MONTHYEARL-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 L-PI-24-009, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-09 Safety Injection System and Volume Control System Category C Check Valve Quarterly Testing2024-02-13013 February 2024 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-09 Safety Injection System and Volume Control System Category C Check Valve Quarterly Testing L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-032, Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables2023-12-0404 December 2023 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables L-PI-23-027, Revision to 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals2023-10-0303 October 2023 Revision to 10 CFR 50.55a Requests Nos. 1-RR-5-10 and 2-RR-5-10, Proposed Alternative to Reactor Vessel Inservice Inspection (ISI) Intervals L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report L-PI-23-010, Annual Report of Individual Monitoring2023-04-27027 April 2023 Annual Report of Individual Monitoring L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-005, CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2023-03-0303 March 2023 CFR 50.55a Requests Nos. 1-RR-5-15 and 2-RR-5-15, Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) L-PI-23-001, Day Steam Generator Tube Inspection Report2023-01-30030 January 2023 Day Steam Generator Tube Inspection Report L-PI-22-047, Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report2022-12-21021 December 2022 Resubmittal of Prairie Island Nuclear Generating Plant (PINGP) 2018 Unit 1 180-Day Steam Generator Tube Inspection Report L-PI-22-020, Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2022-12-0202 December 2022 Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-037, Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts2022-09-20020 September 2022 Updated Approach for Prairie Island Unit 1 and Unit 2 Baffle Former Bolts L-PI-22-032, CFR 50.46 LOCA Annual Report2022-06-16016 June 2022 CFR 50.46 LOCA Annual Report L-PI-22-033, Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles2022-06-10010 June 2022 Response to Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, Amendment to Adopt 24-Month Operating Cycles L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-047, Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 22021-12-0707 December 2021 Response to Request for Additional Information 24-Month Cycle Amendment Prairie Island Nuclear Generating Plant, Units 1 and 2 L-PI-21-045, Response to Request for Additional Information Cooling Water System License Amendment Request2021-11-0404 November 2021 Response to Request for Additional Information Cooling Water System License Amendment Request L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-032, Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island2021-09-30030 September 2021 Response to Request for Additional Information Amendment Request to Adopt TSTF-471 and 571-T for Prairie Island L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-027, 2020 10 CFR 50.46 LOCA Annual Report2021-06-28028 June 2021 2020 10 CFR 50.46 LOCA Annual Report L-PI-21-023, Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report2021-05-14014 May 2021 Independent Spent Fuel Storage Installation - 2020 Annual Radiological Environmental Monitoring Program Report L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-050, Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic2020-10-0707 October 2020 Request for a One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements, Due to COVID-19 Pandemic L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-026, Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiativ2020-09-0101 September 2020 Response to Request for Additional Information: License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 L-PI-20-035, = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule2020-07-28028 July 2020 = Request for Revision to Reactor Vessel Material Surveillance Capsule Removal Schedule L-PI-20-023, Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI)2020-06-10010 June 2020 Independent Spent Fuel Storage Installation, Response to Request for Additional Information: License Amendment Request to Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI) L-PI-20-014, Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI2020-04-29029 April 2020 Supplement to License Amendment Request: Expand the Storage Capacity of the Independent Spent Fuel Storage Installation (ISFSI L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency 2024-08-23
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption ML24155A2222024-05-28028 May 2024 Methodology Evaluation Report for Elimination of Response Time Testing Prairie Island Reactor Trip System Rev. 1 ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2023-03-28028 March 2023 Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-22-040, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-10-0606 October 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections L-PI-22-024, Supplement to Application for License Amendment to Implement 24-Month Operating Cycle2022-03-0707 March 2022 Supplement to Application for License Amendment to Implement 24-Month Operating Cycle ML21320A2262021-11-15015 November 2021 License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-PI-21-006, License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions2021-10-0202 October 2021 License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Incorporate Installed Bypass Test Capability for the Power Range RTS Functions L-PI-21-016, Application for License Amendment to Implement 24-Month Operating Cycle2021-08-0606 August 2021 Application for License Amendment to Implement 24-Month Operating Cycle L-PI-21-007, Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes2021-04-19019 April 2021 Application to Revise Technical Specifications to Adopt TSTF-471, Eliminate Use of the Term Core Alterations in Actions and Notes L-PI-20-051, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2020-09-28028 September 2020 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-20-004, License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.132020-03-30030 March 2020 License Amendment Request to Revise Technical Specifications (TS) to Remove Note I from Limiting Condition for Operating (LCO) 3.4.12 and LCO 3.4.13 ML20058F9432020-02-27027 February 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - License Amendment Request: Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules Revision 4 L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-031, License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2019-12-16016 