discussion of containment bypass leakage and of leakage detection capabilities for both manual and automatic initiation of containment isolation, see Sections 6.2.3 and 5.2.5, respectively.

6.2.4.3 Design Evaluation All piping systems penetrating the containment, other than instrument lines, are designed in accordance with GDC 54.

6.2.4.3.1 Evaluation Against GDC 55 GDC 55 requires that lines that penetrate the primary containment and form a part of the reactor coolant pressure boundary (RCPB) must have two isolation valves, one inside the primary containment and one outside, unless it can be demonstrated that the containment isolation provisions for a specific class of lines are acceptable on some other basis.

The RCPB, as defined in 10CFR50, Section 50.2(v), consists of the reactor pressure vessel (RPV), pressure retaining appurtenances attached to the vessel, and valves and pipes that extend from the reactor pressure vessel, up to and including the outermost isolation valve.

The following sections discuss the process and instrument lines that connect directly to the RCPB and the methods of isolating these lines pursuant to the requirements of GDC 55.

6.2-60 HCGS-UFSAR Revision 0 April 11, 1988

Lines with containment isolation valves that receive isolation signals are identified, and the particular isolation signals that initiate closure are listed in Table 6.2-16.

6.2.4.3.1.1 Main Steam Lines The four main steam lines penetrate the primary containment and extend from the RPV to the main turbine and the condensers. Each line is isolated by two independent main steam isolation valves (MSIVs), one inside containment and one just outside containment, and by a main steam stop valve (MSSV).

The MSIVs are wye-pattern globe valves that are mounted so that reactor pressure aids in closing the valve. The valves isolate automatically on the receipt of a containment isolation signal. The MSIVs are spring loaded, pneumatic, piston operated globe valves designed to fail closed on loss of pneumatic pressure or loss of power to the solenoid operated pilot valves. Each valve has two independent pilot valves supplied from independent power sources.

Each MSIV has an air accumulator to assist in its closure upon loss of supply, loss of electrical power to the pilot valves, and/or failure of the loaded spring. The separate and independent action of either air pressure or spring force is capable of closing an isolation valve. See Section 5.4.5 for further discussion of their design and construction.

The MSSVs are motor operated gate valves that are manually operated from the main control room. The MSSVs perform no active safety function.

The MSIVs provide immediate containment isolation after receiving a containment isolation signal upon a postulated loss-of-coolant accident (LOCA) or a break in a steam line downstream of the MSIVs.

6.2-61 HCGS-UFSAR Revision 12 May 3, 2002

To limit the release of fission products after a postulated loss-of-coolant accident, the portion of the main steam lines downstream of the outboard MSIVs up to but not including the main turbine stop valves (MSVs) is credited as remaining intact as a deposition surface. In the accident analysis, leakage through the MSIVs flows through the main steam lines to the non-seismic piping boundary at the MSVs. A large fraction of the fission products deposit on the piping surfaces before being released to the turbine building as discussed in Section 15.6.5.

6.2.4.3.1.2 Feedwater Lines The portion of the feedwater system that forms part of the RCPB and penetrates the primary containment has three containment isolation valves per line. The first valve, a check valve, is classified as a containment isolation valve and located inside the primary containment. The second valve, a positive acting check valve, is classified as a containment isolation valve and located outside the primary containment as close as possible to the primary containment penetration. Upon a loss of water flow into the RPV, these valves close as normal check valves, and, in addition, the main control room operator can assist in starting the outboard valve closure by sending a signal to open two fail-open solenoid valves arranged in parallel, releasing air pressure from the operator cylinder. If a break occurs in the feedwater line, the two containment isolation valves prevent significant loss of inventory and offer immediate isolation. During the postulated LOCA, it is desirable to maintain reactor coolant makeup from all sources of supply. For this reason, the feedwater containment isolation valves do not automatically close on a primary containment isolation signal.

A third valve in the feedwater line is a motor operated check valve located outside primary containment, is classified a containment 6.2-62 HCGS-UFSAR Revision 12 May 3, 2002

isolation valve and is capable of being remotely closed from the main control room. This valve provides redundant isolation and long term leakage protection upon operator judgment that continued makeup through the feedwater line is unavailable.

After observing indication of low feedwater flow, the operator may close the third valve within 20 minutes after a postulated LOCA.

In addition to the third valve, there are containment isolation valves on the high pressure coolant injection (HPCI) and reactor core isolation cooling (RCIC) discharge lines, and on the Reactor Water Cleanup System (RWCU) return lines that connect to the feedwater lines between the two outside containment isolation valves. Those valves can be closed by operator action from the main control room. Additionally, the HPCI and/or RCIC valves can be opened from the main control room to provide a water seal on the third valve in addition to supplying water to the RPV. See Section 6.2.3.2.3 for further details.

See Section 5.4.9 for a further discussion of the design of the main steam lines and the feedwater lines.

6.2.4.3.1.3 Residual Heat Removal Shutdown Cooling Suction Line The residual heat removal (RHR) shutdown cooling suction line penetrates primary containment and taps into one of the two recirculation loops. Two normally closed motor operated gate valves are interlocked closed by a reactor high pressure signal during normal operation and are maintained closed during an accident by a low water level isolation signal. One valve is located inside primary containment, and the second valve is located outside primary containment. Containment isolation is provided by the motor operated gate valve located outside primary containment and by the closed system outside containment that is capable of maintaining system integrity.

6.2-63 HCGS-UFSAR Revision 15 October 27, 2006

6.2.4.3.1.4 Residual Heat Removal Shutdown Cooling Return Lines The RHR shutdown cooling return lines penetrate the primary containment and connect to the discharge side of each recirculation loop, which is connected to the RPV. Each line is provided with a single, normally closed, motor-operated primary containment isolation valve outside primary containment and a testable check valve inside primary containment. Containment isolation is provided by the motor-operated valve located outside primary containment and by the closed system outside containment that is capable of maintaining system integrity.

The motor operated valves are interlocked closed by a reactor high pressure signal during normal operation and are maintained closed during an accident if a low water level isolation signal exists.

Each testable check valve is provided with a bypass line for testing purposes.

These lines are isolated by an air operated, fail closed globe valve.

6.2.4.3.1.5 Residual Heat Removal Low Pressure Coolant Injection and Core Spray Discharge Lines The RHR low pressure coolant injection (LPCI) and the core spray discharge lines penetrate the primary containment and discharge directly into the RPV.

Each line includes a normally closed, motor operated containment isolation valve outside primary containment, and a testable check valve inside primary containment. Containment isolation is provided by the motor-operated valve located outside primary containment and by the closed system outside containment that is capable of maintaining system integrity.

In addition, there is a HPCI line which discharges into the RPV by way of one of the two core spray lines downstream of the containment isolation valve on that core spray line. This line is served by a normally closed motor-operated gate valve outside primary containment in series with the testable check valve on the core spray line. Containment isolation is provided by the motor-operated valve located outside primary containment and by the closed system outside containment that is capable of maintaining system integrity.

Each testable check valve is provided with a bypass line for testing purposes.

These lines are isolated by an air operated fail-closed globe valve.

6.2-64 HCGS-UFSAR Revision 15 October 27, 2006

6.2.4.3.1.6 High Pressure Coolant Injection and Reactor Core Isolation Cooling Steam Supply Lines The high pressure coolant injection (HPCI) and reactor core isolation cooling (RCIC) steam supply lines have two major containment isolation valves in series that are normally open, located inside and outside of the primary containment.

The third containment isolation valve on these lines is a 2-inch, normally closed globe valve, on a 1-inch bypass line around the inside major containment isolation valve. These valves do not receive a containment isolation signal when a LOCA is detected. This permits these ESF systems to function during a LOCA. However, these valves automatically close when a break is detected in the portion of the steam supply line outside primary containment of the respective system.

6.2.4.3.1.7 Reactor Water Cleanup System Line Reactor water processed through the RWCU system is taken out of containment from the reactor recirculation loops. The RWCU line is isolated by two, normally open, motor operated gate valves, one inside and one outside primary containment. Both these valves receive a containment isolation signal.

6.2.4.3.1.8 Reactor Pressure Vessel Headspray Line 6.2-65 HCGS-UFSAR Revision 14 July 26, 2005

6.2.4.3.1.9 Main Steam Drain Line The main steam drain line is isolated by two motor operated gate valves that isolate upon a containment isolation signal.

6.2.4.3.1.10 Reactor Recirculation System Process Sample Lines The Reactor Recirculation System process sample lines are isolated by two, normally open, solenoid operated globe valves that isolate on a containment isolation signal.

6.2.4.3.1.11 Standby Liquid Control Line Provided that the Standby Liquid Control (SLC) System has not been used, the explosive-actuated valves provide the absolute seal for long term leakage control. After system operation, isolation is provided by a check valve inside primary containment, and two, independent, motor operated globe stop check valves located outside primary containment on branching lines. The stop check valves are manually closed from the main control room after system operation.

6.2.4.3.1.12 Reactor Recirculation Pump Seal Lines The reactor recirculation pump seal lines are isolated by a check valve inside primary containment and a motor operated globe valve outside primary containment that closes on a containment isolation signal.

6.2.4.3.1.13 Post-Accident Liquid Sampling System There are seven post-accident sampling lines that penetrate the primary containment. Only one of the seven forms part of the RCPB as well. See Section 6.2.4.3.2.16 for a discussion of the containment isolation provisions for these lines.

6.2-66 HCGS-UFSAR Revision 0 April 11, 1988

6.2.4.3.1.14 Instrument Lines The instrument lines that penetrate the primary containment and form part of the RCPB are designed to optimize their monitoring function and to minimize uncontrolled releases of radioactivity to the environment. These instrument lines have a flow restriction orifice inside the primary containment and an excess flow check valve outside the primary containment for automatic containment isolation in the event of an instrument line break. If an instrument line develops a leak of 1.5 to 2.5 gpm outside containment, the resultant differential pressure of 3 to 10 psi across the excess flow check valve will cause the check valve to close automatically. If an excess flow check valve fails to close when required, the restriction orifice and the main flow path through the valve have a resistance to flow at least equivalent to a sharp edged orifice of 0.250 inches in diameter. Each valve is also provided with one limit switch that operate lights that indicate valve position and a solenoid valve for remote reset. The capability for remote operation has not been provided since there is no remote indication of failure of a specific line.

6.2.4.3.1.15 Control Rod Drive Lines The CRD system has multiple, insert and withdraw lines, that penetrate the primary containment.

The classification of these lines is quality group B, and they are designed in accordance with ASME B&PV Code,Section III, Class 2. The basis upon which the CRD insert and withdraw lines are designed is commensurate with the safety importance of maintaining the pressure integrity of these lines.

It has been an accepted practice not to provide automatic isolation valves for the CRD insert and withdraw lines in order to preclude any possible failure of the scram function. The lines can be isolated by the solenoid valves provided on the hydraulic control units (HCUs) that are located outside the primary containment. The 6.2-67 HCGS-UFSAR Revision 0 April 11, 1988

lines that extend outside the primary containment are 1 inch or smaller and terminate in systems that are designed to prevent outleakage. The solenoid valves are normally closed, but they open upon rod movement and during reactor scram. In addition, a ball check valve located in the CRD flange housing automatically seals the insert line if there is a break. Finally, manual shutoff valves are provided outside the primary containment.

Because of the unique function and features of the CRD system, the previously described design constitutes an acceptable "other defined basis" for containment isolation as recognized by the NRC in the Federal Register (48 FR 23809).

6.2.4.3.1.16 Conclusion on GDC 55 To ensure protection against the consequences of accidents involving the release of radioactive material, piping systems that form the RCPB are shown to have adequate isolation capabilities on a case by case basis. In all cases, a minimum of two barriers are shown to protect against the release of radioactive materials.

In addition to meeting the isolation requirements stated in GDC 55, the pressure retaining components that comprise the RCPB are designed to meet other requirements that minimize the probability or consequences of an accidental pipe rupture. The quality requirements for these components ensure that they are designed, fabricated, and tested to the highest quality standards.

6.2.4.3.2 Evaluation Against GDC 56 GDC 56 requires that lines that penetrate the primary containment and connect directly to the containment atmosphere must have two isolation valves, one inside the primary containment and one outside, unless it can be demonstrated that the containment isolation provisions for a specific class of lines are acceptable on some other basis.

6.2-68 HCGS-UFSAR Revision 0 April 11, 1988

Unless justified on some other defined bases, lines that penetrate the primary containment and connect directly to the containment atmosphere are provided with two isolation valves located outside the primary containment as close to the containment as is practical.

This arrangement is intended to satisfy GDC 56 on the "other defined basis" criterion in that:

1. There is limited space within the primary containment, and placing these valves inside would seriously impede accessibility for inspection and maintenance of these valves and other equipment.
2. Placing these valves inside the primary containment would subject them to a harsh environment and thus increase the probability of failure.
3. Some of the lines that fall into this category are not in use during normal operation, and, therefore, the isolation valves are normally closed.
4. Valves should be accessible in systems that must be available for long term operation following an accident. An example is the containment atmosphere sampling lines.

Typically, lines that connect directly to the suppression chamber are provided with a single isolation valve located outside the primary containment. These valves are located in the Torus Area Room (4102) in the Reactor Building, which has provisions for collection of any fluid leakage, adjacent to the primary containment. Whenever possible, lines to the suppression chamber are submerged to assist in trapping the primary containment atmosphere and preventing its escape to the environment.

The systems to which the lines from the suppression chamber connect outside the primary containment are closed systems meeting the 6.2-69 HCGS-UFSAR Revision 12 May 3, 2002

appropriate "other defined basis" requirements of closed systems outside containment, except for those lines such as the suppression pool cleanup lines that have redundant containment isolation valves.

The valves in the lines from the suppression chamber provide a barrier outside containment to prevent loss of suppression pool water if a leak develops downstream of the valves. The valves are either closed from the main control room or automatically closed. Leak detection is provided for the lines outside the primary containment to aid the operator in determining which valve is to be closed. If a leak develops outside the primary containment, the fluid will be contained within the Reactor Building.

6.2.4.3.2.1 Drywell Purge Inlet and Drywell Purge Vent Lines The drywell purge inlet line is isolated by five butterfly valves located outside primary containment. One valve is located as close as possible to the primary containment. The remaining four are located on branching lines upstream of the first. All valves receive a containment, isolation signal.

In addition to the containment isolation for the main drywell purge inlet line, there is a line to the B train containment hydrogen recombiner that connects to the drywell purge vent line between the primary containment and the first containment isolation valve. This line is isolated by two motor-operated gate valves that also receive a containment isolation signal.

The drywell purge vent line is isolated by two butterfly valves located outside primary containment.

In addition to the containment isolation for the main drywell purge vent line, there is an inlet line to the A train containment hydrogen recombiner that connects to the vent line between the primary containment and the first containment isolation valve. This line is isolated by two motor operated gate valves. All isolation valves receive a containment isolation signal.

6.2-70 HCGS-UFSAR Revision 0 April 11, 1988

Also connected to the primary containment purge vent line is a 2-inch exhaust line that connects to the vent line between the two main isolation valves. This line is isolated by the isolation valve on the purge line and by an air operated globe valve. The valve is normally closed and is maintained closed by a containment isolation signal. For a detailed evaluation of the primary containment venting operation against BTP CSB 6-4 requirements see Section 1.14.1.71.

During normal operation, the 6-, 24-, and 26-inch containment purge valves are administratively controlled closed, except as permitted by the Technical Specifications. These valves are qualified to close within 5 seconds, including an assumed 1-second instrument time delay, against the flow following a postulated LOCA.

To prevent the unlikely event of a containment purge valve being prevented from closing by debris that could be entrained in the containment purge lines, the drywell purge lines are provided with debris screens. Debris screens are not provided for the suppression pool purge lines for the following reasons:

1. There are no high energy lines in the suppression pool.
2. There is no insulation or other loose debris in the suppression pool to become entrained in exiting fluid.

6.2-71 HCGS-UFSAR Revision 3 April 11, 1991

The debris screens are designed based on the following criteria:

1. The debris screens are Seismic Category I and installed upstream of the inboard isolation valves, inside the primary containment.
2. The debris screens are designed to withstand the differential pressure resulting from a LOCA.
3. The debris screen openings are approximately 2 inches by 1 3/16 inches.

6.2.4.3.2.2 Residual Heat Removal Containment Spray Lines Each of the two RHR containment spray lines have two, normally closed, motor operated gate valves located outside the primary containment. The valve closest to the penetration is the containment isolation valve.

This design is justified on the basis that RHR containment spray lines meet the "other design basis" requirements of a closed system outside primary containment and also because the RHR containment spray function is used only after a LOCA to lower the pressure in the primary containment. During normal operation, the valves are closed, and a system of interlocks ensures that only one valve can be opened at a time during system testing. Both valves can be opened only by manual action from the main control room after a high primary containment pressure signal is received.

After termination of the containment spray function, the valves are closed by manual operation from the main control room in order to isolate containment.

The containment isolation provisions of the RHR containment spray lines ensure dependability of the system to initiate a supply of cooling water while meeting the particular isolation requirements of these lines. The design takes 6.2-72 HCGS-UFSAR Revision 8 September 25, 1996

credit for the RHR system being a closed system outside primary containment.

6.2.4.3.2.3 Liquid Radwaste Collection Lines The liquid radwaste collection lines are isolated by two motor operated gate valves, one inside and one outside the primary containment, that close upon receipt of a containment isolation signal.

6.2.4.3.2.4 Compressed Air Service Line The compressed air service line is normally closed. It is isolated during reactor operation by two manual, normally locked closed gate valves, one inside and one outside primary containment. In addition to the two isolation valves, the line is blocked off by a spectacle flange during plant operation.

6.2.4.3.2.5 Traversing Incore Probe Guide Tube Lines The traversing incore probe (TIP) guide tube lines do not connect directly to the primary containment atmosphere. However, inside the primary containment, the indexing mechanism (a revolver like mechanism used for selecting a guide tube leading into the reactor vessel) is mounted inside a housing equipped with a pressure relief valve which communicates with primary containment atmosphere.

This pressure relief valve is unique in that it will open on a negative or positive pressure inside the housing. The indexing mechanism (indexer) has a slip fitting with the guide tubes leading to the reactor vessel. If a LOCA occurred and the primary containment became pressurized, the pressure relief valve would open to reduce the pressure differential across the indexer housing and the containment atmosphere would leak past the slip fitting into the tip line. Under these conditions, GDC 56 applies.

The TIP insertion/withdrawal lines have two isolation valves outside the primary containment. One is a solenoid operated ball valve and 6.2-73 HCGS-UFSAR Revision 0 April 11, 1988

the other is an explosive valve; both can be remote-manually closed for containment isolation. The solenoid operated ball valve is normally closed. It opens only to admit the insertion of the TIP probe into the reactor. If the probe is in the reactor, the containment isolation signal automatically retracts the probe and closes the ball valve. If this operation is not successful, the operator is alerted and can manually actuate the explosive shear valve which cuts the probe line to seal the primary containment penetration.

Automatic isolation is not provided, and the containment isolation valves are not provided with redundant standby power.

This arrangement is intended to satisfy GDC 56 on the "other defined basis criteria" in that:

1. It is designed commensurate with the importance to safety of isolating this line
2. Locating both valves outside containment improves the reliability of the system
3. Remote manual isolation decreases the probability that the valves will be inadvertently actuated
4. It is a standard design used in other BWR nuclear power plants of similar or identical design.
5. The information provided in IE Information Notice No. 86-75 was consulted and utilized in classifying the lines.

6.2.4.3.2.6 Traversing Incore Probe Purge Tube Line The TIP purge tube line does not connect directly to the primary containment atmosphere However, the same situation described in Section 6.2.4.3.2.5 for the Traversing Incore Probe Guide Tube lines 6.2-74 HCGS-UFSAR Revision 0 April 11, 1988

is applicable. Therefore, GDC 56 is applicable. By meeting the requirements of GDC 56, the system's isolation capability is commensurate with its importance to safety. The TIP purge tube line is isolated by a simple check valve inside primary containment and by a normally open, air operated globe valve outside primary containment. The containment isolation valve on the outside receives a containment isolation signal.

6.2.4.3.2.7 Primary Containment Instrument Gas Lines The portion of the primary containment instrument gas system that is directly connected to the primary containment atmosphere consists of two instrument gas supply headers and a suction line. Isolation for each supply header is provided by a normally open, motor operated globe valve inside primary containment and a normally open, motor operated globe valve outside primary containment. The containment isolation valves isolate upon a containment isolation signal.

The intake line to the compressor is isolated by a normally open, motor operated globe valve inside primary containment and by two motor operated globe valves on branching lines outside primary containment. All three valves close upon a containment isolation signal.

6.2.4.3.2.8 High Pressure Coolant Injection and Reactor Core Isolation Cooling Exhaust Lines and Reactor Core Isolation Cooling Gland Seal Vacuum Pump Discharge Lines The HPCI and RCIC turbine exhaust lines and the RCIC gland seal vacuum pump discharge lines have a motor operated valve that can be remote manually closed for containment isolation in the event of a postulated accident. These lines also have a check valve upstream of the motor operated valve. The check valve provides a second and immediate isolation barrier in the event of a break upstream of the check valve. In addition to closing the containment isolation 6.2-75 HCGS-UFSAR Revision 0 April 11, 1988

valves to isolate the HPCI and RCIC turbine exhaust lines, the HPCI and RCIC turbine exhaust line vacuum breaker valve network must be isolated. Isolation of this system is described in Section 6.2.4.3.2.11.

Automatic isolation for accident protection is not provided since greater safety is ensured by providing the means to initiate a cooling water supply to the RPV.

6.2.4.3.2.9 Emergency Core Cooling System and Reactor Core Isolation Cooling Suction Lines The Emergency Core Cooling System (ECCS) and RCIC suction lines from the suppression pool are isolated by a single, remote manually actuated, motor operated valve. The containment isolation valves on each of the RHR and core spray suction lines are normally open. The containment isolation valves on the HPCI and RCIC suction lines are normally closed. However, they both automatically open upon low condensate storage tank (CST) level and HPCI also opens on high suppression pool level.

Use of the single valve and the automatic opening of a containment isolation valve is again justified on the basis that greater safety is ensured by increasing system reliability so that a supply of cooling water can be initiated to the reactor. To enhance safety, the systems are designed as closed systems outside primary containment.

6.2.4.3.2.10 Emergency Core Cooling System and Reactor Core Isolation Cooling Suppression Pool Return Lines The ECCS and RCIC suppression pool return lines include the following:

1. RCIC minimum flow return line
2. HPCI minimum flow return line 6.2-76 HCGS-UFSAR Revision 0 April 11, 1988
3. Core spray full flow test line
4. RHR suppression pool cooling and system test return line.

The HPCI minimum flow return line has a single motor operated containment isolation valve located outside the primary containment. The RCIC minimum flow return line has two solenoid-operated valves, one for minimum flow isolation and the other for containment isolation, located outside the primary containment. The primary containment isolation valves do not receive a containment isolation signal.

Each core spray full flow test line is isolated by one motor operated globe valve. The globe valve is normally closed. In addition, connecting to each core spray full flow test line, between the suppression chamber and the containment isolation valve, is a core spray minimum flow bypass line and a pressure relief valve discharge line. The relief valve isolates the discharge line and a normally open motor operated globe valve isolates the bypass line.

Two, normally closed, motor-operated globe valves in parallel isolate each of two RHR Suppression Pool Cooling and System Return Lines from the various RHR/LPCI pump discharge flow paths. The Division I line is isolated by RHR Loop A Test Return valve, BC-HV-F024A, and RHR Loop C Test Return valve, BC-HV-F010A, and the Division II line is isolated by RHR Loop B Test Return valve, BC-HV-F024B, and RHR Loop D Test Return valve, BC-HV-F010B. In addition, each Suppression Pool Return Line connects to two full flow test lines; a jockey pump discharge line; an abandoned in place, Steam-condensing Return to Suppression Pool line; two RHR pump minimum flow lines; and two LPCI injection line relief valve discharge lines. As previously mentioned, the two parallel, normally closed, motor-operated globe valves isolate the full flow test lines.

A check valve (BC-V206, Division I line and BC-V260, Division II line) isolates the jockey pump discharge line. A normally open, motor-operated gate valve (BC-HV-F007A, BC-HV-F007B, BC-HV-F007C, and BC-HV-F007D) may provide isolation for each of the RHR pump miniflow lines. The pressure relief valves on each of the LPCI injection lines (BC-PSV-F025A, BC-PSV-F025B, BC-PSV-F025C, and BC-PSV-F025D) isolate their discharge lines from the Suppression Pool Return Lines.

Finally, the Steam-condensing Return system was abandoned in place. Valve, BC-HV-F011A, isolates the Division I line and valve, BC-HV-F011B, isolates the Division II line. Both of these valves are permanently out of service with electrical power disconnected and their manual overrides chain-locked in the closed position.

6.2-77 HCGS-UFSAR Revision 12 May 3, 2002

Again, use of a single valve is justified on the basis that greater safety is achieved by increasing system reliability and because the system is designed as a closed system outside primary containment.

6.2.4.3.2.11 High Pressure Coolant Injection and Reactor Core Isolation Cooling Turbine Exhaust Line Vacuum Breaker Valve Network The HPCI and RCIC turbine exhaust line vacuum breaker valve network runs between the suppression pool air space to the turbine exhaust lines on the HPCI and RCIC systems and the RHR heat exchanger relief valve discharge lines.

The network is designed as a closed system outside primary containment. Each one of the two branching lines to the HPCI and RCIC system is isolated by a single normally open motor operated gate valve.

The system does not receive a containment isolation signal so that a supply of cooling water can be initiated to the reactor. However, should a break be detected in the steam supply line in either the HPCI or RCIC system, the respective portion of the network will automatically isolate.

6.2.4.3.2.12 Suppression Chamber Spray Header Lines The RHR suppression chamber spray lines have a normally closed, motor operated isolation valve located outside the primary containment. This valve receives a containment isolation signal. Use of a single valve is justified on the basis that the system is designed as a closed system outside containment.

6.2.4.3.2.13 Residual Heat Removal Heat Exchanger Relief Valve Discharge Lines Each of the RHR heat exchanger relief valve discharge lines to the suppression pool from the RHR heat exchangers is isolated by a relief valve.

6.2.4.3.2.14 Suppression to Containment Prepurge Cleanup Lines, Suppression Chamber Vacuum Relief and Suppression Chamber to Atmosphere The suppression chamber to containment prepurge cleanup lines are isolated by two redundant valves outside the primary containment. The valves are normally closed. To limit the possibility of an uncontrolled release of radioactivity, the valves are administratively controlled closed during reactor operation, except as permitted by the Technical Specifications, and will be verified closed. In addition, there are connections to the containment hydrogen recombiners between the first containment isolation valves and the 6.2-78 HCGS-UFSAR Revision 12 May 3, 2002

primary containment. These lines are isolated by two motor operated gate valves. All isolation valves receive a containment isolation signal.

A suppression chamber vacuum breaker assembly is attached to each of the above two 24 inch lines. Each assembly consists of a check type vacuum relief valve and a pneumatically operated butterfly valve. These assemblies are located outside the primary containment. Their operation is discussed in Section 6.2.1.1.4.1.

The suppression chamber to atmosphere line is isolated by two redundant valves outside the primary containment. The valves are normally closed. To limit the possibility of an uncontrolled release of radioactivity, the valves are administratively controlled closed during reactor operation, and will be verified closed. In addition, electric power to the outboard valve is administratively blocked out and a rupture disc is installed in series downstream of the outboard valve to contain primary containment bypass leakage within the secondary containment. The outboard isolation valve is configured as a sealed closed barrier, in accordance with NUREG 0737, Item II.E.4.2.7, Position 6.

6.2.4.3.2.15 Suppression Pool Cleanup Lines The suppression pool cleanup lines are isolated by redundant containment isolation valves that close upon a containment isolation signal.

6.2.4.3.2.16 Post-Accident Sampling System Lines The Post-Accident Sampling System penetrates the primary containment in seven locations. One line is for gathering liquid samples and it forms part of the RCPB. Two lines are sampling return lines to the suppression chamber. The other four lines sample the primary containment atmosphere at different locations within the drywell and suppression chamber. Isolation for these lines consists of two solenoid-operated valves in series, located outside of primary containment. The valves are normally closed, and the penetrations are designed to be a sealed closed system. Administrative procedures prevent the valves from being inadvertently opened by ensuring that power is not supplied to the normally deenergized solenoids until the system is required to operate.

6.2.4.3.2.17 Plant Leak Detection System Lines The two plant leak detection lines penetrate primary containment and connect directly to the primary containment atmosphere. Each line is isolated by two motor operated globe valves, located outside primary containment, that receive a containment isolation signal.

6.2-79 HCGS-UFSAR Revision 12 May 3, 2002

6.2.4.3.2.18 Hydrogen/Oxygen Analyzer Lines The eight hydrogen/oxygen analyzer lines penetrate primary containment and connect directly to the primary containment atmosphere. Four of these lines penetrate the drywell, and the remaining four penetrate the suppression chamber. Each of the eight lines are isolated by two motor-operated globe valves located outside containment.

6.2.4.3.2.19 Primary Containment Instrument Gas Header Line The primary containment instrument gas header to the suppression chamber supplies instrument gas to vacuum relief valves located there. This line is isolated by two air operated globe valves outside primary containment. Each valve receives a containment isolation signal.

6.2.4.3.2.20 Integrated Leakage Rate Test Lines The integrated leakage rate test (ILRT) lines are not used during normal plant operation. They are isolated by two manually locked closed globe valves, one inside and one outside primary containment.

6.2.4.3.2.21 Instrument Lines Each instrument line that penetrates the primary containment and is connected directly to the containment atmosphere is isolated by a manual valve. This design is justified on the basis that system reliability is greater with a manual isolation valve, that these systems are closed systems outside containment designed to be reliable boundaries against containment leakage, and that the system is maintained by visually checking for leaks during normal instrument calibrations.

The instrument lines that sense suppression pool water level have a remote manual valve for isolation. Their design is justified on the 6.2-80 HCGS-UFSAR Revision 0 April 11, 1988

"other defined basis" because system reliability is greater with a single isolation valve and because these systems are closed systems outside containment that can accommodate a single failure without loss of system reliability as a boundary against containment leakage.

6.2.4.3.2.22 Location of Outside Containment Isolation Valves All outside primary containment isolation valves are located as close to containment as practical. Valve location is governed by many considerations, e.g., spatial limitations, the need to support the valves and valve actuators, dynamic loading and equipment accessibility considerations. The valves whose location appears to be somewhat removed from the containment and a short justification for their existing location are identified below.

P-22 GS-V020 This penetration shares containment isolation GS-V022 provisions with P-220. GS-V020 and V022 are located nearer to P-220 and therefore as close as practical but at some distance from P-22.

P-212A, BC-PSV-F025A These safety relief valves were located as 212B BC-PSV-F025B close as practical to the piping they are BC-PSV-F025C protecting protecting to meet the intent of BC-PSV-F025D ASME Section III.

