ML080140425
Letter Sequence Approval | |
---|---|
MONTHYEARML0733105802007-09-18018 September 2007
[Table View]E-mail from Mahesh Chawla to Dale Vincent PI ECCS LAR Project stage: Other L-PI-07-087, Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3 Operability Requirements for Safety Injection (SI) Subsystem2007-11-19019 November 2007 Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3 Operability Requirements for Safety Injection (SI) Subsystem Project stage: Supplement L-PI-07-099, Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3 Operability Requirements for Safety Injection (SI) Subsystem2007-12-13013 December 2007 Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3 Operability Requirements for Safety Injection (SI) Subsystem Project stage: Supplement ML0801404252008-01-28028 January 2008 Issuance of Amendments (TAC Nos. MD4209 & MD4210) - Tech Specs Project stage: Approval 2007-12-13 |
ML080140425 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 01/28/2008 |
From: | NRC/NRR/ADRO/DORL/LPLIII-1 |
To: | |
Chawla M, NRR/DORL/LPL3-1, 301-415-8371 | |
Shared Package | |
ML080100073 | List: |
References | |
TAC MD4209, TAC MD4210 | |
Download: ML080140425 (1) | |
Similar Documents at Prairie Island | |
---|---|
Category:Technical Specifications
MONTHYEARML24221A3622024-09-27027 September 2024
[Table view]Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24008A1292024-03-0505 March 2024 Enclosure 2 - PI ISFSI Amendment 12 Section 4.0 Design Features Technical Specifications ML22357A1002023-03-31031 March 2023 And Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22181A0002022-08-17017 August 2022 Issuance of Amendments Reactor Trip System Power Range Instrumentation Channels L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22061A2062022-04-0101 April 2022 Issuance of Amendments TSTF-471, Rev. 1, TSTF-571-T, and Administrative Changes to Technical Specification Section 5.0 L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 ML20346A0202021-03-15015 March 2021 Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20356A0022021-02-0505 February 2021 Issuance of Amendment Nos. 234 and 222, Revise Technical Specifications 3.2.1 and 5.6.5 Identified in Westinghouse Nuclear Safety Advisory Letters NSAL-09-05, Revision 1, and NSAL-15-1 ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency ML19045A4802019-04-16016 April 2019 Issuance of Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19029A0942019-01-29029 January 2019 Issuance of Amendment No. 213, One-Time Technical Specification Change to Extend Completion Time for EDGs D5 and D6 (Emergency Circumstances) ML17362A2022018-03-0505 March 2018 Issuance of Amendment Concerning Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos. MF9345 and MF9346; EPID L-2017-LLA-0175) ML16133A4062016-06-16016 June 2016 Issuance of Amendment Nos. 217 and 205, Adoption of Technical Specifications Task Force TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation (CAC Nos. MF6449 and MF6450) ML15264A2092015-11-30030 November 2015 Issuance of Amendment Nos. 216 and 204 Regarding Revisions to Technical Specification 3.3.3 and Renewed Facility Operating License ML15229A1762015-08-26026 August 2015 Issuance of Amendment Nos. 215 and 203 Regarding Revision to Licensing Basis Analysis for a Waste Gas Decay Tank Rupture ML15209A5122015-07-17017 July 2015 Technical Specifications - Updating Instructions -Effective Date: 7/24/2015 ML15209A5092015-07-17017 July 2015 Technical Specifications - Updating Instructions L-PI-15-030, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-06-29029 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML15086A0462015-05-21021 May 2015 Issuance of Amendment Nos. 214 and 202 Regarding Revisions to Technical Specification 3.8.1, AC Sources - Operating ML15062A0132015-05-20020 May 2015 Issuance of Amendments 213 and 201 to Revise TS 3.5.3, ECCS - Shutdown L-PI-15-004, Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System)- Shutdown2015-02-26026 February 2015 Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System)- Shutdown L-PI-14-034, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation2014-12-11011 December 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation ML14058A2072014-02-19019 February 2014 Technical Specifications (3801 TS Markup) ML13214A0292013-08-0202 August 2013 Correction Letter for License Amendment Nos. 207 (Unit 1) and 194 (Unit 2) ML13113A4002013-07-0202 July 2013 License Amendments TSTF-510 L-PI-13-030, License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr).2013-05-23023 May 2013 License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr). ML13093A3442013-05-0909 May 2013 License Amendments for Fuel Oil System and TSTF-501 L-PI-12-028, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits2012-05-15015 May 2012 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits L-PI-12-013, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology2012-02-24024 February 2012 Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology ML1129011152011-12-0101 December 2011 Issuance of Amendments Revision of Technical Specifications 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications. L-PI-11-037, License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil2011-08-11011 August 2011 License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil ML11172A0202011-06-27027 June 2011 Technical Specifications, Unit 1, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant ML11172A0222011-06-27027 June 2011 Technical Specifications, Unit 2, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant L-PI-11-016, License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.2011-02-0303 February 2011 License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating. L-PI-10-104, Supplement to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.102010-10-20020 October 2010 Supplement to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.10 ML1025715492010-09-16016 September 2010 Correction to Amendment Nos. 195 and 184 Regarding Technical Specification Changes to Control Room Habitability Requirements ML0925703672009-09-15015 September 2009 Correction to Technical Specifications (TAC Nos. MD9142 and MD9143) L-PI-08-080, License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.92008-11-0404 November 2008 License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.9 ML0826815912008-09-22022 September 2008 (PINGP-1 and 2), Technical Specifications ISFSI, Issuance of Amendments to Conform the Facility Operating Licenses to Reflect Transfer of Operating Authority (TAC L24245) ML0826812912008-09-22022 September 2008 Revised Operating Licenses & Technical Specifications, Issuance of Amendments to Conform the Facility Operating Licenses to Reflect Transfer of Operating Authority (TAC L24245, MD9622 and MD9623) ML0820504452008-07-18018 July 2008 Tech Spec Pages for Amendments 186 & 176 Adopting Provisions of Regulatory Guide (Rg) 1.52 Revision 3 ML0818402342008-06-27027 June 2008 Prairie, Units 1 and 2, Tech Spec Pages for Amendments 185 and 175 Regarding Incorporation of TS Task Force Travelers TSTF-479, TSTF-485 and TSTF-497 ML0812705062008-05-0101 May 2008 Submittal of Entire Re-Issue of ISFSI Technical Specifications ML0801404252008-01-28028 January 2008 Issuance of Amendments (TAC Nos. MD4209 & MD4210) - Tech Specs ML0735204002007-12-14014 December 2007 Technical Specifications in Support of Containment Sump Resolution 2024-09-27 |
Text
ECCS - Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS - Shutdown LCO 3.5.3 One ECCS train shall be OPERABLE.
NOTES
- 1. An RHR train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.
- 2. An SI train may be considered OPERABLE when the pump is capable of being manually started from the control room.
APPLICABILITY: MODE 4 when both RCS cold leg temperatures are > SI pump disable temperature specified in PTLR.
ACTIONS
.NOTE LCO 3.0.4.b is not applicable to ECCS safety injection (SI) subsystem.
CONDITION REQUIRED ACTION COMPLETION TIME A. Required ECCS residual A. 1 Initiate action to restore Immediately heat removal (RHR) required ECCS RHR subsystem inoperable, subsystem to OPERABLE status.
B. Required ECCS safety B.1 Restore required ECCS SI 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> injection (SI) subsystem subsystem to OPERABLE inoperable, status.
Prairie Island Unit 1 - Amendment No. 4-58 4-67 183 Units I and 2 3.5.3-1 Unit 2 - Amendment No. 449 447 173