December 2019 License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency L-PI-19-006, Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements2019-01-29029 January 2019 Emergency License Amendment Request Regarding One-Time Extension for Technical Specification Completion Time Requirements L-PI-18-064, License Amendment Request (LAR) to Revise Current Licensing Basis, Supplement 12018-12-0404 December 2018 License Amendment Request (LAR) to Revise Current Licensing Basis, Supplement 1 L-PI-18-014, License Amendment Request (LAR) to Revise Current Licensing Basis2018-10-0202 October 2018 License Amendment Request (LAR) to Revise Current Licensing Basis L-PI-18-031, License Amendment Request to Adopt TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco.2018-06-26026 June 2018 License Amendment Request to Adopt TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco. L-PI-18-005, License Amendment Request to Revise License Condition Associated with Implementation of NFPA 8052018-05-18018 May 2018 License Amendment Request to Revise License Condition Associated with Implementation of NFPA 805 ML17090A2012017-03-31031 March 2017 License Amendment Request to Revise Technical Specification for Plant/Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML17094A5762017-03-29029 March 2017 License Amendment Request to Revise Emergency Action Level (EAL) Scheme ML17055C3592017-02-23023 February 2017 License Amendment Request: Revision to Emergency Plan Staff Augmentation Response Times L-PI-16-060, License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action2016-08-31031 August 2016 License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action L-PI-16-020, License Amendment Request Regarding One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources- Operating.2016-04-0707 April 2016 License Amendment Request Regarding One-Time Extension for Technical Specification Surveillance Requirement 3.8.4.3. DC Sources- Operating. L-PI-16-003, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process2016-01-25025 January 2016 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process ML15327A2282015-11-17017 November 2015 License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes L-PI-15-087, Enclosures 7 & 8: Modeling of Fuel Assemblies Containing Both Ifba and Gadolinia Absorber Rods with Westinghouse Core Design Code Systems and Affidavit2015-10-31031 October 2015 Enclosures 7 & 8: Modeling of Fuel Assemblies Containing Both Ifba and Gadolinia Absorber Rods with Westinghouse Core Design Code Systems and Affidavit L-PI-15-030, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-06-29029 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process L-PI-14-034, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation2014-12-11011 December 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation L-PI-14-072, License Amendment Request (LAR) to Revise the Licensing Basis Analysis for a Waste Gas Decay Tank Rupture2014-08-21021 August 2014 License Amendment Request (LAR) to Revise the Licensing Basis Analysis for a Waste Gas Decay Tank Rupture L-PI-14-037, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources- Operating, Emergency Diesel Generator Voltage and Frequency Limits2014-06-0909 June 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources- Operating, Emergency Diesel Generator Voltage and Frequency Limits ML14126A7272014-05-0505 May 2014 Supplement to License Amendment Request (LAR) for Cyber Security Plan Implementation Date Extension L-PI-13-102, License Amendment Request (LAR) to Revise Staff Augmentation Times in the Prairie Island Nuclear Generating Plant (PINGP) Emergency Plan2013-12-20020 December 2013 License Amendment Request (LAR) to Revise Staff Augmentation Times in the Prairie Island Nuclear Generating Plant (PINGP) Emergency Plan ML13333B6742013-11-27027 November 2013 License Amendment Request (LAR) for Northern States Power Company, Minnesota (NSPM) Cyber Security Plan Implementation Date Extension L-PI-13-076, Supplement to License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement2013-07-25025 July 2013 Supplement to License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement L-PI-13-071, Supplement to License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA 1.2 and Fuel Clad Barrier Loss Criteria2013-07-23023 July 2013 Supplement to License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA 1.2 and Fuel Clad Barrier Loss Criteria L-PI-13-030, License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr).2013-05-23023 May 2013 License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr). L-PI-13-017, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System) - Shutdown2013-02-20020 February 2013 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System) - Shutdown L-PI-12-110, License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA1.2 and Fuel Clad Barrier Loss Criteria2012-12-13013 December 2012 License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA1.2 and Fuel Clad Barrier Loss Criteria ML12278A4052012-09-28028 September 2012 Prairie Island, Units 1 and 2, License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors L-PI-12-054, Application to Revise Technical Specifications Associated with Steam Generator Replacement and Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection2012-07-25025 July 2012 Application to Revise Technical Specifications Associated with Steam Generator Replacement and Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection L-PI-12-055, License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement2012-07-25025 July 2012 License Amendment Request for Exception to Technical Specification 5.5.14 Testing Requirements Associated with Steam Generator Replacement L-PI-12-028, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits2012-05-15015 May 2012 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits L-PI-11-037, License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil2011-08-11011 August 2011 License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil L-PI-11-038, Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology2011-04-0606 April 2011 Supplement to License Amendment Request to Exclude the Dynamic Effects Associated with Certain Postulated Pipe Ruptures from the Licensing Basis Based Upon Application of Leak-Before-Break Methodology 2024-06-03
[Table view] Category:Technical Specifications