P-217B BE-PSV-F012 This safety relief valve is located as close as practical to the piping it is protecting to meet the intent of ASME Section III.

J-7D GS-V053 This penetration shares containment isolation GS-V042 provisions with J-202. GS-V042 and V043 are GS-V043 located nearer to J-202 and therefore at some distance 6.2-81 HCGS-UFSAR Revision 0 April 11, 1988

from J-7D. GS-V053 was located based on accessibility considerations.

J-202 GS-034 This penetration shares containment isolation provisions with J-7D. GS-V034 is located nearer to J-7D and therefore at some distance from J-202.

6.2.4.3.2.23 Conclusion on GDC 56 To ensure protection against the consequences of accidents involving release of significant amounts of radioactive materials, fluid lines that penetrate the primary containment have been demonstrated to provide isolation capabilities on a case by case basis in accordance with GDC 56.

In addition to meeting isolation requirements, the pressure retaining components of these systems are designed to the same quality standards as the containment.

6.2.4.3.3 Evaluation Against GDC 57 6.2.4.3.3.1 Chilled Water System Lines and Reactor Auxiliaries Cooling System Lines The chilled water and the reactor auxiliaries cooling system (RACS) lines are closed systems inside primary containment. However, greater safety is achieved by meeting the requirements of GDC 56. Therefore, two redundant motor operated isolation valves that isolate on a containment isolation signal, one inside and one outside primary containment, are provided.

6.2-82 HCGS-UFSAR Revision 0 April 11, 1988

6.2.4.3.4 Evaluation Against Regulatory Guides 6.2.4.3.4.1 Evaluation Against Regulatory Guide 1.11 (Safety Guide 11)

Compliance with Regulatory Guide 1.11 (Safety Guide 11) is discussed in Section 1.8.11.

6.2.4.3.4.2 Evaluation Against Regulatory Guide 1.141 Compliance with Regulatory Guide 1.141 is discussed in Section 1.8.1.141.

Regulatory Guide 1.141 is not a requirement for HCGS. However, our assessment is that the other defined bases for complying with GDC 54, 55, 56, and 57 that were implemented on HCGS meet Regulatory Guide 1.141 requirements.

6.2.4.3.4.3 Failure Mode and Effects Analyses A single failure can be defined as a failure of a component in any safety system that results in a loss or reduction of the system's capability to perform its safety function. Active mechanical components are defined in Regulatory Guide 1.48 as components that must perform a mechanical motion during the course of accomplishing a system safety function. Appendix A to 10CFR50 requires that electrical systems be designed against passive single failures as well as active single failures. Sections 3.1 and 15.9 describe the implementation of these requirements as well as the requirements of GDC 17, 21, 35, 41, 44, 54, 55, 56, and 57.

6.2.4.3.5 Evaluation of Other Defined Bases An ESF System may use only one containment isolation valve if a closed system outside primary containment is used as a second isolation barrier to accommodate a single active failure. Such a configuration can be used to increase ESF System reliability or to eliminate 10CFR50 Appendix J testing of the valve being replaced by the closed system outside of containment as the second containment barrier. The Leakage Reduction Program periodically verifies the system integrity of the closed system outside of containment.

Acceptable means for providing boundary isolation of the closed system are identified in Section 1.10 of the UFSAR.

In the case of a single failure, the closed 6.2-83 HCGS-UFSAR Revision 15 October 27, 2006

system accommodates the failure by being an extension of the containment. Table 6.2-25 identifies those penetrations isolated with only a single isolation valve. Figures 6.2-45, 6.2-46, 6.2-47, and 6.2-48 show the limits of the extended containment boundary. All manual valves at the system boundary, vent valves, test valves, and drain valves are under administrative control to assure the integrity of the extended containment boundary. Isolation provisions for the extended containment boundaries are identified in Table 6.2-26. Table 6.2-26 also evaluates the ability of check valves and safety/relief valves to maintain the extended containment boundary. All extended containment boundaries are Quality Group B (i.e., ASME B&PV Code Class 2 piping), Seismic Category I, and designed to temperature and pressure ratings at least equal to that of the containment as identified in Figures 6.2-45 through 6.2-48.

Missile protection for plant systems and structures is discussed in Section 3.5.

6.2.4.3.5.1 Conclusion on Other Defined Bases When equivalent or greater safety is ensured by using a single primary containment isolation valve, a dependable closed system outside primary containment is provided to act as a second barrier against the release of radioactive materials.

6.2.4.4 Tests and Inspections The Containment Isolation System incorporates the components and isolation functions of all systems penetrating the primary containment. It also has the capability for periodic testing and the determination of containment system leakage.

As required by the testing requirements of the Technical Specifications, the system is periodically tested to meet the leakage testing requirements of 10CFR50, Appendix J, Option B, and the inservice testing requirements of ASME,Section XI. This is discussed in Sections 3.9.6 and 6.2.6. The hard seated containment 6.2-84 HCGS-UFSAR Revision 12 May 3, 2002

purge isolation valves will be demonstrated operable in accordance with the Primary Containment Leakage Rate Testing Program, at least once per 24 months.

Specific exceptions to Appendix J are discussed below:

6.2.4.4.1 Thermal Relief Valves 10CFR50, Appendix J, Paragraph III.C.2(a) requires valves, unless pressurized with fluid from a seal system, to be pressurized with air or nitrogen at a pressure of Pa. Thermal relief valves that discharge into the primary containment atmosphere and also serve as containment isolation valves will have their integrity verified during the Type A test rather than during the Type C tests. This exemption is justified since relief valves that serve as containment isolation valves are designed so that their discharge piping will withstand temperature and pressure at least equal to the containment design temperature and pressure. In fact, LOCA pressure seats the valve's disk. The addition of another valve to form a test boundary would not only defeat the purpose for which the relief valves were installed but might also decrease the probability that the relief valves would function properly when required.

6.2.4.4.2 Instrument Lines 10CFR50, Appendix J, requires valves, unless pressurized with fluid from a seal system, to be pressurized with air or nitrogen at a pressure of Pa. Instrument lines that are not included in the Type C test program, i.e., suppression pool level and pressure instrumentation, drywell pressure instrumentation, and those lines containing excess flow check valves, will have their leak tightness verified during the Type A test. These instrument lines were designed on an "other defined basis" of GDC 56 (see 6.2-85 HCGS-UFSAR Revision 21 November 9, 2015

Sections 6.2.4.3.2.21 and 6.2.4.3.5) and hence are not capable of being Type C tested. Instrument lines are provided with a manual isolation valve outside containment for greater reliability. The systems they serve are closed systems outside containment, thereby providing reliable boundaries against containment leakage. The Type A test that will be conducted on these instrument lines serves to adequately assure integrity.

6.2.4.4.3 Main Steam Isolation Valves 10CFR50, Appendix J, paragraph III.C.2(a) requires valves to be pressurized with air or nitrogen to a test pressure not less than Pa. The main steam isolation valves (MSIVs) will be leakrate tested by pressurizing between the inboard and outboard MSIVs at reduced pressure of 5 psig. This restriction is necessary because a backpressure differential of 25 psi will lift the MSIV disk, unseating the valve. Therefore, testing of the two MSIVs simultaneously, between the valves, at Pa would lift the disk at the inboard valve and result in a meaningless test. A test will be conducted using air/nitrogen at 5 psig with the observed leakage through each main steam line limited to 41 scfh.

This limit is the single steam line allowable leakage of 150.0 scfh (Technical Specification 3.6.1.2) corrected from 50.6 psig to 5 psig.

6.2.4.4.4 Containment Airlocks 10CFR50, Appendix J, Option B, requires airlock testing to be performed on a frequency of at least once every 30 months at a pressure not less than Pa.

Airlock individual testable components which include the shaft seals and door seals shall also be performed on a frequency of at least once every 30 months.

Airlock tests shall be performed in accordance with ANSI/ANS 56.8-1994. In addition to the 30-month testing requirement, following maintenance on a pressure retaining boundary, a leakage test shall be performed either on the airlock or the affected area or component.

6.2-86 HCGS-UFSAR Revision 17 June 23, 2009

Airlock door seals shall be tested within 7 days after each containment access whenever containment integrity is required. During periods when multiple containment entries are required more frequently than once every seven days, the door seals may be tested once per 30 days.

These commitments assured that when replacement, modifications, or other alternatives to the airlocks are made that affect sealing capability, surveillances will be conducted to verify that the airlock satisfies acceptance criteria. Therefore, the test that will be performed, i.e., after maintenance affecting the sealing capability, represents sufficient surveillance (in addition to the 30 month and 7 day requirements) to assure proper leakage verification.

6.2.4.4.5 Traversing Incore Probe System 10CFR50, Appendix J, Paragraph III.D.3 requires that valves classified as Type C valves be leak tested by local pressurization during each reactor shutdown for refueling but in no case at 6.2-87 HCGS-UFSAR Revision 9 June 13, 1998

intervals greater than 2 years. The traversing incore probe (TIP) system's shear valves will not be Type C tested because the shear valves require testing to destruction. The following actions will be implemented as an alternative to Type C testing in order to ensure the shear valves will perform their intended functions. First, the continuity of the explosive charge will be verified at least once every 31 days. Second, the explosive squib from at least one explosive valve will be removed at least once every 18 months (such that each explosive squib in each explosive valve is removed at least once every 90 months) and tested by initiating the explosive squib. Third, the replacement charge for the exploded squib will be from the same manufactured batch as the one fired or from another batch which has been certified by having at least one of that batch successfully fired. Finally, all charges will be replaced according to the manufacturer's recommended life time.

6.2.4.4.6 Other Deviations The following discussion details additional deviations from the requirements of Appendix J; however, these items need not be identified as exemptions since 10CFR50 allows an alternative or equivalent testing method.

1. Appendix J, indicates Type C tests should be performed in the same direction as that when the valve is utilized under accident conditions unless a pressure applied in a different direction will provide equivalent or more conservative results.

Four types of valves are leak rate tested in a direction other than the anticipated accident flow direction. Justification that such testing will provide equivalent or more conservative results relative to those resulting from test pressure applied in the direction of anticipated accident flow includes:

6.2-88 HCGS-UFSAR Revision 9 June 13, 1998

a. Globe valves - Test pressure in the reverse direction will tend to unseat the valve
b. Butterfly valves - All applicable valves have seat constructions which are designed for sealing against pressure on either side
c. Gate valves - Some valves are tested by pressurizing between the seats. Pressurizing in the normal direction tends to seat one of the discs, whereas pressurizing between the discs has applies pressure equally to each seat.
d. Relief valves - Test pressure in the reverse direction will tend to unseat the valve.
2. Appendix J, requires valves unless pressurized with fluid from a seal system to be pressurized with air or nitrogen to Pa. Although the suppression pool is not a water seal system, it does provide a water seal for all valves identified in Table 6.2-24 except for feedwater lines. NUREG-0800, SRP 6.2.6 states that hydrostatic testing of containment isolation valves is permissible if the line is not a potential containment atmospheric leak path. Therefore, those identified valves will be tested at 1.1 P with water and a

total leakage limited to 10 gpm.

3. Appendix J, allows exclusion from combined 0.60La of leakage from valves that are sealed with fluid from a seal system if the fluid leakage rates do not exceed those specified in the Technical Specifications. Since the Control Rod Drive (CRD) System was designed on an "other defined basis" of GDC 55 system 6.2-89 HCGS-UFSAR Revision 21 November 9, 2015

integrity is verified by the following leakage monitoring capabilities in lieu of Type C tests.

a. CRD high temperature alarms
b. CRD position indication
c. Level instruments in the reactor building sumps
d. Area radiation monitors that indicate an alarm in the control room Furthermore, leakage monitoring of the CRD lines will be provided during the CILRT when the reactor pressure vessel and the nonseismic portion of the CRD system are vented and the containment is pressurized.

Finally, leakage from the CRD system into the reactor building will be detected for the full spectrum of leakage rates. Small leaks will be detected by observation during daily inspection rounds of the control unit areas by operators. Large leaks will be detected by level indicators on the Reactor Building floor drain sumps. A large leak of reactor coolant from any insert line will be automatically isolated by the ball check valve in the CRD housing. Leaks of CRD supply water will be indicated by increased flow as continuously recorded in the control room. The CRD directional control valves are normally closed. Excessive leakage through the scram valves will be detected by level indicators in the floor drain sumps.

See Section 6.2.6 for a discussion of the test program.

6.2-90 HCGS-UFSAR Revision 12 May 3, 2002

6.2.4.5 SRP Rule Review 6.2.4.5.1 Acceptance Criterion II.6.d Acceptance Criterion II.6.d requires that when it is not practical to provide one isolation valve inside and one outside containment, and both valves are located outside the primary containment, that the valve nearest the containment and the piping between the containment and the first valve, be enclosed in a leaktight or controlled leakage housing. The valve and/or piping compartment must be capable of detecting leakage from the valve shaft and/or bonnet seals and must terminate the leakage.

HCGS does not have a dedicated system for detecting leakage from individual containment isolation valves or from individual lines that penetrate primary containment. Nevertheless, the design is acceptable since Reactor Building sumps level alarms and flooding alarms in ECCS pump rooms alert the main control room operators of excess leakage. Furthermore, all leakage is collected within the Reactor Building sumps and processed in the radwaste system before its controlled release to the environment.

6.2.4.5.2 Acceptance Criterion II.6.h Acceptance Criterion II.6.h of Section 6.2.4 requires that nonessential systems be automatically isolated by the containment isolation signal. HCGS complies with this requirement, with the exceptions that are identified and justified in our response to NUREG-0737, Item II.E.4.2 in Section 1.10.

6.2.4.5.3 Acceptance Criterion II.6.n SRP Section 6.2.4.II.6.n states that for lines which provide an open path from the containment to the environs, isolation valve closure times on the order of 5 seconds or less may be necessary.

6.2-91 HCGS-UFSAR Revision 1 April 11, 1989

Furthermore, it states that closure times for these valves should be based on the radiological consequences.

The only penetrations that provide a direct path from the primary containment to the environs are P-22, P-23, P-219, and P-220. The valves isolating these penetrations that do not meet the 5 second recommended closure requirement are GS-V004, V005, V002, V003, V025, V007, V006, V076, V008, and V010. Eight of these ten valves isolate the lines to the containment hydrogen recombiner system which is considered a closed system. Only GS-V025 and V076 isolate direct paths to the environs. The adequacy of their closure times was confirmed by radiological analysis. The analysis is discussed in Section 1.14.1.71.2.11.1.

6.2.5 Combustible Gas Control in Containment Following a postulated beyond design basis accident, hydrogen gas may be generated within the primary containment as a result of the following processes:

1. Metal water reaction involving the Zircaloy fuel cladding and the reactor coolant
2. Radiolytic decomposition of water in the reactor vessel and the suppression pool (oxygen also evolves in this process)
3. Corrosion of metals and paints in the primary containment.

To preclude the possibility of a combustible mixture of hydrogen and oxygen accumulating in the primary containment, the containment atmosphere is inerted with nitrogen gas before power operation of the reactor.

To control the hydrogen and oxygen concentration in the primary, the following features are provided:

6.2-92 HCGS-UFSAR Revision 15 October 27, 2006

1. A containment hydrogen recombiner system
2. A hydrogen/oxygen analyzer system (HOAS)
3. The capability for a controlled venting of the primary containment.

The Containment Atmosphere Control System (CACS) is composed of:

1. Hydrogen/Oxygen Analyzer System (HOAS)
2. Containment Hydrogen Recombiner System (CHRS)
3. Vacuum Relief Valve System (VRVS)
4. Containment Inerting and Purging System (CIPS)

The CACS interfaces with the Reactor Building Ventilation System (RBVS), with the Filtration, Recirculation and Ventilation System (FRVS), and with the Containment Prepurge Cleanup System (CPCS).

6.2.5.1 Design Bases The CACS is designed to the following criteria:

1. The CACS is designed to remote manually introduce nitrogen gas into the primary containment at a high flow rate, thereby displacing air originally in the containment volume for the purpose of reducing the oxygen concentration in the containment atmosphere to four percent by volume in less than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to power operation.
2. The CACS, operating through remote manual control and in conjunction with the RBVS, is designed to provide a 9000-cfm of filtered outdoor air purge flow to the drywell 6.2-93 HCGS-UFSAR Revision 15 October 27, 2006

and suppression chamber to provide a safe atmosphere for personnel access.

3. The CACS is designed to control the containment pressure within the design specification limits of 2 psig and to maintain the

~

oxygen concentration below four percent during all normal modes of reactor operation by supplying nitrogen gas to and/or releasing gases from the primary containment in a controlled manner.

4. The CACS, through the remote-manual operation of the CPCS and the RBVS, is designed to remove radioactive contaminants from all primary containment gas prior to its release to the environment.
5. Following an accident, the CACS is designed to continuously monitor and, if necessary, alarm upon high concentration of hydrogen or oxygen in the primary containment (2.0 percent hydrogen or 3.8 percent oxygen by volume). The CACS is also designed to be available to monitor the hydrogen and oxygen content of the primary containment atmosphere during normal operation.
6. The CACS is designed to recombine hydrogen and oxygen after a beyond design basis accident with sufficient capacity to prevent the accumulation of a combustible concentration of gases inside the primary containment.
7. The CACS is designed to permit, through remote manual control, a controlled venting of the primary containment atmosphere at a low flow rate. The FRVS is used in this situation to remove radioactive contaminants from this vented gas prior to its release to the environment.

6.2-94 HCGS-UFSAR Revision 15 October 27, 2006

8. The CACS is designed to automatically isolate all lines that penetrate primary containment to ensure the integrity of the containment boundary during accident conditions. The isolation valves are designed to allow remote-manual reopening by pushbutton override switches protected by guards to prevent any accidental actuation.
9. The CACS is designed to monitor the pressure in the suppression chamber and the temperature in both the drywell and suppression chamber under post-LOCA conditions.
10. During normal plant operation, the CACS is designed to limit the pressure difference between the drywell and the suppression chamber to 2.5 psid and the pressure difference between the suppression chamber and Reactor Building to 3.0 psid.
11. The safety-related portions of the CACS are designed to remain functional after a safe shutdown earthquake (SSE). They are listed in Table 6.2-17.
12. The safety-related portions of the CACS are designed so that a single failure of any active component, assuming loss of offsite power (LOP), cannot result in the loss of safety function.
13. The portions of the CACS that operate under post-LOCA conditions are designed to facilitate periodic inspection and testing of safety-related features during all normal modes of plant operation.
14. The safety-related portions of the CACS are designed to remain operable in the environments existing in their respective areas following a LOCA.

6.2-95 HCGS-UFSAR Revision 0 April 11, 1988

15. The containment atmosphere is sufficiently mixed to prevent high concentrations of combustible gases from forming locally. The process is discussed in Section 6.2.5.2.6.

6.2.5.2 Containment Atmosphere Control System Description The CACS uses dedicated and interface systems to accomplish a number of functions including inerting the primary containment with nitrogen, purging the primary containment, limiting the differential pressure between drywell and suppression chamber, monitoring hydrogen and oxygen concentrations in the primary containment, and controlling hydrogen and oxygen concentration in the primary containment.

The CACS controls the drywell and suppression chamber atmosphere during all modes of reactor operation (normal reactor operation, reactor shutdown, and post-accident conditions). Portions of the system are safety-related. See Table 6.2-17 for system design and performance data. All safety-related portions of the CACS are environmentally qualified to normal and accident environments according to Section 3.11 requirements.

The CACS is shown schematically on Plant Drawing M-57-1. The system is located within the Reactor Building except for the nitrogen vaporizer, which is located in the Auxiliary Building; the HOAS hydrogen bottles, which are located in the Yard adjacent to the Condensate Storage Tank; and the control cabinets, which are located in the Auxiliary Building.

6.2.5.2.1 Nitrogen Inerting During normal power operation of the reactor, the oxygen content of the primary containment atmosphere is maintained at a concentration no greater than 4 percent by volume by the Containment Inerting and Purge System (CIPS). This limit is established to preclude the attainment of a combustible gas mixture inside the containment if 6.2-96 HCGS-UFSAR Revision 20 May 9, 2014

combustible gases are released into the containment atmosphere following a beyond design basis accident. Oxygen monitoring during normal operation is done by analyzing grab samples taken either through the Leak Detection System (LDS) or the Hydrogen/Oxygen Analyzer System (HOAS). The LDS drywell sample skid is equipped with two connection points upstream of the sample pump (see Plant Drawing M-25-1), to which a portable oxygen monitor can be attached whenever a drywell oxygen sample is required. The HOAS contains a permanently connected oxygen monitor in only the "A" train between the suppression chamber sample suction and return lines of the HOAS panel (see Plant Drawing M-57-1),

which can be utilized whenever a suppression chamber oxygen sample is required.

This low oxygen atmosphere is achieved by displacing air in the primary containment with nitrogen gas. The nitrogen is supplied from a liquid nitrogen facility, which consists of two liquid nitrogen storage tanks and one steam-heated water bath vaporizer.

Gaseous nitrogen flow rate from the discharge of the vaporizer is supplied to the drywell and/or the suppression chamber as controlled by the operator.

Displaced gases released from the primary containment during nitrogen inerting are processed through the HEPA filters of the RBVS exhaust system and monitored for radioactivity before release to the environment. The RBVS is discussed in Section 9.4.2.

During the inerting operation, nitrogen is supplied to the containment through one RBVS supply purge penetration, and gases are released from the containment through one RBVS exhaust purge penetration. The 6-inch nitrogen supply butterfly valve (HV-4978) has been qualified to close against the dynamic effects associated with a LOCA. During the makeup operation, nitrogen is supplied to the containment through the 1-inch nitrogen makeup lines. The gases are released from the containment to the RBVS exhaust system by opening the inboard 26-inch and/or 24-inch purge exhaust valve and the 2-inch bypass valve around the closed 24- and/or 26-inch outboard purge exhaust valve (reference Plant Drawing M-57-1). Once the 6.2-97 HCGS-UFSAR Revision 20 May 9, 2014

four percent by volume oxygen concentration in the primary containment has been achieved, nitrogen flow is terminated and the isolation valve(s) in the purge exhaust lines is/are closed.

6.2-97a HCGS-UFSAR Revision 2 April 11, 1990

THIS PAGE INTENTIONALLY BLANK 6.2-97b HCGS-UFSAR Revision 2 April 11, 1990

The nitrogen vaporizer receives liquid nitrogen from the off-gas treatment system liquid nitrogen tanks. Sufficient nitrogen is available to inert the primary containment one time (where inerting requires two volume changes) plus an equivalent 1/4 containment volume for makeup purposes that may be required to keep the oxygen concentration below four percent by volume during reactor operation.

The nitrogen vaporizer has the capability to provide sufficient gaseous nitrogen to satisfy the demand of the CIPS during inerting and makeup operation. Process conditions for the vaporizer are tabulated in Table 6.2-17.

The CIPS is capable of reducing the oxygen concentration in the primary containment atmosphere to less than four percent by volume in less than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Makeup nitrogen will be supplied through the nitrogen vaporizer at approximately 100 cfm during makeup and 2500 cfm during inerting. Post-accident operation is not required.

The RBVS is capable of purging the primary containment atmosphere prior to or after each reactor shutdown. Prior to purging, the CPCS may be used to filter the containment atmosphere at a rate of 3000 cfm, as required. The CPCS and RBVS are discussed in Section 9.4.2.

Purging is performed during periods of reactor shutdown to maintain a well-ventilated environment for personnel occupancy of the primary containment.

Purging also may be performed during the operational modes of startup, power operation, and hot shutdown for the purposes of inerting, prepurge cleanup, and deinerting the primary containment.

Purging during the latter three operational modes will be restricted as follows:

1. Inerting will be performed as specified in the Technical Specifications within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after reactor thermal power exceeds 15 percent of rated thermal power following startup.

6.2-98 HCGS-UFSAR Revision 1 April 11, 1989

2. Deinerting (i.e., purging) will be initiated no more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to reducing reactor thermal power to 15 percent of rated thermal power prior to a scheduled reactor shutdown. (A scheduled reactor shutdown includes planned and forced outages.)
3. The CPCS operation may be initiated no more than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> before the start of deinerting, as required.

The number of purge lines in use (i.e., both inboard and outboard valves open) during the operational modes of startup, power operation, and hot shutdown will be limited to one supply (inlet) and one exhaust (vent) line.

The 24- and 26-inch containment vent and purge butterfly valves are closed, except as otherwise allowed by the Technical Specifications, and under administrative control during normal plant operating conditions. During normal operation, power ascension, and descension, the 24- and/or 26-inch inboard vent valves (1-GS-HV-4964 & 4952), in conjunction with 2-inch air operated globe valves (1-GS-HV-4963 & 4951), may be open to vent the containment as required for thermal expansion of the air volume and control of oxygen concentration.

6.2-98a HCGS-UFSAR Revision 1 April 11, 1989

THIS PAGE INTENTIONALLY BLANK 6.2-98b HCGS-UFSAR Revision 1 April 11, 1989

6.2.5.2.2 Deleted (Combined with Section 6.2.5.2.1) 6.2.5.2.3 Containment Pressure Control Normal Operation The CIPS controls thermal expansion of the containment atmosphere resulting from normal operating transients through the operation from the main control room of the inboard RBVS purge exhaust isolation valve at the drywell and the 2-inch bypass valve around the outboard isolation valve. Flow is directed to the RBVS exhaust ductwork.

The VRVS limits pressure differentials between the suppression chamber and drywell. Eight 24-inch vacuum relief valves are sized to prevent the drywell pressure from falling 2.5 psid below the suppression chamber pressure. The VRVS vacuum valves are fully open when the drywell pressure falls below that of the suppression chamber by 0.25 psid.

The VRVS also limits the pressure differentials between the Reactor Building and the suppression chamber to less than 3.0 psid through the operation of Reactor Building to suppression chamber vacuum relief valves. The two 24-inch valves are fully open at 0.25 psid and will vent air into the suppression chamber from the Reactor Building.

The VRVS operability can be demonstrated by exercising vacuum relief valves to the open position. Each valve is equipped with redundant valve position indicators that indicate and alarm in the main control room. The sensitivity of the indicators is sufficient to detect an offset greater than 0.01 ( 0.005)

~

inch at the valve centerline. The flow through the eight suppression pool to drywell vacuum breakers with each offset at 0.01 inch is equivalent to the flow through a 0.5 inch diameter hole.

6.2-99 HCGS-UFSAR Revision 1 April 11, 1989

The redundant position indicators are visually observed and verified at each refueling outage in accordance with ASME Section XI, Article IWV-330 to confirm that remote valve indications accurately reflect valve operation. The accuracy verification is in accordance with the instructions provided by the valve supplier.

6.2.5.2.4 Containment Hydrogen Recombiner System The Containment Hydrogen Recombiner System (CHRS) is part of the CACS. The CHRS consists of two redundant hydrogen recombiner packages, each of which has adequate processing capacity to control the quantity of the hydrogen and oxygen postulated to be generated in the primary containment after a beyond design basis accident. The recombiners are thermal recombination type and are described in Reference 6.2-13.

A schematic diagram of one recombiner package is shown on Plant Drawing M-58-1.

Each hydrogen recombiner package consists of three modules: the recombiner skid assembly, the power cabinet, and the control cabinet. The recombiner skid assembly, which is shown on Figure 6.2-31, contains the process components. The process components include flow control valves, canned motor/blower assembly, gas heater pipe, reaction chamber, water spray cooler, and water separator and associated instrumentation. The gas heater pipe and the reaction chamber are located within an insulated enclosure that also contains electric heater elements. The recombiner skid assembly is located outside the primary containment in the reactor building.

The power cabinet houses the power distribution components for the recombiner package. The cabinet is located near to its associated recombiner skid assembly and contains the 480 V power supply, control transformer, blower motor starter, circuit breakers, control relays, and the silicon controlled rectifiers (SCRs) that control electrical power to the heater elements.

The control cabinet contains all of the instrumentation, annunciators, lights, and switches necessary for operation of the 6.2-100 HCGS-UFSAR Revision 20 May 9, 2014

recombiner package. The control cabinet is located in the control room.

Each recombiner is designed to process a minimum of 60 scfm of drywell gas containing five percent oxygen, or up to 150 scfm of drywell gas containing two percent oxygen, with the balance consisting of hydrogen, nitrogen, fission products, and water vapor. The system will also process 150 scfm of gas containing four percent hydrogen. The recombination process is accomplished by increasing the temperature of the process stream to approximately 1300F, at which temperature the hydrogen and oxygen combine spontaneously to form water vapor. Virtually complete recombination occurs so that the oxygen concentration in the effluent from the recombiner is negligible when excess hydrogen is present in the process gas. Similarly, the hydrogen concentration in the effluent is negligible when excess oxygen is present in the process gas.

During the recombiner operation, gas from the drywell flows through the drywell purge penetrations to the inlet piping of the recombiner. The effluent from the recombiner flows through the outlet piping to the suppression chamber purge penetrations and into the suppression chamber. By taking suction from the drywell and discharging to the suppression chamber, a differential pressure is created between these two volumes. This differential pressure is limited to 0.25 psid by the primary containment vacuum relief valve assemblies that open to allow gas to flow from the suppression chamber back into the drywell.

The recombiner inlet and outlet lines are each provided with two normally closed automatic valves for containment isolation. These valves can be operated by handswitches in the control room and are automatically closed upon receipt of a containment isolation signal. The isolation signal can be overridden from the main control room to reopen the isolation valves.

Containment isolation is discussed further in Section 6.2.4.

6.2-101 HCGS-UFSAR Revision 0 April 11, 1988

Recombined effluent flows from the reaction chamber to the water spray cooler, where the effluent is cooled to less than 250F. The cooling water at 150F maximum is supplied to the recombiners from the Residual Heat Removal (RHR)

System. Cooled effluent flowing from the cooler is passed through a water separator that prevents any water droplets from entering the gas recirculation line. The separated water drains down to the suppression pool through the recombiner outlet piping. Recirculation (dilution) gas is drawn from the top of the water separator and is routed to the recombiner inlet piping.

Recirculation is controlled from the main control room via a motor operated valve in the recirculation line. The amount of gas recirculated increases as the amount of excess hydrogen in the process gas exceeds four percent.

Operation of the hydrogen recombiner is initiated manually from the control cabinet. When process gas flow and cooling water has been established, the heater elements are energized automatically. Approximately 2 hours are required for the system to reach operating temperature. When the temperature at the gas heater pipe outlet reaches 1300F, power to the heater elements is automatically turned off. When the temperature at the gas heater pipe outlet falls below 1300F, an interlock is cleared and power is controlled to the heater elements at a lower level than during startup. Temperatures in the gas heater pipe stay below those required for recombination so that recombination occurs in the reaction chamber. A temperature indicator controller located in the control cabinet is used to maintain reaction chamber temperature at about 1300F.

The CHRS is designed to be operable for 40 years including up to six full power tests per year and 180 days of post-accident operation.

