Issuance of Amendments (TAC Nos. MD4209 & MD4210) - Tech Specs
ML080140425
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 01/28/2008
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
Chawla M, NRR/DORL/LPL3-1, 301-415-8371
Shared Package
ML080100073 List:
References
TAC MD4209, TAC MD4210
Download: ML080140425 (1)


Text

ECCS - Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS - Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.

NOTES

1. An RHR train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.
2. An SI train may be considered OPERABLE when the pump is capable of being manually started from the control room.

APPLICABILITY: MODE 4 when both RCS cold leg temperatures are > SI pump disable temperature specified in PTLR.

ACTIONS

.NOTE LCO 3.0.4.b is not applicable to ECCS safety injection (SI) subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. Required ECCS residual A. 1 Initiate action to restore Immediately heat removal (RHR) required ECCS RHR subsystem inoperable, subsystem to OPERABLE status.

B. Required ECCS safety B.1 Restore required ECCS SI 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> injection (SI) subsystem subsystem to OPERABLE inoperable, status.

Prairie Island Unit 1 - Amendment No. 4-58 4-67 183 Units I and 2 3.5.3-1 Unit 2 - Amendment No. 449 447 173