LIC-95-0196, Forwards Monthly Operating Rept for Sept 1995 for Fort Calhoun Station Unit 1 & Corrected Pages to Monthly Operating Rept for Aug 1995

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Sept 1995 for Fort Calhoun Station Unit 1 & Corrected Pages to Monthly Operating Rept for Aug 1995
ML20093G740
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 10/13/1995
From: Tira Patterson
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20093G743 List:
References
LIC-95-0196, LIC-95-196, NUDOCS 9510190217
Download: ML20093G740 (1)


Text

i (

= -

EIf -

fiBEE!33EEI@

Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/63 & 2000 October 13, 1995 LIC-95-0196 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-137 Washington, D.C. 20555

References:

1. Docket No. 50-285
2. Letter from OPPD (T. L. Patterson) to NRC (Document Control Desk) dated September 15, 1995 (LIC-95-0172)

SUBJECT:

September 1995 Monthly Operating Report (MOR)

Enclosed please find the September 1995 MOR for Fort Calhoun Station (FCS)

Unit No.1 as required by FCS Technical Specification 5.9.1.

Also enclosed are the corrected " Operating Data Report" and " Unit Shutdowns and Power Reductions" forms for the August 1995 report period. Reference 2 was submitted with the number of forced outage hours as 39.1 rather than 52.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

During preparation of the August MOR, the number of forced outage hours was inadvertently calculated using reactor critical hours rather than generator on-line hours.

If you should have any questions, please contact me.

Sincerely,

'h.A hah T. L. Patterson Division Manager Nuclear Operations Enclosures c: Winston & Strawn L. J. Callan, NRC Regional Administrator, Region IV R. L. Wharton, NRC Project Manager W. C. Walker, NRC Senior Resident Inspector R. T. Pearce, Combustion Engineering R. J. Simon, Westinghouse INP0 Records Center 9510190217 951013 PDR ADOCK 05000285 R

Employment w:th Equa; opportun:ty PDR g

3p.,

45 512c [c ,

'"r .; g' '