MONTHYEARML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24008A1292024-03-0505 March 2024 Enclosure 2 - PI ISFSI Amendment 12 Section 4.0 Design Features Technical Specifications ML22357A1002023-03-31031 March 2023 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22181A0002022-08-17017 August 2022 Issuance of Amendments Reactor Trip System Power Range Instrumentation Channels L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22061A2062022-04-0101 April 2022 Issuance of Amendments TSTF-471, Rev. 1, TSTF-571-T, and Administrative Changes to Technical Specification Section 5.0 L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 ML20346A0202021-03-15015 March 2021 Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20356A0022021-02-0505 February 2021 Issuance of Amendment Nos. 234 and 222, Revise Technical Specifications 3.2.1 and 5.6.5 Identified in Westinghouse Nuclear Safety Advisory Letters NSAL-09-05, Revision 1, and NSAL-15-1 ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency ML19045A4802019-04-16016 April 2019 Issuance of Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19029A0942019-01-29029 January 2019 Issuance of Amendment No. 213, One-Time Technical Specification Change to Extend Completion Time for EDGs D5 and D6 (Emergency Circumstances) ML17362A2022018-03-0505 March 2018 Issuance of Amendment Concerning Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos. MF9345 and MF9346; EPID L-2017-LLA-0175) ML16133A4062016-06-16016 June 2016 Issuance of Amendment Nos. 217 and 205, Adoption of Technical Specifications Task Force TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation (CAC Nos. MF6449 and MF6450) ML15264A2092015-11-30030 November 2015 Issuance of Amendment Nos. 216 and 204 Regarding Revisions to Technical Specification 3.3.3 and Renewed Facility Operating License ML15229A1762015-08-26026 August 2015 Issuance of Amendment Nos. 215 and 203 Regarding Revision to Licensing Basis Analysis for a Waste Gas Decay Tank Rupture ML15209A5122015-07-17017 July 2015 Technical Specifications - Updating Instructions -Effective Date: 7/24/2015 ML15209A5092015-07-17017 July 2015 Technical Specifications - Updating Instructions L-PI-15-030, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-06-29029 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML15086A0462015-05-21021 May 2015 Issuance of Amendment Nos. 214 and 202 Regarding Revisions to Technical Specification 3.8.1, AC Sources - Operating ML15062A0132015-05-20020 May 2015 Issuance of Amendments 213 and 201 to Revise TS 3.5.3, ECCS - Shutdown L-PI-15-004, Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System)- Shutdown2015-02-26026 February 2015 Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System)- Shutdown L-PI-14-034, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation2014-12-11011 December 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation ML14058A2072014-02-19019 February 2014 Technical Specifications (3801 TS Markup) ML13214A0292013-08-0202 August 2013 Correction Letter for License Amendment Nos. 207 (Unit 1) and 194 (Unit 2) ML13113A4002013-07-0202 July 2013 License Amendments TSTF-510 L-PI-13-030, License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr).2013-05-23023 May 2013 License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr). ML13093A3442013-05-0909 May 2013 License Amendments for Fuel Oil System and TSTF-501 L-PI-12-028, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits2012-05-15015 May 2012 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits L-PI-12-013, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology2012-02-24024 February 2012 Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology ML1129011152011-12-0101 December 2011 Issuance of Amendments Revision of Technical Specifications 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications. L-PI-11-037, License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil2011-08-11011 August 2011 License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil ML11172A0222011-06-27027 June 2011 Technical Specifications, Unit 2, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant ML11172A0202011-06-27027 June 2011 Technical Specifications, Unit 1, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant L-PI-11-016, License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.2011-02-0303 February 2011 License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating. L-PI-10-104, Supplement to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.102010-10-20020 October 2010 Supplement to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.10 ML1025715492010-09-16016 September 2010 Correction to Amendment Nos. 195 and 184 Regarding Technical Specification Changes to Control Room Habitability Requirements ML0925703672009-09-15015 September 2009 Correction to Technical Specifications (TAC Nos. MD9142 and MD9143) L-PI-08-080, License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.92008-11-0404 November 2008 License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.9 ML0826815912008-09-22022 September 2008 (PINGP-1 and 2), Technical Specifications ISFSI, Issuance of Amendments to Conform the Facility Operating Licenses to Reflect Transfer of Operating Authority (TAC L24245) ML0826812912008-09-22022 September 2008 Revised Operating Licenses & Technical Specifications, Issuance of Amendments to Conform the Facility Operating Licenses to Reflect Transfer of Operating Authority (TAC L24245, MD9622 and MD9623) ML0820504452008-07-18018 July 2008 Tech Spec Pages for Amendments 186 & 176 Adopting Provisions of Regulatory Guide (Rg) 1.52 Revision 3 ML0818402342008-06-27027 June 2008 Prairie, Units 1 and 2, Tech Spec Pages for Amendments 185 and 175 Regarding Incorporation of TS Task Force Travelers TSTF-479, TSTF-485 and TSTF-497 ML0812705062008-05-0101 May 2008 Submittal of Entire Re-Issue of ISFSI Technical Specifications ML0801404252008-01-28028 January 2008 Issuance of Amendments (TAC Nos. MD4209 & MD4210) - Tech Specs ML0735204002007-12-14014 December 2007 Technical Specifications in Support of Containment Sump Resolution L-PI-07-086, License Amendment Request (LAR) to Revise Containment Spray Nozzle Surveillance Requirements (SR)2007-11-19019 November 2007 License Amendment Request (LAR) to Revise Containment Spray Nozzle Surveillance Requirements (SR) 2024-05-01
[Table view] |
Text
tl Xcel Energy L-PI-13-030
,vIAY 23 2013 10 CFR 50.90 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)"
Pursuant to 10 CFR 50.90, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), hereby requests an amendment to the TS for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2, to add a methodology to TS 5.6.5. NSPM evaluated the proposed changes in accordance with 10 CFR 50.92 and concluded that they involve no significant hazards consideration.