Additional CHRS design and performance data is contained in Table 6.2-17. The CHRS environmental qualification plan is found in Reference 6.2-12. The CHRS meets the environmental qualification requirements described in Section 3.11 for conditions described in Sections 3.10 and 3.11.

6.2-102 HCGS-UFSAR Revision 15 October 27, 2006

6.2.5.2.5 Combustible Gas Analyzer The HOAS is part of the Containment Atmosphere Control System, which is shown schematically on Plant Drawing M-57-1. The HOAS consists of two identical redundant analyzer packages, each of which contains a hydrogen analyzer cell and an oxygen analyzer cell. Each package takes samples from two different elevations in the drywell and from one point in the suppression chamber.

Processed samples are returned to the suppression chamber.

PSEG has verified that the Hydrogen Monitoring System is capable of diagnosing the course of significant beyond design-basis accidents and has committed to maintain this capability. The Hydrogen Monitoring System is functional, reliable, and capable of measuring the concentration of hydrogen in the containment atmosphere following a significant beyond design-basis accident for accident management, including emergency planning. The Hydrogen Monitoring System is classified as Category 3, as defined in Regulatory Guide 1.97.

PSEG has verified that the Oxygen Monitoring System is capable of verifying the status of the inerted containment atmosphere and has committed to maintain this capability. The Oxygen Monitoring System is functional, reliable, and capable of measuring the concentration of oxygen in the containment atmosphere following a significant beyond design-basis accident for combustible gas control and accident management, including emergency planning. The Oxygen Monitoring System is classified as Category 2, as defined in Regulatory Guide 1.97.

Each analyzer package consists of a sample cabinet located in the Reactor Building, a remote oxygen indicator located also in the Reactor Building, and a remote control panel located in the control room. Sample points in the primary containment are located as follows:

6.2-103 HCGS-UFSAR Revision 20 May 9, 2014

HOAS Sample Locations Radial Distance Elevation, from Centerline Penetration ft Azimuth of RPV, ft System A Sample point A J-9E 153'-0" 291 28'-11" Sample point B J-10C 153'-0" 36 27'-5" Sample point C J-212 87'-8" 191 56'-4" System B Sample point A J-3B 153'-0" 169 30'-6" Sample point B J-7D 153'-0" 157 29'-1" Sample point C J-210 83'-7" 87 66'-9" Each sample suction and return line is provided with two, normally closed, motor-operated valves for containment isolation. These valves are operated by manual switches in the main control room and are automatically closed upon receipt of a containment isolation signal. The isolation signal to the valves can be overridden manually from the main control room. Containment isolation is discussed further in Section 6.2.4. Following an accident, one HOAS channel is manually initiated and operates continuously for the duration of the accident.

Each analyzer package can only sample one sample point at one time. The selection of a specific sample point is determined by the operator. Gases from the selected sample point are routed in parallel through a hydrogen analyzer cell and oxygen analyzer cell located in the analyzer panel inside the reactor building or, in the case of a sample from the suppression chamber, can be routed through the suppression chamber supplementary oxygen monitor bypassing the HOAS panel. This provision permits periodic measurement of suppression chamber compartment oxygen concentration during normal 6.2-104 HCGS-UFSAR Revision 15 October 27, 2006

operation (see Section 6.2.5.2.1).

In Amendment 160 to the Hope Creek Facility Operating License, the station committed to maintaining at least one hydrogen/oxygen concentration analyzer channel and monitor operable during Operational Conditions 1, 2, and 3. With no hydrogen/oxygen analyzer channels operable, at least one channel should be restored to an operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or an alternate method of monitoring the parameter should be established.

The hydrogen/oxygen concentration analyzer channels are demonstrated operable by the performance of a channel check at least once per month and by performance of a channel calibration at least once per quarter. The channel calibration is performed using a sample gas containing 5 volume % oxygen (balance nitrogen) for the oxygen analyzer and by use of a 5 volume % hydrogen (balance nitrogen) sample gas for the hydrogen monitor.

The operation of the hydrogen and oxygen analyzer cells is based on the measurement of thermal conductivity of the gas sample. The thermal conductivity of the gas mixture changes proportionally to 6.2-104a HCGS-UFSAR Revision 15 October 27, 2006

THIS PAGE INTENTIONALLY BLANK 6.2-104b HCGS-UFSAR Revision 2 April 11, 1990

the changes in the concentration of the individual gas constituents of the mixture. The thermal conductivity of hydrogen is far greater (approximately seven times the thermal conductivity of air) than any other gas expected to be present in the primary containment. The hydrogen analyzer cell incorporates a catalytic combustion feature in which hydrogen in the sample is removed by catalytic recombination with a reagent gas (oxygen). The thermal conductivity of the sample is measured before and after recombination, and the two measurements are compared. The difference in thermal conductivity is proportional to the concentration of hydrogen originally in the sample. The oxygen analyzer operates simultaneously in a similar manner, except that the reagent gas is hydrogen.

The hydrogen analyzer has dual range capability of 0 to 10 percent by volume and 0 to 30 percent by volume. The oxygen analyzer has dual range capability of 0 to 10 percent by volume and 0 to 25 percent by volume. The hydrogen and oxygen concentrations in the sample gas are indicated at the analyzer panel in the reactor building and at the remote control panel in the main control room.

The concentrations are also recorded in the main control room. An additional oxygen indication is provided at the entrance to the drywell service hatch.

Sample gases are drawn through the analyzer cells by the diaphragm pump located in the analyzer panel. Sample gases and any excess moisture, either from the sample or created by the catalytic recombination, are routed back to the suppression chamber.

HOAS design and performance data is included in Table 6.2-17. The HOAS environmental qualification program is found in Reference 6.2-23. The HOAS meets the environmental qualification requirements described in Section 3.11 for conditions described in Sections 3.10 and 3.11.

6.2-105 HCGS-UFSAR Revision 0 April 11, 1988

6.2.5.2.6 Containment Atmosphere Mixing The potential for hydrogen or oxygen concentration gradients within a single containment compartment is dependent upon the source of hydrogen or oxygen, the temperature of steam, and air flow conditions within the compartment.

In most cases with a hydrogen source, both hydrogen and steam will be entering a compartment at a high temperature and a high velocity compared to the pre-existing conditions in the room. The initial turbulence will cause a significant amount of mixing within the first few seconds after the hydrogen enters. Steam expansion likewise will create large initial mixing flows.

NUREG/CR 2540 indicates that the hydrogen/steam mixtures will be at 500 to 2500F, which will be well in excess of the 120 to 340F expected in the containment air spaces.

For long term steady state conditions, e.g., hydrogen or oxygen evolving from radiolysis of water on the containment floor or hydrogen entering a compartment through a large vent opening, it is expected that convective mixing currents will be the major driving force to mix the hydrogen. For a discussion of this phenomenon, refer to NUREG/CR-1575.

The computer modeling discussed in NUREG/CR-1575 indicates that for the situation with an air temperature 2.8K above the wall temperature, the maximum hydrogen concentration gradient observed was 0.14 percent. This modeling considered molecular diffusion, Eddy diffusion, and convective flows along the walls, all for an extremely simple model with only one major temperature gradient of 2.8K. For a real situation with pumps and pipes at temperatures up to several hundred degrees hotter than the walls and the containment air, and with the complex geometries of heat sources, it is believed that highly complex and much more rapid air flow patterns would be 6.2-106 HCGS-UFSAR Revision 15 October 27, 2006

established resulting in complete hydrogen mixing within the containment compartment.

These local mixing flows would be enhanced by the major convective heating flow that occurs in the containment in order to transport the heat from the vessel to the Containment Heat Removal System.

Within the Hope Creek containment, hydrogen or oxygen could accumulate in either the drywell or wetwell volumes. These volumes are connected by the downcomers, the vacuum breakers, and the recombiner supply and exhaust piping, thus allowing mixing between the volumes. Within the drywell, mixing and turbulence would be caused by the blowdown from the pipe break, the drywell sprays if they are manually initiated, and the large convective mixing air flows caused by the high temperatures of the reactor vessel and piping. There are no large volumes where pocketing is probable and where convective mixing would not mix the gases during the long times required for the accumulation of burnable mixtures. Within the wetwell, water turbulence and discharges would also enhance the air mixing due to the temperature differentials. Figures in Section 1.2 show the locations of the various floors and volumes of the primary containment where the combustible gases could be circulating post-LOCA.

6.2.5.2.7 Controlled Venting of Primary Containment The capability to vent the primary containment in order to control oxygen and hydrogen concentration is provided. This controlled venting is non-safety-related except for portions that constitute part of the primary containment boundary. For compliance to Regulatory Guide 1.7, see Section 1.8.1.7.

Controlled venting of Primary Containment, if used, would be accomplished by use of a modified mode of the CACS.

6.2-107 HCGS-UFSAR Revision 15 October 27, 2006

Controlled venting of the containment would be through two 2-inch flow control valves as described in 6.2.5.2.3. Gases exhausted from the containment during controlled venting would be processed through the FRVS recirculation filters in order to remove radioactive particulate and Halogen contaminants prior to release to the environment. This system is discussed in Section 6.8.

6.2.5.3 Section deleted 6.2-108 HCGS-UFSAR Revision 15 October 27, 2006

This page Intentionally blank 6.2-109 HCGS-UFSAR Revision 15 October 27, 2006

This page intentionally blank 6.2-110 HCGS-UFSAR Revision 15 October 27, 2006

This page intentionally blank 6.2-111 HCGS-UFSAR Revision 15 October 27, 2006

This page intentionally blank 6.2-112 HCGS-UFSAR Revision 15 October 27, 2006

This page intentionally blank 6.2-113 HCGS-UFSAR Revision 15 October 27, 2006

This page intentionally blank 6.2-114 HCGS-UFSAR Revision 15 October 27, 2006

This page intentionally blank 6.2-115 HCGS-UFSAR Revision 15 October 27, 2006

6.2.5.4 Tests and Inspections The CACS is preoperationally tested in accordance with the requirements of Section 14 and periodically tested in accordance with the requirements of Section 16. Inservice inspection of the safety-related systems will be in accordance with the ASME B&PV Code, Section XI, for Section III, Class 2 components. See Section 6.2.6 for additional testing requirements.

6.2.5.5 Instrumentation Requirements The instrumentation requirements for the CACS are discussed in Section 7.3.1.

6.2.5.6 Safety Evaluation The CHRS, the VRVS and the HOAS, including supporting structures, are designed to Seismic Category I requirements as defined in Section 3.7, with the exception of the HOAS H2/O2 bottle racks, which are designed to Seismic Category III requirements. Except for tubing internal to the sample cabinets of the HOAS and the bottle station supply lines to the HOAS, piping and tubing associated with both systems are designed, fabricated, inspected, and tested in accordance with the requirements of the ASME B&PV Code,Section III, Class 2.

The tubing internal to the 6.2-116 HCGS-UFSAR Revision 15 October 27, 2006

sample cabinet and the bottle station supply lines conform to the requirements of ANSI B31.1.0. All portions of these systems, with the exception of the HOAS bottle stations, are located within the Reactor Building and Auxiliary Building, which are designed to Seismic Category I requirements as discussed in Section 3.8.4. The bottle stations are located in the Yard area, adjacent to the Condensate Storage Tank. Evaluation of the these systems with respect to the following areas is discussed in FSAR sections as indicated:

1. Protection from wind and tornado effects - Section 3.3
2. Flood design - Section 3.4
3. Missile protection - Section 3.5
4. Protection against dynamic effects associated with the postulated rupture of piping - Section 3.6
5. Environmental design - Section 3.11.

The CHRS and the HOAS both consist of two separate packages that are fully redundant and independent with the exception of the HOAS hydrogen and oxygen supply bottles. One set of hydrogen and oxygen bottles supply both HOAS packages. The redundant packages are powered from different divisions of Class 1E power. A single failure in either system would only render the affected package unavailable, with the redundant package fully capable of performing the required function at full capacity. Failure modes and effects analyses for the CHRS and the HOAS are provided in Tables 6.2-18 and 6.2-19, respectively.

The CACS lines penetrating the primary containment are provided with redundant isolation valves powered from different divisions of Class 1E power.

6.2-117 HCGS-UFSAR Revision 15 October 27, 2006

Loss of power to any individual valve or to all valves powered from the same division does not disable the containment isolation function. In the event of a failure of any single valve to close when required, the redundant valve on the same line provides the isolation function. The bypass of an isolation signal to any valve is annunciated in the control room. In the event of a failure of any single isolation valve to reopen when required, the redundant system will be used.

6.2.5.7 SRP Rule Review Acceptance Criterion II.4 of Standard Review Plan 6.2.5 requires that the repressurization of the containment following a LOCA be limited to less than 50 percent of the containment design pressure. At HCGS, pressure increases originally due to MSIV seal system inleakage following a LOCA were eliminated by the deletion of the MSIV Sealing System.

6.2.6 Primary Reactor Containment Leakage Rate Testing The proposed primary reactor containment leakage test program involves the following three tests:

1. Type A tests - Tests intended to measure the Primary Reactor Containment System overall integrated leakage rate, both after erection of the primary reactor 6.2-118 HCGS-UFSAR Revision 12 May 3, 2002

containment system has been completed and the system has been made ready for operation and at subsequent periodic intervals.

2. Type B tests - Tests intended to detect local leaks and to measure leakage across pressure containing or leakage-limiting boundaries other than valves.
3. Type C tests - Tests intended to measure primary reactor containment system isolation valve leakage rates.

The proposed testing program conforms to 10CFR50, Appendix J, Option B, "Primary Reactor Containment Leakage Testing for Water Cooled Power Reactors,"

and Appendix A, General Design Criteria (GDC) 52, "Capability for Containment Leakage Rate Testing," GDC 53 "Provisions for Containment Testing and Inspection," and GDC 54, Piping Systems Penetrating Containment.

6.2.6.1 Primary Containment Integrated Leakage Rate Test The Type A test is performed to determine the total atmospheric (air) leakage from the containment. The leakage rate must not exceed the maximum allowable, L , at the calculated peak containment internal pressure, P .

a a Definitions of terms and pertinent test information are shown in Table 6.2-22.

The Type A test piping and instrumentation are shown on Plant Drawing M-60-1.

The Type A acceptance criteria are given in the Primary Containment Leakage Rate Testing Program as referenced in HCGS Technical Specifications in Section 16.

The absolute method of leakage determination is used for all Type A tests. This method of leakage rate determination is based on the measurement of temperature and pressure of the primary reactor containment atmosphere with corrections for changes in water vapor pressure. The absolute method assumes that the temperature and pressure variations during the test are insufficient to effect 6.2-119 HCGS-UFSAR Revision 20 May 9, 2014

significant changes in the internal free air volume of the structure.

The mass point and total time analysis techniques are used for data analysis.

Data from an absolute system are reduced to a contained air mass by application of the ideal gas law. This test data is a time-series of independent values of containment air mass. This test data can then be easily analyzed by the method of linear least squares. The method of least squares is a statistical procedure for finding the "best fitting" straight line, commonly called the regression line, to fit within the test data. The slope of the regression line is the leak rate.

The duration of the test period must be sufficient to enable adequate data to be accumulated and statistically analyzed so that a leakage rate and upper confidence limit (UCL) can be accurately determined. The calculated leakage rate and UCL are reported.

Upon construction completion of the primary containment, the structure must pass a structural integrity test (SIT), which demonstrates the capability of the primary containment to withstand specified internal pressure loads.

The preoperational Type A test is performed to verify that the actual primary containment leakage rate does not exceed the design limit. The requirements for this test are outlined in the HCGS Technical Specifications, Section 16.

After completion of the preoperational test, subsequent Type A tests are done at intervals outlined in the Primary Containment Leakage Rate Testing Program as referenced in HCGS Technical Specifications in Section 16.

A general visual inspection is performed in accordance with the Primary Containment Leakage Rate Testing Program as referenced in HCGS Technical Specifications in Section 16. This involves inspection of accessible interior and exterior surfaces of the primary containment and components to uncover any evidence of structural deterioration that may affect either the structural integrity or leaktightness. If there is evidence of structural deterioration, an engineering evaluation is performed prior to a Type A test and corrective action may be required prior 6.2-120 HCGS-UFSAR Revision 9 June 13, 1998

to performance of the test. Repairs or adjustments are made to components between the times of completion of one Type A test and the start of the containment inspection for the subsequent Type A test. If repairs and/or adjustments were performed on containment components during the outage prior to the completion of the Type A test, the change in local leak rate for these components must be used to determine the as found integrated leak rate. This is done by conducting local leakage rate tests on the affected components to determine the minimum pathway leakage before and after the repairs/adjustments.

The difference in minimum pathway leakage is then added to the Type A test result to obtain the required As Found result. The minimum pathway leakage would be the smaller leakage rate for in-series valves tested individually, one-half the leakage rate for in-series valves tested in parallel. This differential of the leakage is the correction factor added to the as left integrated leak rate to determine the as found integrated leak rate.

The Type A test includes an assessment of the leaktightness of the test valves used for performing the Type C tests, as described in Section 6.2.6.3.

Before the start of a Type A test, the following set of requirements must be met:

1. Primary containment isolation valve closure - The primary containment isolation valves must be closed, by normal operation, for the Type A test. Tightening of remotely operated valves after closure or other adjustments is not allowed. Exercising valves to improve leakage performance is not permitted. In the event that a valve cannot be closed by normal methods, the method used is documented.
2. Periodic tests - A primary containment isolation system functional test, Type B, and Type C tests should be completed prior to the Type A test.
3. Preoperational tests - The preoperational Type A test follows the preoperational structural integrity test. A primary containment isolation system functional test, Type B, and Type C leakage tests should be completed before the preoperational Type A test.
4. System venting and draining - This procedure applies to the following systems:

6.2-121 HCGS-UFSAR Revision 17 June 23, 2009

a. Systems listed in Table 6.2-23 that are needed to properly conduct the test or to maintain the plant in a safe condition during the test must be operable in their normal mode. These systems do not need to be vented or drained.
b. Systems that are normally filled with water and operable under post-accident conditions do not need to be vented or drained.
c. Fluid systems that are part of the primary containment boundary and that may open directly to the primary containment or outside atmosphere under post-accident conditions must be opened or vented to the appropriate atmosphere during the test.
d. Those lines that are normally filled with a liquid and may be drained or have the fluid drawn off by the accident must be drained to the extent necessary to expose the primary containment isolation valve seats to the primary containment atmosphere. These lines include portions of closed systems inside the containment penetrating the primary containment, which could rupture due to a loss-of-coolant accident (LOCA).
e. Systems not vented or drained during the Type A test that could become exposed to the primary containment atmosphere during the design basis accident (DBA) must have been Type B or C tested within the last twenty-four (24) calendar months prior to the Type A test and the Type B and/or C results used to apply a correction to the Type A test results.
f. For planning or scheduling purposes, or ALARA considerations, system pathways that have been local leakage rate tested within the previous twenty-four (24) calendar months need not be drained or vented for the Type A test.
5. Liquid level monitoring - Liquid levels in the primary containment may vary. Therefore, changes in the primary containment free volume must be monitored. If the level change results in free volume changes during the test, it must be included in the final leakage rate.

6.2-122 HCGS-UFSAR Revision 17 June 23, 2009

6. Pressuring considerations - Pressurized components, e.g., tanks must be removed or depressurized and vented. Alternatively, the tank pressures measured prior to and after the Type A test can be compared to demonstrate that there is no leakage into the primary containment.

Sources of instrument air or service air into the primary containment must be isolated and vented, or disconnected, during the Type A test. Components not designed to withstand the test pressure should be removed or otherwise protected.

7. Containment atmosphere stabilization - The primary containment atmosphere must be allowed to stabilize for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the test pressure is reached before the Type A test can begin. Temperature stabilization is essential for controlling the pressure in the primary containment. Stabilization is achieved when the requirements of ANSI/ANS 56.8-1994 and/or BN-TOP-1 are met. The primary containment ventilation and cooling water systems may be run at this time to expedite air mixing.

After the primary containment atmosphere has stabilized, the Type A test may begin. The duration of the Type A test must be sufficient to enable adequate data to be accumulated and statistically analyzed so that the leakage rate and UCL can be determined. Test criteria, test duration and total number of data points will meet the requirements of ANSI/ANS 56.8-1994 and/or BN-TOP-1.

Depending on the sensitivity of the instrumentation, the stability of the primary containment, and the uncertainty associated with the calculated leakage rate, the duration of a Type A test may have to be extended beyond the required minimum time duration to reasonably ensure 6.2-123 HCGS-UFSAR Revision 17 June 23, 2009

acceptability. If the leakage rate exceeds the acceptance criterion, corrective action is required. If, during the performance of a Type A test, excessive leakage occurs through locally testable penetrations or isolation valves to the extent that it would interfere with the satisfactory completion of the test, the leakage paths should be isolated and the Type A test continued. A local leakage test must be performed before and after the repair of each isolated leakage path.

A verification test must also be performed following each Type A test. This test ensures that systematic error or bias is given adequate consideration. It is accomplished by imposing a known leak on the containment. Verification test acceptance criteria are given in the HCGS Technical Specifications in Section 16.

If any Type A test fails to meet the acceptance criteria, the adjusted test schedule for subsequent Type A tests is described in the Primary Containment Leakage Rate Testing Program as referenced in HCGS Technical Specification in Section 16.

Systems or portions of systems outside containment which operate at a pressure less than P will be examined for leakage during the CILRT, as required by a

Section 1.10 Paragraph III.D.1.1.

6.2.6.2 Primary Containment Penetration Leakage Rate Test Type B tests are used to detect local leaks and to measure leakage across pressure containing or leakage limiting boundaries other than valves. Type B tests apply to the following:

1. Penetrations whose design incorporates resilient seals, gaskets, sealant compounds, expansion bellows, or flexible seal assemblies.
2. Seals, including door operating mechanism penetrations that are part of the primary containment system.
3. Doors and hatches with resilient seals or gaskets, except for seal-welded doors.

All containment penetrations subject to Type B testing are listed in Table 6.2-30.

6.2-124 HCGS-UFSAR Revision 9 June 13, 1998

The Type B preoperational and periodic leakage rate tests are conducted in accordance with 10CFR50, Appendix J, Option B. All Type B tests are conducted at a pressure not less than pressure P , as defined in Table 6.2-22.

a Penetrations are provided in the air lock to permit pressure testing of the door seals and the entire lock. The pressure testing penetrations have threaded caps.

The locations of all mechanical and electrical penetrations in the air lock are shown on Figure 6.2-42. Details of the door seals and the pressure test connections are shown on Figure 6.2-43.

The personnel access air lock volume is charged with air to containment peak accident pressure while undergoing periodic leak testing. The test schedule for the air lock is outlined in the Primary Containment Leakage Rate Testing Program as referenced in HCGS Technical Specifications in Section 16. The air lock containment bulkhead door is not designed to have a pressure differential greater than 3 psid in the reverse direction, air lock volume to primary containment volume. Therefore, 12 clamps are provided for holding the primary containment bulkhead door against internal pressure, P , during leak tests. The clamps shown on Figure 6.2-44 are installed for the duration of the internal pressure tests. The clamps are installed on the primary air lock side of the containment bulkhead door. The force exerted by the clamps during air lock leak testing is not monitored.

The air lock mechanical and electrical penetrations are also leak tested by charging the air lock volume to containment peak accident pressure, P .

a The air lock bulkhead doors have testable seals; the seal test pressure is governed by the Primary Containment Leakage Rate Testing Program as referenced in HCGS Technical Specifications in Section 16. The seal test cannot be substituted for the periodic air lock leakage test at pressure, P .

a 6.2-125 HCGS-UFSAR Revision 9 June 13, 1998

6.2.6.3 Primary Containment Isolation Valve Leakage Rate Tests Type C tests are intended to measure primary reactor containment system isolation valve leakage rates. Type-C test valves are primary containment isolation valves, including those valves that are closed, that close automatically upon receipt of an isolation signal in response to controls intended to effect primary containment isolation, or that operate under post-accident conditions to effect primary containment isolation. Type C tests are not required for those valves described above which do not present a potential primary containment atmospheric pathway during and following a design basis accident.

The valves that are Type-C-tested are listed in Table 6.2-24.

The Type B and C tests are performed by locally pressurizing components. The Type C test for a containment isolation valve is performed with the leakage through the valve in the same direction as leakage in a design basis LOCA.

Valves may be tested in the "reverse" direction if the "reverse" direction test is shown to be conservative or equivalent to the test in the LOCA direction.

For more information, see Table 6.2-24.

All valves that are exposed to the primary containment atmosphere after a DBA are tested with air or nitrogen at primary containment peak accident pressure, P , as defined in Table 6.2-22.

a Valves in lines designed to remain filled with a liquid inside the containment boundary for a minimum of 30 days after a DBA, but have credible leakage pathways outside of the containment boundary, are leakage rate tested with the same liquid at a minimum pressure of 1.1 P .

a Liquid leakage is not converted to equivalent air leakage, or added to the Type C testing total, but is reported separately as "liquid leakage" and included in the Technical Specifications. All the valves tested with liquid are identified in Table 6.2-24.

Containment isolation of the feedwater lines represents a unique situation which requires a combination of air and water testing and therefore merits further discussion. During the short term feedwater system line up, isolation of the feedwater lines is 6.2-126 HCGS-UFSAR Revision 21 November 9, 2015

provided by valves AE-V002, AE-V003, AE-V006 and AE-V007 and the water seal upstream of the third feedwater heaters (see Section 6.2.3.2.3). Hence, a Type C air test will be performed on these valves with their leakage appropriately included in the 0.60 La criteria. During the long term feedwater system line up, isolation of the feedwater lines is provided by a water seal on the third feedwater check valves, AE-V001, and AE-V005. Identification of these valves as containment isolation valves requires a similar classification for the first valve in each branch line between the second and third feedwater check valves, BD-V005, BJ-V059, and AE-V021. Since the leakage past these valves will be into the RCIC, HPCI and RWCU systems, respectively, which are seismically qualified, water filled, closed systems outside containment, there is no requirement to identify their specific leakage in the Technical Specifications. However, leakage through the valves which form the long term seal boundary of the feedwater lines (i.e., AE-V001, AE-V005, AE-V021, BD-V005 and BJ-V059) will be determined by a Type C water test and will be limited to 10 gpm as specified in the Technical Specifications. Since these valves are sealed with water, the leakage determined from their Type C test need not be included in performance criteria per 10CFR50 Appendix J, Option B, paragraph III.B.

Within Tables 6.2.16 and 6.2.24 are penetrations where leak rate testing is not applicable for certain containment isolation valves which are located in lines that penetrate the primary containment and terminate below the minimum water level in the suppression chamber (i.e., torus). The torus is designed and operated so that the supply of water is assured during all design bases and post accident modes of operation keeping the isolation valves "sealed" by water for a minimum of 30 days. Also, the piping outside containment meets the requirements of a closed system identified in FSAR 6.2.4.1.2. Based on the above information, leak rate testing of CIV's is not necessary to insure that post accident radiological release from the containment is minimized. The CIVs will be tested in accordance with the applicable requirements of ASME Section XI, Article IWV-3000.

Figure 6.2-28, sheets 1 through 48, show the test valves that exist for the purpose of conducting the Appendix J Type C test. The test connections are not branch lines and they cannot be tested for leakage during the Appendix J Type C test as they are open during the Appendix J Type C test of the containment isolation valve.

The test valves are one inch manual valves and are under administrative control to ensure that they are closed. Their leaktightness is assessed as part of the leaktightness of the containment boundary during the integrated leak rate test (10CFR50 Appendix J, Option B, Type A test).

6.2-127 HCGS-UFSAR Revision 9 June 13, 1998

The Total Allowable Leakage acceptance criteria for penetrations and isolation valves subject to Type B and C tests are given in the Primary Containment Leakage Rate Testing Program as referenced by HCGS Technical Specifications in Section 16.

6.2.6.4 Scheduling and Reporting of Periodic Tests The periodic leakage rate test schedules for Type A, B, and C testing are given in the Primary Containment Leakage Rate Testing Program as referenced by HCGS Technical Specifications in Section 16.

Type B and C tests are performed prior to initial criticality and periodically thereafter, during shutdown periods or normal plant operations.

The preoperational Type A test follows the preoperational ASME Section III pressure test. A primary containment isolation system functional test and Type B and C leakage tests are completed prior to the preoperational Type A test.

The procedure for reporting test results is given in the Primary Containment Leakage Rate Testing Program as referenced by HCGS Technical Specifications in Section 16.

6.2.6.5 Special Testing Requirements 6.2.6.5.1 Drywell to Pressure Suppression Chamber Atmosphere Bypass Area Test A drywell to pressure suppression chamber atmosphere bypass area test is conducted periodically to determine the overall bypass area that would allow the drywell atmosphere to flow directly to the pressure suppression chamber atmosphere, after a LOCA, without passing through the pressure suppression pool water. The test is conducted at intervals determined by the HCGS Technical Specifications.

The leakage rate test is performed by pressurizing the drywell below a pressure that forces drywell air through the downcomer vent 6.2-128 HCGS-UFSAR Revision 9 June 13, 1998

Code,Section III. These materials have been found acceptable within the context of GDC 51 based on the following.

Materials for the pressure boundary components of the containment vessel, drywell head, penetrations, equipment hatch including personnel lock and control rod drive removal hatch are impact quality materials conforming to ASME B&PV Code,Section III, Subsection NE. All nonexempt materials and components were impact tested satisfactorily in accordance with the requirements of ASME B&PV Code Section III, 1974 edition, Winter 1974 addenda. The ASME B&PV Code requirements of 1974 Winter addenda and 1977 Summer addenda applicable to the fracture toughness review are the same except that spray nozzles, backing rings, and backing bars were added to the list of exempted materials in the 1977 Summer addenda. Records for all nonexempt materials of the containment vessel, drywell head, penetrations, equipment hatch including personnel lock and CRD removal hatch are available for inspection.

6.2.7.2 Piping, Pump, and Valve Materials The ferritic materials of all piping, pumps, and valves attached to the containment vessel that are part of the containment pressure boundary were purchased and installed in accordance with the ASME B&PV Code Section III, Winter 1974 edition. Installation of welded attachment to Class 2 and 3 piping, after hydrostatic testing is in accordance with ASME Section III, 1980 Edition through 1981 Winter Addenda, Paragraphs NC/ND-4436. The NRC staff has performed an assessment of the fracture toughness of these materials based on the metallurgical characterization and fracture toughness data presented in NUREG-0577, "Potential for Low Fracture Toughness and Lamellar Tearing on PWR Steam Generator and Reactor Coolant Pump Supports"; and the ASME Code,Section III, Summer 1977 Addenda, Subsection NC. This review has indicated that all ferritic components of the HCGS containment pressure boundary, except feedwater check valves 1F074 A and B, have sufficient fracture toughness to meet GDC 51.

