LD-83-018, Advises That Results of CESSAR-F Load Limiter Tests in Reactor Vessel Lower Key Horizontal Supports Will Be Provided to Az Public Svc During Second Quarter 1983 for Inclusion in Dockets for Palo Verde Plants

From kanterella
Jump to navigation Jump to search
Advises That Results of CESSAR-F Load Limiter Tests in Reactor Vessel Lower Key Horizontal Supports Will Be Provided to Az Public Svc During Second Quarter 1983 for Inclusion in Dockets for Palo Verde Plants
ML20079N021
Person / Time
Site: 05000470
Issue date: 02/28/1983
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
LD-83-018, LD-83-18, NUDOCS 8303030419
Download: ML20079N021 (2)


Text

C-E Powerbystens Tel. 203/688-1911 Combustion Engineenng, Inc. Telex: 99297 1000 Prospect Hill Road Windsor. Connecticut 06095 POWER H SYSTEMS Docket No.: STN 50-470F February 28, 1983 LD 018 Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

CESSAR-F Load Limiter Tests

Reference:

Letter LD-81-097, A. E. Scherer to J. R. Miller, dated December 12, 1981

Dear Mr. Eisenhut:

Combustion Engineering (C-E) has committed to provide results of testing on load limiting devices in the reactor vessel lower key horizontal supports.

This commitment was transmitted via the Reference as part of Amendment 6 to CESSAR-F. Specifically, Section 3.9.1.4.1 states that the " specification for the procurement of these load limiting devices includes a requirement for a test to demonstrate conformance to the required characteristics ... test results will be provided to the Nuclear Regulatory Commission ...".

The required characteristics for the load limiters are currently specified in CESSAR-F based on generic normal, upset, and safe shutdown earthquake loadings. In actuality, the load limiters are now being tested under plant specific normal, upset and safe shutdown earthquake loadings. Therefore, conformance will be demonstrated for the plant specific loadings at the Palo Verde Nuclear Generating Station site and test results will be transmitted to Arizona Public Service (APS) for submittal on their docket. C-E will provide the information to APS in the second quarter of 1983, which is compatible with their projected licensing schedule.

Reference to the generic test results will be removed from CESSAR-F in the next amendment. If you have any questions on this change, please feel free to contact me or Mr. G.A. Davis of my staff at (203) 688-1911, extension 2803.

Very truly yours, COMBUSTION ENGINEERING, INC.

W A. E. Scherer Director Nuclear Licensing .

[

AES:las 9303030419 830229 PDR ADOCK 05000470 A PDR

m , m__ , . _ . ...1...--. _.._s - ~ . ~ . . .m m4 .

J; e J :;; 4 _ E - '

C-E Power Systems Combustion Engineering,Inc.

g,gj '>- D ~7gi g j~[ji D QQ,, f, AQQ f  :  ;

1000 Prospect Hill Road .

m20's:- "f'y /t,A _ ,-

Iiu v Nuo I wan:20 Post Office Box 500 ,:  :

Windsor, Connecticut 06095-0500 (NUM e;iliio'l A  :

A. E. Scherer, 9438-1922

  • 1 [

t MS i

Mr. Darrell G. Eisenhut, Director i Division of Licensing  ;

+

U.S.- Nuclear Reg latory Commission Washington, D.C. ,20555 c

[

\ I

\  !

0,

-- - -.m- - - _ m.. . _. _ _ __ _ - ,.y.._. _ ,,,_ ,.,_ _ _ .,~.. ,,_ . , _ . . . _ _