The enclosure to this letter, "Evaluation of the Proposed Changes", contains the licensee's evaluation of the proposed changes.
NSPM requests approval of this LAR within one calendar year of the submittal date.
Upon NRC approval, NSPM requests 90 days to implement the associated changes. In accordance with 10 CFR 50.91, NSPM is notifying the State of Minnesota of this LAR by transmitting a copy of this letter and enclosure to the designated State Official.
If there are any questions or if additional information is needed, please contact Mr. Dale Vincent, P.E., at 651-388-1121.
1717 Wakonade Drive East
- Welch, Minnesota 55089-9642 Telephone: 651.388.1121
Document Control Desk Page 2 Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
I declare under p7n~lty of perjury that the foregoing is true and correct.
Executed on 5; r23j)S d!~
Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosures (1) cc: Administrator, Region III, USNRC Project Manager, PINGP, USNRC Resident Inspector, PINGP, USNRC State of Minnesota
ENCLOSURE Evaluation of the Proposed Changes License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)"
- 1.
SUMMARY
DESCRIPTION
- 2. DETAILED DESCRIPTION 2.1 Proposed Changes
2.2 Background
- 3. TECHNICAL EVALUATION
- 4. REGULATORY SAFETY ANALYSIS 4.1 Applicable Regulatory Requirements/Criteria 4.2 Precedent 4.3 Significant Hazards Consideration 4.4 Conclusions
- 5. ENVIRONMENTAL CONSIDERATION
- 6. REFERENCES ATTACHMENTS:
- 1. Technical Specification Pages (Markup)
- 2. Technical Specification Pages (Retyped)
Page 1 of 12
Enclosure NSPM Revise TS 5.6.5
- 1.
SUMMARY
DESCRIPTION This evaluation supports a request to amend Renewed Operating Licenses DPR-42 and DRP-60 for Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2, respectively.
Pursuant to 10 CFR 50.90, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy (hereafter "NSPM"), hereby requests an amendment to the TS for PINGP, Units 1 and 2, to add a methodology to TS 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)".
- 2. DETAILED DESCRIPTION 2.1 Proposed Changes A brief description of the associated proposed TS changes is provided below along with a discussion of the justification for each change. The specific wording changes to the TS are provided in Attachments 1 and 2 to this enclosure.
TS 5.6.5, "CORE OPERATING LIMITS REPORT (COLR)": This LAR proposes to add new references 32 and 33 to the list of NRC-approved topical reports for calculating core operating limits. These changes are acceptable because these references embody an NRC-approved methodology which applies to the reactor core design for pressurized water reactors (PWRs) which utilize uranium fuel.
PINGP is a PWR with uranium fuel.
There are no Bases changes associated with this LAR.
In summary these changes are acceptable because they assure the core operating limits have been calculated in accordance with an NRC approved methodology. Use of this methodology will improve plant safety through more accurate core design capability.
2.2 Background The reactor core for each PINGP unit operating cycle is designed in accordance with NRC-approved methodologies and evaluated pursuant to 10 CFR 50.59. Under the guidance of GL 88-16, "Removal of Cycle-Specific Parameter Limits from Technical Specifications" (ML031150407) and NUREG-1431, Rev. 2.2, Standard Technical Specifications Westinghouse Plants", (ML031270565) the topical reports for these methodologies are listed in TS 5.6.5.b. Westinghouse has developed improved methods for use of the Westinghouse Advance Nodal Computer Code (ANC) which the NRC has reviewed and approved in WCAP-16045-P-A, "Qualification of the Two-Page 2 of 12
Enclosure NSPM Revise TS 5.6.5 Dimensional Transport Code PARAGON" and WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology". NSPM proposes to add these references to TS 5.6.5.b and use this methodology in the reactor core design at PINGP.