6.2-130 HCGS-UFSAR Revision 0 April 11, 1988

Based on a letter dated March 12, 1985 (R. L. Mittl, PSE&G, to A. Schwencer, NRC), these valves will undergo inspection of the entire valve bodies, both internal and external, as part of the inservice inspection (ISI) program, implemented at the first refueling outage. A more detailed program is described in the ISI program submitted 6 months after the start of commercial operation.

6.2.8 References 6.2-1 NEDO-20566A, General electric Model for LOCA Analysis in Accordance With 10CFR50 Appendix K, September 1986.

6.2-2 A.J. James, "The General Electric Pressure Suppression Containment Analytical Model," NEDO-10320, General Electric, April 1971.

6.2-3 A.J. James, "The General Electric Pressure Suppression Containment Analytical Model," Supplement 1, NEDO-10320, General Electric, May 1971.

6.2-4 A.J. James, "The General Electric Pressure Suppression Containment Analytical Model," Supplement 2, NEDO-10320, General Electric, January 1973.

6.2-5 I.E. Idel'chik, "Handbook of Hydraulic Resistance...", AEC-TR-6630, 1966, pp 2, 105, 416.

6.2-6 Crane Co, "Flow of Fluids," Crane Technical Paper 410, Chicago, 1969.

6.2-7 F.J. Moody, "Maximum Two-Phase Vessel Blowdown from Pipes," Topical Report APED-4827, General Electric, 1965.

6.2-8 A.J. James, "The General Electric Pressure Suppression Containment Analytical Model," NEDO-10320, April 1971.

6.2-131 HCGS-UFSAR Revision 17 June 23, 2009

6.2-9 A.J. James, "The General Electric Pressure Suppression Containment Analytical Model," Supplement 1, NEDO-10320, May 1971.

6.2-10 Takashi Tagami, "Interim Report on Safety Assessment and Facilities Establishment (SAFE)

Project," Hitachi Ltd, Tokyo, Japan, February 28, 1966.

6.2-11 Donald J. Wilhelm, "Condensation of Metal Vapors: Mercury and the Kinetic Theory of Condensation," ANL - 6948, October 1964.

(Historical Information) 6.2-12 Rockwell International, N116QP120001, Hope Creek Hydrogen Recombiner Mechanical Components Qualification Plan and Test Procedures.

6.2-13 Rockwell International, "Thermal Hydrogen Recombiner System for Mark I and II Boiling Water Reactors," AI-77-55, September 1977.

6.2-14 H.A. McLain, "Potential Metal-Water Reaction in Light-Water-cooled Power Reactors," ORNL-NSIC-23, August 1968, pp 4-17.

6.2-15 H.H. Uhlig, "Corrosion Handbook," John Wiley & Sons, New York, 1948, pp 39-43.

6.2-16 R.C. Burchell and D.D. Whyte, "Corrosion Study for Determining Hydrogen Generation from Aluminum and Zinc during Post-accident Conditions," WCAP-8776, 1976.

6.2-17 G.L. Cox, "Effect of Temperature on the Corrosion of Zinc,"

"Industrial and Engineering Chemistry," Vol 23, No. 8, 1931, p 902.

6.2-132 HCGS-UFSAR Revision 15 October 27, 2006

(Historical Information) 6.2-18 J.R. Baylis, "Prevention of Corrosion and 'Red Water'," "Journal of American Water Works Association," Vol 5, 1926, pp 598-633.

6.2-19 Franklin Institute Research Laboratories, "Hydrogen Evolution from Zinc Corrosion Under Simulated Loss-of-coolant Accident Conditions,"

FIRC Report F-C 4290, August 1976.

6.2-20 D. Van Rooyen, "Hydrogen Release Rate from Corrosion of Zinc and Aluminum," BNL-NUREG 24532, May 1978.

6.2-21 G.V. Cranston, "Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants," BN-TOP-1, Bechtel, San Francisco, California, November 1972.

6.2-22 American Nuclear Society - Standards Committee, "American National Standard Containment System Leakage Testing Requirements,"

ANSI/ANS56.8, American National Standards Institute/American Nuclear Society, 1981.

6.2-23 Environmental Qualification Report for Hydrogen/Oxygen Analyzer System by Comsip Delphi, September 14, 1981.

6.2-24 NUREG-0783, "Suppression Pool Temperature Limits for BWR Containments," USNRC, November 1981.

6.2-25 NEDC-30154, "Hope Creek Generating Station Suppression Pool Temperature Response," General Electric Company, June 1983, (GE Proprietary).

6.2-26 "HCGS Plant Unique Analysis Report (PUAR)," transmitted from R. L.

Mittl to A. Schwencer, February 10, 1984.

6.2-27 NEDC-32424P, General Guidelines for General Electric Boiling Water Reactor Extended Power Up-rate, Class III, February 1999 (ELTR).

6.2-133 HCGS-UFSAR Revision 17 June 23, 2009

TABLE 6.2-26 (1)

SYSTEM ISOLATION VALVES WITH PRIMARY CONTAINMENT ISOLATION Line Valve(4) Operator Essential/ Isolation Comments Isolated Number Number Non-Essential Signals(2) (3)

RHR to Radwaste BC-V042 HV-F049 Non-Essential B,D A BC-V041 HV-F040 Non-Essential B,D RHR to Process -- BC-SV-F079A Non-Essential B,D A Sampling -- BC-SV-F080A Non-Essential B,D RHR to Process -- BC-SV-F079B Non-Essential B,D A Sampling -- BC-SV-F080A Non-Essential B,D RHR to Post-Accid. -- RC-SV-F0645A Non-Essential None A,B,C Sampling -- RC-SV-F0645B Non-Essential None RHR to Post-Accid. -- RC-SV-F0646A Non-Essential None A,B,C Sampling -- RC-SV-F0646B Non-Essential None RHR to Contain. BC-V520 HV-V055A Non-Essential A,B,C A Hydrogen Recomb. GS-V150 HV-5057A Non-Essential A,B,C RHR to Contain. BC-V521 HV-5055B Non-Essential A,B,C A Hydrogen Recomb. GS-V151 HV-5057B Non-Essential A,B,C HPCI/RCIC to CST AP-V004 HV-F011 Non-Essential A,B RCIC from CST BD-V001 HV-F010 Essential None RCIC to Lube BD-V022 HV-F046 Essential None Oil Cooler HPCI from CST BJ-V005 HV-F004 Essential None HPCI to Lube BJ-V028 HV-F059 Essential None Oil Cooler FLEX Tie-in Connection to RHR BC-V636 Non-Essential None HPCI Steam Supply -- BC-PV-F051B Non-Essential None E 1 of 3 HCGS-UFSAR Revision 22 May 9, 2017

TABLE 6.2-26 (Cont)

(3)

Comments A. Using two intersystem isolation valves is conservative. If there is a single failure, and the containment isolation valve is unable to close, HCGS assumes credit for the closed system outside primary containment to accommodate the failure: Only one intersystem isolation valve in conjunction with the containment isolation valve is required to assure that the integrity of the closed system serving as an extension of the primary containment is maintained. If the single failure is loss of the intersystem isolation valves, the containment isolation valve will still be functional. Hence, the closed system would not constitute an extension of the primary containment and a second intersystem valve would not be required.

B. The post-accident sampling system is a fail-safe system, and will isolate on loss of power. The system meets the requirement of a sealed closed system. Power to open the system is provided only under administrative control.

C. Although the system is classified as non-essential, if the system is functional, it will be necessary to open the containment isolation valves after an accident, in order for the system to perform its intended function.

D. Deleted.

E. The valve is seal closed.

F. Use of a check valve as a system isolation valve is acceptable because it is located below the suppression pool and will be maintained closed in the reverse flow direction by the hydrostatic pressure in the suppression pool.

G. Use of a relief valve in the forward flow direction as an isolation valve is acceptable because its set pressure is greater than 1.5 times the containment pressure. The set pressure is 100 psig.

H. Use of relief valve in the forward flow direction as an isolation valve is acceptable because its set pressure is greater than 1.5 times the containment pressure. The set pressure is 170 psig.

(4)

Drain valves, vent valves, and manual valves under administrative control have not generally been identified in this table for simplicity. However, they are identified in Figures 6.2-45, 6.2-46, 6.2-47, and 6.2-48.

3 of 3 HCGS-UFSAR Revision 22 May 9, 2017

Security Related Information Table Withheld Under 10 CFR 2.390

TABLE 6.2-30 (Cont)

Penetration (1)

No. Nomenclature Test Type P220 GS-V022 - Containment Side Flange B P220 GS-V038 - Containment Side Flange B P220 GS-V038 - Valve Stem Packing B Electrical Penetrations W100A B W100B B W100C B W100D B W101A B W101B B W101C B W101D B W101E B W101F B W102A B W102B B W102C B W102D B W103A B W103B B W104A B W104B B W104C B W104D B W104E B W104F B W104G B W104H B W104J B W104K B 8 of 9 HCGS-UFSAR Revision 22 May 9, 2017

PRIMARY FI:PV CONTAINMENT I CONTAINMENT

[

GS-V203 I:¢J GS-PSE-11554

  • ..L G$-V201 j j

,.j_ GS-Y027 .-oAO

'e;cJAO G$-V076 FROM PRIMARY CONTAINMENT HYDROGEN RECOMBINER GS-PSV-5030 GS.V080 SYSTEM

./-*,

I DETAIL 31 REVISION 22 ' MAY g ' 2017 Hope Creek Nuclear Generating Station SUPRESSION CHAMBER PURGE AND SUPPRESSION PSEG Nuclear, LLC CHAMBER VACUUM RELIEF LINE HOPE CREEK NUCLEAR GENERATING STATION Sheet 31 of 49 FSAR 6.2-27

© 2000 PSEG Nuclear, LLC. All Rights Reserved.

Security Related Information Table Withheld Under 10 CFR 2.390

Security Related Information Figure Withheld Under 10 CFR 2.390

Security Related Information Figure Withheld Under 10 CFR 2.390

Security Related Information Figure Withheld Under 10 CFR 2.390

Security Related Information Figure Withheld Under 10 CFR 2.390

Security Related Information Figure Withheld Under 10 CFR 2.390

Security Related Information Figure Withheld Under 10 CFR 2.390

Security Related Information Figure Withheld Under 10 CFR 2.390

Security Related Information Figure Withheld Under 10 CFR 2.390

6.3 EMERGENCY CORE COOLING SYSTEM 6.3.1 Design Bases and Summary Description This section provides the design bases for the Emergency Core Cooling System (ECCS) and a summary description of the several ECCS subsystems, as an introduction to the more detailed design descriptions provided in Section 6.3.2 and the performance evaluation provided in Section 6.3.3.

6.3.1.1 Design Bases 6.3.1.1.1 Performance and Functional Requirements The ECCS is designed to provide protection against postulated loss-of-coolant accidents (LOCAs) caused by ruptures in reactor coolant pressure boundary (RCPB) piping. The functional requirements (e.g., coolant delivery rates) specified in Table 6.3-2 are such that the system performance under all LOCA conditions postulated in the design satisfies the requirements of Paragraph 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Cooled Nuclear Power Reactors, of 10CFR50. These requirements are summarized in Section 6.3.3.2. The effects of known changes or errors on the calculated limiting peak cladding temperature transient applicable to HCGS have also been estimated in accordance with 10 CFR 50.46(a)(3)(i). In addition, the ECCS is designed to meet the following requirements:

1. Protection is provided for any RCPB line failure up to, and including, the guillotine failure of the largest line.
2. Two independent and diverse cooling methods (flooding and spraying) are provided to cool the reactor core.
3. One High Pressure Cooling System is provided which maintains the reactor vessel water level above the top of the core and prevents Automatic Depressurization System (ADS) actuation for breaks equivalent to a failure of a pipe less than 1 inch nominal diameter.

6.3-1 HCGS-UFSAR Revision 9 June 13, 1998

4. No operator action is required until 10 minutes after an accident, to allow for operator assessment and decision.
5. The ECCS is designed to satisfy all criteria specified in Section 6.3 for any normal mode of reactor operation.
6. Access to a sufficient water source, and the necessary piping, pumps, and other hardware are provided so that the primary containment and reactor core can be flooded for long term, post-LOCA core heat removal.

6.3.1.1.2 Reliability Requirements The following reliability requirements apply:

1. The ECCS conforms to all licensing requirements and good design practices of isolation, separation, and common mode failure considerations.
2. The ECCS network has built-in redundancy so that adequate reactor core cooling can be provided, even in the event of specified failures. As a minimum, the following combination of equipment makes up the ECCS:
a. One High Pressure Coolant Injection System (HPCI)
b. Two core spray loops
c. One Low Pressure Coolant Injection System (LPCI)
d. One ADS
3. The ECCS is designed so that a single active or passive component failure cannot disable the ADS.
4. In the event of the failure of a pipe that is not part of the ECCS, no single active component failure in the ECCS 6.3-2 HCGS-UFSAR Revision 0 April 11, 1988

prevents automatic initiation and successful operation of less than one of the following combinations of ECCS equipment:

a. Three LPCI loops, one core spray loop, and the ADS and HPCI, i.e., single standby diesel generator (SDG) failure
b. Four LPCI loops, two core spray loops, and the ADS, i.e.,

HPCI failure.

5. In the event of the failure of a pipe that is part of the ECCS, no single active component failure in the ECCS prevents automatic initiation and successful operation of less than one of the following combinations of ECCS equipment:
a. Three LPCI loops and the ADS, i.e., single SDG failure and core spray injection line failure
b. Two LPCI loops, one core spray loop, and the ADS and HPCI, i.e., single SDG failure and LPCI injection line failure.
6. Long term (10 minutes after initiation signal) cooling requires the removal of reactor core decay heat via the Safety Auxiliaries Cooling System (SACS). In addition to the RCPB failure that initiated the loss of coolant event, the system can sustain one failure, either active or passive, and still have at least one low pressure ECCS injection loop (LPCI or core spray) operating for vessel makeup, and all required SACS water flow to the residual heat removal (RHR) heat exchanger operating for heat removal.

6.3-3 HCGS-UFSAR Revision 11 November 24, 2000

7. Offsite power is the preferred source for the ECCS network.

However, onsite standby power is provided with sufficient redundancy and capacity so that all the above requirements are met, even if offsite power is not available.

8. The diesel load configuration is one RHR (LPCI) pump and one core spray pump connected to a single SDG (typical for four SDGs).
9. Systems that interface with, but are not part of, the ECCS are designed and operated such that failure(s) in the interfacing systems do not propagate to, and/or affect the performance of, the ECCS.
10. Non-Class 1E systems interfacing with the Class 1E buses are automatically shed from the Class 1E buses when a LOCA signal exists.
11. Each subsystem of the ECCS, including flow rate and sensing networks, is capable of being tested during shutdown. All active components are capable of being tested during plant operation, including logic required to automatically initiate component action.
12. Provisions for testing the ECCS network components (electronic, mechanical, hydraulic, and pneumatic, as applicable) are designed in such a manner that they are an integral and nonseparable part of the system.

6.3.1.1.3 ECCS Requirements for Protection from Physical Damage The ECCS piping and components are protected against damage from the effects of movement, thermal stresses, a LOCA, and the safe shutdown earthquake (SSE).

6.3-4 HCGS-UFSAR Revision 0 April 11, 1988

The ECCS is protected against the effects of pipe whip, which might result from piping failures up to, and including, the design basis LOCA. This protection is provided by either spatial separation or pipe whip restraints. Either of these methods provides protection against damage to piping and components of the ECCS, which otherwise could reduce ECCS effectiveness to an unacceptable level.

For the purpose of mechanical separation, ECCS components are grouped into two divisions. The division A ECCS components include:

1. Core spray loop A
2. LPCI loops A and C
3. HPCI.

The division B ECCS components include:

1. Core spray loop B
2. LPCI loops B and D
3. ADS.

Each of the ECCS pumps and its associated components are located in individual compartments within the reactor building. This compartmentalization ensures that environmental disturbances, such as fire, pipe rupture, falling objects, etc, affecting one system do not affect the remaining systems. For ECCS mechanical components located outside the pump compartments, such as the outboard containment isolation valves, separation between the different divisions is provided by distance or by locating the components in different compartments.

Electrical separation is described in Sections 7.1 and 8.1.4.

6.3-5 HCGS-UFSAR Revision 0 April 11, 1988

6.3.1.1.4 ECCS Environmental Design Basis Each subsystem of the ECCS injection network, except the HPCI system, has a safety-related injection/isolation testable check valve located in piping within the drywell. The HPCI system injects through the core spray and feedwater systems. However, the HPCI system has an isolation valve in the drywell portion of its steam supply piping. No portion of the ECCS piping is subject to drywell flooding (except during post-accident containment flooding),

since water drains into the suppression chamber through the drywell to suppression chamber vent system. The safety-related valves within the drywell are qualified for the following environmental conditions:

1. Normal and upset plant operating ambient temperatures, relative humidities, and pressures, as shown in Reference 3.11-5.
2. Envelope of accident conditions for temperature, relative humidity, and pressure for various time periods following the accident, as shown in Reference 3.11-5.
3. Normal and envelope of accident radiation environment (gamma and neutron), as shown in Reference 3.11-5.

The portions of ECCS piping and equipment located outside the primary containment and within the Reactor Building are qualified for the following environmental conditions:

1. Normal and upset plant operating ambient temperatures, relative humidities, and pressures, as shown in Reference 3.11-5.
2. Envelope of accident conditions for temperature, relative humidity, and pressure for various time periods following the accident, as shown in Reference 3.11-5.

6.3-6 HCGS-UFSAR Revision 10 September 30, 1999

3. Normal and envelope of accident radiation environment (gamma and neutron), as shown in Reference 3.11-5.

6.3.1.2 Summary Descriptions of ECCS The ECCS injection network consists of an HPCI system, a core spray system, and the LPCI mode of the RHR system. These systems are briefly described here as an introduction to the more detailed system design descriptions provided in Section 6.3.2. The ADS, which assists the ECCS injection network under certain conditions, is also briefly described. Boiling water reactors (BWRs) with similar ECCS designs are listed in Table 1.3-3.

6.3.1.2.1 High Pressure Coolant Injection The HPCI system pumps water through one of the core spray spargers and one of the feedwater spargers. The primary purpose of HPCI is to maintain reactor vessel inventory after small breaks that do not depressurize the reactor vessel. The HPCI system is also used to maintain reactor vessel inventory following a reactor isolation and coincident failure of the non-ECCS Reactor Core Isolation Cooling (RCIC) System.

6.3.1.2.2 Automatic Depressurization System The ADS uses a number of the reactor safety/relief valves to reduce reactor vessel pressure during small or isolated breaks, in the event HPCI fails. When reactor vessel pressure is reduced to within the design capability of the low pressure systems (core spray and LPCI), these systems provide reactor vessel coolant inventory makeup, so that acceptable post-accident reactor core coolant temperatures are maintained.

6.3.1.2.3 Core Spray The two core spray system loops pump water into peripheral ring spray spargers mounted above the reactor core. The primary purpose 6.3-7 HCGS-UFSAR Revision 10 September 30, 1999

of core spray is to provide reactor vessel inventory makeup and spray cooling during large breaks in which the reactor core is calculated to uncover. After ADS initiation, core spray also provides inventory makeup following a small break.

6.3.1.2.4 Low Pressure Coolant Injection LPCI is an operating mode of the RHR system. Four pumps deliver water from the suppression chamber to four separate reactor vessel nozzles and inject directly into the core shroud region. The primary purpose of LPCI is to provide reactor vessel coolant inventory makeup following large breaks. After ADS initiation, LPCI also provides inventory makeup following a small break.

6.3.2 System Design Detailed descriptions of the individual Emergency Core Cooling System (ECCS) subsystems, including individual design characteristics, are covered in Sections 6.3.2.2.1 through 6.3.2.2.4. The following discussion also provides details of the composite ECCS network and, in particular, those design features and characteristics that are common to all ECCS subsystems.

6.3.2.1 Schematic Piping and Instrumentation and Process Diagrams The piping and instrumentation diagrams (P&IDs) for the ECCS injection systems, and the process diagrams that show the various operating modes of each injection system, are identified in Section 6.3.2.2.

6.3.2.2 Equipment and Component Descriptions The initiation signal for the ECCS comes from independent and redundant sensors of high drywell pressure and low reactor water level. The ECCS is actuated automatically and requires no operator action during the first 10 minutes following the accident. A time 6.3-8 HCGS-UFSAR Revision 0 April 11, 1988

sequence for starting of the ECCS subsystems is provided in Table 6.3-1.

Electric power for operation of the ECCS is from the preferred offsite power supply. Upon loss of the preferred source, operation is from the onsite standby power supply. Four standby diesel generators (SDGs) supplying individual ac buses have sufficient redundancy and capacity so that operation of any three units satisfies minimum ECCS requirements. One core spray pump and one residual heat removal (RHR)/low pressure coolant injection (LPCI) pump are powered by each ac bus. Section 8.3 contains a more detailed description of the power supplies for the ECCS.

See Section 3.11 for a discussion of environmental qualification of ECCS equipment and components.

6.3.2.2.1 High Pressure Coolant Injection System The High Pressure Coolant Injection (HPCI) System consists of a steam turbine driven, constant flow pump assembly and associated system piping, valves, controls, and instrumentation. The P&IDs for HPCI, Plant Drawings M-55-1 and M-56-1, show the system components and their arrangement. The HPCI system process diagram, Vendor Technical Document PN1-E41-1020-0004, shows the design operating modes of the system.

The HPCI equipment is installed in the Reactor Building. Suction piping comes from both the condensate storage tank (CST) and the suppression chamber.

Injection water is piped to the reactor vessel via the core spray loop A sparger and feedwater sparger A. Steam supply for the turbine is piped from main steam line C in the drywell. This piping is provided with an isolation valve on each side of the containment. Controls for valve and turbine operation are provided in the main control room. Valve position indication and instrumentation alarms are also displayed in the main control room. The controls and instrumentation of the HPCI system are described in Section 7.3.

6.3-9 HCGS-UFSAR Revision 20 May 9, 2014

The HPCI system ensures that the reactor core is not uncovered if there is a small break in the reactor coolant pressure boundary (RCPB) that does not result in rapid depressurization of the reactor vessel. This permits the plant to be safely shut down, by maintaining sufficient reactor vessel water inventory while the reactor vessel is depressurized. The HPCI system continues to operate until the reactor vessel is depressurized to the point at which LPCI and/or core spray system operation can maintain core cooling. The HPCI system also fulfills the objectives of the non-ECCS Reactor Core Isolation Cooling (RCIC) System, in the event RCIC becomes isolated or otherwise inoperative. The HPCI system head flow characteristics assumed for loss-of-coolant accident (LOCA) analyses are shown on Figures 6.3-4 and 6.3-5.

The HPCI system is designed to pump water into the reactor vessel over a wide range of pressures in the reactor vessel. Initially, demineralized water from the CST is used instead of water from the suppression chamber. This provides reactor grade water to the reactor vessel. A total reserve storage of 135,000 gallons is available from the CST for use by the HPCI and RCIC systems (see Section 9.2.6.2.1). During HPCI/RCIC system stand-by mode, if the water level in the CST drops below the reserved storage volume, suction source will be manually transferred to the torus. If the systems are operating, suction path will auto-transfer upon a low CST level. The minimum required suppression 3

chamber water volume is approximately 118,000 ft (Technical Specification 3

minimum during cold shutdown conditions is 57,232 ft ). Water from either source is pumped into the reactor vessel through a core spray sparger and a feedwater sparger, to obtain proper mixing with the reactor hot water or steam.

The minimum HPCI flow available, 5600 gpm, was used in the accident analysis for simulation of the flow over the high pressure range, with 2000 to 3000 gpm injecting through the core spray sparger and the remainder through the feedwater sparger. When the vessel pressure drops below the shutoff head of the core spray system, it will inject water into the reactor vessel and the total flow of the HPCI/CS system will be a minimum of 6150 gpm at 105 psid.

This is the combined HPCI/CS flow shown in Figure 6.3-5. Any additional HPCI/CS flow above the assumed minimums is conservatively ignored in the LOCA calculations presented in Section 6.3.3.

6.3-10 HCGS-UFSAR Revision 12 May 3, 2002

The CST level instrumentation used to automatically transfer the HPCI suction from the CST to the suppression chamber, and the portion of the suction piping exposed to outside air temperatures, are protected from cold weather effects respectively by 1 and 2 in. of insulation, along with a single non-1E powered heat trace on each line.

Motor control center (MCC) 1OB272015 supplies the normal power to the local heat tracing panel, 1OC284, that powers the heat tracing for the above two lines. The heat tracing is initiated automatically at 40F, with backup auto initiation at 35F if the 40F thermostat (1-AP-TS-0110) fails.

Failure of the 35F thermostat (1-AP-TS-0111) is alarmed on 1OC284 and in the main control room. Loss of power to 1OC284 (at any temperature) is also alarmed in the main control room. Diesel generator CG400 provides a backup source of power to 1OC284.

Additional heat tracing reliability for the 2-inch level sensing line is assured by an RTD (1-AP-TE-2048) that provides continuous monitoring of temperature in the line. The water temperature and an associated alarm are available in the main control room via the plant computer.

The HPCI pump assembly is located below the minimum water levels of the CST and the suppression chamber to ensure positive suction head to the pump assembly.

The check valve at the pump discharge is also located below the water levels in the CST and the suppression chamber to ensure that piping upstream of the valve is maintained full of water. Pump net positive suction head (NPSH) requirements are met by providing adequate suction head and adequate suction line size. Available NPSH with suction from the CST is 51.9 feet [Reference Calculation BJ-0002, Rev. 6] and the suppression chamber is 21.4 feet. Both available NPSH values are calculated using the assumptions of Regulatory Guide 1.1 and incorporating all appropriate instrumentation uncertainty. The required NPSH of the HPCI Booster Pump at speed 2093 rpm and flow 5920 gpm is 19.7 feet [Reference Calculation BJ-0002, Rev. 6, Section 7.3].

6.3-11 HCGS-UFSAR Revision 16 May 15, 2008

THIS PAGE INTENTIONALLY BLANK 6.3-12 HCGS-UFSAR Revision 13 November 14, 2003

Pump characteristic curves are given on Figure 6.3-6.

The HPCI turbine pump assembly and piping are protected from detrimental physical effects of the design basis LOCA, such as pipe whip, flooding, and high temperature. The equipment is located outside the primary containment.

The HPCI turbine is driven by steam from the reactor vessel generated by decay and residual heat. The steam is extracted from main steam line C upstream of the main steam isolation valves (MSIVs). The inboard and outboard HPCI containment isolation valves in the steam line to the HPCI turbine are normally open. This keeps the piping to the turbine at an elevated temperature to permit rapid startup of the HPCI system. The inboard isolation valve has a bypass line containing a normally closed valve. This bypass line permits pressure equalization and drainage around the isolation valve and downstream line warmup prior to opening of the isolation valve. Signals from the HPCI control system open or close the steam supply shutoff valve adjacent to the turbine.

6.3-13 HCGS-UFSAR Revision 13 November 14, 2003

A condensate drain pot is provided upstream of the steam supply shutoff valve to prevent the HPCI steam supply line from filling with water. The drain pot normally routes the condensate to the main condenser. However, upon receipt of an HPCI initiation signal, or upon loss of control air pressure, isolation valves on the condensate line automatically close.

The turbine power is controlled by a flow controller that senses pump discharge flow and provides a variable signal to the turbine governor to maintain constant pump discharge flow over the pressure range of operation. The turbine control system is capable of limiting speed overshoot to 15 percent of maximum operating speed on a quick start while driving only the pump inertia load.

Limit switches are provided on the turbine control (governor) valve to indicate fully open and closed positions. Both valve status lights are illuminated when the valve is in midposition.

As reactor steam pressure decreases, the HPCI turbine control valve opens further to pass the steam flow required to provide the necessary pump flow. The capacity of the system is selected to provide sufficient reactor core cooling to prevent cladding temperatures from exceeding the limits of 10CFR50.46 while the pressure in the reactor vessel is above the pressure at which core spray and LPCI can begin injection.

Exhaust steam from the HPCI turbine is discharged below the surface of the suppression pool. A drain pot at the low point in the exhaust line collects moisture present in the steam. Collected moisture is discharged through an orifice to the HPCI barometric condenser.

The HPCI turbine gland seals are vented to the barometric seal condenser for cooling. Noncondensable gases from the barometric condenser are normally pumped to the Filtration, Recirculation, and Ventilation System (FRVS). During testing of the HPCI turbine pump assembly, the noncondensable gases can be routed to the main 6.3-14 HCGS-UFSAR Revision 9 June 13, 1998

condenser. However, an interlock and a motor-operated isolation valve are provided to prevent the use of the discharge path to the main condenser during periods of low reactor water level.

A system of vacuum relief valves and isolation valves is installed as a vacuum breaker line, which connects the free space in the suppression chamber with the HPCI turbine exhaust line. This mitigates the effects of water from the suppression pool being drawn into the HPCI turbine exhaust line. The isolation valves in this vacuum breaker line isolate automatically, via a combination of low reactor vessel pressure and high drywell pressure.

Startup of the HPCI system is completely independent of ac power. Only dc power from the station battery and steam extracted from the nuclear boiler system are necessary.

The HPCI controls automatically start the system and bring it to design flow rate within 35 seconds from receipt of a reactor pressure vessel (RPV) low water level signal or a primary containment (drywell) high pressure signal.

Refer to Section 15 for more analysis details.

A large fraction of the 5600-gpm HPCI flow is delivered through one of the core spray spargers to inject makeup water directly over the core. Formerly, all the HPCI flow was injected into the core spray sparger. Analyses of anticipated transients without scram (ATWS) have resulted in the current design, which limits the HPCI flow through the core spray sparger to 3000 gpm and diverts the balance to the feedwater sparger. This change would minimize adverse reactivity effects from a postulated uninserted control rod during an ATWS. This change does not alter the ECCS analyses results presented in Section 6.3.3 since the loss of HPCI flow is assumed in the single failure scenario assumed in these analyses. During a small break accident for which the HPCI system was designed its primary purpose is to maintain reactor vessel inventory. This is accomplished with essentially the same degree of effectiveness 6.3-15 HCGS-UFSAR Revision 2 April 11, 1990

whether the flow is injected via the feedwater system or the core spray system.

The ECCS separation criterion is that there should be both electrical and mechanical separation such that a LOCA plus any single failure would not result in the peak cladding temperature (PCT) exceeding the requirements of 10 CFR 50.46 (i.e., PCT is less than 2200, the oxidation limits are met, etc.). The generic ECCS analysis has shown that this criterion is met with a portion of the HPCI flow injection into the core spray line. Plant specific ECCS analyses for other plants with this configuration have shown that the loss of both the core spray and HPCI systems from a break of their common line also would not violate this criterion.

An advantage of partial HPCI flow through the core spray sparger is the additional reflooding flow inside the shroud. Also, the effect of the loss of HPCI flow that would be due to a break in a recirculation line is reduced. A possible disadvantage of the partial HPCI flow through the core spray sparger is an adverse reactivity effect during a postulated ATWS event. This disadvantage has been minimized by limiting the HPCI flow through the core spray sparger to a maximum of 3000 gpm.

