LD-83-013, Responds to NRC 820326 Request Re Info Concerning Rapid Depressurization & DHR Capability.Some Responses Will Rely on plant-specific Info from Balance of plant.C-E Owners Group Rept Will Be Submitted by 830630

From kanterella
Jump to navigation Jump to search
Responds to NRC 820326 Request Re Info Concerning Rapid Depressurization & DHR Capability.Some Responses Will Rely on plant-specific Info from Balance of plant.C-E Owners Group Rept Will Be Submitted by 830630
ML20071D331
Person / Time
Site: 05000470
Issue date: 02/28/1983
From: Scherer A
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
LD-83-013, LD-83-13, NUDOCS 8303090351
Download: ML20071D331 (2)


Text

.~. .

C-E P wer Systems Tel. 203/688-1911 ,

Combustion Engineenng. Inc. Te'ex 99297  !

1000 Prospect Hii: Road i Windsor Connectncuto6095 I POWER H SYSTEMS February 28, 1983 Docket No: STN-50-470F LD-83-013 Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

PORV's Rapid Depressurization and Decay Heat Removal Capability

Reference:

(A) Letter, R. L. Tedesco to A. E. Scherer, dated March 26, 1982 (B) Letter LD-82-046, A. E. Scherer to R. L. Tedesco, dated April 19, 1982 (C) Letter RWW-82-64, R. W. Wells to D. G. Eisenhut, dated October 28, 1982

Dear Mr. Eisenhut:

Reference (A) transmitted to Combustion Engineering (C-E) the Staff's request for information on the rapid depressurization and decay heat removal capability of the System 80" design. C-E provided via Reference (B) justification for the continued licensing of CESSAR-F in the interim and committed to identify a schedule for responding to the staff's questions. The purpose of this letter is to provide that schedule and indicate the scope of the CESSAR-F response.

The majority of the Staff's questions were considered to be generically applicable to C-E reactors without Power Operated Relief Valves and will be addressed as a C-E Owners Group (CE0G) activity. The NRC was informed of this in Reference (C). The CE0G report will be provided to the NRC, and referenced on the CESSAR-F docket, by June 30, 1983.

l Not all of the questions in Reference (A), however, will be answered on the CESSAR-F docket. A number of the question responses will rely upon plant-specific information from the balance-of-plant and must be deferred to the referencing applicant's docket. The questions are tabulated below for the purpose of identifying those questions which are considered to be within or outside of the CESSAR-F scope.

l EK)D3090351 830228 fj PDR ADOCK 05000470 w A pon

l-l A. . -

i Staff Questions Within Staff Questions Outside CESSAR-F Scope of CESSAR-F Scope

~

1 6a, 6b 4 2 8 3 9 4 10 5 11

! 6c, 6d, 6e 12 7 13a, 13c, 13d 13b 14 If I can be of any further assistance in this matter, please contact me or Mr.

- G. A~. Davis of my staff at (203) 688-1911, extension 2803.

Very truly yours, 4

COMBUSTION ENGINEERING, INC.

A. E. Scherer i Director Nuclear Licensing AES:tmr cc: ' Gary Meyer (Project Manager /USNRC)-

l 1