NSPM requests approval of this LAR within one year. If this LAR is approved in the requested timeframe, NSPM will apply this methodology to the Unit 1 reactor core designated as 1R29 which commences in the autumn of 2014, the Unit 2 reactor core designated as 2R29 which commences in the autumn of 2015, and subsequent reactor core designs.
With the TS changes proposed in this LAR the plant will continue to operate safely, and the health and welfare of the public will continue to be protected.
- 3. TECHNICAL EVALUATION PINGP is a two unit plant located on the right bank of the Mississippi River approximately six miles northwest of the city of Red Wing, Minnesota. The facility is owned and operated by Northern States Power Company, a Minnesota corporation (NSPM). Each unit at PINGP employs a two-loop pressurized water reactor designed and supplied by Westinghouse Electric Corporation. The initial PINGP application for a Construction Permit and Operating License was submitted to the Atomic Energy Commission (AEC) in April 1967. The Final Safety Analysis Report (FSAR) was submitted for application of an Operating License in January 1971. Unit 1 began commercial operation in December 1973 and Unit 2 began commercial operation in December 1974.
The PINGP was designed and constructed to comply with the licensee's understanding of the intent of the AEC General Design Criteria (GDC) for Nuclear Power Plant Construction Permits, as proposed on July 10, 1967. PINGP was not licensed to NUREG-0800, "Standard Review Plan (SRP)."
Core Operating Limits Report (COLR)
Each PINGP reactor core fuel cycle design requires cycle-specific parameter limits to be defined in the plant TS to assure the plant is operated safely. In accordance with the guidance of NUREG-1431, Revision 4, "Standard Technical Specifications, Westinghouse Plants", each applicable PINGP TS references the COLR as containing the applicable limit. TS 5.6.5.a requires, "Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following ... ", after which follows the list of all TS which reference the COLR to specify core operating limits. TS 5.6.5.b states, "The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents ... ", after which follows the list of NRC-approved topical reports that embody the methodologies used to determine the core operating limits. TS 5.6.5.c Page 3 of 12
Enclosure NSPM Revise TS 5.6.5 requires, "The core operating limits shall be determined such that all applicable limits ..
. of the safety analysis are met." TS 5.6.5.d requires each revision of the COLR to be provided to the NRC.
PINGP license amendments (LA) 162 and 153 (LA-162/153) issued April 28, 2004 (ML040900209), for Units 1 and 2 respectively, adopted the provisions of NUREG-1431, Revision 2, which revised the content requirements for COLR references.
NUREG-1431, Revision 2, incorporated Technical Specifications Task Force (TSTF) industry traveler TSTF-363, "Revise Topical Report references in ITS 5.6.5, COLR",
which removed the specific date and revision for topical report references and requires the reference details to be included in the COLR for references used to prepare the COLR. NRC letter dated August 4, 2011, (ML110660285) allows licensees, which adopted this format prior to the date of the letter, to continue to use the TSTF-363 format. The PINGP COLR is consistent with the guidance of NUREG-1431, Revision 2, as allowed by NRC letter dated August 4, 2011 (ML110660285), and includes the complete identification for each of the TS referenced topical reports used to prepare the COLR, that is, report number, title, revision, date, and any supplements.
Proposed Changes Currently, PINGP reactor cores are designed using WCAP-11596-P-A, "Qualification of the PHOENIX-P/ANC Nuclear Design System for Pressurized Water Reactor Cores".
Westinghouse has developed a revised methodology for reactor core design using the Westinghouse Advanced Nodal Computer Code (ANC) which was reviewed and approved by the NRC in WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON," and WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology". This LAR requests approval to use this revised methodology in the design of the PINGP Unit 1 and 2 reactor cores in lieu of WCAP-11596-P-A and include this methodology in the PINGP TS by addition of two references to TS 5.6.5.b as follows:
- 32. WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON"; and
- 33. WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology".
Technical Basis for Change TS 5.6.5.b lists the analytical methods which are used to determine the core operating limits. The proposed TS change will modify TS 5.6.5.b to add references WCAP-16045-P-A and WCAP-16045-P-A, Addendum 1-A. TS Section 5.6.5.b states that the analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC.
Page 4 of 12
Enclosure NSPM Revise TS 5.6.5 WCAP-16045-P-A confirms the qualifications of the PARAGON code both as a standalone transport code and as a substitute for the PHOENIX-P code, the code currently used in PINGP design, as a nuclear data source for nodal codes. As part of the qualification process, the topical report includes a comparison of PARAGON predicted values to measured data from several plants. Benchmarking has shown that results from the PARAGON/ANC code package are essentially the same as those obtained from the current PHOENIX-P/ANC system. WCAP-16045-P-A concludes that the application of PARAGON does not result in any undesirable changes in predicted fuel performance or safety analysis results. The NRC Safety Evaluation (SE) for the PARAGON nuclear data methodology attached to a letter dated March 18, 2004, (ML040780402) states, "... the staff considers the new PARAGON code to be well qualified as a stand-alone code replacement for the PHOENIX-P lattice code, wherever the PHOENIX-P code is used in NRC-approved methodologies."