The HPCI flow through the feedwater system is automatic. The initiating and closing logic for the injection valve to the feedwater line is the same as the logic for the injection valve to the core spray line. Thus for any automatic or system-level manual initiation of the HPCI system, the flow to the reactor vessel will be divided between the core spray line and the feedwater line. As in the case of other accident modes (i.e., a LOCA), during an ATWS the HPCI system will be automatically initiated by a low water level-2 signal; the injection would be via the core spray and feedwater lines as represented by Modes F and G on the process diagram (Vendor Technical Document PN1-E21-1020-0003).

6.3-16 HCGS-UFSAR Revision 20 May 9, 2014

The HPCI turbine is shut down automatically by any one of the following signals:

1. HPCI turbine overspeed - preventing damage to the turbine
2. RPV high water level - indicating that core cooling requirements are satisfied
3. HPCI pump low suction pressure - preventing damage to the pump due to loss of flow
4. HPCI turbine exhaust high pressure - indicating a turbine or turbine control malfunction.

If an initiation signal is received after the turbine is shut down, the system restarts automatically if no shutdown signal exists.

Because the steam supply line to the HPCI turbine is part of the RCPB, certain signals automatically isolate this line and thereby shut down the HPCI turbine.

However, automatic depressurization and the low pressure injection systems of the ECCS act as backup. Automatic shutoff of the steam supply to the HPCI turbine does not negate the ability of the ECCS to satisfy its safety objective. Automatic shutoff of the HPCI steam supply is described in Sections 7.3 and 7.6.1.3.

In addition to the automatic operational features of the system, provisions are included for remote manual startup, operation, and shutdown, provided automatic initiation or shutdown signals do not exist.

HPCI operation automatically actuates the following valves:

1. Opens the HPCI pump discharge shutoff valves
2. Opens the HPCI steam supply shutoff valve 6.3-17 HCGS-UFSAR Revision 0 April 11, 1988
3. Opens the HPCI turbine stop valve
4. Opens the HPCI turbine control (governor) valve
5. Closes the HPCI steam line drain isolation valves
6. Closes the HPCI test valve (if open)
7. Closes the HPCI pump minimum flow bypass valve (upon high flow).

Startup of the auxiliary oil pump and proper functioning of the hydraulic control system are required to open the turbine stop and control valves.

Operation of the barometric condenser components prevents out leakage from the turbine shaft seals. Startup of the condenser equipment is automatic, but its failure does not prevent the HPCI system from fulfilling its core cooling objective. Prior to startup, the Turbine Control System is held at the low speed design condition. Upon receipt of an initiating signal, a speed ramp generator module automatically runs the control system toward its high speed design point, thereby controlling the transient acceleration of the turbine.

The flow controller then automatically overrides the speed ramp generator. When rated flow is established, the flow controller signal adjusts the setting of the turbine control so that rated flow is maintained as nuclear system pressure decreases.

A minimum flow bypass is provided for pump protection. The bypass valve automatically opens on a low flow signal, and automatically closes on a high flow signal. When the bypass is open, flow is directed to the suppression chamber. A line used for full flow system testing branches from the HPCI pump discharge line to the CST. The shutoff valves in this line are sequenced to close by the signal that actuates system operation, and are interlocked closed when the suction valve from the suppression chamber is open. All automatically operated valves are equipped with a remote manual functional test feature.

6.3-18 HCGS-UFSAR Revision 0 April 11, 1988

The HPCI system initially injects water from the CST. When the water level in the tank falls below a predetermined level or the suppression chamber water level is high, the pump suction is automatically transferred to the suppression chamber. This transfer may also be made from the main control room using manual controls. When the pump suction has been transferred to the suppression chamber, a closed loop is established for recirculation of water escaping from a break in the RCPB.

To ensure continuous core cooling, signals to isolate the primary containment do not operate any HPCI valves. The HPCI system also incorporates a relief valve in the pump suction line to protect the components and piping from inadvertent overpressure conditions.

Provisions included in the HPCI system that permit system testing are:

1. A full flow test line to route water from and to the CST, without entering the RPV
2. A line to route noncondensible gases from the barometric condenser to the plant main condenser
3. Instrumentation to indicate system performance during test operations
4. Motor operated valves capable of manual operation for test purposes
5. Drains to leak test the major system valves.

All components of the HPCI system are capable of individual functional testing during normal plant operation. Except as 6.3-19 HCGS-UFSAR Revision 10 September 30, 1999

indicated below, the HPCI control system design provides automatic alignment from test to operating mode if system initiation is required. The exceptions are as follows:

1. The auto/manual station is in "manual" on the flow controller. This feature is required for operator flexibility during system operation.
2. Closure of either or both of the steam inboard/outboard isolation valves requires operator action to properly sequence their opening.

Indication of the status of these valves is provided in the main control room.

3. Parts of the system that are bypassed or deliberately rendered inoperative are indicated automatically or manually in the main control room.

Interlocks for the HPCI system are described in Section 7. Operating requirement parameters for the components of the HPCI system (listed below) are shown on Vendor Technical Document PN1-E41-1020-0004.

1. One 100 percent capacity booster and main pump assembly
2. One 100 percent capacity turbine driver, with accessories
3. Piping, valves, and instrumentation for:
a. Steam supply to the turbine
b. Turbine exhaust to the suppression pool
c. Makeup supply from the CST to the pump suction
d. Makeup supply from the suppression chamber to the pump suction 6.3-20 HCGS-UFSAR Revision 20 May 9, 2014
e. Pump discharge to the core spray loop A sparger and feedwater sparger A, a test line to the CST, a minimum flow bypass line to the suppression chamber, and a cooling water supply to accessory equipment.

6.3.2.2.2 Automatic Depressurization System If the non-ECCS RCIC system or the HPCI system cannot maintain the reactor water level, the Automatic Depressurization System (ADS), which is independent of any other subsystem of the ECCS, reduces the reactor vessel pressure so that flow from the LPCI and/or core spray systems enters the reactor vessel in time to cool the core and limit fuel cladding temperature.

The ADS employs nuclear system safety/relief valves to relieve high pressure steam to the suppression pool. The design, number, location, description, operational characteristics, and evaluation of the safety/relief valves are discussed in Section 5.2.2. The instrumentation and controls for the ADS are discussed in Section 7.3.

6.3.2.2.3 Core Spray System Each of the two redundant core spray system loops consists of two 50 percent capacity centrifugal pumps, a spray sparger in the reactor vessel above the core (a separate sparger for each core spray loop), piping and valves to convey water from the suppression chamber to the sparger, and associated controls and instrumentation. A connection to the HPCI system is provided to allow HPCI system injection through the core spray loop A sparger. Plant Drawing M-52-1, the core spray P&ID, presents the system components and their arrangement. The core spray process diagram, Vendor Technical Document PN1-E21-1020-0003, shows the design operating modes of the system. A simplified system flow diagram showing system injection into the reactor vessel is included on Vendor Technical Document PN1-E21-1020-0003.

6.3-21 HCGS-UFSAR Revision 20 May 9, 2014

When low water level in the reactor vessel or high pressure in the drywell is sensed, the core spray pumps automatically start. When reactor vessel pressure is low enough, the core spray injection valves are automatically opened, and water is injected into the reactor vessel to cool the core. Each core spray injection line enters the reactor vessel, divides, and enters the core shroud at two points near the top of the shroud. A semicircular sparger is attached to each outlet. Nozzles are spaced around the spargers to spray the water radially over the core and onto the top of the fuel assemblies.

The Core Spray System is designed to provide cooling to the reactor core only when the reactor vessel pressure is low, as is the case for large break loss-of-coolant accident (LOCA) sizes. However, when the Core Spray System operates in conjunction with the ADS, the effective core cooling capability of core spray is extended to all break sizes, because the ADS rapidly reduces the reactor vessel pressure to the core spray operating range. The Core Spray System head flow characteristics assumed for LOCA analyses are shown on Figure 6.3-9.

The core spray system injection (isolation) valves are interlocked with reactor pressure such that they do not receive an opening permissive signal, following an accident, until reactor pressure has fallen below the maximum allowable pressure (approximately 460 psig) for the core spray discharge pipe.

The core spray pumps and all motor operated valves can be operated individually by manual switches located in the main control room. Operating indication is provided in the main control room by a flow meter for each core spray injection loop and by valve and pump status lights. Provisions to preclude inadvertent openings of the injection valves are discussed in Section 7.6.

To ensure continuity of reactor core cooling, signals to isolate the primary containment do not operate any Core Spray System valves. However, the bypass valves for the testable check valves and the 6.3-22 HCGS-UFSAR Revision 0 April 11, 1988

pump full flow test return valves are isolated on an automatic core spray initiation signal.

Each injection line to the reactor vessel is provided with two valves. One of these valves is a testable check valve located inside the drywell as close as practical to the reactor vessel. Core spray injection flow causes this valve to open during LOCA conditions, i.e., no power is required for valve actuation during a LOCA. If the core spray line breaks outside the primary containment, the check valve in the line inside the drywell prevents loss of reactor water.

The other valve, which is the containment isolation valve, and which is also referred to as the core spray injection valve, is a motor operated gate valve located outside the primary containment, as close as is practical to the core spray discharge line containment penetration. The connection to the HPCI system is located between the primary containment and the core spray loop A injection valve. The core spray injection valves are capable of opening against a maximum differential pressure equal to normal reactor vessel pressure minus the minimum core spray system shutoff pressure. These injection valves, which are normally closed to back up the testable check valves for primary containment integrity purposes, are capable of opening within 27 seconds of receipt of an automatic core spray initiation signal. Separate, independent power sources are provided for each core spray injection valve, so that failure of a single electrical channel does not disable more than one core spray injection loop. The primary containment isolation design of the Core Spray System is discussed in Section 6.2.4.

The Core Spray System piping and components are designed and arranged to avoid unacceptable damage from the physical effects of pipe whip, missiles, high temperature, high pressure, or high humidity. All principal, active core spray equipment is located outside the primary containment.

6.3-23 HCGS-UFSAR Revision 0 April 11, 1988

Check valves (one per core spray pump), a flow element, and a restricting orifice are provided in each core spray injection loop from the pumps to each injection valve. Each check valve is located below the minimum suppression chamber water level, so that the piping upstream of the valve is maintained full of water. The flow element is provided to measure system flow rate during LOCA and test conditions, and for automatic control of the minimum flow bypass valve. The measured flow is indicated in the main control room. The restricting orifice is sized during preoperational testing of the system to limit system flow to acceptable values, as described on the Core Spray System process diagram on Vendor Technical Document PN1-E21-1020-0003.

A minimum flow bypass line connects to each core spray pump discharge line upstream of each pump discharge check valve. The line bypasses water to the suppression chamber to prevent pump damage due to overheating when other discharge line valves are closed, or when reactor vessel pressure is greater than the Core Spray System discharge pressure following system initiation. A motor operated globe valve in each bypass line automatically closes when flow in the corresponding injection loop is sufficient.

Flow to each core spray pump passes through a motor operated pump suction valve that is normally open. This valve can be closed by a manual switch, located in the main control room, to isolate the core spray system from the suppression chamber should a leak develop in the system. This valve is located in the core spray pump suction line as close to the suppression chamber penetration as is practical. Because the Core Spray System conveys water from the suppression chamber, a closed loop is established for recirculation of water escaping from a break in the RCPB.

The minimum core spray flow is 6150 gpm at 105 psid differential pressure from RPV to Torus. The minimum HPCI flow is 5600 gpm. A maximum of 3000 gpm and a minimum of 2000 gpm of the HPCI flow enters the reactor vessel via core spray Loop A piping. The remainder of the HPCI flow enters the reactor via feedwater piping. Therefore, the present core spray piping is adequately sized for the flow from either system operating separately.

6.3-24 HCGS-UFSAR Revision 20 May 9, 2014

At reactor pressures above the core spray system capability (>289 psid), all flow will be from the HPCI system. At reactor pressures less than 289 psid, line flow will be provided by both systems; but in no case will this flow be less than core spray alone. As vessel pressure falls to the HPCI minimum rated case (150 psig), more of the core spray line flow will come from the core spray pump and less from the HPCI pump. HPCI will then pump a greater proportion of its total flow into the feedwater.

The core spray pumps are located in the Reactor Building below the water level in the suppression chamber to ensure positive suction head to the pumps. Pump NPSH requirements are met by providing adequate suction head and adequate suction line size. Available NPSH with suction from the CST is 41.8 feet

[Reference Calculation BE-0016, Rev. 5, Page 27] at an approximate maximum pump flow of 3600 gpm; available NPSH with suction from the suppression pool is 11.3 feet at an approximate maximum pump flow of 4175 gpm. Both available NPSH values are calculated using the assumptions of Regulatory Guide 1.1.

6.3-25 HCGS-UFSAR Revision 16 May 15, 2008

The required NPSH for the core spray pumps is 5.6 feet at 4300 gpm. Pump characteristic curves are given on Figure 6.3-10.

Each Core Spray System injection loop incorporates relief valves to protect the components and piping from inadvertent overpressure conditions. One relief valve, located at the discharge of the pumps, is set at 500 psig, with a capacity of 100 gpm at 10 percent accumulation. Relief valves located at the suction of each pump are set at 100 psig, with a capacity of at least 10 gpm at 10 percent accumulation.

Provisions included in the Core Spray System that permit system testing are:

1. Full flow test lines to route suppression chamber water back to the suppression chamber, without entering the RPV.
2. A test line supplying water from the CST to the core spray pump suction, for testing discharge capacity to the RPV during normal plant shutdown.
3. Instrumentation to indicate system performance during test operations.

6.3-26 HCGS-UFSAR Revision 14 July 26, 2005

4. Motor operated valves and check valves capable of manual operation for test purposes.
5. Drains to leak test the major system valves.

All active core spray components are capable of individual functional testing during normal plant operation. Except as indicated below, the core spray control system design provides automatic alignment from test to operating mode if system initiation is required. The exceptions are as follows:

1. Closure of any of the motor operated pump suction valves requires operator action to reopen them. Indication of the status of these valves is provided in the main control room.
2. Parts of the system that are bypassed or deliberately rendered inoperative are indicated automatically or manually in the main control room.

6.3.2.2.4 Low Pressure Coolant Injection System The LPCI system is an operating mode of the RHR system that is automatically actuated by low water level in the reactor vessel or high pressure in the drywell. It uses four motor driven RHR pumps to draw suction from the suppression chamber and inject cooling water into the reactor core via four separate reactor vessel nozzles and core shroud penetrations. Separate, independent power sources are provided for the electrically powered components in each LPCI injection loop, so that failure of a single electrical channel does not disable more than one injection loop. Using the suppression chamber as the source of water for LPCI establishes a closed loop for recirculation of water escaping from a break in the RCPB.

The LPCI system, like the Core Spray System, is designed to provide cooling to the reactor core only when the reactor vessel pressure is low, as is the case for large break LOCA sizes. However, when the 6.3-27 HCGS-UFSAR Revision 0 April 11, 1988

LPCI system operates in conjunction with the ADS, the effective core cooling capability of LPCI is extended to all break sizes, because the ADS rapidly reduces the reactor vessel pressure to the LPCI operating range. The LPCI system head flow characteristics assumed for LOCA analyses are shown on Figure 6.3-11.

Figure 6.3-12 shows a process diagram and process data for the RHR system, including LPCI. The RHR system P&ID is shown on Plant Drawing M-51-1. The process diagram and P&ID indicate that many flow paths are available other than the LPCI injection lines. However, the low reactor water level or high drywell pressure signals, which automatically initiate the LPCI mode, are also used to align RHR system valves to the LPCI lineup. Inlet and outlet valves for the RHR heat exchangers receive no automatic signals, since the system is designed to provide rated flow to the reactor vessel whether they are open or not. To ensure continuity of core cooling, signals to isolate the primary containment do not operate any RHR system valves that interfere with the LPCI mode of operation. Provisions to preclude inadvertent openings of the injection valves are discussed in Section 7.6.

A check valve in each pump discharge line is located below the minimum water level in the suppression chamber to ensure that piping upstream of the valve is maintained full of water. A flow element in each pump discharge line is used to provide a measure of pump flow and to originate automatic signals for control of each pump minimum flow bypass valve. The minimum flow bypass valves permit a small flow to the suppression chamber if no pump discharge valve is open, or if reactor vessel pressure is higher than the pump shutoff pressure.

The LPCI system incorporates a relief valve on each of the pump suction and discharge lines, which protects the components and piping from inadvertent overpressure conditions. These valves are set to relieve at pressures equal to the corresponding piping design pressures shown on Figure 6.3-12.

6.3-28 HCGS-UFSAR Revision 20 May 9, 2014

The RHR pumps, and equipment used for LPCI, are described in Section 5.4.7, which also describes the other functions served by the same pumps if they are not needed for the LPCI function. The RHR heat exchangers are not associated with the emergency core cooling function. The heat exchangers are discussed in Section 6.2.2.

The pumps used for LPCI are located in the Reactor Building below the water level in the suppression chamber to ensure positive suction head to the pumps.

Pump NPSH requirements are met by providing adequate suction head and adequate line size. Available NPSH for the LPCI function is calculated using the assumptions of Regulatory Guide 1.1 and the following data:

1. Each pump is operating at its maximum flow rate.
2. Pump suction is from the suppression chamber, which is at its minimum normal operating water level of Elevation 71 feet.
3. Suppression chamber water is at its maximum temperature (for the given operating mode) of 212F.
4. The free space in the suppression chamber is at atmospheric pressure.
5. The pump suction strainers (in the suppression chamber) are fouled uniformly with containment debris, both preexisting and that which was generated following a DBLOCA, based upon the criteria set forth in USNRC Bulletin 96-03 and NUREG/CR-6224.
6. The datum line for calculation of NPSH is the pump suction center line elevation of 55 ft. 9 in.
7. NPSH = hs - hf + ha - hvp using data from the limiting case (D pump):

hs = static head = (71 feet - 55.8 feet) = 15.2 feet 6.3-29 HCGS-UFSAR Revision 11 November 24, 2000

hf = friction head loss = 5.2 feet ha = atmospheric pressure head = 35.38 feet hvp = vapor pressure (head loss) = 35.38 feet NPSH = 10.0 feet Minimum required NPSH for the RHR pumps is provided by the manufacturers pump curves, and is shown on Figure 6.3-12. A representative pump characteristic curve is given on Figure 6.3-13.

Provisions included in the LPCI system that permit system testing are:

1. Full flow test lines to route suppression chamber water back to the suppression chamber, without entering the RPV
2. Instrumentation to indicate system performance during test operations
3. Motor operated valves and check valves capable of manual operation for test purposes
4. Shutdown cooling lines taking suction from the recirculation system to permit testing of the RHR discharge into the RPV after normal plant shutdown
5. Drains to leak test the major system valves.

All active LPCI components are capable of individual functional testing during normal plant operation. Except as indicated below, the LPCI control system design provides automatic alignment from test to operating mode if system initiation is required. The exceptions are as follows:

6.3-30 HCGS-UFSAR Revision 11 November 24, 2000

1. Closure of any of the motor operated pump suction valves in the suction lines from the suppression chamber requires operator action to reopen them. Indication of the status of these valves is provided in the main control room.
2. Parts of the system that are bypassed or deliberately rendered inoperative are indicated automatically or manually in the main control room.

6.3.2.2.5 ECCS NPSH Margin and Vortex Formation NPSH calculations for ECCS pumps, such as the calculation in the previous section, have shown adequate margin to ensure capability of proper pump operation under accident conditions. This capability is verified during preoperational testing and by post-modification testing and engineering analysis. The geometries of the RHR, core spray and HPCI suction strainer and piping in the torus have been evaluated and the resulting Froude numbers are less than 0.8 for all strainers. Tests have shown that no air core vortices or air withdrawal are observed for BWR Mark I geometries where the Froude number is less than 0.8. Therefore the HCGS design avoids the formation of air core vortices and possible air ingestion.

6.3.2.2.6 ECCS Discharge Line Fill Network A requirement of the ECCS is that cooling water flow to the RPV be initiated rapidly when the system is called upon to perform its function. This quick start system characteristic is provided by quick opening valves, quick start pumps, and standby power sources. The lag between the signal to start the pump and the initiation of flow into the RPV can be minimized by keeping the ECCS pump discharge lines full. Additionally, if these lines are empty when the systems are called upon, the large momentum forces associated with accelerating fluid into a dry pipe could cause physical damage to the piping. Therefore, the ECCS discharge line fill network is designed to maintain the ECCS pump discharge lines in a filled condition.

6.3-31 HCGS-UFSAR Revision 11 November 24, 2000

Since the ECCS discharge lines are elevated above the water level in the suppression chamber, check or stop-check valves are provided near the pumps to prevent backflow from emptying the lines into the suppression chamber. Past experience shows that these valves may leak slightly, producing a small backflow that could eventually empty the discharge piping. To ensure that this leakage from the discharge lines is replaced and the lines are always kept full, makeup flow is provided by the ECCS discharge line fill network.

The fill network consists of three independent jockey pump loops, as shown on Plant Drawings M-55-1, M-56-1, and M-51-1. Two of the pump loops serve the low pressure ECCS pump (LPCI and core spray) discharge lines; the third pump loop serves the HPCI pump discharge line. Each jockey pump, and its respective controls and instrumentation, is powered from a separate Class 1E electrical channel. Physical separation is provided by locating two of the jockey pumps in separate RHR pump compartments, and the third jockey pump in the HPCI equipment compartment. The fill network is safety-related and designed to Seismic Category I criteria, but is not considered an integral part of the ECCS.

Nonetheless, a single failure of an active component in the fill network will not prevent the ECCS from performing its intended function.

Each of the jockey pumps operates continuously to maintain the ECCS pump discharge lines above atmospheric pressure, so that entrapped air pockets can be released through the piping high point vents during surveillance testing of the fill network. The jockey pumps serving the low pressure ECCS injection lines take suction from two different RHR pump suppression chamber suction lines. Jockey pump protection (from overheating) is provided by continuously recirculating this flow back to the suppression chamber via the RHR pump full flow test lines. The jockey pump serving the HPCI system takes its suction from the HPCI pump suction and recirculates flow back to the HPCI pump suction piping.

Controls for operation of the jockey pumps are provided in the main control room. Instrumentation is also provided to assist the 6.3-32 HCGS-UFSAR Revision 20 May 9, 2014

operator in ascertaining the proper operation of the entire fill network. Controls and instrumentation associated with the fill network are discussed in Section 7.6.

Each ECCS injection loop is provided with a separate, isolable fill line to permit maintenance of individual ECCS injection loops without disabling other ECCS injection equipment. This isolation feature also ensures that the ECCS pump discharge lines remain filled and pressurized during maintenance of ECCS injection equipment.

There are times during normal operation, when a jockey pump must be removed from service to perform preventative or corrective maintenance or periodic testing. When a jockey pump must be removed from service, it is prudent not to impact availability of the associated ECCS or RCIC system(s). Therefore, availability of the affected system(s) is maintained by transferring the keepfill function to the Condensate Transfer and Storage System. Under these conditions, the jockey pump is removed from service in accordance with station administrative controls which ensure that the impact on system operability is assessed and appropriate compensatory actions are considered and implemented.

Additionally, only a single jockey pump, associated with an operable ECCS or RCIC system is removed from service at a time.

Surveillance tests to determine if the discharge lines of the ECCS pumps are full are as required by the plant technical specifications in Section 16.

6.3.2.3 Applicable Codes and Classifications The applicable codes and classifications of the ECCS are specified in Section 3.2. All piping systems and components (pumps, valves, etc.) for the ECCS comply with applicable codes, addenda, code cases, and errata in effect at the time the equipment is procured.

The equipment and piping of the ECCS are also designed to the requirements of Seismic Category I. This seismic designation applies to all structures and equipment essential to the core cooling function. IEEE standards applicable to the controls and power supplies are specified in Section 7.1.

6.3.2.4 Materials Specifications and Compatibility Materials specifications and compatibility for the ECCS are presented in Section 6.1.

Nonmetallic materials, e.g., lubricants, seals, packings, paints and primers, insulation, etc, and metallic materials are selected as a result of an engineering review and evaluation for compatibility with other materials in the system and the surroundings, with concern for chemical, radiolytic, mechanical, and nuclear effects.

Materials used are reviewed and evaluated with 6.3-33 HCGS-UFSAR Revision 8 September 25, 1996

regard to both radiolytic and pyrolytic decomposition, and attendant effects on safe operation of the ECCS.

6.3.2.5 System Reliability Analysis shows that no single failure prevents either the starting of the ECCS when required, or the delivery of coolant to the reactor vessel. No individual system of the ECCS is single failure proof, with the exception of the ADS; hence, it is expected that single failures will disable individual systems of the ECCS. The most severe single failure event with respect to loss of equipment is the LOCA, due to an ECCS pipe break coincident with a loss of offsite power. The consequences of the most severe single failure are shown in Table 6.3-6. See Section 15.9 for a system level, qualitative failure modes and effects analysis.

6.3.2.6 Protection Provisions Protection provisions are included in the design of the ECCS. Protection is afforded against missiles, pipe whip, and flooding. Also accounted for in the design are thermal stresses, loadings from a LOCA, and seismic effects.

The ECCS piping and components located outside the primary containment are protected from internally and externally generated missiles by the reinforced concrete structure of the ECCS pump rooms.

The ECCS is protected against the effects of pipe whip which might result from piping failures up to, and including, the design basis LOCA. This protection is provided by either spatial separation or pipe whip restraints. Either of these methods provides protection against damage to piping and components of the ECCS, which otherwise could reduce ECCS effectiveness to an unacceptable level. See Section 3.6 for criteria on pipe failures.

6.3-34 HCGS-UFSAR Revision 0 April 11, 1988

The component supports that protect the ECCS against damage from movement and from seismic events are discussed in Section 5.4.14. The methods used to provide assurance that thermal stresses do not cause damage to the ECCS are described in Section 3.9.3.

6.3.2.7 Provisions for Performance Testing Periodic system and component testing provisions for the ECCS are described in Section 6.3.2.2 as part of the individual system descriptions.

6.3.2.8 Manual Actions The ECCS is actuated automatically and requires no operator action during the first 10 minutes following the accident.

During the long term cooling period (after 10 minutes), the operator takes action, as specified in Section 6.2.2.2, to place the Containment Cooling System into operation. Placing the Containment Cooling System into operation is the only manual action that the operator needs to accomplish during the course of the LOCA.

The operator has multiple instrumentation available in the main control room to assist him in assessing the post-LOCA conditions. This instrumentation indicates reactor vessel pressure and water level, and primary containment pressure, temperature, and radiation levels, as well as indicating the operation of the ECCS. ECCS flow indication is the primary parameter available to assess proper operation of the system. Other indications, such as position of valves, status of circuit breakers, and essential power bus voltage, are also available to assist the operator in determining system operating status.

The instrumentation and controls for the ECCS are discussed in Section 7.3.

Monitoring instrumentation available to the operator is discussed in more detail in Section 5 and Section 6.2.

Consideration has been given to the unlikely possibility that manual valves in the ECCS might be left in the wrong position and remain undetected when an accident occurs. Many of the manual valves in the ECCS are vent, drain, or test connection valves, which are normally closed and capped. Administrative controls, such as prestartup valve lineup checks, suffice to reasonably ensure that such valves will not degrade ECCS performance. In other cases, two isolation valves are provided in series to minimize the possibility of inter or 6.3-35 HCGS-UFSAR Revision 11 November 24, 2000

intra system leakage. Position indication of manual valves that are in the main flowpaths of the ECCS, and that are inaccessible during normal plant operation, is provided in the main control room. Proper administrative controls and/or surveillance testing are relied upon to ensure the position of the remaining valves.

6.3.2.9 TMI Action Plans See Section 1.10 for a discussion of TMI Task Action Plan requirements applicable to HCGS.

6.3.3 Performance Evaluation The performance of the Emergency Core Cooling System (ECCS) is determined through application of the 10CFR50, Appendix K evaluation models, and demonstrated conformance to the acceptance criteria of 10CFR50.46. The analytical models are documented in Section S.2.2.3.2 of GESTAR II (Reference 6.3-3). The effects of known changes or errors on the calculated limiting peak cladding temperature transient applicable to HCGS have also been estimated in accordance with 10 CFR 50.46(a)(3)(i).

A SAFER/GESTR-LOCA analysis has been performed (Reference 6.3-4) using the NRC-approved methods contained in GESTAR II (Reference 6.3-3). This analysis further maintains the design basis analysis as contained in the following sections. The Reference 6.3-4 analysis was performed to support EPU operation, and the analysis incorporated all the known changes or errors on the calculated limiting peak cladding temperature transient applicable to HCGS in accordance with 10 CFR 50.46(a)(3)(i). Changes or errors in the ECCS evaluation models have been discovered since performance of the SAFER/GESTR-LOCA analysis supporting EPU operation. The effects of those known changes or errors in the acceptable ECCS evaluation models on the calculated limiting peak cladding temperature transient have also been evaluated and are shown in Table 6.3-7.

The ECCS performance is evaluated for the entire spectrum of break sizes for postulated LOCAs. The accidents, as listed in Section 15, for which ECCS operation is required are:

1. Section 15.6.6 - Feedwater piping break
2. Section 15.6.4 - Spectrum of boiling water reactor (BWR) steam system piping failures outside of containment 6.3-36 HCGS-UFSAR Revision 20 May 9, 2014
3. Section 15.6.5 - LOCAs Section 15 provides a description of the radiological consequences of the events listed above.

6.3.3.1 ECCS Bases for Technical Specifications The maximum average planar linear heat generation rates calculated in this performance analysis provide the basis for technical specifications designed to ensure conformance with the acceptance criteria of 10CFR50.46. An evaluation of the effects of known changes and errors in the acceptable ECCS evaluation models ensures the basis remains valid and the acceptance criteria are met.

Minimum ECCS functional requirements are specified in Sections 6.3.3.4 and 6.3.3.5. Testing requirements are discussed in Section 6.3.4. Limits on minimum suppression chamber water level are discussed in Section 6.2.

6.3.3.2 Acceptance Criteria for ECCS Performance The applicable acceptance criteria, extracted from 10CFR50.46, are listed below. For each criterion, applicable parts of Section 6.3.3 (where conformance is demonstrated) are indicated. A detailed description of the methods used to show compliance is contained in Section S.2.2.3.2 of Reference 6.3-3.