WCAP-16045-P-A, Addendum 1-A, verifies the accuracy of NEXUS for cross section representation. As part of this topical report, different assembly types were calculated using NEXUS, which include the following: both Westinghouse and Combustion Engineering assembly types; U0 2 fuel; and integral fuel burnable absorber (lFBA); wet annular burnable absorber (WABA); and Gd 2 0 3 burnable absorbers. The k-infinity results from these calculations were compared directly to PARAGON k-infinity results at corresponding conditions. The comparisons demonstrated that the NEXUS cross sections are accurate over the range of temperatures, boron concentrations, and power levels expected to be encountered in PWR core calculations. The NRC SE for the NEXUS nuclear data methodology attached to a letter dated February 23, 2007 (ML070320398) states:
The NRC staff has reviewed the TR [Topical Report] submitted by Westinghouse and determined that the NEXUS/ANC code system is adequate to replace the PARAGON/ANC code system wherever the latter is used in NRC-approved methodologies. The NRC staff, furthermore, has determined that NEXUS/ANC is qualified as a stand-alone code system so long as its use is limited by the provisions listed in Section 4.0 of this safety evaluation.
The provisions listed in Section 4.0 state that NEXUS/ANC shall be limited to uranium-fueled PWR applications (that is, not mixed-oxide fuel). As such, NEXUS/ANC is acceptable for use for PINGP.
Later versions of the Westinghouse ANC code require cross section data which is generated using the PARAGON neutron transport code. The NEXUS/ANC system is a version of the PARAGON/ANC system in that all nuclear data is based on PARAGON and only the methods of representing this data in ANC have been changed from the version of PARAGON/ANC described in WCAP-16045-P-A. Therefore, NEXUS methodology will be used as a replacement to the PHOENIX-P methodology when NSPM moves to a later version of ANC.
Page 5 of 12
Enclosure N8PM Revise T8 5.6.5 The other methodologies used to determine operating limits referenced in the COLR remain applicable with the use of PARAGON and NEXUS. Future changes to the values of the operating limits are controlled by the 10 CFR 50.59 process, may only be developed using NRC approved methodologies, and must remain consistent with all applicable plant safety analysis limits addressed in the Updated Safety Analysis Report (USAR). The consequences of the design basis accidents will continue to be calculated using NRC accepted methodologies. Assumptions used in the safety analysis are not changed by the use of PARAGON and NEXUS. Safety analysis acceptance criteria are not being altered by the use of PARAGON and NEXUS.
Specifically, at PINGP, these proposed methodologies will be used to determine the core operating limits specified in TS or confirm that the safety analyses which set the limits in the core operating limits report bound expected cycle operation.
The COLR contains twelve sections which provide the limits associated with each of twelve TS that reference the COLR to provide applicable limits.
The methodologies proposed in this LAR will be used to determine the following core operating limits:
- COLR Section 9 addresses axial flux difference limits required by TS 3.2.3. The actual limits are provided in COLR Figures 5 and 6;
- COLR Section 12 (a) addresses the maximum core reactivity allowed for the refueling boron concentrations required by TS 3.9.1; and
The methodologies proposed in this LAR will be used to confirm that the safety analyses, which set the following core operating limits, bound expected cycle operation:
- COLR Section 1 addresses reactor core safety limits required by TS 2.1.1.
COLR Figure 1 provides the actual limits;
- COLR Section 3 provides isothermal temperature upper and lower limits required by TS 3.1.3;
- COLR Section 5 addresses control bank insertion limits required by TS 3.1.6.
The actual limits are provided in COLR Figures 2,3 and 4;
- COLR Section 7 provides the heat flux hot channel factor limit required by TS 3.2.1;
- COLR Section 8 provides the nuclear enthalpy rise hot channel factor (F ~HN) limit required by TS 3.2.2;
Enclosure NSPM Revise TS 5.6.5 instrumentation as required by TS 3.3.1; and
The methodologies proposed in this LAR will be used to determine the penalty factors to be applied prior to determining if the limit has been met:
- COLR Section 7 addresses heat flux hot channel factor (Fo(Z)) required by TS 3.2.1. Tables 2 through 6 specify the penalty factors applied to the steady state Fo (TS Feo(Z)) before determining if the limit specified in COLR Section 7 is met.
Figures 5 and 6 specify which of these Tables are used in the determination.
The methodologies proposed in this LAR are not used to determine the core operating limits in COLR Section 4 and COLR Section 12 (b).
The proposed change from use of PHOENIX-P/ANC to PARAGON-NEXUS/ANC requires updating from ANC Version 8 to ANC Version 9. Since PINGP TS 5.6.5.b Reference 21 does not specify the applicable ANC version, no change to this reference is required or proposed.