1. Criterion 1, Peak Cladding Temperature "The calculated maximum fuel element cladding temperature shall not exceed 2200F." Conformance to Criterion 1 is shown in Sections 6.3.3.7.3, 6.3.3.7.4, 6.3.3.7.5, 6.3.3.7.6, and specifically in Table 6.3-3. The effects of known changes or errors in the acceptable ECCS evaluation models on the calculated limiting peak cladding temperature transient have also been evaluated and are shown in Table 6.3-7.
2. Criterion 2, Maximum Cladding Oxidation "The calculated total local oxidation of the cladding shall nowhere exceed 0.17 times the total cladding thickness before oxidation." Conformance to Criterion 2 is shown in Table 6.3-3.
3. Criterion 3, Maximum Hydrogen Generation "The calculated total amount of hydrogen generated from the chemical 6.3-37 HCGS-UFSAR Revision 14 July 26, 2005

reaction of the cladding with water or steam shall not exceed 0.01 times the hypothetical amount that would be generated if all the metal in the cladding cylinder surrounding the fuel, excluding the cladding surrounding the plenum volume, were to react." Conformance to Criterion 3 is shown in Table 6.3-3.

4. Criterion 4, Coolable Geometry "Calculated changes in core geometry shall be such that the core remains amenable to cooling." As described in Reference 6.3-4, conformance to Criterion 4 is demonstrated by conformance to Criteria 1 and 2.
5. Criterion 5, Long-Term Cooling "After any calculated successful initial operation of the ECCS, the calculated core temperature shall be maintained at an acceptably low value and decay heat shall be removed for the extended period of time required by the long lived radioactivity remaining in the core." Conformance to Criterion 5 is demonstrated in Reference 6.3-4. Briefly summarized, the core remains covered to at least the jet pump suction elevation, and the uncovered region is cooled by spray cooling and/or by steam generated in the covered part of the core.

6.3.3.3 Single Failure Considerations The functional consequences of single failures, including operator errors that might cause any manually controlled, electrically operated valve in the ECCS to move to a position that could adversely affect the ECCS, and the potential for submergence of valve motors in the ECCS, are discussed in Sections 6.3.1.1.2 and 6.3.1.1.4. The most severe single failures are identified in Table 6.3-6.

Therefore, only these single failures are considered in the ECCS performance analyses. For both large and small breaks, failure of the channel A dc source is the most severe failure. A 6.3-38 HCGS-UFSAR Revision 14 July 26, 2005

single failure in the ADS (one ADS valve) has no effect in large breaks.

Therefore, as a matter of calculational convenience, it is assumed in all calculations that one ADS valve fails to operate in addition to the identified single failure. This assumption reduces the number of calculations required in the performance analysis and bounds the effects of one ADS valve failure and the channel A dc source failure by themselves. The only effect of the assumed ADS valve failure on the calculations is a small increase (on the order of 100F) in the calculated temperatures following small breaks.

6.3.3.4 System Performance During the Accident In general, the system response to an accident can be described as the following:

1. An initiation signal is received.
2. A small lag time (to open all valves and run the pumps up to rated speed) occurs.
3. The ECCS flow enters the reactor vessel.

Key ECCS actuation setpoints and time delays are provided in Table 6.3-2. The minimization of the delay from the receipt of signal until the ECCS pumps have reached rated speed is limited by the physical constraints on accelerating the standby diesel generators (SDGs) and the ECCS pumps. The delay time due to valve motion in the high pressure system provides a suitably conservative allowance for valves available for this application. In the low pressure systems, the time delay for valve motion is such that the pumps are at rated speed prior to the time the reactor vessel pressure decreases to the pump shutoff pressure.

The flow delivery rates analyzed in Section 6.3.3 can be determined from the head flow curves on Figures 6.3-4, 6.3-5, 6.3-9, and 6.3-11, and from the pressure versus time plots discussed in Section 6.3.3.7. Piping and instrumentation diagrams for the ECCS 6.3-39 HCGS-UFSAR Revision 0 April 11, 1988

injection network are identified in Section 6.3.2.2. Functional control diagrams (FCDs) for the ECCS are provided in Section 7.3. The operational sequence of the ECCS for the design basis LOCA is shown in Table 6.3-1.

Operator action is not required, except as a monitoring function, during the short term cooling period following the LOCA. During the long term cooling period, the operator takes action as specified in Section 6.2.2.2 to place the Containment Cooling System into operation.

6.3.3.5 Use of Dual Function Components for ECCS With the exception of the Automatic Depressurization System (ADS) and the Low Pressure Coolant Injection (LPCI) System, the systems of the ECCS are designed to accomplish only one function: to cool the reactor core following a loss of reactor coolant. To this extent, components or portions of these systems, except for pressure relief, are not required for operation of other systems that have emergency core cooling functions, or vice versa. Because either the ADS initiating signal or overpressure of the reactor pressure vessel (RPV) opens the safety/relief valves, no conflict exists.

The LPCI system, however, uses the residual heat removal (RHR) pumps and some of the RHR valves and piping. When the reactor water level is low, the LPCI system has priority, through the valve control logic, over the other RHR modes of operation. Immediately following a LOCA, the RHR system is aligned to the LPCI mode.

6.3.3.6 Limits on ECCS System Parameters Refer to Sections A.6.3.3.6 through A.6.3.3.7.2 of Appendix A of Reference 6.3-3.

Compliance with Regulatory Guide 1.47 is identified in Section 1.8.

6.3.3.7 ECCS Analyses for LOCA Starting in Cycle 13, Hope Creek is analyzed with the SAFER/GESTR-LOCA methodology as described in GESTAR (Reference 6.3-3).The corresponding analysis results are reported in Reference 6.3-4 and have been incorporated into the UFSAR.

6.3-40 HCGS-UFSAR Revision 14 July 26, 2005

6.3.3.7.1 LOCA Analysis Procedures and Input Variables Refer to Section S.2.2.3.2 of Reference 6.3-3. The significant input variables used by the LOCA codes are given in Table 6.3-2 and on Figure 6.3-15.

6.3.3.7.2 Accident Description Reference to a detailed description of the LOCA calculation is provided in Section S.2.2.3.2 of Reference 6.3-3.

6.3.3.7.3 Break Spectrum Calculations A complete spectrum of postulated break sizes and locations is considered in the evaluation of ECCS performance.

A summary of the results of the break spectrum calculations is shown in tabular form in Table 6.3-3 and graphically on Figure F6.3-14 for GE14 fuel. The effects of known changes or errors in the acceptable ECCS evaluation models on the calculated limiting peak cladding temperature transient have also been evaluated and are shown in Table 6.3-7. Conformance to the acceptance criteria (peak cladding temperature 2200F, local oxidation 17 percent, and core wide metal water reaction 1 percent) is demonstrated. Details of calculations for specific breaks are included in subsequent paragraphs.

6.3.3.7.4 Large Recirculation Line Break Calculations The characteristics that determine which is the most limiting large break are:

1. The calculated time for reflooding the hot node
2. The calculated time for uncovering the hot node
3. The calculated time of boiling transition.

6.3-41 HCGS-UFSAR Revision 20 May 9, 2014

The calculated time of boiling transition increases with decreasing break size, since the time of uncovering of the jet pump suction inlet, which leads to boiling transition, is determined primarily by the break size. The calculated time for uncovering the hot node also generally increases with decreasing break size, since it is determined primarily by the reactor coolant inventory lost during the blowdown.

The hot node reflooding time is determined by a number of interacting phenomena, such as depressurization rate, countercurrent flow limiting, and a combination of available ECCS.

The period between the uncovering of the hot node and its reflooding is the period when the hot node has the lowest heat transfer. Hence, the break that results in the longest period during which the hot node remains uncovered results in the highest calculated peak cladding temperature. If two breaks have similar times during which the hot node remains uncovered, then the larger of the two breaks will be limiting, as it would have an earlier boiling transition time (i.e., the larger break would have a more severe result from a blowdown heat transfer analysis).

The design basis accident (DBA) was determined to be the break that results in 2 2 the highest calculated peak cladding temperature in the 1.0 ft to 4.1 ft region (the largest possible area of a recirculation system line break is 2

4.1 ft ). Confirmation that this is the most limiting break over the entire break spectrum is shown in Figure 6.3-14.

Important variables from the analysis of the DBA are shown on Figures 6.3-20 through 6.3-23 for the GNF2 fuel type. These variables are:

6.3-42 HCGS-UFSAR Revision 22 May 9, 2017

6.3-20 Water level as a function of time 6.3-21 Pressure as a function of time 6.3-22 Fuel rod convective heat transfer coefficient as a function of time for GNF2.

6.3-23 Peak cladding temperature as a function of time for GNF2.

The maximum local oxidation, and peak cladding temperature are shown in Table 6.3-3. The effects of known changes or errors in the acceptable ECCS evaluation models have not been incorporated into the figures for peak cladding temperature as a function of time but have been evaluated and are shown in Table 6.3-7.

6.3.3.7.5 Transition Recirculation Line Break Calculations Important variables from the analysis of the 60% DBA break are shown on Figures 6.3-30 through 6.3-33. These variables are:

6.3-43 HCGS-UFSAR Revision 22 May 9, 2017

6.3-30 Water level (large break methods) as a function of time 6.3-31 Pressure (large break methods) as a function of time 6.3-32 Fuel rod convective heat transfer coefficient (large break methods) as a function of time for GE14.

6.3-33 Peak cladding temperature (large break methods) as a function of time for GE14.

6.3.3.7.6 Small Recirculation Line Break Calculations Important variables from the analysis of the small break yielding the highest cladding temperature are shown on Figures 6.3-38 through 6.3-41 for the GNF2 fuel type. These variables are:

6.3-38 Water level as a function of time 6.3-39 Pressure as a function of time 6.3-40 Fuel rod convective heat transfer coefficient as a function of time for GNF2.

6.3-41 Peak cladding temperature as a function of time for GNF2.

6.3-44 HCGS-UFSAR Revision 22 May 9, 2017

6.3.3.7.7 Calculations for Other Break Locations In addition to the spectrum of recirculation line breaks, calculations were also performed to determine the peak clad temperatures for line breaks in the following systems and locations: core spray line, steam line inside containment, steam line outside containment, feedwater line, and LPCI line. The results for the other break locations are shown in Table 6.3-3a.

6.3.3.8 LOCA Analysis Conclusions Having shown compliance with the applicable acceptance criteria of Section 6.3.3.2, it is concluded that the ECCS will perform its function in an acceptable manner and meet all of the 10CFR50.46 acceptance criteria, given operation at or below the maximum average planar linear heat generation rates used in the analysis. In addition, an evaluation of the effects of known changes or errors in the acceptable ECCS models in accordance with 10 CFR 50.46(a)(3)(i) as presented in Table 6.3-7.

6.3.4 Tests and Inspections 6.3.4.1 ECCS Performance Tests All systems of the Emergency Core Cooling System (ECCS) are tested for their operational ECCS function during the preoperational and/or startup test program. Each component is tested for power source, range, direction of rotation, setpoint, limit switch setting, torque switch setting, etc, as applicable. Each ECCS pump is tested for flow capacity, for comparison with vendor data, and for verification of flow measuring capability. The flow tests involve the same 6.3-45 HCGS-UFSAR Revision 20 May 9, 2014

suction and discharge source, i.e., suppression chamber or condensate storage tank (CST).

All logic elements are tested individually, and then as a system, to verify complete system response to emergency signals, including the ability of the valves to revert to the ECCS alignment from other positions.

Finally, the entire system is tested for response time and flow capacity, taking suction from its normal source and delivering flow into the reactor vessel. This last series of tests is performed with power supplied from both offsite power and onsite standby power sources.

See Section 14 for a thorough discussion of preoperational testing for these systems.

6.3.4.2 Reliability Tests and Inspections The average reliability of a standby (nonoperating) safety system is a function of the duration of the interval between periodic functional tests. The factors considered in determining the periodic test interval of the ECCS are: the desired system availability (average reliability), the number of redundant functional system success paths, the failure rates of the individual components in the system, and the schedule of periodic tests (simultaneous versus uniformly staggered versus randomly staggered). For the ECCS, the factors above were used to determine safe test intervals, utilizing the methods described in References 6.3-2, 6.3-5 and 6.3-6.

All of the active components of the High Pressure Coolant Injection (HPCI),

Core Spray, and Low Pressure Coolant Injection (LPCI) Systems are designed so that they may be tested during normal plant operation. Full flow test capability of each ECCS injection system is provided by a test line back to its respective suction source. The full flow test is used to verify the capacity of each ECCS pump loop, while the plant remains undisturbed in the power generation 6.3-46 HCGS-UFSAR Revision 7 December 29, 1995

mode. In addition, each individual valve may be tested during normal plant operation. Input jacks are provided such that by racking out the injection valve breaker, each ECCS loop can be tested for response time.

All of the active components of the Automatic Depressurization System (ADS),

except the check valves for the ADS accumulators and the safety/relief valves and their associated solenoid valves, are designed so that they may be tested during normal plant operation. The safety/relief valves and associated solenoid valves are all tested at least once every 18 months during plant startup following a refueling outage. Safety/relief valves and their associated solenoid valves which have been overhauled during a plant outage are tested during the startup following that outage. Testing of the check valves for the ADS accumulators is done in accordance with ASME B&PV Code,Section XI.

Inservice testing of the ECCS pumps and valves is in accordance with the ASME B&PV Code,Section XI (see Section 3.9.6).

Testing of the initiating instrumentation and controls portion of the ECCS is discussed in Section 7.3. The Standby Power System, which supplies electrical power to the ECCS if offsite power is unavailable, is tested as described in Section 8.3. The frequency of testing is specified in Section 16. Visual inspections of all the ECCS components located outside the primary containment can be made at any time during power operation. Components inside the primary containment can be visually inspected only during periods of access to the primary containment. When the reactor vessel is open, the spargers and other reactor vessel internals can be inspected.

6.3.4.2.1 HPCI Testing The HPCI system can be tested at full flow with CST water at any time during plant operation, except when the reactor vessel water level is low, when the condensate level in the CST is below the reserve level, or when the valves from the suppression chamber to the pump are open. If an initiation signal occurs while the HPCI 6.3-47 HCGS-UFSAR Revision 0 April 11, 1988

system is being tested, the system aligns automatically to the operating mode.

A design flow functional test of the HPCI system over the operating pressure and flow range is performed by pumping water from the CST, and back through the full flow test return line to the CST. The HPCI system turbine pump is driven at its rated output by steam from the reactor. The suction valves from the suppression chamber and the discharge valves to the core spray and feedwater lines remain closed. These valves are tested separately to ensure their operability.

The HPCI test conditions are tabulated on the HPCI process diagram, Vendor Technical Document PN1-E41-1020-0004.

6.3.4.2.2 ADS Testing The ADS valves are tested during the time when the reactor vessel is at reduced pressure prior to a refueling outage. This testing includes simulated automatic actuation of the system throughout its emergency operating sequence, but excludes actual valve actuation.

During plant operation, the ADS can be checked as discussed in Section 7.3.

6.3.4.2.3 Core Spray Testing The Core Spray System pumps and valves are tested periodically during reactor operation. With the injection valve closed, and the return line to the suppression chamber open, full flow pumping capability is demonstrated. The injection valve and the check valve are tested in a manner similar to that used for the LPCI valves. The system test conditions during reactor shutdown are shown on the core spray system process diagram, Vendor Technical Document PN1-E21-1020-0003. The portion of the core spray system outside the drywell may be inspected for leaks during tests.

6.3-48 HCGS-UFSAR Revision 20 May 9, 2014

6.3.4.2.4 LPCI Testing Each LPCI loop can be tested during reactor operation. The test conditions are tabulated in Figures 6.3-12. During plant operation, this test does not inject cold water into the reactor vessel, because the injection line check valve is held closed by the reactor vessel pressure, which is higher than the pump pressure. The injection line portion is tested with reactor water when the reactor is shut down and when a closed system loop is created. This prevents unnecessary thermal stresses.

To test a residual heat removal (RHR)/(LPCI) pump at rated flow, the test line valve to the suppression chamber is opened, the pump suction valve from the suppression chamber is opened (this valve is normally open), and the pumps are started using the manual switches in the main control room. Correct operation is determined by observing instruments in the main control room.

If an LPCI initiation signal occurs during the test, the RHR system aligns to the LPCI operating mode. The valves in the test bypass lines close automatically to ensure that the RHR (LPCI) pump discharge is correctly routed to the reactor vessel.

6.3.5 Instrumentation Requirements Design details, including redundancy and logic of the Emergency Core Cooling System (ECCS) instrumentation, are discussed in Section 7.3.

All instrumentation required for automatic and manual initiation of the High Pressure Coolant Injection System (HPCI), core spray, and Low Pressure Coolant Injection System (LPCI) systems and Automatic Depressurization System (ADS) is discussed in Section 7.3.2, and is designed to meet the requirements of IEEE 279 and other applicable standards.

The HPCI system is automatically initiated on low reactor water level or high drywell pressure. The core spray and LPCI systems are 6.3-49 HCGS-UFSAR Revision 0 April 11, 1988

automatically initiated on low reactor water level or high drywell pressure (in combination with low reactor vessel pressure). The ADS is automatically actuated by sensed variables for reactor vessel low water level and drywell high pressure, plus the indication that at least one core spray loop or LPCI pump is operating. The HPCI, core spray, and LPCI systems automatically realign from system flow test modes to the emergency core cooling mode of operation following receipt of an automatic initiation signal. The core spray and LPCI systems begin injection into the reactor pressure vessel (RPV) when reactor vessel pressure decreases to system discharge shutoff pressure. HPCI injection begins as soon as the HPCI turbine-pump is up to speed. The injection valve is open, since the HPCI system is capable of injecting water at full flow into the RPV over a pressure range from 200 psig to reactor pressure specified in mode A of Vendor Technical Document PN1-E41-1020-0004.

6.3.6 References 6.3-1 Deleted.

6.3-2 H. M. Hirsch, "Methods for Calculating Safe Test Intervals and Allowable Repair Times for Engineered Safeguard Systems," NEDO-10739, General Electric, January 1973.

6.3-3 General Electric, "General Electric Standard Application for Reactor Fuel," including the "United States Supplement," NEDE-24011-P-A and NEDE-24011-P-A-US (latest revision).

6.3-4 SAFER/GESTR-LOCA Loss-of-Coolant Accident Analysis for Hope Creek Generating Station at Power Uprate, NEDC-33172P, March 2005.

6.3-5 General Electric Licensing Topical Report NEDC-30936P-A, "BWR Owner's Group Technical Specification Improvement Methodology,"

Parts 1 and 2, dated December 1988.

6.3-6 General Electric Licensing Topical Report GENE-770-06-2-A, "Addendum to Bases for Changes to Surveillance Test Intervals and Allowed Out-of-Service Times for Selected Instrumentation Technical Specifications," dated December 1992.

6.3-50 HCGS-UFSAR Revision 20 May 9, 2014

6.3-7 Deleted 6.3-8 Deleted 6.3-9 Deleted 6.3-10 ABB Combustion Engineering Nuclear Operations, Reference Safety Report for Boiling Water Reactor Reload Fuel, CENPD-300-P-A.

6.3-11 Deleted.

6.3-12 NFS-0256 (latest revision), Hope Creek Generating Station, 10CFR50.46 Report Source Information.

6.3-13 NFVD-AB-2000-004-00, HCGS LOCA Analysis Report, March 2000.

6.3-14 NFSI-04-056, GE9B MAPLHGR Information Considering a Reduced LPCI Flow Rate, April 30, 2004.

6.3-15 Hope Creek Generating Station GNF2 ECCS-LOCA Evaluation, 002N5176-R0, Revision 0, August 2016.

6.3-51 HCGS-UFSAR Revision 22 May 9, 2017

TABLE 6.3-2 (Cont)

Variable Value Maximum allowed delay time 27 seconds (core spray system) from initiating signal to 35 seconds (HPCI system) rated flow available and injection valve wide open HPCI flow rate 3000 gpm (maximum) injected through the core 2000 gpm (minimum) spray sparger Automatic Depressurization System Total number of relief 5 valves installed with ADS function Number of ADS valves 4 (for large break) used in analysis 5 (for small break, see References 6.3-4 and 6.3-15) 6 Total minimum flow capacity 4.0 x 10 lbm/h, at for 5 valves, at a vessel 1125 psig pressure ADS timer initiating signals a) Low water level, and 1.0 feet above top of active fuel high drywell pressure, 2.0 psig and a 4 of 6 HCGS-UFSAR Revision 22 May 9, 2017

TABLE 6.3-2 (Cont)

Variable Value

3. Fuel Parameters Fuel type Control cell core Fuel bundle geometry 10 x 10 Number of fueled rods per bundle 92 Peak technical specification MAPLHGR linear heat generation rate is defined in Technical Specifications Core Operating Limit Report Initial minimum critical 1.25 power ratio 6 of 6 HCGS-UFSAR Revision 22 May 9, 2017

TABLE 6.3-3

SUMMARY

OF LOCA ANALYSIS RESULTS

1. Fuel Type GNF2 Fuel GE14 Fuel Acceptance Criteria
2. Limiting Break DBA Suction DBA Suction
3. Limiting Failure Battery Battery
4. Peak Cladding Temperature 1610°F 1380°F 2200°F (Licensing Basis)
5. Maximum Local Oxidation <1.0% <1.0% 17%
6. Core-Wide Metal-Water <0.1% <0.1% <1.0%

Reaction

7. 4.1 ft2 (DBA, Appendix K) (3) 1591°F(2) 1360°F(1)(4)
8. 0.08 ft2 (Appendix K) 1522°F(2) 1146°F(1)

(1) SAFER/GESTR methodology (2) SAFER/PRIME methodology (3) This case assumes the LPCI minimum flow bypass valve remains open and has reduced LPCI flow.

(4) This does not include the effects on peak cladding temperature of known changes or errors in the acceptable ECCS evaluation models. Results of peak cladding temperature including 10CFR50.46 Notification Letters are provided in Table 6.3-7.

1 of 1 HCGS-UFSAR Revision 22 May 9, 2017

Table 6.3-3a

SUMMARY

OF SAFER/GESTR-LOCA RESULTS FOR NON-RECIRCULATION LINE BREAKS(1)

(Nominal Analysis Basis)

Break Size Single GE14 Break Location(4) Failure PCT (F) 0.32 ft2 Core Spray Line Battery 616 3.89 ft2 Steam Line inside Battery 589(2)

Containment(3) 3.64 ft2 Steam Line outside Battery 589(2)

Containment(3) 1.07 ft2 Feedwater Line Battery 589(2) 0.50 ft2 LPCI Line Battery 589(2)

NOTES: (1) All cases assume the LPCI minimum flow bypass valve is open. For GE14, peak local oxidation is <1% and core-wide metal-water reaction is <0.1% for all cases.

(2) Maximum PCT is at the initial operating temperature.

(3) Steam line break areas are prior to MSIV closure.

Following MSIV closure, the inside containment break area is reduced to 2.98 ft2 and the outside containment break area is zero.

(4)

These break locations being historically shown non-limiting for the system, it is inferred they would remain so with a GNF2 core; therefore, the analysis is not repeated with the later fuel bundle design.

1 of 1 HCGS-UFSAR Revision 22 May 9, 2017

TABLE 6.3-7 Changes or Errors in Acceptable ECCS Evaluation Models Peak Cladding Temperature The following results include the effects of known changes or errors (Reference 6.3-12) in the approved ECCS evaluation models described in Reference 6.3-3 on the calculated limiting peak cladding temperature transient applicable to HCGS as estimated in accordance with 10 CFR 50.46(a)(3)(i).

Licensing Basis Peak Licensing Basis Event Cladding Temperature 2

4.1 ft (DBA) Recirc. 1380F (GE14C)

Suction/Channel A dc source 1610F (GNF2)

GE14C FUEL Final Peak Description of Change/Error Impact Cladding Temperature Impact of Database error for heat deposition on the Peak Cladding Temperature for +45F 1425F 10x10 fuel bundles Impact of updated formulation for gamma heat deposition to channel wall +5F 1430F for 9x9 and 10x10 fuel bundles PRIME code implementation for fuel rod T/M performance, replacing +45F 1475F GESTR 1 of 2 HCGS-UFSAR Revision 22 May 9, 2017

WPEMJIX K - SWU IHAK 4AOS- -

MJIX K Ll1lf£ IHAK 1400 1200 APPEMJIX K SWU IHAK - !WJS

". Nl)lltW.

  • SM:'tLIHAK
  • 4MS

/

N()tltW. *LNlf IHAK 800 600 tOUNfl - SWi.L BREAK * !"ftlS OOEAK SIZE so. FT.

I NOMINAL AND APPENDIX K LOCA BREAK SPECTRUM RESUL TS(*)

(*) THESE RESULTS ARE FOR GE14C FUEL REPRESENTATIVE ONLY.

REVISION 22, MAY 9, 2017 Hope Creek Nuclear e er tinntotion PSEG Nuclear, LLC PEAK CLADDING TEMPE A U E MAXIMUM LOCAL OXIDATION VS BREAK AREA HOPE CREEK NUCLEAR GENERATING STATION Updated FSAR 6.3*14 lOOO PSEG Nuclecr, LLC. All Rights Reserved.

HOPE CREEK 1. H OT CHANNEL I DBA SUCT BREAK

2. AVERAGE CHANNEL
3. TOP OF ACTIVE FUEL BATTERY FAILURE 60.

40.

0 .. .. J . .. .......................... ****'"" ...*--**-----**-*******..___ t_. . .-...........----

40. 80. 120. 160.

0.

GRJ 18879 TIME (SECOND) 20160407 1255.2

  • REVISION 22 9 MAY g ' 2017 Ho pe Creek Nuclear Generating Station PSEG Nuclear, LLC WATER L.EVEL INSIDE SHROUD VS TIME AFTER BREAK (DBA, RECIRCULATION SUCTION BREAK, HOPE CREEK NUCLEAR GENERATING STATION FLURE OF CHANNEL A DC SOUR CE)

Updated FSAR Figure 6.3-20

© 2000 PSEG Nuclear, LLC. All RiQhts Reserved.

HOPE CREEK 1. VESSEL PRESSURE DBA SUCT BREAK BATTERY FAlLURE

1. 2 ***************--------**-----.-**-----*-********-*-**-------------- .. *-------------------* : *******--------*-----* --------------**----*-*---*-------*----- **---------*-

X10' 0.8

0. I
0. 80. 120. 160.

GRJ 18879 TIME (SECOND) 20160407 1255.2 REVISION 22 , MAY g 9 2017 Hope Creek Nuclear Generating Station PSEG Nuclear, LLC REACTOR VESSEL PRESSURE VS TIME AFTER BREAK (DBA, RECIRCULATION SUCTION BREAK, HOPE CREEK NUCLEAR GENERATING STATION FNLURE O F CHANNEL A DC SOURCE)

Updated FSAR Figure 6.3-21

© 2000 PSEG Nuclear, LLC. All Rights Reserved.

1. CONV HTC HOT n5 HOPE CREEK 2. CONV HTC HOT *6 DBA SUCT BREAK 3.RAD HTC HOT *5 BATTERY FLURE 4. RAD HTC HOT *6 5.

.. _ ... .. ..._ .._______ .. ____ g: +tc i% §t- :

LL.

=

I .

(".

f-LL.

I .

=

=

=

f-E:9

(._

=

I

(_)

f-

=

GRJ 18879 20160407 1255.2 TIME (SECOND)

REVISION 22 v MAY 9 v 2017 Hope Creek Nuclear Generating Station PSEG Nuclear, LLC FUEL ROD CONVECTIVE HEAT TRANSFER COEFFICIENT VS TIME AFTER BREAK (LARGE BREAK MODELl (DBA, RECIRCULATION HOPE CREEK NUCLEAR GENERATING STATION SUCTION BREAK, FAILURE OF CHANNEL A DC SOURCEl Updated FSAR F ig ur e 6.3-22

© 2000 PSEG Nuclear, LLC. All Rights Reserved.

HOPE CREEK 1. PEAK CLAD TEMPER DBA SUCT BREAK BATTERY FAlLURE

3. -.......... _ .. ...

. h ....

X10' 0

w 0

0. .L.J....L.J.J_.J. J .J. J

... ** ... ..J_ .. . ..

0. 40. 80. 120. 160.

GRJ 18879 2o1so4o7 12ss.2 TIME ( s ECOND)

REVISION 22 1 MAY 9 1 2017 Hope Creek Nuclear Generating Station PSEG Nuclear, LLC PEAK CLADDING TEMPERATURE VS TIME AFTER BREAK (DBA, RECIRCULATION SUCTION BREAK, HOPE CREEK NUCLEAR GENERATING STATION FAlLURE OF CHANNEL A DC SOURCE)

Updated FSAR Figure 6.3-23

© 2000 PSEG Nuclear, LLC. All Rights Reserved.

HOPE CREEK 1. HOT CHANNEL 2 AVERAGE CHANNEL 0.08FT2 SUCT BRK 3. TOP OF ACTIVE BATTERY FAILURE 60.

f LL.

_j w

i: 20.

_j 0:

w f

<(

3:

0.

0. 200. 400. 600. 800.

GRJ 1664D 20160414 1522.1 TIME (SECOND)

REVISION 22 MAY 9 2017 fl Ho e Creek Nuclear Generating Station WA ER LEVEL INSIDE SHROUD VS TIME AFTER BREAK PSEG Nuclear, LLC (SMALL BREAK MODEU W.09 F]2 RECIRCULATION SUCTION BREAK '

F AlLURE OF CHANNEL A DC SOURCE)

HOPE CREEK NUCLEAR GENERATING STATION Updated FSAR Figure 6.3-38

© 2000 PSEG Nuclear, LLC. All Rihts Reserved.

O I H PE CREEK 0.08FT2 SUCT BRK I

i

1. VESSEL PRESSURE I

BATTERY FAILURE I

1 2 --

X10.3

'l\

0.8 _ - - -- - -- --** *-- * -*-

w 0:

0.4

\.

J

()

()

w 0:

[L 1\

1

0. - . L ------ --  ::.=:::-==--*--**------L. ..----
0. 200. 400. 600. 800.

gt6o4t4 11 TIME (SEC 0 N D)

REVISION 22, MAY g, 2017 Hope Creek Nuclear Generatin Station REACTOR VESSEL PRESSURE VS Tl E AFTER BREAK PSEG Nuclear, LLC (SMALL BREAK MODEU W.09 Ff RECIRCULATION SUCTION BREAK, FAlLURE OF CHANNEL A DC SOURCD HOPE CREEK NUCLEAR GENERATING STAT ION Updated FSAR Figure 6.3-39

© 2000 rsEG NucI ear I LLC. AII R I Qhts Reserved.

HOPE CREEK 1. CONV HTC HOT 7 I

2. CONV HTC HOT *8 0.08FT2 SUCT BRK
3. RAD HTC HOT *7 j

BATTERY F AlLURE

4. RAD HTC HOT *8
5. ********---*"*****--** ..*** ............ ...........-*******-*..*--*--**-***-..*---------- ----------*

.. ***g3*8[ .. ___.........

16

3. - - *-- -- --

i.

0 I

f i.

I 0:

I

=:)

r eo C) 0

__]

I u

f I

-1.  : ----*-*********---- .. *---------*------ ______________________..

0. 200. 400. 600. 800.