Currently core operating limits provided in the PINGP COLR are based on the methodology in PINGP TS 5.6.5.b Reference 23. This LAR does not propose to delete Reference 23. PINGP is a two unit plant governed by a single set of Technical Specifications. This LAR requests NRC approval of the proposed changes by June 2014 after which the proposed TS changes would be incorporated into the TS and the current methodology and the methodology proposed in this LAR would both be available for use in determining PINGP core operating limits. NSPM plans to apply the new methodology in this LAR to the Unit 1 fuel cycle 1R29 which commences in the autumn of 2014. At that time PINGP Unit 2 will continue to require use of the current methodology until the next Unit 2 refueling outage in the autumn of 2015, 2R29, after which Unit 2 will apply the methodology proposed in this LAR. Since there is an unavoidable transition period when the current and proposed methodologies are both required to support core operating limits, NSPM does not propose in this LAR to remove Reference 23. Removal of Reference 23 would require another LAR after the transition period which would not serve a safety function. The NRC and NSPM resources required to process an LAR to remove Reference 23 would better serve plant safety applied to other issues.
Conclusions This LAR requests approval to use a new methodology with the Westinghouse Advanced Nodal Computer Code (ANC) as described in topical reports WCAP-16045-P-A and WCAP-16045-P-A, Addendum 1-A, and proposes to add these topical reports as References 32 and 33 in PINGP TS 5.6.5.b. The NRC has reviewed and approved this new methodology for design of pressurized water reactor cores with uranium fuel, and since PINGP is a pressurized water reactor which utilizes uranium fuel, this Page 7 of 12
Enclosure NSPM Revise TS 5.6.5 methodology is applicable to PINGP. With the addition of these references to PINGP TS 5.6.5.b, core operating limits will be determined using this methodology. Operation of the Prairie Island Nuclear Generating Plant with the proposed TS revisions will continue to protect the health and safety of the public.
- 4. REGULATORY SAFETY ANALYSIS 4.1 Applicable Regulatory Requirements/Criteria Title 10 Code of Federal Regulations 50.36, "Technical specifications":
(c) Technical specifications will include items in the following categories:
(5) Administrative controls. Administrative controls are the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner. Each licensee shall submit any reports to the Commission pursuant to approved technical specifications as specified in § 50.4.
This license amendment request proposes to add two topical report references to the COLR list of NRC-approved methodologies in the Technical Specification Administrative Controls, Report Requirements Section 5.6. These methodologies will be used to determine core operating limits which assure the plant is operated in a safe manner and therefore this proposed change meets the requirements of Title 10 CFR 5.36(c)(5).
With these changes, the Technical Specifications will continue to specify limiting conditions for operation which assure safe operation, maintenance and testing of the plant. Thus with the changes proposed in this license amendment request, the requirements of Title 10 CFR 50.36 continue to be met.
NUREG-1431, Revision 4, "Standard Technical Specifications, Westinghouse Plants" NUREG-1431 provides format and content guidance for Technical Specifications for Westinghouse plants. The current NRC-approved version of NUREG-1431, Revision 4, provides the following COLR content guidance:
5.6.3 CORE OPERATING LIMITS REPORT
- b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
Page 8 of 12
Enclosure NSPM Revise TS 5.6.5
~E:\lIE:\AlE:~'~ ~OlrE:----------------------------------------
Licensees that have received prior ~RC approval to relocate lropical ~eport revision numbers and dates to licensee control need only list the number and title of the Topical ~eport, and the COL~ will contain the complete identification for each of the lrechnical ~pecification referenced lropical
~eports used to prepare the COL~ (Le., report number, title, revision, date, and any supplements). ~ee ~~C ADAM~ Accession ~o: ML110660285 for details.
[Identify the lropical ~eport(s) by number, title, date, and ~~C staff approval document or identify the staff ~afety E:valuation ~eport for a plant specific methodology by ~~C letter and date.]
lrhis license amendment request proposes to add two topical report references to the COL~ list of ~~C-approved methodologies which will be used to determine core operating limits which assure the plant is operated in a safe manner. Consistent with the reviewer's note, these references will be identified by the topical report number and title as allowed by PI~GP license amendments 162 and 153 and ~~C letter dated August 4, 2011 (ML110660285).
lrherefore, with the changes proposed in this license amendment, the lrechnical
~pecifications will identify ~~C-approved topical reports in accordance with the format and content guidance of ~U~E:G-1431 which assure safe operation of the plant.
4.2 Precedent On August 14, 2012, ~outhern ~uclear Operating Company submitted an LA~ for the Joseph M. Farley ~uclear Plant (ML12227A884) which proposed to revise their lrechnical ~pecification 5.6.5, "Core Operating Limits Report (COL~)," to reference and allow use of \Alestinghouse \AlCAP-16045-P-A, Addendum 1-A, "Qualification of the
~E:XU~ ~uclear Data Methodology," to determine core operating limits. In their February 28, 2013, (ML13063A291) response to requests for additional information,
~~OC stated that their submittal also implies use of \AlCAP-16045-P-A.