GRJ 16440 20150414 1!>22.1 TIME (SECOND)

REVISION 22 9 MAY 9 9 2017 Hobe Creek Nuclear Generating Station FUEL R D CONVECTIVE HEAT TRANSFER COEFFICIENT VS TIME PSEG Nuclear, LLC AFTER BREAK (SMALL BREAK MODELl W.09 Ff RECIRCULATION SUCTION BREJIJ<, FAILURE OF CHANNEL A DC SOURCEl HOPE CREEK NUCLEAR GE NERATI NG STATION Updated FSAR Figure 6.3-40

© 2000 PSEG Nuclear. LLC. All R1ghts Reserved.

HOPE CREEK 0.08FT2 SUCT BRK

1. PEAK CLAD TEMPE ATURE l '

BATTERY F AlLURE

3. .. . -. .. *----. .. . . . .. ...... - ... ... - --- - -- - --- __,___... . ........ .... .. .. . ' .. ------------------- . ... ............... :--------- ....... .

I X103 I

LL

(_')

w 0

w cr:

1-

<I cr:

w 0.

  • --*-*_...,.****.,..-***r ..*o.... ...

2:

w 1-

0. .... L..L.LL_Lt. .. ..........-*-**-*- -----

0* 200. 400. 600. 800.

GRJ 1644D 2o16o414 1s22.1 TIME ( s E c OND)

REVISION 22 MAY 9 2017 H Ake Creek Nuclear Generatin Station PE CLADDING TEMPERATURE VS Tl E AFTER BREAK PSEG Nuclear, LLC (SMALL BREAK MODELl W.09 FT2 RECIRCULATION SUCTION BREAK, F,ILURE OF CHANNEL A DC SOURCEJ HOPE CREEK NUCLEAR GENERATING STATION Updated FSAR Figure 6.3-41

© 1000 PEG Nuclear, LLC. All Riahts Reserved.

6.4 HABITABILITY SYSTEMS The main control room habitability systems provide safety and comfort for operating personnel during normal operations and during postulated emergency conditions. These habitability systems include radiation shielding; charcoal air filter systems; heating, ventilating, and air conditioning (HVAC); storage for food and water; sanitary facilities; and fire protection. The habitability systems are designed to meet 10 CFR 50.67 requirements (Reference 6.4-2). The technical support center (TSC), which serves to back up the control room monitoring and diagnosis during emergency conditions, is discussed in Section 12.3.3. The TSC is designed for the same environmental habitability requirements as for the main control room.

6.4.1 Design Bases The design bases for the habitability systems are summarized as follows:

1. The control room environmental envelope is designed for continuous occupation during normal and abnormal conditions to maintain an indoor design condition as indicated in Section 9.4.1. Occupancy by operating personnel is ensured for a minimum of 30 days after a design basis accident (DBA).
2. The habitability systems are designed to support five people during normal and abnormal station operating conditions. An initial 5-day emergency supply of food and water is provided within the control room habitability envelope.
3. Sanitary facilities and medical supplies for minor injuries are provided within the boundary of the control room habitability envelope for the use of control room personnel during normal and accident conditions.

6.4-1 HCGS-UFSAR Revision 19 November 5, 2012

4. The radiological effects on the control room personnel that could exist as a consequence of the postulated DBA described in Section 15 do not exceed the guidelines set by 10CFR50.67.
5. Respiratory and skin protection and emergency breathing apparatus are provided within the control room envelope for control room operators.
6. The Control Room Ventilation System is capable of automatic transfer from its normal operational mode to its emergency pressurization recirculation mode upon detection of high radiation.

It is also capable of manual transfer to the isolation recirculation mode.

7. The Control Room Ventilation System is designed to remain functional during and after an operating basis earthquake (OBE) or a safe shutdown earthquake (SSE).
8. The habitability systems are designed to remain functional following an active failure of any one of the HVAC system components.
9. Radiation monitors continuously monitor the outside air at the control room envelope outside air intake. The detection of high radiation is alarmed in the main control room, and radiological protection functions are automatically initiated, as described in Section 6.4.3.2.
10. Smoke detectors are provided in the normal and emergency outside air ducts. They alarm in the main control room.
11. The control room HVAC system design bases are discussed in Section 9.4.1.
12. The seismic category, quality group classification, and corresponding codes and standards that apply to the 6.4-2 HCGS-UFSAR Revision 16 May 15, 2008

design of the habitability systems are discussed in Section 3.2.

13. Regulatory Guides 1.52, 1.78, and 1.95 apply to the design of habitability systems. Section 1.8 analyzes plant requirements associated with these Regulatory Guides. Conformance to design aspects of the guides is as follows:
a. There is partial conformance with Regulatory Guide 1.52, as discussed in Sections 6.5.1 and 1.8. Section 6.5.1 also provides a detailed description of the air filters.
b. As discussed in Section 2.2.3, the only toxic chemical that may accumulate to any appreciable amount is ammonia resulting from an ammonium hydroxide release at the SGS. Sufficient time exists from the time of detection in the control room to the time of when the concentrations exceed the toxicity limit established in Regulatory Guide 1.78. Therefore, the design considerations of Regulatory Guide 1.78 are applicable to HCGS as denoted in Section 1.8.
c. As discussed in Section 2.2.3, chlorine does not pose a danger to HCGS control room personnel. Therefore, the design considerations of Regulatory Guide 1.95 are not applicable to HCGS.
14. The control room outside air intakes have been located to prevent the possibility of diesel gas exhaust concentrations in the main control room during operation of the standby diesel generators (SDGs).

The design of the habitability systems with respect to the following aspects is discussed in separate FSAR sections as indicated:

6.4-3 HCGS-UFSAR Revision 5 May 11, 1993

1. Protection from wind and tornado effects - Section 3.3
2. Flood design - Section 3.4 6.4-3a HCGS-UFSAR Revision 5 May 11, 1993

THIS PAGE IS INTENTIONALLY BLANK 6.4-3b HCGS-UFSAR Revision 5 May 11, 1993

3. Missile protection - Section 3.5
4. Protection against dynamic effects associated with postulated rupture of piping - Section 3.6
5. Environmental design - Section 3.11.

6.4.2 System Design 6.4.2.1 Definition of Control Room Envelope The control room envelope maintained under habitable conditions following an accident is shown on Plant Drawing A-5655-0. The envelope consists of the main control room, computer room, shift supervisors' office, ready room, instructional viewing area, corridors, toilets, kitchen and storage room, all at Auxiliary Building Elevation 137 feet and the console pit at Elevation 132 feet and 4 inches.

Ingress and egress are provided by one door from the shift supervisors' office to the work control center, one door from the control room corridor to the work control center, one door from the control room corridor to the radwaste building service area corridor, one door from the control room corridor to the elevator lobby corridor, and one door from the rear of the control room to the electrical tray space corridor.

The volume of the control room envelope served by the Heating, Ventilating, and Air Conditioning (HVAC) System is approximately 85,000 cubic feet. The allowable carbon dioxide buildup and the occupancy time period when the control room is completely isolated are described in Section 9.4.1.

6.4-4 HCGS-UFSAR Revision 20 May 9, 2014

6.4.2.2 Ventilation System Design The control room HVAC system, including the major equipment design parameters, is discussed in detail in Section 9.4.1, and the system is shown schematically on Plant Drawing M-78-1.

Figure 6.4-2 shows the plant layout, including the location of the control room and its outside air intakes. The main control room arrangement is shown on Plant Drawing A-5655-0. The seismic category and quality group classification of components, instrumentation, and ducts are listed in Section 3.2 and 7.3 and shown on Plant Drawing M-78-1.

Principal equipment in the Control Room Ventilation System includes:

1. Two 100 percent capacity air handling units, including low and high efficiency filters, fans, chilled water cooling coils, and electric heating coils, are provided for use during normal operation or following an accident. Electric pan humidifiers are provided for use during normal operation.
2. Two 100 percent capacity return air fans are provided for use during normal plant operation and following a design basis accident (DBA).
3. Two 100 percent capacity emergency air filtration units are provided for use following an accident. Each unit has its own fan, low efficiency prefilters, electric heating coils, upstream high efficiency particulate air (HEPA) filters, charcoal adsorbers, and downstream HEPA filters.
4. An exhaust fan is provided to exhaust air from the control room, and toilet facilities during normal operation.
5. Two separate outside air intakes with plenum, through a common missile shielded tube are provided for use during normal operation or following a DBA.

6.4-5 HCGS-UFSAR Revision 20 May 9, 2014

6. The dampers for control room isolation purposes are bubbletight, with a closure time of 5 seconds maximum.

6.4.2.3 Leaktightness Control room envelope construction joints and penetrations for cable, pipe, HVAC duct, HVAC equipment, dampers, and doors are designed specifically for leaktightness. A list of potential leak paths to the control room is provided in Table 6.4-1, along with the type of material, joint, or penetration.

Periodic tests to verify control room leaktightness are discussed in Section 6.4.5.

CREF boundary operability is demonstrated periodically by performance of unfiltered air inleakage testing in accordance with the CRE Habitability Program described in plant Technical Specification 6.16.

6.4.2.4 Interaction with Other Zones and Pressure-Containing Equipment Design of the control room envelope boundaries, ductwork, penetrations, and isolation dampers minimizes leakage of exterior radioactive gases into the control room envelope.

The control room envelope, as shown on Plant Drawing A-5655-0, is surrounded by an electrical access area and a corridor, which are served by the Control Equipment Room Supply (CERS) System; the work control center and control area office space (formerly Unit 2 control room area), which are served by the Unit 2 control area HVAC system (GC); and the access control area of the Radwaste Building, which is served by the Service Area Supply (SAS) System. The control equipment mezzanine at Elevation 117 feet 6 inches and the inverter rooms at Elevation 124 feet, below the envelope, are served by the CERS system.

The control area heating and ventilating equipment room, 6.4-6 HCGS-UFSAR Revision 20 May 9, 2014

also served by the CERS system, is above the envelope at Elevation 155 feet 3 inches. The CERS and SAS systems are described in Sections 9.4.1 and 9.4.3, respectively.

The control room return air ductwork, under negative pressure in the control area HVAC equipment room, is gas tight up to the flexible connection to the control room return air (CRRA) fan. Pressure with respect to the HVAC equipment room is positive from the outlet of the CRRA fan through the control room supply (CRS) system. Dampers in the negative pressure ductwork have welded frames and shafts in oil impregnated bearings. These dampers are provided with gaskets and are bolted to the ductwork.

Steam lines and central carbon dioxide fire prevention system tanks, and any other equipment or piping containing hazardous materials, are not located within the control room envelope. Failure of any pressure containing tank, equipment, or piping located outside the control room envelope will not cause transfer of hazardous material into the control room, as the control room is maintained at a positive pressure with respect to its adjacent areas at all times during normal plant operation by the Control Room Supply System.

6.4.2.5 Shielding Design Control room shielding is discussed in Section 12.3.2. Section 12.3.2 identifies the radiation sources, shielding zones, and shielding thickness.

6.4.3 System Operational Procedures 6.4.3.1 Normal Operation During normal plant operation, the control room supply (CRS system, control room return air (CRRA) fan, and control area exhaust (CAE) system maintain the design conditions in the control room envelope. The CRS/CRRA system consists of redundant, 100 percent 6.4-7 HCGS-UFSAR Revision 0 April 11, 1988

capacity units, each supplied by a separate Class 1E power source. Each CRS system consists of an outside air intake louver and plenum, tornado damper, smoke detector, radiation sensor, radiation monitor, outside air intake isolation dampers, ASHRAE 55 percent dust spot low efficiency prefilters, 80 percent to 85 percent ASHRAE dust spot high efficiency filters, humidifier, electric heating coil, supply fan, and chilled water coil. See Section 9.2.7 for a description of the chilled water system ductwork, controls, and monitoring. A fixed amount of outside air, 3000 cfm, is provided to satisfy ventilation, exhaust, and pressurization requirements. The control room envelope is maintained at a positive pressure of at least 1/8" water gauge with respect to its adjacent areas during normal plant operation, by supplying more air to than exhausting from the control room envelope. Air is returned from the air conditioned space through the CRRA fan to the CRS system supply unit.

The excess air is exhausted outdoors by the CAE fan and by exfiltration.

6.4.3.2 Post-Accident Operation The Control Room Envelope Heating, Ventilation and Air Conditioning (HVAC)

Systems are designed to ensure habitability during any design basis radiological accident with redundant trains. Upon receipt of a reactor vessel low water level (L1)/high drywell pressure signal from a loss of coolant accident (LOCA), the following occurs for both ventilation trains: the normal outside air intake isolation dampers for CRS system close, the CAE fan stops, the CAE exhaust isolation dampers close, and both control room emergency filter (CREF) trains start automatically to filter 2000 cfm emergency outside air intake for room pressurization when the mode switch is in the outdoor air position.

On high radioactivity in the outside air intake, the following occurs for both ventilation trains: the normal outside air intake isolation dampers for the CRS system close, the CAE fan stops, the CAE exhaust isolation dampers close, and the control room emergency filter (CREF) train connected to the operating CRS unit starts automatically to filter 1000 cfm emergency outside air intake for room pressurization when the mode switch is in the outdoor air position.

On a high radiation signal, the redundant CREF train remains on standby. Low flow or a loss of airflow in the operating CREF automatically trips and isolates the operating CREF train and alarms in the main control room. Manual actuation of the redundant CREF train is then required. The CREF system consists of two 100 percent capacity trains, each supplied by a separate Class 1E power system and interlocked with one of the CRS/CRRA systems. Each CREF train consists of an outside air connection to the CRS outside air intake plenum, radiation sensor, tornado damper, smoke detector, outside and return air dampers, fan, 80 to 85 percent ASHRAE dust spot efficiency filters, electric heating coil for humidity control, 6.4-8 HCGS-UFSAR Revision 12 May 3, 2002

upstream high efficiency particulate air (HEPA) filter, charcoal adsorber, a downstream HEPA filter, and a discharge damper. The CREF system may operate in one of the two following modes:

1. A pressurizing mode in which 1000 cfm of outside air is mixed with 3000 cfm of control room return air before entering the CREF unit, thus pressurizing the control room envelope above the surrounding space This mode is an automatic mode following a detection of high airborne radioactivity in the control room normal air intake.
2. The operator can override the control room pressurization mode to initiate isolation mode by manually closing the outside air intake isolation damper for the operating CREF unit. However, this mode is not automatically used following a radiological accident. The recirculation (isolation) mode is circulating 4000 cfm of return air, without introduction of outside air, through a CREF unit.

6.4.4 Design Evaluations The Control Room Habitability System is designed with redundancy and separation of active components to provide reliable operation under normal conditions and to ensure operation under accident conditions. The design basis accident (DBA) radiation source terms used for control room dose evaluation are in accordance with Regulatory Guide 1.183 (Reference 6.4-3).

6.4.4.1 Radiological Protection A detailed discussion of the dose calculation model for control room operators following the postulated DBA is provided in Section 6.4.7.

The design basis accidents have been evaluated to determine the worse case accident scenario for control room habitability design purposes. The control room operator doses can be derived for each of the accidents by the methodology described in Section 6.4.7 with the radiation source terms defined in the appropriate sections in Section 15 and the release locations relative to the control room intake shown in Figure 6.4-2 and Table 6.4-6.

The release locations for the DBA LOCA are:

(a) For primary containment leakage and leakage from engineered safety feature (ESF) components outside primary containment:

(1) Directly to the atmosphere before Reactor Building drawdown, and (2) The FRVS exhaust vent at the top of the Reactor Building after Reactor Building drawdown.

6.4-9 HCGS-UFSAR Revision 19 November 5, 2012

(b) For main steam isolation valve (MSIV) leakage, exfiltration from the Turbine Building The release locations for the fuel handling accident, which occurs in the Reactor Building, are assumed to be through the Reactor Building truck bay door.

The release location for the main steam line break, occurring outside the Reactor Building is the blowout panels.

The release location for the instrument line break accident occurring in the Reactor Building is the FRVS exhaust vent at the top of the Reactor Building.

The release location for the control rod drop accident is the Turbine Building louvers.

Of all the accidents with their various combinations of source terms and atmospheric dispersions, the accident yielding the most severe control room dose consequences is the DBA LOCA, which has been designated the worst-case accident for control room habitability.

6.4-10 HCGS-UFSAR Revision 18 May 10, 2011

The resulting calculated dose for control room occupancy on a rotating shift basis, for the containment, ESF, and MSIV leakages, is shown in Table 6.4-4 and is less than 5 rem total effective dose equivalent (TEDE) which is consistent with the requirements of 10CFR50.67.

Control room shielding design, based on the most limiting radiological accident, a design basis LOCA, is discussed in Section 12.3.2. The evaluations in Section 15 demonstrate that radiation exposures to control room personnel originating from containment shine, external cloud shine, and control room filter shine are reduced to a small fraction of the total by means of the walls surrounding the main control room (see Table 6.4-4).

6.4.4.2 Toxic Gas Protection As discussed in Section 2.2.3, there is no danger to control room personnel from toxic chemicals stored onsite or offsite or transported near Hope Creek Generating Station (HCGS).

Response to a hazardous chemical release by Industrial Safety and Fire Protection per the Artificial Island Spill Plan will limit the release to a short duration accident. Although the ammonium hydroxide release may pose a danger, the control room would remain habitable by a combination of design and operator responses.

The possibility of diesel gas exhaust concentrations in the control room has been analyzed. The concentration of NO has been calculated. Using the x

control room dose model with X/Q values determined by the Modified Halitsky Methodology, as discussed in Section 6.4.7. The calculated NO concentration, x

1.6 ppm, is below the TLV of 3 ppm from Reference 6.4-1.

6.4-11 HCGS-UFSAR Revision 16 May 15, 2008

6.4.4.3 Chlorine Protection As discussed in Section 2.2.3, chlorine does not pose a danger to HCGS control room personnel.

6.4.4.4 Smoke Protection Detectors in the outside air intakes alarm upon presence of smoke. The operator can then manually start the Control Room Emergency Filter (CREF)

System in the recirculation mode, isolating the control room from outside air.

6.4.4.5 Respiratory Protection Full faced, self-contained breathing apparatus and protective clothing are available for control room operators.

Respiratory equipment designs and capabilities are constantly improving. For this reason, specific equipment has not yet been selected for HCGS. In selecting the respiratory equipment, consideration is given to these improvements, as well as to reliability, durability, and serviceability. The minimum number of respiratory devices provides an onsite 6-hour air supply for each of five people with unlimited bottled air replenishment available from nearby locations. One extra respiratory device is provided for every three respiratory devices needed to meet the minimum capacity.

Control room operators are included in the provisions of the respiratory protection program. The respiratory protection program includes training in the method of putting on the equipment, proper use and care of the equipment, equipment limitations, and verification of individual capability to achieve and maintain a proper facial seal. Personnel familiar with the equipment should be able to put on and start use of the respirator within 2 minutes.

6.4-12 HCGS-UFSAR Revision 0 April 11, 1988

A program for periodic inspection of control room operator respiratory equipment is established. The program addresses inspection for defects, storage conditions, and, as necessary, cleaning, disinfecting, and repairing.

In addition, the equipment will be cleaned, disinfected, and inspected after each use. Replacements and repairs are made only by trained personnel using parts designed for that equipment. The equipment is stored to protect against dust, sunlight, extreme heat or cold, excessive moisture, and damaging chemicals.

6.4.5 Testing and Inspection The Control Room Heating, Ventilating, and Air Conditioning (HVAC) Emergency System filtration components are tested in a program with the following classifications:

1. Shop tests and factory component qualification tests to ensure the quality of the manufactured product. Refer to Table 9.4-6 for details of inspection and testing.
2. Preoperational tests in accordance with the requirements of Section 14.
3. Periodic tests during power generation in accordance with the requirements of Section 16.

The frequency of tests and inspections is selected to ensure the continued integrity of the system. Charcoal testing frequency is in accordance with Regulatory Guide 1.52 for the efficiency claimed and the bed depth specified.

Written test procedures establish minimum acceptable values for all tests. Test results are recorded as a matter of performance records, thus permitting early detection of faulty operating performance.

6.4-13 HCGS-UFSAR Revision 0 April 11, 1988

The shop and factory component qualification tests in place and laboratory testing criteria are in accordance with the recommendations and guidelines presented in Regulatory Guide 1.52 Section C-3, C-5, and C-6. High efficiency particulate air (HEPA) filters have a minimum efficiency of 99.97 percent when measured with a 0.3-micron dioctyl phthalate (DOP) aerosol. Carbon lot testing is required and certified by a qualified testing agency to establish gas adsorption efficiency, uniformity of density, ignition temperature, hardness, and impregnant content.

Filter plenums are tested for leakage under positive pressure. Plenums are pressurized to 125 percent of the design pressure with soap bubble tests at all welds. The maximum permissible leakage rate is 0.1 percent of the filter plenum rated flow in cfm at 125 percent of the positive design plenum pressure.

The ductwork associated with each emergency filtration system is also tested for the same maximum permissible 0.1 percent leakage of the rated flow as used for testing the filter plenums.

Preoperational tests are conducted in accordance with the requirements of Section 14. In general, the tests include:

1. Visual inspection
2. Isolation valve leak tests
3. Airflow capacity verification test
4. Airflow distribution verification test
5. In place HEPA test
6. In place adsorber test
7. Laboratory test of adsorbent
8. Electric heater test.

6.4-14 HCGS-UFSAR Revision 0 April 11, 1988

Periodic tests for leaktightness of the control room envelope are conducted in accordance with the requirements of Chapter 16.

Periodic in place testing of HEPA filters and charcoal adsorbers and laboratory testing of charcoal adsorbers is performed in accordance with the requirements of Section 16.

6.4.6 Instrumentation Requirements Differential pressure indicators are provided locally to measure the pressure drop across each filter element. The overall pressure drop across the CRS filters alarms in the main control room on high differential pressure. The differential pressure across the upstream high efficiency particulate air (HEPA) filter is transmitted to a local panel and alarms in the main control room. It is also recorded by the plant computer.

The instrumentation required for the deluge system of each charcoal adsorber is described in Section 9.5.1, Fire Protection System. In addition, the charcoal adsorber temperature is continuously indicated locally. High charcoal temperature alarms in the main control room. Deluge flow is sensed at high high charcoal temperature and alarms locally and in the main control room. The CREF fans are manually tripped which closes the outside air, return air, and discharge dampers of the emergency filter unit. Deluge flow is manually initiated.

The electric heating coils upstream of the filter are modulated to maintain a maximum of 70 percent relative humidity entering the charcoal adsorber. High relative humidity alarms in the main control room. Because of the small amount (1000 cfm), 25 percent of the control room emergency filter (CREF) unit flow rate, of outside air and the anticipated 3000 cfm return air of 76F dry bulb and 50 percent relative humidity under summer conditions, it is anticipated that the heater will rarely operate, and no additional heat load is presumed for the CRS system. Assuming the 1000 cfm outside air is 100 percent relative humidity at 94F dry bulb (conservative), and is mixed with 3000 cfm return air at 76F dry 6.4-15 HCGS-UFSAR Revision 22 May 9, 2017

bulb, 50 percent relative humidity, the resulting mixed air entering the charcoal adsorber is at 76.5F dry bulb and 64 percent relative humidity which is still below the maximum 70 percent relative humidity limit.

Radiation monitors are provided in the outside air intake plenum. The monitors alarm in the main control room and start the CREF system upon high radiation.

Smoke detectors are provided in the normal and emergency outside air ducts.

They alarm in the main control room.

The handswitches for heating, ventilating, and air conditioning (HVAC) equipment required for control room habitability are located in the control room. Flows and temperatures are indicated at the local panel in the control equipment room.

Sections 9.4.1 and 7.3 address the controls, instrumentation, and logic requirements for the control room HVAC systems.

Tornado damper position is monitored and alarmed by the computer.

6.4.7 Control Room Dose Evaluation Models The radiological effects of a loss of coolant accident (LOCA) were analyzed using the models described below.

6.4.7.1 Control Room Atmospheric Dispersion Model The ARCON96 computer code (Reference 6.4-4) was used to calculate relative concentrations at the control room air intake that would be exceeded no more than 5 percent of the time for primary containment leakage, leakage from ESF outside primary containment, and MSIV leakage. These concentrations are calculated for averaging periods ranging from one hour to 30 days in duration.

The ARCON96 code uses site-specific hourly meteorological data and plant-specific data relating to release locations, building wake surface areas, the air intake location, and directions from the release locations to the air intake. The resulting atmospheric dispersion factors are shown in Table 6.4-2.

6.4-16 HCGS-UFSAR Revision 19 November 5, 2012

6.4.7.2 Control Room Dose Model The control room is modeled as a single region with a volume of approximately 85,000 cubic feet.

The RADTRAD computer code (Version 3.02) (Reference 6.4-5) was used to determine doses within the control room resulting from primary containment leakage, leakage from ESF components outside the primary containment, and leakage from the main steam isolation valves (MSIVs) based on the parameters listed in Table 15.6-12.

The methods, assumptions, and conditions used to evaluate this accident are in accordance with those guidelines set forth in the NRC Standard Review Plan (SRP) 15.0.1 and Regulatory Guide 1.183. These are:

0 to 1 day = 1 1 to 4 days = .6 4 to 30 days = .4

-4 3 A breathing rate of 3.5 x 10 m /s is assumed in accordance with the guidance provided in Regulatory Guide 1.183.

6.4.8 References 6.4-1 American Conference of Governmental Industrial Hygienists, "Threshold Limit Values for Chemical Substances and Physical Agents in the Workroom Environment with Intended Changes for 1981."

6.4-2 10 CFR 50.67, Accident Source Term.

6.4-3 US NRC Regulatory Guide 1.183, Alternate Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors, July 2000.

6.4-4 J. V. Ramsdell, Jr., C. A. Simonen, Atmospheric Relative Concentrations in Building Wakes, NUREG/CR-6331, USNRC, May 1997.

6.4-5 S. L. Humphreys et al., RADTRAD: A simplified Model for Radionuclide Transport and Removal and Dose Estimation, NUREG/CR-6604, USNRC, April 1998.

6.4-17 HCGS-UFSAR Revision 19 November 5, 2012

TABLE 6.4-4 DBA LOCA CONTROL ROOM DOSE1 Airborne exposure due to primary containment leakage: 0.526 rem TEDE Airborne exposure due to ESF leakage: 2.45 rem TEDE Airborne exposure due to MSIV leakage: 0.982 rem TEDE Control room filter shine: 0.00357 rem TEDE External cloud shine: negligible Shine from Reactor Building and primary containment: negligible TOTAL: 3.96 rem TEDE

1. The above results of the radiological consequence evaluations include the impact of introduction of 12 GE14i assemblies at HCGS.

1 of 1 HCGS-UFSAR Revision 22 May 9, 2017

Security Related Information Figure Withheld Under 10 CFR 2.390

SECURITY - RELATED INFORMATION WITHHELD UNDER 10 CFR 20390 REVISION 0 SK.A 0305 0 REV. 3 APRIL 11, 1988 PSEG NUCLEAR, L.L.C.

HOPE CREEK NUCLEAR GENERATING STATION PLANT LAYOUT WITH RESPECT TO CONTROL ROOM INTAKE Updated FSAR

6.5 FISSION PRODUCT REMOVAL AND CONTROL SYSTEMS 6.5.1 Engineered Safety Feature Filter Systems During post loss of coolant accident (post-LOCA) conditions, the Engineered Safety Features (ESF) Filtration Systems indicated below are required to perform the following safety-related functions:

1. The main control room emergency filter (CREF) units remove halogens and particulates that are potentially present in the air following a postulated accident, to ensure that radiation exposures to operating personnel in the main control room are maintained within the guideline values of 10CFR50, Appendix A, GDC 19. The air is then introduced into the main control room Heating, Ventilating, and Air Conditioning (HVAC) System, as discussed in Sections 6.5.1.1 and 9.4.1.
2. The Filtration, Recirculation, and Ventilation System (FRVS) units filter the air in the Reactor Building following a LOCA or other accidents involving large radioactivity releases. This is to reduce the concentration of radioactive halogens and particulates potentially present in the Reactor Building atmosphere. The FRVS is described in detail in Section 6.8.

6.5.1.1 Control Room Emergency Filter System 6.5.1.1.1 Design Bases The design bases for the CREF system filters, fans, and associated ductwork are as follows:

1. Two 100 percent filter trains are each sized and specified for treating 4000 cfm (25 percent of the main control room area HVAC system capacity).

6.5-1 HCGS-UFSAR Revision 0 April 11, 1988

2. Filter train capacity and efficiency is maintained with all particulate filters fully loaded (dirty)
3. Two banks of high efficiency particulate air (HEPA) filters operate in series, in each filter train, and each is rated for a maximum airflow resistance of 1 inch water gauge when clean and 3 inches water gauge when dirty. An inplace percentage penetration of less than 0.05 percent when DOP tested in accordance with Section 10 to ANSI-N510 verifies acceptability of the filter bank and can be considered to warrant a 99 percent removal efficiency for particulates in accident dose evaluations.
4. The 4-inch deep charcoal adsorber is assigned a decontamination efficiency of 99 percent for trapping radioactive iodine as elemental iodine (I ), and 99 percent for trapping radioactive 2

iodine as methyl iodide (CH I) when processing air at 70 percent 3

relative humidity. An electric heater assures the relative humidity is maintained lower than 70 percent.

5. Tornado dampers are provided in outside air intakes for tornado protection
6. Missile protection is provided for the equipment, ducts, and accessories.

See Sections 6.4 and 9.4.1 for further discussion of the CREF system.

6.5.1.1.2 System Design The CREF system consists of two 100 percent redundant filter trains, each supplied by a separate Class 1E power source. Each CREF unit consists of a prefilter, electric heating coil, upstream HEPA filters, charcoal adsorber, and downstream HEPA filters, as shown in 6.5-2 HCGS-UFSAR Revision 0 April 11, 1988

Table 6.5-1. The filter train is located downstream of its supply fan. Each CREF unit is capable of handling 4000 cfm of air recirculated from the main control room and adjacent areas, or handling a combination of 3000 cfm recirculated air mixed with 1000 cfm of outdoor air.

Each filter train, fan, and duct system is Seismic Category I design. The CREF system is located within the control area of the Seismic Category I Auxiliary Building.

Under normal plant conditions, the CREF system is not in operation; however, when high radiation is detected at the outside air intake, the main control room outside air supply is automatically diverted through the CREF system.

Total room air recirculation may be manually selected if a high radioactive noble gas concentration is detected in the outside air intake.

When the CREF system is in operation, the volume of air flowing through it is continuously indicated on a local panel. Low flow or a loss of airflow in the CREF automatically trips and isolates the operating CREF train(s) and alarms in the main control room. High differential pressure across the upstream HEPA filter is also alarmed in the main control room.