4.3 Significant Hazards Consideration
~orthern ~tates Power Company, a Minnesota corporation (~~PM), evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CF~ 50.92, "Issuance of amendment,"
as discussed below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
~esponse: ~o Page 9 of 12
Enclosure NSPM Revise TS 5.6.5 This license amendment request proposes to revise the Technical Specifications to reference and allow use of WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON", and WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology", for determining core operating limits.
The methodologies which this license amendment proposes for determination of core operating limits are improvements over the current methodologies in use at the Prairie Island Nuclear Generating Plant. The NRC staff reviewed and approved these methodologies and concluded that these analysis codes are acceptable as a replacement for the current analysis code. Thus core operating limits determined using the proposed codes continue to assure that the reactor operates safely and, thus, the proposed changes do not involve an increase in the probability of an accident.
Operation of the reactor with core operating limits determined by use of the proposed analysis codes does not increase the reactor power level, does not increase the core fission product inventory, and does not change any transport assumptions. Therefore the proposed methodology and Technical Specification changes do not involve a significant increase in the consequences of an accident.
Therefore, the proposed methodology change and associated Technical Specification changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No This license amendment request proposes to revise the Technical Specifications to reference and allow use of WCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON",and WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology", for determining core operating limits.
The proposed changes provide revised methodology for determining core operating limits, but they do not change any system functions or maintenance activities. The changes do not involve physical alteration of the plant, that is, no new or different type of equipment will be installed. The changes do not alter assumptions made in the safety analyses but ensure that the core will operate within safe limits. These changes do not create new failure modes or mechanisms which are not identifiable during testing, and no new accident precursors are generated.
Page 10 of 12
Enclosure NSPM Revise TS 5.6.5 Therefore, the proposed methodology change and associated Technical Specification changes do not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No This license amendment request proposes to revise the Technical Specifications to reference and allow use ofWCAP-16045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON", and WCAP-16045-P-A, Addendum 1-A, "Qualification of the NEXUS Nuclear Data Methodology", for determining core operating limits.
This license amendment proposes revised methodology for determining core operating limits. The proposed methodology is an improvement that allows more accurate modeling of core performance. The NRC has reviewed and approved this methodology for use in lieu of the current methodology, thus, the margin of safety is not reduced due to this change.
Therefore, the proposed methodology change and associated Technical Specification changes do not involve a significant reduction in a margin of safety.
Based on the above, Northern States Power Company, a Minnesota corporation, (NSPM) concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
4.4 Conclusions In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
- 5. ENVIRONMENTAL CONSIDERATION A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant Page 11 of 12
Enclosure NSPM Revise TS 5.6.5 hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
- 6. REFERENCES None Page 12 of 12
ENCLOSURE, ATTACHMENT 1 Technical Specification Pages (Markup) 5.0-37 1 page follows
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 29. Caldon Engineering Report ER-157P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate with the LEFM or LEFM CheckPlus System";
- 30. WCAP-126IO-P-A, "VANTAGE+ Fuel Assembly Reference Core Report"; aru:i
- 31. WCAP-I261O-P-A and CENPD-404-P-A, Addendum I-A, "Optimized ZIRLOTM"~-:
- 32. WCAP-I6045-P-A. "Oualification of the Two-Dimensional Transport Code PARAGON'; and
- 33. WCAP-I6045-P-A. Addendum I-A. "Oualification of the NEXUS Nuclear Data Methodology".
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal-mechanical limits, core thermal-hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
Prairie Island Unit 1 - Amendment No. 168 197!99 Units 1 and 2 5.0-37Unit 2 - Amendment No. 158 186-l-8+
ENCLOSURE, ATTACHMENT 2 Technical Specification Pages (Retyped) 5.0-37 1 page follows
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)
- 29. Caldon Engineering Report ER-I57P, "Supplement to Topical Report ER-80P: Basis for a Power Uprate with the LEFM or LEFM CheckPlus System";
- 30. WCAP-I26IO-P-A, "VANTAGE+ Fuel Assembly Reference Core Report";
- 31. WCAP-I261O-P-A and CENPD-404-P-A, Addendum I-A, "Optimized ZIRLO TM,,;
- 32. WCAP-I6045-P-A, "Qualification of the Two-Dimensional Transport Code PARAGON'; and
- 33. WCAP-I6045-P-A, Addendum I-A, "Qualification of the NEXUS Nuclear Data Methodology".
- c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal-mechanical limits, core thermal-hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
Prairie Island Unit I - Amendment No. -l-9-+ 19-9 Units I and 2 5.0-37 Unit 2 - Amendment No. -l-86 +8+