Each CREF train contains the following components:

1. An electric heater to maintain relative humidity of the entering air below 70 percent - If relative humidity is 70 percent or higher, the heater is energized by a humidity controller when sufficient airflow is maintained, and provides approximately 15F temperature rise to the air. This ensures that the entering air, ranging from 58 to 80F, enters the charcoal adsorber with a relative humidity of less than 70 percent.

6.5-3 HCGS-UFSAR Revision 12 May 3, 2002

2. A 4-inch deep permanent single unit (PSU) adsorber, gasketless and welded, containing approximately 1450 pounds of coconut shell 3

charcoal (30 lb/ft ) impregnated with potassium iodide and/or triethylene diamine. Eight test canisters are provided which contain the same depth of identical charcoal as the adsorber. The canisters are located so that airflow through each canister is representative of the adsorber. A laboratory test is performed on the carbon absorbent initially (before loading), every 18 months thereafter, after 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of system operation, and following painting, fire, or chemical release in any ventilation zone communicating with the system. Testing conforms to Regulatory Guide 1.52-1978 using ASTM D3803 Method A. The adsorber is evacuated and recharged with bulk charcoal when it fails to meet the acceptance criteria.

3. HEPA filters - One bank is upstream of the charcoal adsorber and one is downstream of the charcoal adsorber. The filter is rated at 4000 cfm +/-10 percent with a maximum airflow resistance of 1 inch water gauge across the filter bank when clean and 3 inches water gauge when dirty. The filter bank is considered to warrant a 99 percent removal efficiency for particulates in the accident dose evaluation when it meets the criteria of Section C.5.c of Regulatory Guide 1.52-1978 using Section 10 of ANSI N510-1980. The differential pressure across the upstream HEPA filter bank is indicated and any high value is alarmed in the main control room.

The differential pressure is monitored by the plant computer.

4. A prefilter bank with an airflow rating of 4000 cfm +/-10 percent -

Maximum airflow resistance is 0.35 inches water gauge when clean, and 1.0 inch water gauge when dirty. Minimum filter efficiency is 80 percent by dust spot test method.

6.5-4 HCGS-UFSAR Revision 0 April 11, 1988

5. A housing of carbon steel welded construction and designed to withstand 23 inches water gauge positive internal pressure - Each housing is provided with individual access doors for servicing the heater and filter banks.

The access doors are provided with transparent windows to allow inspection of components without violating the housing integrity.

Filter housings, including water drains, are in accordance with recommendations in Section 4.3 of ERDA-76-21.

Interior lights, with external switches and outside access for bulb replacement, are provided to facilitate inspection, testing, and replacement of components.

6. A direct drive centrifugal fan with a nonoverloading blade design -

Fan performance and motor selection are based on the maximum air density and maximum system pressure drop anticipated during CREF operation. A manual switch for the fan is located in the main control room. Flow instrumentation controls the fan inlet vanes to maintain a constant airflow

7. Galvanized steel ductwork - Designed and qualified by analysis and testing to be Seismic Category I.

A Fire Protection Water Deluge System is provided to extinguish any ignition within the charcoal adsorber. This system is described in Section 9.5.1.

See Section 6.4 for further information on the CREF operation.

The work, equipment, and materials for the CREF system conform to the applicable requirements and recommendations of the guides, codes, and standards listed in Section 3.2.

6.5-5 HCGS-UFSAR Revision 0 April 11, 1988

The system design is consistent with recommendations of Regulatory Guide 1.52 using ANSI N509 as a guide for the design, construction, and testing of the unit, and ANSI N510 for field testing, as described in Section 1.8, and as summarized in Tables 6.5-2 and 6.5-4.

The CREF is designed to Seismic Category I requirements.

The power supply meets the IEEE-308 criteria and ensures that, in the event of loss of normal offsite ac power, standby power is supplied from the Class 1E standby diesel generator (SDG).

6.5.1.1.3 Safety Evaluation The CREF system is designed to maintain functional integrity and performance during a design basis accident (DBA).

The equipment is located within the Auxiliary Building, a tornado protected Seismic Category I structure. During loss of offsite power (LOP), standby power is available from the Class 1E diesel generators to ensure operation of the CREF equipment.

The single failure criteria for safety-related equipment are met by using redundant equipment and controls, and by switching from one redundant train to the other in the event one fails. Active equipment such as fans, controls, and dampers are redundant. Since redundant HVAC systems are provided to control the ambient conditions for safety-related equipment, operating temperature limits are not exceeded and no degradation of CREF equipment performance is anticipated.

A redundant radiation monitoring system is provided in the outside air intake to detect high radiation, initiate measures to ensure that personnel safety and equipment functions in the main control room are not impaired, and see that the requirements of 10CFR20 are satisfied. In the event of a high outside air radiation condition, the normal outside air supply to the HVAC system is automatically 6.5-6 HCGS-UFSAR Revision 0 April 11, 1988

diverted to the CREF train before being delivered by the HVAC system to the main control room, and all outside air isolation dampers, except those on the emergency intake, are closed. The operator may elect to go to a total recirculation mode, which diverts 4000 cfm of air from the main control room area to the CREF.

The operating mode of the CREF system is indicated in the main control room.

The CREF system and the Auxiliary Building shielding envelope are designed to limit the occupational dose level in the main control room, as required by GDC 19 of 10CFR50.

The introduction of a controlled quantity of outside air maintains the main control room and the adjoining areas served by the main control room HVAC system at a positive pressure with respect to surrounding areas. This positive pressure is maintained during all plant operating conditions, except when the HVAC and CREF systems are in the total recirculation mode.

Maximum permissible leakage rates for filter housing and ductwork shall be as defined in Section 4.12 of ANSI N509.

6.5.1.1.4 Test and Inspections Preoperational and inservice tests and inspections are described in Sections 6.4 and 9.4.1.

6.5.1.1.5 Instrumentation Instrumentation requirements are discussed in Sections 6.4 and 9.4.1.

6.5.1.1.6 Materials Construction materials used in the CREF system are given in Table 6.5-3.

6.5-7 HCGS-UFSAR Revision 0 April 11, 1988

Materials used in the CREF system are selected to ensure that system operability is not adversely affected by radiation, temperature, or other environmental effects, nor susceptible to any fire or other detrimental hazard.

Environmental qualification of the system is discussed in Section 3.11.

Since the CREF system is located in the control area of the Auxiliary Building, it is protected from extremes of radiation and temperature that could potentially produce radiolytic or pyrolytic decomposition of materials. Thus, decomposition products are not generated.

6.5.1.2 SRP Rule Review Acceptance criteria II in SRP 6.5.1 requires design of instrumentation for ESF atmosphere cleanup systems to the guidelines of Regulatory Guide 1.52 and to the recommendations of ANSI N509 as summarized in SRP Table 6.5.1-1.

Compliance with the minimum instrumentation requirements for the EREF system is discussed in Table 6.5-4.

Compliance with the minimum instrumentation requirements for the FRVS is discussed in Table 6.8-5.

6.5.2 The Primary Containment Spray System The Primary Containment Spray System, which is an integral part of the Residual Heat Removal (RHR) System, is designed to aid in reducing drywell pressure and temperature following a loss-of- coolant accident (LOCA). A description of the design features and operating mode of the Primary Containment Spray System (Containment Cooling System) is given in Section 6.2.2.1. The system is started manually after the Low Pressure Coolant Injection (LPCI) System cooling requirements have been satisfied.

6.5-8 HCGS-UFSAR Revision 0 April 11, 1988

The Primary Containment (drywell) Spray System is not designed to perform a fission product removal function following any accident, including a design basis accident (DBA).

Although not designed for such a function, the spray action of the system would probably result in a substantial reduction of fission product concentrations introduced to the drywell atmosphere during an accident. However, no credit is given to this possible activity reduction in any of the drywell airborne activity release calculations.

6.5.3 Fission Product Control Structures and Systems In the unlikely event of an accident, any release of fission products from the reactor core or from a dropped spent fuel assembly is controlled by a number of passive and active design features. The passive control of released fission products is by containment in two major plant structures: the primary containment and the reactor building. Active control is attained through the operation of air filter systems in the reactor building only.

6.5.3.1 Primary Containment The primary containment structure consists of the drywell and the pressure suppression chamber (torus), connected by vent pipes. The suppression chamber is in the shape of a torus concentrically surrounding the drywell, which has the shape of a light bulb. The primary containment pressure suppression concept is the GE Mark I design. The drywell is made of welded steel plate and is provided with a domed steel head. The structural design of the primary containment is discussed in Section 3.8.2. Plan and elevation views and design details of the primary containment are shown on Figures 3.8.2-1 through 3.8.2-

17. The suppression chamber is also made of welded steel plate and is connected to the drywell by eight symmetrically located vent pipe sections.

6.5-9 HCGS-UFSAR Revision 0 April 11, 1988

The primary containment structure and its penetrations, isolation devices, hatches, and locks function to limit the release of radioactive materials subsequent to postulated accidents, so that the resulting offsite doses are less than the guideline values of 10CFR50.67. Primary containment parameters affecting fission product release accident analysis are given in Section 6.2.1.

The primary containment does not have a filter system for post-accident airborne fission product cleanup. The primary Containment Prepurge Cleanup System (CPCS) is used only prior to normal purge operations by the Reactor Building Ventilation System (RBVS) during normal plant shutdowns. A detailed description of the CPCS and its design function is given in Section 9.4.2.

Section 6.2.4 gives a detailed description of the primary containment isolation modes responding to specific isolation signals. A detailed description of the Primary Containment Isolation Control System is given in Section 7.1.

6.5.3.2 Reactor Building Enclosure The Reactor Building completely encloses both the drywell and the suppression chamber and is provided to contain radioactive leakage from the primary containment, so that such leakage can be processed by filtration systems prior to release to the environment. The Reactor Building enclosure boundary is formed by the exterior walls of the Reactor Building. The design of the Reactor Building is discussed in Section 3.8.4, and plan and elevation views of the Reactor Building complex are shown on Plant Drawings P-0001-0 through P-0007-0 and P-0011-0.

The Filtration Recirculation Ventilation System (FRVS) removes fission products from Reactor Building enclosure air following an accident resulting in the release of radioactivity in either the primary containment or the Reactor Building. Besides the cleanup of air, the FRVS also maintains a differential pressure of at least 0.25 inches water gauge inside the Reactor Building enclosure in 6.5-10 HCGS-UFSAR Revision 20 May 9, 2014

order to minimize the potential for unfiltered release of fission products to the environment. A detailed description of the FRVS design and its function is given in Section 6.8. Section 7.1 describes in detail the Reactor Building Isolation Control System. Reactor Building design parameters affecting fission product releases are given in Section 6.2.3.

For a detailed description of the isolation modes for the Reactor Building responding to specific isolation signals, see Section 9.4.2.

6.5.4 Ice Condensers as a Fission Product Cleanup System Hope Creek Generating Station does not have an Ice Condenser System.

6.5-11 HCGS-UFSAR Revision 0 April 11, 1988

6.8 FILTRATION, RECIRCULATION, AND VENTILATION SYSTEM The Filtration, Recirculation, and Ventilation System (FRVS) consists of two subsystems that are required to perform post-accident, safety-related functions simultaneously. These subsystems are:

1. Recirculation system - The FRVS Recirculation System is an Engineered Safety Feature (ESF) System, located inside the Reactor building that reduces offsite doses significantly below 10CFR50.67 guidelines during a loss-of-coolant accident (LOCA), refueling accident, or high radioactivity in the Reactor Building. Upon Reactor Building isolation, the FRVS Recirculation System is actuated and recirculates the Reactor Building air through filters for cleanup. This subsystem is the initial cleanup system before discharge is made via the FRVS ventilation subsystem to the outdoors.
2. Ventilation system - The FRVS Ventilation System is an ESF system, located inside the Reactor Building that maintains the building at a negative pressure with respect to the outdoors. The system takes suction from the discharge duct of the FRVS Recirculation System and discharges the air through filters to the outdoors via a vent at the top of the Reactor Building.

6.8.1 FRVS Recirculation System 6.8.1.1 Design Bases The FRVS Recirculation System is designed to accomplish the following objectives:

1. Recirculates and filters the air in the Reactor Building following a LOCA, or other high radioactivity accident, to reduce the concentration of radioactive halogens and 6.8-1 HCGS-UFSAR Revision 17 June 23, 2009

particulates potentially present in the Reactor Building. See Plant Drawing M-76-1 for design airflow rates in the Reactor Building. The circulating rate is approximately 3.0 percent of Reactor Building free volume per minute.

2. Maintain air flow from the low to the high contamination areas.
3. Cools the air in the reactor building to limit its expansion and reduce its temperature to the maximum average of 140F and to the maximum localized of 148F during a LOCA, with the exception of pipe chase 4329, which reaches a maximum of 151F.
4. Ensures that failure of any component of the system, assuming loss of offsite power (LOP), cannot impair the ability of the system to perform its safety function.
5. Remains intact and functional in the event of a safe shutdown earthquake (SSE).
6. Automatically starts in response to any one of the following signals within one minute:
a. High drywell pressure
b. Low reactor pressure vessel (RPV) water level (level 2)
c. Refueling floor exhaust duct high radioactivity
d. Reactor Building exhaust air high radioactivity
e. Manual PCIS initiation The FRVS recirculation units can also be started manually from the main control room 6.8-2 HCGS-UFSAR Revision 20 May 9, 2014
7. The design bases employed for sizing the filters, fans, and associated ductwork are as follows:
a. Each filter train is sized and specified for treating incoming air at 30,000 cfm at 140F.
b. The system capacity is maintained with all filters fully loaded (dirty), and Reactor Building atmosphere at maximum calculated relative humidity.
c. The high efficiency particulate air (HEPA) filter bank has an airflow rating of 30,000 cfm +/-10 percent with maximum airflow resistance of 1 inch water gauge when clean and 3 inches water gauge when dirty. The filter bank is considered to warrant a 99 percent removal efficiency for particulates in the accident dose evaluation when the filter bank is tested and meets the criteria of Section C.5.c of Regulatory Guide 1.52-1978 using Section 10 of ANSI N510-1980.
d. Each charcoal adsorber is assigned a decontamination efficiency of 95 percent removal efficiency for radioactive iodine as elemental iodine (I ), and 95 percent removal 2

efficiency for radioactive iodine as methyl iodide (CH I) 3 when passing through the charcoal at 70 percent relative humidity and 30C.

e. Each operating equipment train contains the amount of charcoal required to adsorb the inventory of fission products calculated to be released from the primary containment during a LOCA, with adequate margin to prevent charcoal ignition.

6.8.1.2 System Description The FRVS Recirculation System is an ESF system located inside the Reactor Building. This system consists of six 25 percent capacity 6.8-3 HCGS-UFSAR Revision 0 April 11, 1988

recirculation fans and filter trains connected to ducts, controls, and instrumentation. It is connected in parallel with the Reactor Building Ventilation System (RBVS), to the extensive supply and exhaust duct network within the Reactor Building. All six FRVS recirculation units include fan inlet vanes and isolation dampers, moisture separators to recirculate the Reactor Building air, high efficiency particulate air (HEPA) filters, charcoal filters, HEPA afterfilters, and water cooling coils. Upon a LOCA signal, all six FRVS recirculation units start with the two units designed as standby manually stopped and re-aligned to "Auto" mode. Four of the six FRVS recirculation units recirculate the Reactor Building air for at least 10 minutes after a LOCA signal. Cooling provided by the four operating FRVS recirculation units limits the expansion and temperature of the Reactor Building air following a LOCA. The cooling coils are provided with water from the Safety Auxiliaries Cooling System (SACS). One of the two 100 percent SACS cooling water loops supplies water to the three cooling coils while the redundant loop supplies the three remaining coils. Assuming one Safety Auxiliaries Cooling System (SACS) cooling water loop fails after 10 minutes, three FRVS recirculating cooling coils operate to maintain Reactor Building space temperatures below 148F maximum and 140F average except as noted in paragraph 6.8.1.1.3, above.

The airflow diagram for the FRVS Recirculation System is shown on Plant Drawing M-76-1. The instruments and controls are shown on Plant Drawing M-83-1. The system design parameters are provided in Table 6.8-1.

The quality group classification and corresponding applicable codes and standards that apply to the design of the FRVS system are discussed in Section 3.2.

Compliance of the system design with Regulatory Guide 1.52 is described in Section 1.8 and Tables 6.8-2 and 6.8-5.

6.8-4 HCGS-UFSAR Revision 20 May 9, 2014

Each redundant FRVS recirculation unit has a constant capacity of 30,000 cfm.

Fan performance and motor selection are based on a maximum pressure drop of 3 inches water gauge across each of the two banks of HEPA filters, in addition to other design pressure drops in the system. The air flow is maintained at a constant rate by modulating the fan inlet vanes in response to flow sensors mounted in the ductwork.

Each permanent single unit (PSU) adsorber is gasketless and all welded stainless steel, filled with charcoal impregnated with potassium iodide and/or triethylenediamine. Each adsorber holds a total of approximately 5260 pounds of charcoal that has a minimum ignition temperature of 330C. The charcoal adsorber is bulk filled and bulk evacuated at its installed location by supplementary equipment.

A water deluge spray system is provided for each charcoal adsorber. The spray system is connected to the Fire Protection System, as discussed in Sections 9.5.1.1.17 and 9.5.1.2.7, with the water deluge valve assembly mounted outside the charcoal adsorber. Multiple thermistors on the inlet of the adsorber provide continuous temperature indication.

Eight test canisters are provided in each charcoal adsorber. These canisters contain the same depth of the same charcoal that is in the adsorber. The canisters are so mounted that a parallel flow path is created between each canister and the adsorber. A laboratory test is performed on the carbon adsorbent initially (before loading), every 18 months thereafter, after 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of system operation, and following painting, fire, or chemical release in any ventilation zone communicating with the system. Testing conforms to Regulatory Guide 1.52-1978 using ASTM D3803 Method A.

The moisture separator is a passive component used to remove gross and micrometer sized droplets of water or condensed steam from the air stream in order to prevent downstream HEPA filters from becoming 6.8-5 HCGS-UFSAR Revision 0 April 11, 1988

clogged with water. The water is drained away and prevented from reentering the airstream.

The upstream HEPA filters remove the fine discrete particulate matter and pass the air stream to the adsorber. The HEPA filters downstream of the adsorption units collect carbon fines and provide redundant protection against particulate release in case of failure of the upstream HEPA filter bank.

An access door is provided for each access compartment in the FRVS recirculation unit. The doors have transparent portholes to allow inspection of components without violating train integrity.

Each FRVS filter plenum is of all welded carbon steel construction. Gas tight interior lights (with external light switches and fixture access) are provided for access compartments to facilitate inspection, testing, and replacement of components.

The FRVS Recirculation System is actuated either automatically by separate, redundant trip circuits, or manually from the main control room. The automatic actuation is originated by the signals listed in Section 6.8.1.1. The automatic actuation results in the start of all six recirculation units. Two standby units are subsequently manually stopped. Associated controls are then activated to open or modulate appropriate dampers so that the system function is accomplished. See Section 7 for detail discussion of startup and operating conditions. If any one of the four fans fails to operate, a standby fan starts automatically, and its filter train is activated.

The FRVS recirculation units and ducts are designed to Seismic Category I requirements.

The FRVS is supplied with diesel generator power automatically during a LOCA coincident with LOP.

6.8-6 HCGS-UFSAR Revision 0 April 11, 1988

See Appendix 6C for the structural design criteria for Seismic Category I HVAC ducts and duct supports.

6.8.1.3 Safety Evaluation The FRVS Recirculation System is Seismic Category I design and located in a Seismic Category I, tornado protected structure. It has redundant automatic startup signals and manual actuation capability from the main control room. It is normally in a standby mode of operation and is available for testing, inspection, and maintenance.

The FRVS Recirculation System is designed to filter contaminated air in the Reactor Building following a postulated accident or abnormal occurrence that could result in high airborne radiation in the Reactor Building. It also limits the expansion and temperature of the Reactor Building air during a LOCA.

FRVS equipment is powered from separate Class 1E buses, and all power circuits meet IEEE-279 and 308 requirements to ensure uninterrupted FRVS operation in the event of LOP. Redundant components are provided to ensure that a single failure does not impair or preclude system operation and performance. The FRVS is designed to Seismic Category I requirements, as discussed in Section 3.7, to ensure that the system remains intact and functional in the event of an SSE.

Components and materials of the FRVS have been selected to ensure integrity of the system under postulated accident conditions. An FRVS failure mode and effect analysis is presented in Table 6.8-3.

6.8-7 HCGS-UFSAR Revision 13 November 14, 2003

6.8.1.4 Tests and Inspections Tests and inspections are described in Table 6.8-6 and Section 9.4.2.4.

Conformance with Regulatory Guide 1.52 is discussed in Table 6.8-2. The system is preoperationally tested in accordance with the requirements of Section 14, and periodically tested during power generation in accordance with the requirements of Section 16.

6.8.1.5 Instrument Requirements The FRVS recirculation units can be actuated manually from the main control room. Each FRVS train is designed to function automatically upon receipt of an ESF system actuation signal. The status of system equipment, including indication of fan motor readiness, filter pressure drops, air temperatures, and air flow rates, is displayed in the main control room during both normal and accident conditions.

Tables 6.8-2 and 6.8-5 addresses the extent to which the recommendations of Regulatory Guide 1.52 are followed with respect to instrumentation.

All instrumentation performing safety related functions is qualified to Seismic Category I requirements. Redundancy and separation of the instrumentation is maintained, equal to the redundancy and separation of the equipment.

The following alarms are annunciated in the main control room:

1. Fan failure
2. High pressure drop across the upstream HEPA filter bank
3. High pressure drop across all filter banks (a group alarm) 6.8-8 HCGS-UFSAR Revision 13 November 14, 2003
4. Preignition charcoal temperature
5. Ignition charcoal temperature
6. Charcoal fire detection system failure (includes the deluge valve solenoid circuit discontinuity).

6.8.1.6 Materials The materials used for the FRVS Recirculation System are given in Table 6.1-2.

They are selected to ensure that system operability is not affected by radiation, temperature, or other environmental effects. Environmental qualification of the FRVS is discussed in Section 3.11.

The filter materials selected will not decompose due to radiation during the specified useful life of the filter. High temperature buildup effects are minimized by the fire protection system for the charcoal adsorber.

6.8.2 FRVS Ventilation System 6.8.2.1 Design Bases The Filtration, Recirculation, and Ventilation System (FRVS) Ventilation System is designed to accomplish the following objectives:

1. Exhausts sufficient filtered air from the Reactor Building to maintain a differential pressure of at least 0.25 inches water gauge with respect to the outdoors, at all elevations and in all climatic conditions following Reactor Building Ventilation System Isolation, as discussed in Section 9.4.2 for LOCA and high radioactivity accidents.
2. Filters the exhaust air to remove radioactive particulate, and elemental forms of iodine to limit offsite doses significantly below the guidelines of 10CFR50.67.

6.8-9 HCGS-UFSAR Revision 17 June 23, 2009

3. Ensures that the failure of any component of the system, assuming loss of offsite power (LOP), cannot impair the ability of the system to perform its safety function
4. Remains intact and functional in the event of an safe shutdown earthquake (SSE)
5. Automatically starts in response to any one of the following signals within one minute:
a. High drywell pressure
b. Low reactor pressure vessel (RPV) water level (level 2)
c. Refueling floor exhaust duct high radioactivity
d. Reactor Building exhaust air high radioactivity
e. Manual PCIS initiation The FRVS vent units can also be started manually from the main control room
6. The design bases employed for sizing the filters, fans, and associated ductwork are as follows:
a. Each filter unit is sized and specified for treating incoming air at 9000 cfm +/-10 percent maximum flow and 107F
b. System design performance is maintained with all filters fully loaded (dirty) and Reactor Building atmosphere at maximum calculated relative humidity
c. The HEPA filterbank is considered to warrant a 99 percent removal efficiency for particulate in the 6.8-10 HCGS-UFSAR Revision 6 October 22, 1994

accident dose evaluation by meeting the acceptance criteria of Section C.5.c of Regulatory Guide 1.52-1978.

d. The adsorber is assigned a decontamination efficiency of 95 percent for elemental iodine (I ) and methyl iodide (CH I) 2 3 when a sample is tested at 70 percent relative humidity and 30C in accordance with Method A of ASTM D3803.
e. The FRVS ventilation system short-term maximum ventilating capacity (9000 cfm +/-10 percent) is based on:

(1) The calculated leakage into the Reactor Building with the Reactor Building maintaining a differential pressure of at least 0.25 inches of water with respect to the outdoors in all climatic conditions (2) An allowance for thermal expansion of the Reactor Building air volume due to LOCA heat generation (3) An allowance for leakage from the containment into the Reactor Building

f. The FRVS Ventilation System long term ventilating capacity (250 cfm) is based on (a) and (c), defined above.

6.8.2.2 System Description The FRVS Ventilation System is an Engineered Safety Feature (ESF) System located inside the Reactor Building, and it consists of two 100 percent capacity centrifugal fans, filter trains, ducts, controls, and instrumentation.

Each fan is provided with inlet vanes and isolation dampers. One vent unit runs while the other is 6.8-11 HCGS-UFSAR Revision 13 November 14, 2003

on standby. Each vent unit takes the discharge from the FRVS Recirculation System and processes the air through a charcoal filter and HEPA filter. It exhausts to the outdoors through a vent at the top of the Reactor Building.

The exhaust is monitored for radioactivity before release to the environment.

The airflow diagram for the FRVS Ventilation System is shown on Plant Drawing M-76-1. The system instruments and controls are shown on Plant Drawing M-84-1, and system design parameters are provided in Table 6.8-1.

The quality group classification and corresponding applicable codes and standards are discussed in Section 3.2.

Compliance of the system design with Regulatory Guide 1.52 is described in Section 1.8 and Tables 6.8-2 and 6.8-5.

Each redundant FRVS ventilating unit, consisting of a fan and a filter plenum, has a maximum exhaust capacity of 9000 cfm +10 percent and a design minimum exhaust rate of 250 cfm in response to an indoor-outdoor differential pressure controller.

The fan performance and motor selection are based on a maximum system pressure drop of 4 inches water gauge across the component filters and the ductwork. The airflow is maintained at a constant rate through the filter train by modulating the fan inlet vanes in response to flow sensors mounted in the ductwork.

Excess flow is returned to the building as required by the differential pressure controller.

Each charcoal adsorber consists of 2-inch-deep removable trays filled with charcoal impregnated with potassium iodide and/or triethylenediamine. The bank holds a total of approximately 2160 pounds of charcoal having a minimum ignition temperature of 330C.

6.8-12 HCGS-UFSAR Revision 20 May 9, 2014

A water deluge spray system is provided for each charcoal adsorber. The spray system is connected to the Fire Protection System, as discussed in Sections 9.5.1.1.17 and 9.5.1.2.7, with the water deluge valve assembly mounted outside the charcoal adsorber. Multiple thermistors are provided on the inlet of the adsorber.

The HEPA filters downstream of the adsorption units collect carbon fines.

Eight test canisters are provided in each charcoal adsorber. These canisters contain the same depth of the same charcoal that is in the adsorber. The canisters are so mounted that a parallel flow path is created between each canister and the adsorber. A laboratory test is performed on the carbon adsorbent initially (before loading), every 18 months thereafter, after 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of system operation, and following painting, fire, or chemical release in any ventilation zone communicating with the system. Testing conforms to Regulatory Guide 1.52-1978 using ASTM D 3803 Method A.

An access door is provided for each access compartment in the FRVS vent units.

The doors have transparent portholes to allow inspection of components without violating train integrity.

Each FRVS filter plenum is of all-welded carbon steel construction. Gas-tight interior lights (with external light switches and fixture access) are provided for access compartments to facilitate inspection, testing, and replacement of components.

The FRVS Ventilation System is actuated automatically by separate, redundant trip circuits, or manually from the main control room. The automatic actuation is originated by the signals listed in Section 6.8.2.1. The automatic actuation results in the start of one ventilation unit. Associated controls are then activated to open or modulate appropriate dampers so that the system function is accomplished. See Section 7 for a detailed discussion of startup and operating conditions. If the lead fan fails to operate, the standby fan starts automatically, and its filter train is activated.

6.8-13 HCGS-UFSAR Revision 0 April 11, 1988

The FRVS ventilation units and ducts are designed to Seismic Category I requirements and the exhaust duct vent atop the reactor building is protected by tornado dampers.

The FRVS is supplied with diesel generator power automatically during a loss-of-coolant accident (LOCA) coincident with LOP.

6.8.2.3 Safety Evaluation The FRVS ventilation system is Seismic Category I design and located in a Seismic Category I, tornado protected structure. It has redundant automatic startup signals and manual actuation from the main control room. It is normally in a standby mode and is available for testing, inspection, and maintenance.

The FRVS ventilation system is designed to preclude direct exfiltration of contaminated air from the Reactor Building following an accident or abnormal occurrence that could result in high airborne radiation in the Reactor Building. Equipment is powered from separate Class 1E buses, and all power circuits meet IEEE-279 and -308 requirements. Redundant components are provided to ensure that a single failure does not impair or preclude system operation. FRVS failure mode and effect analysis is presented in Table 6.8-5.

6.8.2.4 Tests and Inspections Tests and inspections are described in Table 6.8-6 and Section 9.4.2.4.

Conformance with Regulatory Guide 1.52 is discussed in Table 6.8-2. The system is preoperationally tested in 6.8-14 HCGS-UFSAR Revision 13 November 14, 2003

accordance with the requirements of Section 14, and periodically tested during power generation in accordance with the requirements of Section 16.

6.8.2.5 Instrument Requirements Each FRVS Ventilation System unit is designed to function automatically upon receipt of an ESF system actuation signal. The FRVS Ventilation System can also be actuated manually from the main control room. The status of system equipment, including indication of fan motor readiness, filter pressure drops, air temperature, and air flow rates, is displayed in the main control room during both normal and accident plant conditions.

Tables 6.8-2 and 6.8-15 address the extent to which the recommendations of Regulatory Guide 1.52 are followed with respect to instrumentation.

All instrumentation performing safety related functions is qualified to Seismic Category I requirements. Redundancy and separation of the instrumentation is maintained consistent with the redundancy and separation of the equipment.

The following alarms are annunciated in the main control room:

1. Fan failure
2. High pressure drop across all filter banks (a group alarm)
3. Preignition charcoal temperature
4. Ignition charcoal temperature
5. Charcoal fire detection system failure (includes the deluge valve solenoid circuit discontinuity) 6.8-15 HCGS-UFSAR Revision 13 November 14, 2003
6. High and low building pressure.

6.8.2.6 Materials Materials used for the ventilation system of the FRVS are given in Table 6.1-2.

They are selected to ensure that system operability is not affected by radiation, temperature, or other environmental effects. Environmental qualification of the ventilation system of the FRVS is discussed in Section 3.11.

Filter materials used does not decompose due to radiation during the specified useful life of the filter. High temperature buildup effects are minimized by the fire protection system for the charcoal adsorber.

6.8-16 HCGS-UFSAR Revision 13 November 14, 2003